SlideShare une entreprise Scribd logo
1  sur  49
Télécharger pour lire hors ligne
PILE DRIVEABILITY ANALYSIS REPORT



                                          TABLE OF CONTENTS

1.0     INTRODUCTION .................................................................................................. 4
1.1     GENERAL PROJECT DESCRIPTION ................................................................... 4
1.2     LOCATION ............................................................................................................. 4
1.3     FIELD DEVELOPMENT ........................................................................................ 5
1.4     SCOPE OF WORK .................................................................................................. 5
1.5     SYSTEM OF UNITS ............................................................................................... 6
1.6     SOFTWARES .......................................................................................................... 6
1.7     ANALYSIS PROCEDURE ...................................................................................... 6
1.8     ANALYSIS RESULTS ............................................................................................ 7
2.0     REFERENCES ....................................................................................................... 8
2.1     PROJECT SPECIFICATIONS AND REPORTS ...................................................... 8
2.2     CODES AND STANDARDS ................................................................................... 8
3.0     PILE DRIVEABILITY ANALYSIS...................................................................... 9
3.1     DESCRIPTION OF DRIVEABILITY ANALYSIS .................................................. 9
3.2     LIMITATION OF PILE STRESS ............................................................................ 9
3.3     SOIL RESISTANCE TO DRIVING......................................................................... 9
3.4     HAMMER DATA.................................................................................................. 10
3.5     WAVE AND CURRENT LOAD ........................................................................... 11
3.6     SOIL PROPERTIES .............................................................................................. 11
3.7     RESULTS OF DRIVEABILITY ANALYSIS ........................................................ 12
4.0     PILE MAKE-UP DESIGN................................................................................... 14
4.1     PILE UP-ENDING................................................................................................. 14
4.2     PILE STICK-UP .................................................................................................... 14

APPENDIX A: TL PLEM PILE DRIVEABILITY ANALYSIS RESULTS…………..…....16
APPENDIX B: DD PLEM PILE DRIVEABILITY ANALYSIS RESULTS………….……33




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 2 of 49
PILE DRIVEABILITY ANALYSIS REPORT



TABLE OF FIGURES

Figure 1.1: Thang Long – Dong Do Field…………………………………………………………..….4
Figure 1.2: Development Schematic…………………………………………………………………..5
Figure 1.3: Pile and Soil Model for Stress Wave Analysis …………………………………...……….6


TABLE OF TABLES

Table 1.1: Summary of TL Pile Driveability and Stick-up Analysis ………………….……………….7
Table 1.2: Summary of DD Pile Driveability and Stick-up Analysis ………………………………….7
Table 3.1: Hammer data used in the analysis .……………………………………………...…………11
Table 3.2: Wave and Current Parameters ……………………………………………………………..11
Table 3.3: Soil profile input for Wave equation analysis ………………………………………...…...11
Table 3.4: Soil dynamic properties for wave equation analysis ………………………..…………..…12
Table 3.5: Pile Drivability Result Summary for TL PLEM …………………………….……………..12
Table 3.6: Pile Drivability Result Summary for DD PLEM …………………………………….…….13
Table 3.7: Pile Self-penetration ………………………………………………………………………..13
Table 4.1: Pile Stress Unity Check ………………………………………….………………………....14
Table 4.2: TP PLEM Pile Stick Up Length & Combined Static and Dynamic UC …………………...15
Table 4.3: DD PLEM Pile Stick Up Length & Combined Static and Dynamic UC ………..…………15




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 3 of 49
PILE DRIVEABILITY ANALYSIS REPORT



1.0     INTRODUCTION

1.1     GENERAL PROJECT DESCRIPTION

       Lam Son JOC was established following a Petroleum Contract being signed between
       Petro Vietnam (50%) and Petronas Carigali Overseas Sdn. Bhd. (50%) on 7th January
       2003, providing for Lam Son JOC to conduct petroleum exploration within Blocks
       01/97 & 02/97 which are the relinquishments of a Petroleum Sharing Contract (PSC)
       for Blocks 01 & 02 signed in September 1991 between Petronas Carigali Overseas
       Sdn. Bhd. (85%) and Petro Vietnam (15%).

1.2     LOCATION

       Thang Long is geographically located in the south-western part of Block 01/97 &
       02/97 in the Cuu Long basin (see Figure 1.1) approximately 120 km east of Vung
       Tau, 26 km south of Ruby field and 35 km northeast of Su Tu Vang Field. The oil
       was discovered by 02/97-TL-1X well (June, 2004) in the Lower Miocene and Lower
       Oligocene sandstones. Dong Do is approximately located 5 km southeast of Thang
       Long. The oil was discovered by 02/97-DD-1X (May, 2007). Water depths across the
       block range from 60m to 70m. There were total 06 wells drilled in Thang Long -
       Dong Do field.

                             Figure 1.1: Thang Long - Dong Do Field




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 4 of 49
PILE DRIVEABILITY ANALYSIS REPORT




    1.3    FIELD DEVELOPMENT

           The development plan calls for a central processing facility located on an FPSO with
           production from the two fields via dry trees only. As such two wellhead platforms will
           be tied back; one located on Thang Long the other on Dong Do delivering full well
           stream transfer to the FPSO as shown in Figure 1.2.

                                  Figure 1.2: Development Schematic




           The FPSO will be located 2.84 km from the Thang Long WHP and 2.0 km from Dong
           Do WHP.

           Unprocessed fluids from the wellhead platforms will be transferred to the FPSO where
           the crude will be dewatered and stabilized to meet a tanker loading specification.
           Associated gas will be used to provide fuel for the FPSO and lift gas for Thang Long
           and Dong Do wells with the balance exported to a near-by gas export pipeline.
           Produced water will be treated prior to discharge overboard.

    1.4    SCOPE OF WORK

            This report documents the results of the TL PLEM and DD PLEM pile drivability and
            pile stick-up analyses. The scope covers the followings:
           • Skirt pile installation feasibility study.
           • Perform pile driveability study based on lower bound and upper bound SRD values
               extracted from final Geotechnical report.

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 5 of 49
PILE DRIVEABILITY ANALYSIS REPORT



           •   Asses the performance viability of hydraulic hammers IHC S-400 for piling.
           •   Perform pile stick-up analysis to check the pile stresses during hammer placement.
           •   Recommend piling sequence to the target depth

    1.5    SYSTEM OF UNITS

           The System International of Units (SI units) shall be used in all design, engineering
           document and drawings. Where standard equipment is supplied with Imperial Units,
           the Imperial Units shall be shown on the drawings with Metric equivalent in brackets.

    1.6    SOFTWARES

           The Pile driveability analyses for TL PLEM and DD PLEM are performed with GRL-
           WEAP and SACs computer programs.

    1.7    ANALYSIS PROCEDURE

           1. Performing the pile driveability analysis base on the stress wave equation model as
              the figure bellow:

                        Figure 1.3: Pile and Soil Model for Stress Wave Analysis




           2. Determining the parameters are follow:
              - Blow count versus depth of penetration for the given soil properties and
                 particular hammer type.

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 6 of 49
PILE DRIVEABILITY ANALYSIS REPORT



              -   SRD versus blow count relationship for the given soil properties and particular
                  hammer type.
              -   Self-weight penetration and any incremental penetration upon placement of
                  hammer.
              -   Maximum dynamic stresses during continuous driving.

           3. Pile strength code checking for pile stick-up and pile driving condition in
              accordance with API RP 2A.

    1.8    ANALYSIS RESULTS

    1.8.1 Summary of Analysis results

           The summary of pile driveability and stick-up analysis results for TL and DD PLEM
           are shown in the table 1.1 and 1.2 bellow:

                    Table 1.1: Summary of TL Pile Driveability and Stick-up Analysis

                          Pile    Stick-up                 Maximum        Max
                                               Hammer
             Case       length     length                   Blown        Combine       Conclusion
                                                Type
                          (m)        (m)                   count/m         UC
              TL
             PLEM         19         14       IHC S-500        6.7          0.44       Acceptable
              Pile


                    Table 1.2: Summary of DD Pile Driveability and Stick-up Analysis

                          Pile    Stick-up                 Maximum        Max
                                   length      Hammer
             Case       length                              Blown        Combine       Conclusion
                                                Type
                          (m)        (m)                   count/m         UC
              DD
             PLEM         21         16       IHC S-500        7.9          0.45       Acceptable
              Pile

    1.8.2 Conclusion

           1. The hammer IHC S-500 is satisfied the driving capacity for TL PLEM pile and DD
              PLEM pile.
           2. The piles are satisfied the strength of material for the stick-up condition and the
              driving condition.




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 7 of 49
PILE DRIVEABILITY ANALYSIS REPORT



     2.0        REFERENCES

    2.1     PROJECT SPECIFICATIONS AND REPORTS

           1. TLDD-0003-4JAW-A01-0001, “PLEM Design Basis”
           2. TLDD-0003-4JAW-A07-0001, “PLEM Foundation Design”.
           3. TLDD-0003-4JAW-A07-0003, “PLEM In-place Analysis Report”.
           4. Metocean Criterial Study, Block 01/97 and 02/97, Viet Nam – Fugro Global
              Environmental and Ocean Sciences, October, Number C50631/5751/R1, February,
              17th, 2010.
           5. Geotechnical Investigation report for BH-DD WHP, DONG DO LOCATION
              OFFSHORE VIET NAM” – No AGSB/116/SI/09/SGN(B) – Asiangeos, October,
              23rd, 2009

    2.2     CODES AND STANDARDS

    2.2.1. American Institute of Steel Construction (AISC)

           •    “Specification for Structural Steel Buildings - Allowable Stress Design and Plastic
                Design”.

    2.2.2. American Petroleum Institute (API)

           •    RP 2A-WSD, "Recommended Practice for Planning, Designing and Constructing
                Fixed Offshore Platforms - Working Stress Design”. Errata and Supplement 3
                October 2007.
           •    RP 17 A, “Recommended Practice for Design and Operation of Subsea Production
                System”, second edition, December 1996.

    2.2.3. Des Norske Veritas (DNV)

           •    RP – C204, “Design Against Accidental Loads”, October 2010.
           •    OS – C101, “Design of Steel structures general (LRFD method)”, October 2008.




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 8 of 49
PILE DRIVEABILITY ANALYSIS REPORT



     3.0     PILE DRIVEABILITY ANALYSIS

             Pile drivability analysis has been carried out using the GRLWEAP program based on
             the wave equation analysis concept with the soil data of the geo-technical report
             “Geotechnical Investigation report for BH-DD WHP, DONG DO LOCATION
             OFFSHORE VIET NAM” – No AGSB/116/SI/09/SGN(B).

     3.1     DESCRIPTION OF DRIVEABILITY ANALYSIS

             Pile drivability analysis employing wave equation is used to compute the pile driving
             stresses and to predict blow counts based on soil resistance to driving, quake, soil
             damping, pile section and segment length, hammer properties (driving rated energy,
             hammer efficiency).
             In wave equation analysis, pile is subdivided into segments of approximately 1.0m in
             length. In order to cover the variety of soil resistances, various Soil Resistance to
             Driving (SRD) is input for investigation of anticipated driving (dynamic) stresses
             acting throughout the entire pile length.

     3.2     LIMITATION OF PILE STRESS

             Limitation of pile stresses during pile driving of a free standing pile is in accordance
             with API RP 2A WSD:
             • The combination of stresses due to the dynamic impact of hammer and dead load
                of hammer and pile shall not exceed the yield stress of the material.
             • The maximum dynamic stresses shall not exceed 90 percent of the yield stresses.
             • Pile refusal is considered when blow count exceeds 300 blows/ft (1000 blows/m)
                for consecutive five feet (1.5m) as per API RP2A clause 12.5.6.

     3.3     SOIL RESISTANCE TO DRIVING

             Skirt Pile drivability analysis is carried out to ensure the pile drivability
             performance, despite for pile make up verifications and as guidelines for pile
             installation. The analysis is not intentionally aimed to predict the blow counts
             accurately.
             In this one dimensional wave equation analysis, the driving stresses and predicted
             blow counts are governed by the input SRD values taken from the geotechnical
             report.
             The static soil resistances can be estimated based on the followings:
             • API static soil capacity for unplugged condition = ∑ (Fsr A0 ) + ∑ (Fsr Ai ) + q c Aup
             •   API static soil capacity for plugged condition = ∑ (Fsr A0 ) + q c A p


Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 9 of 49
PILE DRIVEABILITY ANALYSIS REPORT




             Where,
             Fsr = Unit skin friction calculated based on remolded shear strength
             qc = Toe resistance at the pile tip
             Ao = Outer pile shaft area
             Ai = Inner pile shaft area
             Ap = Plugged pile end bearing area
             Aup = Unplugged pile end bearing area

             The estimated SRD for continuous driving and soil set-up cases for either plugged or
             unplugged pile can be taken as per PLEM Design Basis, Document No.: TLDD-
             0003-4JAW-A01-0001.

             Three (3) pile driving cases are considered in the analysis described as follows,
             a) Continues driving case
             Estimated SRD equals to 0.6 API static capacity.
             b) Soil set up case - Lower Bound case
             Assuming restart condition up to 12 hour delay, the estimated SRD is 0.9 API static
             capacity.
             c) Soil set up case - Upper Bound case
             Assuming the delays of few days, the estimated SRD is taken equal to API static
             capacity.

             The skin friction on the inside wall of the piles is considered for the continuous
             driving condition as per point a) above. The end bearing component of driving
             resistance is assumed to be less than static end bearing as recommended in PLEM
             Design Basis and assumed to be acting on the annular tip area.
             After delays depending on the delay duration, the internal friction is assumed to
             result in plugged driving, hence plugged condition is considered for the restart
             condition. The end bearing component of driving resistance is assumed to be equal
             to or less than static end bearing and assumed to be acting on the gross tip area in
             accordance PLEM Design Basis..

     3.4     HAMMER DATA

             The list of hammers and their properties have been tabulated in the below table 3.1:




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 10 of 49
PILE DRIVEABILITY ANALYSIS REPORT



                               Table 3.1: Hammer Data used in the Analysis

                                          Rated           Ram        Strole            Hammer
                        Hammer                                       length            Efficiency
                                          Energy         weight
                         Type
                                           (kJ)           (kN)          (m)               (%)
                        IHC S-500         496.544        246.085        2.018             95



     3.5     WAVE AND CURRENT LOAD

             Wave and current forces act on the pile have been considered as per PLEM Design
             Basis [Ref.1]. No reduction due to wave kinematics and current blockage is
             considered. The installation sea state considered for the analysis is:

                                 Table 3.2: Wave and Current Parameters

                            Wave height             Wave period          Current Velocity
                               (m)                     (s)                    (m/s)
                                3                         6                      0.5


     3.6     SOIL PROPERTIES

             Soil properties used for the wave equation analysis in the GRLWEAP program are
             tabulated in the table 3.3 and 3.4 bellow:

                        Table 3.3: Soil Profile Input for Wave Equation Analysis

                                                                     Unit Skin              Unit End
                      Soil depth (m)
            Layer                                  Soil type       Friction (kPa)         Bearing (kPa)
                      From          To                             Top        Bottom       Top      Bottom
                                           Loose to medium
               1        0           2.6                             0           4.7         0        180
                                           dense silty sand
               2       2.6          4.6    Stiff Clayey silt       23.4         27.5       540       540
                                           Medium dense sandy
               3       4.6          6.6                            12.3         18.1       510       750
                                           silt
               4       6.6       11.6      Stiff Clayey silt       37.5         47.1       720       720
               5      11.6          30     Stiff Silty Clay        47.1         75.1       720       720




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 11 of 49
PILE DRIVEABILITY ANALYSIS REPORT



                     Table 3.4: Soil Dynamic Properties for Wave Equation Analysis

                          Parameters                 Clay                      Sand
                        Side Quake (mm)               2.5                       2.5
                        Point Quake (mm)              2.5                       2.5
                     Side Damping (m/s)              0.33                      0.16
                    Point Damping (m/s)               0.5                       0.5


     3.7      RESULTS OF DRIVEABILITY ANALYSIS

              For the driveability assessment, two criteria are evaluated to determine the selection
              of the hammer for the pile installation as below:
               • Maximum pile dynamic stress during driving
               • Pile refusal

     3.7.1    Pile Driveability Analysis Results

              The wave equation analysis for the PLEM Pile - Combination Lower Bound, Upper
              Bound Condition and Continuous Condition for the selected hammer IHC S-400
              performed.

              The material used for piles in this project is the high tensile steel (type II) with a
              minimum yield stress (Fy) of 345 MPa. The dynamic axial stress due to the driving
              is limited to 0.9Fy according to the API RP 2A.

              The results is tabulated in Table 3.5 and Table 3.6. For detailed results, refer to the
              GRLWEAP output files.

                          Table 3.5: Pile Drivability Result Summary for TL PLEM

                                                     Maximum
                                                                      Maximum
                                        Target      blow count/m                      Allowable
                                                                      Dynamic                     Unity
                  Condition           penetration     to target                         Stress
                                                                       Stress                     check
                                       depth (m)     penetration                       (Mpa)
                                                        depth           (Mpa)

             Continuous      Plug          13               3.9         118.7           310.5     0.382
              Driving       Unplug         13               2.5         120.4           310.5     0.388
               Set up        Plug          13               6.7         111.4           310.5     0.359
               Lower
               bound        Unplug         13               3.4          122            310.5     0.393


Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 12 of 49
PILE DRIVEABILITY ANALYSIS REPORT



                                                        Maximum
                                                                       Maximum
                                          Target       blow count/m                 Allowable
                                                                       Dynamic                     Unity
                   Condition            penetration      to target                    Stress
                                                                        Stress                     check
                                         depth (m)      penetration                   (Mpa)
                                                                          (Mpa)
                                                           depth
                Set up        Plug          13              6.4            119.4       310.5       0.385
                Upper
                bound       Unplug          13              3.7            121.4       310.5       0.39


                          Table 3.6: Pile Drivability Result Summary for DD PLEM

                                                         Maximum
                                                                          Maximum
                                           Target       blow count/m                 Allowable
                                                                          Dynamic                  Unity
                  Condition              penetration       to target                   Stress
                                                                           Stress                  check
                                          depth (m)      penetration                   (Mpa)
                                                             depth         (Mpa)

             Continuous        Plug          15             8.2            122.1       310.5       0.393
               Driving       Unplug          15              5             121.4       310.5       0.391
             Set up Lower      Plug          15             7.9             120        310.5       0.386
                 bound       Unplug          15             4.2            124.6       310.5        0.4
             Set up Upper      Plug          15             8.6            125.3       310.5        0.41
                bound        Unplug          15             4.7            124.6       310.5        0.4


     3.7.2     Estimate Self-penetration

               From the soil properties provided, the estimated self penetration of the piles with
               respective pile self weight and hammer weight are calculated. The calculation for the
               pile self weight and the self penetration estimation is present in Appendix A1 and
               B1. The summary of the self penetration calculation results are tabulated in table 3.7
               bellow:
                                       Table 3.7: Pile Self-penetration

                                                                  Minimum
                         Description        Hammer
                                                           Self-penetration (m)
                      TL PLEM Pile          IHC S-500               5.5
                     DD PLEM Pile           IHC S-500               5.2


               Note: The estimated self weight includes the pile weight, hammer and pile helmet.

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 13 of 49
PILE DRIVEABILITY ANALYSIS REPORT



     4.0     PILE MAKE-UP DESIGN

     4.1     PILE UP-ENDING

             The calculation results are shown in the report TLDD-0003-4JAW-A07-0001
             “PLEM Foundation Design” – Section 4.5.

     4.2     PILE STICK-UP

             The maximum pile stick up length at different installation stages is calculated to
             ensure that the acting stresses are within the allowable stress limit during stick-up
             above the pile guide. The maximum permissible stick-up length along with pile self-
             penetration with and without the hammer system is used to predict stickup length
             from the skirt pile guide.
             During pile driving operation, the following stress check applies for pile stickup
             section:
              • Static stresses are compared with allowable stresses as per API-RP-2A.
              • Combined stresses = (Static Stresses + Dynamic Stresses)

                                   Table 4.1: Pile Stress Unity Check

                                    Stress Unity          Allowable Stress
                      Stress
                                       check

                      Static

                    Dynamic            fd/0.9Fy                 0.9Fy
                    Static +
                    Dynamic                                       Fy


             The pile stick up static analysis subject to installation wave and current using SACS
             package program provides member stress unity check. The analysis results are
             attached in Appendix A2 and B2.

             The pile stick up dynamic analysis due to hammer impact energy is calculated using
             GLRWEAP to obtain pile dynamic stress. The analysis results are attached in
             Appendix A3 and B3.




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 14 of 49
PILE DRIVEABILITY ANALYSIS REPORT



             Combined stress analysis result is tabulated in table 4.2 and table 4.3 below:


            Table 4.2: TP PLEM Pile Stick Up Length & Combined Static and Dynamic UC

                 Stick-up    Static     Dynamic       Yield
                                                                 Static    Dynamic      Combine
         Case     length     Stress      Stress     Stress Fy
                                                                  UC         UC           UC
                    (m)      (MPa)       (MPa)       (MPa)
          TL
                    5.5       7.74         122         345        0.172      0.442            0.4
          Pile

            Table 4.3: DD PLEM Pile Stick Up Length & Combined Static and Dynamic UC

                 Stick-up    Static     Dynamic       Yield
                                                                 Static    Dynamic      Combine
         Case     length     Stress      Stress     Stress Fy
                                                                  UC         UC           UC
                    (m)      (MPa)       (MPa)       (MPa)
          DD
                    5.2        7.9         125         345        0.222      0.453        0.41
          Pile




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 15 of 49
PILE DRIVEABILITY ANALYSIS REPORT




             APPENDIX A. TL PLEM PILE DRIVEABILITY ANALYSIS
                                RESULTS




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 16 of 49
PILE DRIVEABILITY ANALYSIS REPORT




            APPENDIX A1. PILE SELF-PENETRATION CALCULATION




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 17 of 49
PILE DRIVEABILITY ANALYSIS REPORT




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 18 of 49
PILE DRIVEABILITY ANALYSIS REPORT




                APPENDIX A2. PILE STICK-UP CALCULATION




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 19 of 49
PILE DRIVEABILITY ANALYSIS REPORT




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 20 of 49
PILE DRIVEABILITY ANALYSIS REPORT



SACs Model

       LDOPT SFINOP +Z 1.025 7.85 -66.00 66.00GLOBMN                    MPTNPNP   K
          PILE DD PLEM
       OPTIONS     MN     SD 1 1
       LCSEL       CB01 CB02 CB03 CB04 CB05 CB06 CB07 CB08
       GRUP
       GRUP PIL      61.000 2.060 21.00 8.0034.50 1 1.001.00      0.50F 7.850
       MEMBER
       MEMBER 1 3 PIL
       MEMBER 2 1 PIL
       JOINT
       JOINT 1 0.000 0.000-66.000                 110000
       JOINT 2 -0.015 -0.015 -71.                111111
       JOINT 3 0.086 0.086-52.000
       CDM
       CDM 10.00 0.683      1.680     1.102     1.260
       CDM 200.00 0.683      1.680    1.102      1.260
       MGROV
       MGROV 0.000 6.000 4.500                   1.300
       MGROV 6.000 16.000 5.500                   1.300
       LOAD
       LOADCN 1
       LOADLB 1PLEM SUBMERGED SELF WEIGHT
       DEAD
       DEAD -Z                      M BML
       LOADCN 2
       LOADLB 2HAMMER WEIGHT
       LOAD 3                -250.               GLOB JOIN
       * OPERATION SEA CONDITION
       LOADCN 21
       LOADLB 21OPER WAVE 0 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00           0.00 D 0.00 18.00 20MS10 1 0
       CURR
       CURR     0.000 0.500 0.000         0.850      US LN
       CURR 33.000 0.500 0.000
       CURR 66.000 0.500 0.000
       LOADCN 22
       LOADLB 22OPER WAVE 45 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00          45.00     D 0.00 18.00 20MS10 1 0
       CURR
       CURR     0.000 0.500 45.000         0.850     US LN
       CURR 33.000 0.500 45.000
       CURR 66.000 0.500 45.000
       LOADCN 23

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 21 of 49
PILE DRIVEABILITY ANALYSIS REPORT



       LOADLB 23OPER WAVE 90 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00    90.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 90.000    0.850    US LN
       CURR 33.000 0.500 90.000
       CURR 66.000 0.500 90.000
       LOADCN 24
       LOADLB 24OPER WAVE 135 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00   135.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 135.000   0.850    US LN
       CURR 33.000 0.500 135.000
       CURR 66.000 0.500 135.000
       LOADCN 25
       LOADLB 25OPER WAVE 180 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00   180.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 180.000   0.850    US LN
       CURR 33.000 0.500 180.000
       CURR 66.000 0.500 180.000
       LOADCN 26
       LOADLB 26OPER WAVE 225 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00   225.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 225.000   0.850    US LN
       CURR 33.000 0.500 225.000
       CURR 66.000 0.500 225.000
       LOADCN 27
       LOADLB 27OPER WAVE 270 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00   270.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 270.000   0.850    US LN
       CURR 33.000 0.500 270.000
       CURR 66.000 0.500 270.000
       LOADCN 28
       LOADLB 28OPER WAVE 315 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00   315.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 315.000   0.850    US LN
       CURR 33.000 0.500 315.000
       CURR 66.000 0.500 315.000

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 22 of 49
PILE DRIVEABILITY ANALYSIS REPORT



       *LOAD COMBINATION
       LCOMB
       LCOMB CB01 1 1.150 2 1.000      21 1.100
       LCOMB CB02 1 1.150 2 1.000      22 1.100
       LCOMB CB03 1 1.150 2 1.000      23 1.100
       LCOMB CB04 1 1.150 2 1.000      24 1.100
       LCOMB CB05 1 1.150 2 1.000      25 1.100
       LCOMB CB06 1 1.150 2 1.000      26 1.100
       LCOMB CB07 1 1.150 2 1.000      27 1.100
       LCOMB CB08 1 1.150 2 1.000      28 1.100
       END




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 23 of 49
PILE DRIVEABILITY ANALYSIS REPORT




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 24 of 49
PILE DRIVEABILITY ANALYSIS REPORT



SACs Results

PILE DD PLEM                              DATE 03-FEB-2012 TIME 07:26:46 PST PAGE   8

               SACS-IV SYSTEM MEMBER DETAIL REPORT


        DIST                                           MAX
  MEMBER GRP LOAD FROM FORCE     MOMENT   MOMENT SHEAR SHEAR TORSION AXIAL BENDING STRESS COMB. SHEAR CRIT.   COMB.
             CASE END    FX        MY       MZ     FY    FZ    MX    STRESS  Y       Z    STRESS STRESS COND. UNITY
                    M    KN       KN-M     KN-M    KN    KN   KN-M   N/MM2 N/MM2 N/MM2 N/MM2 N/MM2            CHECK


 1- 3 PIL CB01 0.00     -294.5   -38.9     -5.7     0.8     3.3     0.0    -7.72 -7.15 -1.04 -14.95    0.18 C<.15 0.08
          CB02          -294.5    -41.2     0.0     0.0     3.7     0.0    -7.72 -7.58 0.00 -15.30     0.19 C<.15 0.08
          CB03          -294.5    -38.9     5.7    -0.8     3.3     0.0     -7.72 -7.15 1.04 -14.95     0.18 C<.15 0.08
          CB04          -294.5    -33.2     8.0    -1.1     2.6     0.0     -7.72 -6.11 1.48 -14.00     0.15 C<.15 0.08
          CB05          -294.5    -27.5     5.7    -0.8     1.8     0.0     -7.72 -5.06 1.04 -12.89     0.10 C<.15 0.07
          CB06          -294.5    -25.2     0.0     0.0     1.5      0.0    -7.72 -4.63 0.00 -12.35    0.08 C<.15 0.07
          CB07          -294.5    -27.5   -5.7      0.8     1.8     0.0     -7.72 -5.06 -1.04 -12.89   0.10 C<.15 0.07
          CB08          -294.5    -33.2   -8.0      1.1     2.6     0.0     -7.72 -6.11 -1.48 -14.00   0.15 C<.15 0.08
          CB0114.00     -250.0     0.0     0.0      0.0    2.2       0.0    -6.55  0.00 0.00 -6.55     0.11 C<.15 0.04
          CB02          -250.0     0.0     0.0      0.0    2.2       0.0    -6.55  0.00 0.00 -6.55     0.11 C<.15 0.04
          CB03          -250.0     0.0     0.0      0.0    2.2       0.0    -6.55  0.00 0.00 -6.55     0.11 C<.15 0.04
          CB04          -250.0     0.0     0.0      0.0    2.2       0.0    -6.55  0.00 0.00 -6.55     0.11 C<.15 0.04
          CB05          -250.0     0.0     0.0      0.0    2.2       0.0    -6.55  0.00 0.00 -6.55     0.11 C<.15 0.04
          CB06          -250.0     0.0     0.0      0.0    2.2       0.0    -6.55  0.00 0.00 -6.55     0.11 C<.15 0.04
          CB07          -250.0     0.0     0.0      0.0    2.2       0.0    -6.55  0.00 0.00 -6.55     0.11 C<.15 0.04
          CB08          -250.0     0.0     0.0      0.0    2.2       0.0    -6.55  0.00 0.00 -6.55     0.11 C<.15 0.04




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 25 of 49
PILE DRIVEABILITY ANALYSIS REPORT




                     APPENDIX A3. DRIVEABILITY RESULTS




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 26 of 49
PILE DRIVEABILITY ANALYSIS REPORT




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 27 of 49
PILE DRIVEABILITY ANALYSIS REPORT




                                         Continuous Driving (Plug)
                3500
                3000
                2500
  SDR (kPa)




                2000
                1500                                                                SDR
                1000
                 500
                   0
                       0   2         4             6             8        10   12
                                               Depth (m)




                                         Set up Lower Bound (Plug)


                6000
                5000
    SDR (kPa)




                4000
                3000                                                                SDR
                2000
                1000
                   0
                       0       5          10               15        20        25
                                               Depth (m)




                                         Set up Upper Bound (Plug)


                6000
                5000
    SDR (kPa)




                4000
                3000                                                                SDR
                2000
                1000
                   0
                       0       5          10               15        20        25
                                               Depth (m)




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 28 of 49
PILE DRIVEABILITY ANALYSIS REPORT




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 29 of 49
PILE DRIVEABILITY ANALYSIS REPORT



 Continuous Driving Case
 Plug Condition




 Unplug Condition




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 30 of 49
PILE DRIVEABILITY ANALYSIS REPORT



 Lower Bound Case
 Plug Condition




 Unplug Condition




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 31 of 49
PILE DRIVEABILITY ANALYSIS REPORT



 Upper Bound Case
 Plug Condition




 Unplug Condition




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 32 of 49
PILE DRIVEABILITY ANALYSIS REPORT




             APPENDIX B. DD PLEM PILE DRIVEABILITY ANALYSIS
                                RESULTS




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 33 of 49
PILE DRIVEABILITY ANALYSIS REPORT




            APPENDIX B1. PILE SELF-PENETRATION CALCULATION




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 34 of 49
PILE DRIVEABILITY ANALYSIS REPORT




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 35 of 49
PILE DRIVEABILITY ANALYSIS REPORT




                    APPENDIX B2. PILE STICK-UP CALCULATION




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 36 of 49
PILE DRIVEABILITY ANALYSIS REPORT




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 37 of 49
PILE DRIVEABILITY ANALYSIS REPORT



      SACs Model

       LDOPT SFINOP +Z 1.025 7.85 -66.00 66.00GLOBMN                    MPTNPNP   K
          PILE DD PLEM
       OPTIONS     MN     SD 1 1
       LCSEL       CB01 CB02 CB03 CB04 CB05 CB06 CB07 CB08
       GRUP
       GRUP PIL      61.000 2.060 21.00 8.0034.50 1 1.001.00      0.50F 7.850
       MEMBER
       MEMBER 1 3 PIL
       MEMBER 2 1 PIL
       JOINT
       JOINT 1 0.000 0.000-66.000                 110000
       JOINT 2 -0.015 -0.015 -71.                111111
       JOINT 3 0.083 0.083-50.000
       CDM
       CDM 10.00 0.683      1.680     1.102     1.260
       CDM 200.00 0.683      1.680    1.102      1.260
       MGROV
       MGROV 0.000 6.000 4.500                   1.300
       MGROV 6.000 16.000 5.500                   1.300
       LOAD
       LOADCN 1
       LOADLB 1PLEM SUBMERGED SELF WEIGHT
       DEAD
       DEAD -Z                      M BML
       LOADCN 2
       LOADLB 2HAMMER WEIGHT
       LOAD 3                -250.               GLOB JOIN
       * OPERATION SEA CONDITION
       LOADCN 21
       LOADLB 21OPER WAVE 0 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00           0.00 D 0.00 18.00 20MS10 1 0
       CURR
       CURR     0.000 0.500 0.000         0.850      US LN
       CURR 33.000 0.500 0.000
       CURR 66.000 0.500 0.000
       LOADCN 22
       LOADLB 22OPER WAVE 45 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00          45.00     D 0.00 18.00 20MS10 1 0
       CURR
       CURR     0.000 0.500 45.000         0.850     US LN
       CURR 33.000 0.500 45.000
       CURR 66.000 0.500 45.000
       LOADCN 23

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 38 of 49
PILE DRIVEABILITY ANALYSIS REPORT



       LOADLB 23OPER WAVE 90 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00    90.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 90.000    0.850    US LN
       CURR 33.000 0.500 90.000
       CURR 66.000 0.500 90.000
       LOADCN 24
       LOADLB 24OPER WAVE 135 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00   135.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 135.000   0.850    US LN
       CURR 33.000 0.500 135.000
       CURR 66.000 0.500 135.000
       LOADCN 25
       LOADLB 25OPER WAVE 180 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00   180.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 180.000   0.850    US LN
       CURR 33.000 0.500 180.000
       CURR 66.000 0.500 180.000
       LOADCN 26
       LOADLB 26OPER WAVE 225 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00   225.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 225.000   0.850    US LN
       CURR 33.000 0.500 225.000
       CURR 66.000 0.500 225.000
       LOADCN 27
       LOADLB 27OPER WAVE 270 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00   270.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 270.000   0.850    US LN
       CURR 33.000 0.500 270.000
       CURR 66.000 0.500 270.000
       LOADCN 28
       LOADLB 28OPER WAVE 315 DEGREE
       WAVE
       WAVE0.90STOK 3.00 71.75 6.00   315.00  D 0.00 18.00 20MS10 1 0
       CURR
       CURR   0.000 0.500 315.000   0.850    US LN
       CURR 33.000 0.500 315.000
       CURR 66.000 0.500 315.000

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 39 of 49
PILE DRIVEABILITY ANALYSIS REPORT



       *LOAD COMBINATION
       LCOMB
       LCOMB CB01 1 1.150 2 1.000      21 1.100
       LCOMB CB02 1 1.150 2 1.000      22 1.100
       LCOMB CB03 1 1.150 2 1.000      23 1.100
       LCOMB CB04 1 1.150 2 1.000      24 1.100
       LCOMB CB05 1 1.150 2 1.000      25 1.100
       LCOMB CB06 1 1.150 2 1.000      26 1.100
       LCOMB CB07 1 1.150 2 1.000      27 1.100
       LCOMB CB08 1 1.150 2 1.000      28 1.100
       END




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 40 of 49
PILE DRIVEABILITY ANALYSIS REPORT




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 41 of 49
PILE DRIVEABILITY ANALYSIS REPORT



    SACs Results
    PILE DD PLEM                            DATE 02-FEB-2012 TIME 17:44:55 PST PAGE     6

                   SACS-IV SYSTEM MEMBER DETAIL REPORT


           DIST                                            MAX
     MEMBER GRP LOAD FROM FORCE      MOMENT   MOMENT SHEAR SHEAR TORSION AXIAL BENDING STRESS COMB. SHEAR CRIT. COMB.
                CASE END   FX          MY       MZ      FY   FZ     MX   STRESS    Y      Z   STRESS STRESS COND. UNITY
                       M   KN         KN-M     KN-M    KN   KN     KN-M N/MM2 N/MM2 N/MM2 N/MM2 N /MM2            CHECK


      1- 3 PIL CB01 0.00 -301.0 -40.7           -7.4      0.9 3.2        0.0    -7.89    -7.48    -1.37 -15.49    0.17 C<.15 0.09
               CB02     -301.0   -43.7           0.0      0.0 3.5       0.0    -7.89    -8.04     0.00 -15.93    0.19 C<.15 0.09
               CB03     -301.0 -40.7             7.4     -0.9 3.2        0.0    -7.89    -7.48     1.37 -15.49   0.17 C<.15 0.09
               CB04     -301.0 -33.2           10.5      -1.3 2.3        0.0    -7.89    -6.11     1.94 -14.30   0.14 C<.15 0.08
               CB05     -301.0 -25.8            7.4      -0.9 1.4        0.0    -7.89    -4.74     1.37 -12.82   0.09 C<.15 0.08
               CB06     -301.0 -22.7            0.0       0.0 1.0       0.0    -7.89    -4.17     0.00 -12.06    0.05 C<.15 0.07
               CB07     -301.0 -25.8           -7.4      0.9 1.4        0.0    -7.89    -4.74    -1.37 -12.82    0.09 C<.15 0.08
               CB08     -301.0 -33.2          -10.5      1.3 2.3        0.0    -7.89    -6.11    -1.94 -14.30    0.14 C<.15 0.08
               CB01 16.00 -250.0     0.0          0.0     0.0 1.9       0.0    -6.55     0.00     0.00 -6.55     0.10 C<.15 0.05
               CB02     -250.0    0.0          0.0        0.0 1.9       0.0    -6.55     0.00     0.00 -6.55     0.10 C<.15 0.05
               CB03     -250.0    0.0          0.0        0.0 1.9       0.0    -6.55     0.00     0.00 -6.55     0.10 C<.15 0.05
               CB04     -250.0    0.0          0.0        0.0 1.9       0.0    -6.55     0.00     0.00 -6.55     0.10 C<.15 0.05
               CB05     -250.0    0.0          0.0        0.0 1.9       0.0    -6.55     0.00     0.00 -6.55     0.10 C<.15 0.05
               CB06     -250.0    0.0          0.0        0.0 1.9       0.0    -6.55     0.00     0.00 -6.55     0.10 C<.15 0.05
               CB07     -250.0    0.0          0.0        0.0 1.9       0.0    -6.55     0.00     0.00 -6.55     0.10 C<.15 0.05
               CB08     -250.0    0.0          0.0        0.0 1.9       0.0    -6.55     0.00     0.00 -6.55     0.10 C<.15 0.05




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 42 of 49
PILE DRIVEABILITY ANALYSIS REPORT




                     APPENDIX A3. DRIVEABILITY RESULTS




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 43 of 49
PILE DRIVEABILITY ANALYSIS REPORT




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 44 of 49
PILE DRIVEABILITY ANALYSIS REPORT




                                                        Continuous Driving (Plug)
                     3500
                     3000
                     2500
       SDR (kPa)




                     2000
                     1500                                                                                           SDR
                     1000
                      500
                        0
                            0   2                 4                6                 8             10        12
                                                               Depth (m)




                                                       Set up Lower Bound (Plug)


                     6000
                     5000
         SDR (kPa)




                     4000
                     3000                                                                                           SDR
                     2000
                     1000
                        0
                            0           5                10                     15            20             25
                                                               Depth (m)




                                                      Set up Upper Bound (Plug)


                     6000
                     5000
        SDR (kPa)




                     4000
                     3000                                                                                         SDR
                     2000
                     1000
                        0
                            0       5                  10                  15            20             25
                                                              Depth (m)




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 45 of 49
PILE DRIVEABILITY ANALYSIS REPORT




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 46 of 49
PILE DRIVEABILITY ANALYSIS REPORT



     Continuous Driving Case
     Plug Condition




     Unplug Condition




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 47 of 49
PILE DRIVEABILITY ANALYSIS REPORT



    Lower Bound Case
    Plug Condition




    UnPlug Condition




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 48 of 49
PILE DRIVEABILITY ANALYSIS REPORT



     Upper Bound Case
     Plug Condition




     Unplug Condition




Document No.: TLDD-0003-4JAW-A07-0006 Revision A1
Page No.: 49 of 49

Contenu connexe

Tendances

R.K.Bansal - A Textbook Of Strength Of Materials_ Mechanics of Solids (2012, ...
R.K.Bansal - A Textbook Of Strength Of Materials_ Mechanics of Solids (2012, ...R.K.Bansal - A Textbook Of Strength Of Materials_ Mechanics of Solids (2012, ...
R.K.Bansal - A Textbook Of Strength Of Materials_ Mechanics of Solids (2012, ...MADHANT5
 
Lrfd Short Course Presentation
Lrfd Short Course PresentationLrfd Short Course Presentation
Lrfd Short Course Presentationdcwotring
 
Chapter02.structural design using staad pro
Chapter02.structural design using staad proChapter02.structural design using staad pro
Chapter02.structural design using staad proKenylNguyen
 
Guide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresGuide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresTimóteo Rocha
 
Indian standard specification for high strength structural bolts
Indian standard specification for high strength structural boltsIndian standard specification for high strength structural bolts
Indian standard specification for high strength structural boltsJisha John
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0Mohammad Mahrous
 
WELDED_CONNECTIONS
WELDED_CONNECTIONSWELDED_CONNECTIONS
WELDED_CONNECTIONSssuser88f04f
 
Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)calir2lune
 
Stress Measures And Failure Criteria
Stress Measures And Failure CriteriaStress Measures And Failure Criteria
Stress Measures And Failure CriteriaAlan Ho
 
Eurocode 2 design of composite concrete
Eurocode 2 design of composite concreteEurocode 2 design of composite concrete
Eurocode 2 design of composite concreteJo Gijbels
 
crack control and crack width estimation
crack control and crack width estimationcrack control and crack width estimation
crack control and crack width estimationKumar Anjneya
 
Cmaa specification-70
Cmaa specification-70Cmaa specification-70
Cmaa specification-70tecnidibujos
 

Tendances (20)

R.K.Bansal - A Textbook Of Strength Of Materials_ Mechanics of Solids (2012, ...
R.K.Bansal - A Textbook Of Strength Of Materials_ Mechanics of Solids (2012, ...R.K.Bansal - A Textbook Of Strength Of Materials_ Mechanics of Solids (2012, ...
R.K.Bansal - A Textbook Of Strength Of Materials_ Mechanics of Solids (2012, ...
 
Lrfd Short Course Presentation
Lrfd Short Course PresentationLrfd Short Course Presentation
Lrfd Short Course Presentation
 
PIPERACK
PIPERACKPIPERACK
PIPERACK
 
Chapter02.structural design using staad pro
Chapter02.structural design using staad proChapter02.structural design using staad pro
Chapter02.structural design using staad pro
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
Guide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresGuide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structures
 
Indian standard specification for high strength structural bolts
Indian standard specification for high strength structural boltsIndian standard specification for high strength structural bolts
Indian standard specification for high strength structural bolts
 
Tutorial #2 - SACS Basic
Tutorial #2 - SACS BasicTutorial #2 - SACS Basic
Tutorial #2 - SACS Basic
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
 
WELDED_CONNECTIONS
WELDED_CONNECTIONSWELDED_CONNECTIONS
WELDED_CONNECTIONS
 
Unit v miscellaneous structures
Unit v miscellaneous structuresUnit v miscellaneous structures
Unit v miscellaneous structures
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
 
Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)
 
ASTM E 190(bend test)
ASTM E 190(bend test)ASTM E 190(bend test)
ASTM E 190(bend test)
 
Stress Measures And Failure Criteria
Stress Measures And Failure CriteriaStress Measures And Failure Criteria
Stress Measures And Failure Criteria
 
Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8 Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8
 
1343
13431343
1343
 
Eurocode 2 design of composite concrete
Eurocode 2 design of composite concreteEurocode 2 design of composite concrete
Eurocode 2 design of composite concrete
 
crack control and crack width estimation
crack control and crack width estimationcrack control and crack width estimation
crack control and crack width estimation
 
Cmaa specification-70
Cmaa specification-70Cmaa specification-70
Cmaa specification-70
 

Similaire à Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

Hydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control ChannelsHydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control ChannelsGustavo Ariza Trelles
 
Coiled tubing technology
Coiled tubing technologyCoiled tubing technology
Coiled tubing technologyakpp01
 
Coiled tubing technology
Coiled tubing technologyCoiled tubing technology
Coiled tubing technologyakpp01
 
Wind turbine - Design file report
Wind turbine - Design file reportWind turbine - Design file report
Wind turbine - Design file reportThomas Arnold
 
Pratik Rao - Thesis Report FINAL
Pratik Rao - Thesis Report FINALPratik Rao - Thesis Report FINAL
Pratik Rao - Thesis Report FINALPratik Rao
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002Minh Bui Si
 
JE Technical Capability in shallow water - Linkedin
JE Technical Capability in shallow water - LinkedinJE Technical Capability in shallow water - Linkedin
JE Technical Capability in shallow water - LinkedinRex Chen
 
Analysis of Bearing and Shaft Failures in Motors.pdf
Analysis of Bearing and Shaft Failures in Motors.pdfAnalysis of Bearing and Shaft Failures in Motors.pdf
Analysis of Bearing and Shaft Failures in Motors.pdfZiad Salem
 
Performance Evaluation for Production of 5000kgHydraulic Jack
Performance Evaluation for Production of 5000kgHydraulic JackPerformance Evaluation for Production of 5000kgHydraulic Jack
Performance Evaluation for Production of 5000kgHydraulic JackIOSR Journals
 
Toyota 2 sdk6 skid steer loader service repair manual
Toyota 2 sdk6 skid steer loader service repair manualToyota 2 sdk6 skid steer loader service repair manual
Toyota 2 sdk6 skid steer loader service repair manualdfjjkskemsme
 
Toyota 2 sdk7 skid steer loader service repair manual
Toyota 2 sdk7 skid steer loader service repair manualToyota 2 sdk7 skid steer loader service repair manual
Toyota 2 sdk7 skid steer loader service repair manualofpsdjksemmds
 
Toyota 2 sdk8 skid steer loader service repair manual
Toyota 2 sdk8 skid steer loader service repair manualToyota 2 sdk8 skid steer loader service repair manual
Toyota 2 sdk8 skid steer loader service repair manualfjskeksmefmms
 
Toyota 2 sdk7 skid steer loader service repair manual
Toyota 2 sdk7 skid steer loader service repair manualToyota 2 sdk7 skid steer loader service repair manual
Toyota 2 sdk7 skid steer loader service repair manualfjjsejfkksefmms
 
Toyota 2 sgk6 skid steer loader service repair manual
Toyota 2 sgk6 skid steer loader service repair manualToyota 2 sgk6 skid steer loader service repair manual
Toyota 2 sgk6 skid steer loader service repair manualfjskeksmefmms
 
Toyota 2 sdk8 skid steer loader service repair manual
Toyota 2 sdk8 skid steer loader service repair manualToyota 2 sdk8 skid steer loader service repair manual
Toyota 2 sdk8 skid steer loader service repair manualfjskekdmmmse
 
Toyota 2 sgk6 skid steer loader service repair manual
Toyota 2 sgk6 skid steer loader service repair manualToyota 2 sgk6 skid steer loader service repair manual
Toyota 2 sgk6 skid steer loader service repair manualfjskekdmmmse
 
Toyota 2 sdk6 skid steer loader service repair manual
Toyota 2 sdk6 skid steer loader service repair manualToyota 2 sdk6 skid steer loader service repair manual
Toyota 2 sdk6 skid steer loader service repair manualfjskekdmmse
 
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-201548. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015Sandeep Bhowmick
 
Flange Shaft Coupling
Flange Shaft CouplingFlange Shaft Coupling
Flange Shaft CouplingBilal Murtaza
 

Similaire à Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1 (20)

Em 1110 2-3102
Em 1110 2-3102Em 1110 2-3102
Em 1110 2-3102
 
Hydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control ChannelsHydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control Channels
 
Coiled tubing technology
Coiled tubing technologyCoiled tubing technology
Coiled tubing technology
 
Coiled tubing technology
Coiled tubing technologyCoiled tubing technology
Coiled tubing technology
 
Wind turbine - Design file report
Wind turbine - Design file reportWind turbine - Design file report
Wind turbine - Design file report
 
Pratik Rao - Thesis Report FINAL
Pratik Rao - Thesis Report FINALPratik Rao - Thesis Report FINAL
Pratik Rao - Thesis Report FINAL
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002
 
JE Technical Capability in shallow water - Linkedin
JE Technical Capability in shallow water - LinkedinJE Technical Capability in shallow water - Linkedin
JE Technical Capability in shallow water - Linkedin
 
Analysis of Bearing and Shaft Failures in Motors.pdf
Analysis of Bearing and Shaft Failures in Motors.pdfAnalysis of Bearing and Shaft Failures in Motors.pdf
Analysis of Bearing and Shaft Failures in Motors.pdf
 
Performance Evaluation for Production of 5000kgHydraulic Jack
Performance Evaluation for Production of 5000kgHydraulic JackPerformance Evaluation for Production of 5000kgHydraulic Jack
Performance Evaluation for Production of 5000kgHydraulic Jack
 
Toyota 2 sdk6 skid steer loader service repair manual
Toyota 2 sdk6 skid steer loader service repair manualToyota 2 sdk6 skid steer loader service repair manual
Toyota 2 sdk6 skid steer loader service repair manual
 
Toyota 2 sdk7 skid steer loader service repair manual
Toyota 2 sdk7 skid steer loader service repair manualToyota 2 sdk7 skid steer loader service repair manual
Toyota 2 sdk7 skid steer loader service repair manual
 
Toyota 2 sdk8 skid steer loader service repair manual
Toyota 2 sdk8 skid steer loader service repair manualToyota 2 sdk8 skid steer loader service repair manual
Toyota 2 sdk8 skid steer loader service repair manual
 
Toyota 2 sdk7 skid steer loader service repair manual
Toyota 2 sdk7 skid steer loader service repair manualToyota 2 sdk7 skid steer loader service repair manual
Toyota 2 sdk7 skid steer loader service repair manual
 
Toyota 2 sgk6 skid steer loader service repair manual
Toyota 2 sgk6 skid steer loader service repair manualToyota 2 sgk6 skid steer loader service repair manual
Toyota 2 sgk6 skid steer loader service repair manual
 
Toyota 2 sdk8 skid steer loader service repair manual
Toyota 2 sdk8 skid steer loader service repair manualToyota 2 sdk8 skid steer loader service repair manual
Toyota 2 sdk8 skid steer loader service repair manual
 
Toyota 2 sgk6 skid steer loader service repair manual
Toyota 2 sgk6 skid steer loader service repair manualToyota 2 sgk6 skid steer loader service repair manual
Toyota 2 sgk6 skid steer loader service repair manual
 
Toyota 2 sdk6 skid steer loader service repair manual
Toyota 2 sdk6 skid steer loader service repair manualToyota 2 sdk6 skid steer loader service repair manual
Toyota 2 sdk6 skid steer loader service repair manual
 
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-201548. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
 
Flange Shaft Coupling
Flange Shaft CouplingFlange Shaft Coupling
Flange Shaft Coupling
 

Plus de robinking277

10 18-2013 8-33-45 pm
10 18-2013 8-33-45 pm10 18-2013 8-33-45 pm
10 18-2013 8-33-45 pmrobinking277
 
Danh sachthuctapkyi 2012
Danh sachthuctapkyi 2012Danh sachthuctapkyi 2012
Danh sachthuctapkyi 2012robinking277
 
Dtnc30 cac cach tt gia tri hstl cua hsn doi voi set yeu
Dtnc30 cac cach tt gia tri hstl cua hsn doi voi set yeu Dtnc30 cac cach tt gia tri hstl cua hsn doi voi set yeu
Dtnc30 cac cach tt gia tri hstl cua hsn doi voi set yeu robinking277
 
Dtnc29 cach ung dung loi giai coc chiu luc ngang khi hsn pbo hinh thang
Dtnc29 cach ung dung loi giai coc chiu luc ngang khi hsn pbo hinh thangDtnc29 cach ung dung loi giai coc chiu luc ngang khi hsn pbo hinh thang
Dtnc29 cach ung dung loi giai coc chiu luc ngang khi hsn pbo hinh thangrobinking277
 
Dtnc28 cach van dung tcxd du bao sct gioi han cua coc
Dtnc28 cach van dung tcxd du bao sct gioi han cua coc Dtnc28 cach van dung tcxd du bao sct gioi han cua coc
Dtnc28 cach van dung tcxd du bao sct gioi han cua coc robinking277
 
Dtnc02 nhung dieu rut ra tu cac hoi thao ve bien doi khi hau
Dtnc02 nhung dieu rut ra tu cac hoi thao ve bien doi khi hauDtnc02 nhung dieu rut ra tu cac hoi thao ve bien doi khi hau
Dtnc02 nhung dieu rut ra tu cac hoi thao ve bien doi khi haurobinking277
 
Tinh toan tuoi tho moi
Tinh toan tuoi tho moiTinh toan tuoi tho moi
Tinh toan tuoi tho moirobinking277
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1robinking277
 
Phuong phap luan de danh gia lai cong trinh bien bang thep
Phuong phap luan de danh gia lai cong trinh bien bang thepPhuong phap luan de danh gia lai cong trinh bien bang thep
Phuong phap luan de danh gia lai cong trinh bien bang theprobinking277
 
Phuong phap luan de danh gia lai cong trinh bien bang thep
Phuong phap luan de danh gia lai cong trinh bien bang thepPhuong phap luan de danh gia lai cong trinh bien bang thep
Phuong phap luan de danh gia lai cong trinh bien bang theprobinking277
 
Construction project management vn
Construction project management vnConstruction project management vn
Construction project management vnrobinking277
 
Bs 2594 1975 welded steel hoztl steek tank_21_dec02
Bs 2594 1975 welded steel hoztl steek tank_21_dec02Bs 2594 1975 welded steel hoztl steek tank_21_dec02
Bs 2594 1975 welded steel hoztl steek tank_21_dec02robinking277
 
Bs 4 structural steel section 29 dec02
Bs 4 structural steel section 29 dec02Bs 4 structural steel section 29 dec02
Bs 4 structural steel section 29 dec02robinking277
 

Plus de robinking277 (20)

10 18-2013 8-33-45 pm
10 18-2013 8-33-45 pm10 18-2013 8-33-45 pm
10 18-2013 8-33-45 pm
 
Danh sachthuctapkyi 2012
Danh sachthuctapkyi 2012Danh sachthuctapkyi 2012
Danh sachthuctapkyi 2012
 
He so nen
He so nenHe so nen
He so nen
 
Up bài
Up bàiUp bài
Up bài
 
Up bài
Up bàiUp bài
Up bài
 
Thi cong 2
Thi cong 2Thi cong 2
Thi cong 2
 
Do an thi cong 2
Do an thi cong 2Do an thi cong 2
Do an thi cong 2
 
Dtnc30 cac cach tt gia tri hstl cua hsn doi voi set yeu
Dtnc30 cac cach tt gia tri hstl cua hsn doi voi set yeu Dtnc30 cac cach tt gia tri hstl cua hsn doi voi set yeu
Dtnc30 cac cach tt gia tri hstl cua hsn doi voi set yeu
 
Dtnc29 cach ung dung loi giai coc chiu luc ngang khi hsn pbo hinh thang
Dtnc29 cach ung dung loi giai coc chiu luc ngang khi hsn pbo hinh thangDtnc29 cach ung dung loi giai coc chiu luc ngang khi hsn pbo hinh thang
Dtnc29 cach ung dung loi giai coc chiu luc ngang khi hsn pbo hinh thang
 
Dtnc28 cach van dung tcxd du bao sct gioi han cua coc
Dtnc28 cach van dung tcxd du bao sct gioi han cua coc Dtnc28 cach van dung tcxd du bao sct gioi han cua coc
Dtnc28 cach van dung tcxd du bao sct gioi han cua coc
 
Dtnc02 nhung dieu rut ra tu cac hoi thao ve bien doi khi hau
Dtnc02 nhung dieu rut ra tu cac hoi thao ve bien doi khi hauDtnc02 nhung dieu rut ra tu cac hoi thao ve bien doi khi hau
Dtnc02 nhung dieu rut ra tu cac hoi thao ve bien doi khi hau
 
Tinh toan tuoi tho moi
Tinh toan tuoi tho moiTinh toan tuoi tho moi
Tinh toan tuoi tho moi
 
De thi cong
De thi congDe thi cong
De thi cong
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
Phuong phap luan de danh gia lai cong trinh bien bang thep
Phuong phap luan de danh gia lai cong trinh bien bang thepPhuong phap luan de danh gia lai cong trinh bien bang thep
Phuong phap luan de danh gia lai cong trinh bien bang thep
 
Phuong phap luan de danh gia lai cong trinh bien bang thep
Phuong phap luan de danh gia lai cong trinh bien bang thepPhuong phap luan de danh gia lai cong trinh bien bang thep
Phuong phap luan de danh gia lai cong trinh bien bang thep
 
Construction project management vn
Construction project management vnConstruction project management vn
Construction project management vn
 
Bs 2594 1975 welded steel hoztl steek tank_21_dec02
Bs 2594 1975 welded steel hoztl steek tank_21_dec02Bs 2594 1975 welded steel hoztl steek tank_21_dec02
Bs 2594 1975 welded steel hoztl steek tank_21_dec02
 
Bs 4 structural steel section 29 dec02
Bs 4 structural steel section 29 dec02Bs 4 structural steel section 29 dec02
Bs 4 structural steel section 29 dec02
 
Di chuc cua bac
Di chuc cua bacDi chuc cua bac
Di chuc cua bac
 

Dernier

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 

Dernier (20)

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 

Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

  • 1.
  • 2. PILE DRIVEABILITY ANALYSIS REPORT TABLE OF CONTENTS 1.0 INTRODUCTION .................................................................................................. 4 1.1 GENERAL PROJECT DESCRIPTION ................................................................... 4 1.2 LOCATION ............................................................................................................. 4 1.3 FIELD DEVELOPMENT ........................................................................................ 5 1.4 SCOPE OF WORK .................................................................................................. 5 1.5 SYSTEM OF UNITS ............................................................................................... 6 1.6 SOFTWARES .......................................................................................................... 6 1.7 ANALYSIS PROCEDURE ...................................................................................... 6 1.8 ANALYSIS RESULTS ............................................................................................ 7 2.0 REFERENCES ....................................................................................................... 8 2.1 PROJECT SPECIFICATIONS AND REPORTS ...................................................... 8 2.2 CODES AND STANDARDS ................................................................................... 8 3.0 PILE DRIVEABILITY ANALYSIS...................................................................... 9 3.1 DESCRIPTION OF DRIVEABILITY ANALYSIS .................................................. 9 3.2 LIMITATION OF PILE STRESS ............................................................................ 9 3.3 SOIL RESISTANCE TO DRIVING......................................................................... 9 3.4 HAMMER DATA.................................................................................................. 10 3.5 WAVE AND CURRENT LOAD ........................................................................... 11 3.6 SOIL PROPERTIES .............................................................................................. 11 3.7 RESULTS OF DRIVEABILITY ANALYSIS ........................................................ 12 4.0 PILE MAKE-UP DESIGN................................................................................... 14 4.1 PILE UP-ENDING................................................................................................. 14 4.2 PILE STICK-UP .................................................................................................... 14 APPENDIX A: TL PLEM PILE DRIVEABILITY ANALYSIS RESULTS…………..…....16 APPENDIX B: DD PLEM PILE DRIVEABILITY ANALYSIS RESULTS………….……33 Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 2 of 49
  • 3. PILE DRIVEABILITY ANALYSIS REPORT TABLE OF FIGURES Figure 1.1: Thang Long – Dong Do Field…………………………………………………………..….4 Figure 1.2: Development Schematic…………………………………………………………………..5 Figure 1.3: Pile and Soil Model for Stress Wave Analysis …………………………………...……….6 TABLE OF TABLES Table 1.1: Summary of TL Pile Driveability and Stick-up Analysis ………………….……………….7 Table 1.2: Summary of DD Pile Driveability and Stick-up Analysis ………………………………….7 Table 3.1: Hammer data used in the analysis .……………………………………………...…………11 Table 3.2: Wave and Current Parameters ……………………………………………………………..11 Table 3.3: Soil profile input for Wave equation analysis ………………………………………...…...11 Table 3.4: Soil dynamic properties for wave equation analysis ………………………..…………..…12 Table 3.5: Pile Drivability Result Summary for TL PLEM …………………………….……………..12 Table 3.6: Pile Drivability Result Summary for DD PLEM …………………………………….…….13 Table 3.7: Pile Self-penetration ………………………………………………………………………..13 Table 4.1: Pile Stress Unity Check ………………………………………….………………………....14 Table 4.2: TP PLEM Pile Stick Up Length & Combined Static and Dynamic UC …………………...15 Table 4.3: DD PLEM Pile Stick Up Length & Combined Static and Dynamic UC ………..…………15 Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 3 of 49
  • 4. PILE DRIVEABILITY ANALYSIS REPORT 1.0 INTRODUCTION 1.1 GENERAL PROJECT DESCRIPTION Lam Son JOC was established following a Petroleum Contract being signed between Petro Vietnam (50%) and Petronas Carigali Overseas Sdn. Bhd. (50%) on 7th January 2003, providing for Lam Son JOC to conduct petroleum exploration within Blocks 01/97 & 02/97 which are the relinquishments of a Petroleum Sharing Contract (PSC) for Blocks 01 & 02 signed in September 1991 between Petronas Carigali Overseas Sdn. Bhd. (85%) and Petro Vietnam (15%). 1.2 LOCATION Thang Long is geographically located in the south-western part of Block 01/97 & 02/97 in the Cuu Long basin (see Figure 1.1) approximately 120 km east of Vung Tau, 26 km south of Ruby field and 35 km northeast of Su Tu Vang Field. The oil was discovered by 02/97-TL-1X well (June, 2004) in the Lower Miocene and Lower Oligocene sandstones. Dong Do is approximately located 5 km southeast of Thang Long. The oil was discovered by 02/97-DD-1X (May, 2007). Water depths across the block range from 60m to 70m. There were total 06 wells drilled in Thang Long - Dong Do field. Figure 1.1: Thang Long - Dong Do Field Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 4 of 49
  • 5. PILE DRIVEABILITY ANALYSIS REPORT 1.3 FIELD DEVELOPMENT The development plan calls for a central processing facility located on an FPSO with production from the two fields via dry trees only. As such two wellhead platforms will be tied back; one located on Thang Long the other on Dong Do delivering full well stream transfer to the FPSO as shown in Figure 1.2. Figure 1.2: Development Schematic The FPSO will be located 2.84 km from the Thang Long WHP and 2.0 km from Dong Do WHP. Unprocessed fluids from the wellhead platforms will be transferred to the FPSO where the crude will be dewatered and stabilized to meet a tanker loading specification. Associated gas will be used to provide fuel for the FPSO and lift gas for Thang Long and Dong Do wells with the balance exported to a near-by gas export pipeline. Produced water will be treated prior to discharge overboard. 1.4 SCOPE OF WORK This report documents the results of the TL PLEM and DD PLEM pile drivability and pile stick-up analyses. The scope covers the followings: • Skirt pile installation feasibility study. • Perform pile driveability study based on lower bound and upper bound SRD values extracted from final Geotechnical report. Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 5 of 49
  • 6. PILE DRIVEABILITY ANALYSIS REPORT • Asses the performance viability of hydraulic hammers IHC S-400 for piling. • Perform pile stick-up analysis to check the pile stresses during hammer placement. • Recommend piling sequence to the target depth 1.5 SYSTEM OF UNITS The System International of Units (SI units) shall be used in all design, engineering document and drawings. Where standard equipment is supplied with Imperial Units, the Imperial Units shall be shown on the drawings with Metric equivalent in brackets. 1.6 SOFTWARES The Pile driveability analyses for TL PLEM and DD PLEM are performed with GRL- WEAP and SACs computer programs. 1.7 ANALYSIS PROCEDURE 1. Performing the pile driveability analysis base on the stress wave equation model as the figure bellow: Figure 1.3: Pile and Soil Model for Stress Wave Analysis 2. Determining the parameters are follow: - Blow count versus depth of penetration for the given soil properties and particular hammer type. Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 6 of 49
  • 7. PILE DRIVEABILITY ANALYSIS REPORT - SRD versus blow count relationship for the given soil properties and particular hammer type. - Self-weight penetration and any incremental penetration upon placement of hammer. - Maximum dynamic stresses during continuous driving. 3. Pile strength code checking for pile stick-up and pile driving condition in accordance with API RP 2A. 1.8 ANALYSIS RESULTS 1.8.1 Summary of Analysis results The summary of pile driveability and stick-up analysis results for TL and DD PLEM are shown in the table 1.1 and 1.2 bellow: Table 1.1: Summary of TL Pile Driveability and Stick-up Analysis Pile Stick-up Maximum Max Hammer Case length length Blown Combine Conclusion Type (m) (m) count/m UC TL PLEM 19 14 IHC S-500 6.7 0.44 Acceptable Pile Table 1.2: Summary of DD Pile Driveability and Stick-up Analysis Pile Stick-up Maximum Max length Hammer Case length Blown Combine Conclusion Type (m) (m) count/m UC DD PLEM 21 16 IHC S-500 7.9 0.45 Acceptable Pile 1.8.2 Conclusion 1. The hammer IHC S-500 is satisfied the driving capacity for TL PLEM pile and DD PLEM pile. 2. The piles are satisfied the strength of material for the stick-up condition and the driving condition. Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 7 of 49
  • 8. PILE DRIVEABILITY ANALYSIS REPORT 2.0 REFERENCES 2.1 PROJECT SPECIFICATIONS AND REPORTS 1. TLDD-0003-4JAW-A01-0001, “PLEM Design Basis” 2. TLDD-0003-4JAW-A07-0001, “PLEM Foundation Design”. 3. TLDD-0003-4JAW-A07-0003, “PLEM In-place Analysis Report”. 4. Metocean Criterial Study, Block 01/97 and 02/97, Viet Nam – Fugro Global Environmental and Ocean Sciences, October, Number C50631/5751/R1, February, 17th, 2010. 5. Geotechnical Investigation report for BH-DD WHP, DONG DO LOCATION OFFSHORE VIET NAM” – No AGSB/116/SI/09/SGN(B) – Asiangeos, October, 23rd, 2009 2.2 CODES AND STANDARDS 2.2.1. American Institute of Steel Construction (AISC) • “Specification for Structural Steel Buildings - Allowable Stress Design and Plastic Design”. 2.2.2. American Petroleum Institute (API) • RP 2A-WSD, "Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms - Working Stress Design”. Errata and Supplement 3 October 2007. • RP 17 A, “Recommended Practice for Design and Operation of Subsea Production System”, second edition, December 1996. 2.2.3. Des Norske Veritas (DNV) • RP – C204, “Design Against Accidental Loads”, October 2010. • OS – C101, “Design of Steel structures general (LRFD method)”, October 2008. Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 8 of 49
  • 9. PILE DRIVEABILITY ANALYSIS REPORT 3.0 PILE DRIVEABILITY ANALYSIS Pile drivability analysis has been carried out using the GRLWEAP program based on the wave equation analysis concept with the soil data of the geo-technical report “Geotechnical Investigation report for BH-DD WHP, DONG DO LOCATION OFFSHORE VIET NAM” – No AGSB/116/SI/09/SGN(B). 3.1 DESCRIPTION OF DRIVEABILITY ANALYSIS Pile drivability analysis employing wave equation is used to compute the pile driving stresses and to predict blow counts based on soil resistance to driving, quake, soil damping, pile section and segment length, hammer properties (driving rated energy, hammer efficiency). In wave equation analysis, pile is subdivided into segments of approximately 1.0m in length. In order to cover the variety of soil resistances, various Soil Resistance to Driving (SRD) is input for investigation of anticipated driving (dynamic) stresses acting throughout the entire pile length. 3.2 LIMITATION OF PILE STRESS Limitation of pile stresses during pile driving of a free standing pile is in accordance with API RP 2A WSD: • The combination of stresses due to the dynamic impact of hammer and dead load of hammer and pile shall not exceed the yield stress of the material. • The maximum dynamic stresses shall not exceed 90 percent of the yield stresses. • Pile refusal is considered when blow count exceeds 300 blows/ft (1000 blows/m) for consecutive five feet (1.5m) as per API RP2A clause 12.5.6. 3.3 SOIL RESISTANCE TO DRIVING Skirt Pile drivability analysis is carried out to ensure the pile drivability performance, despite for pile make up verifications and as guidelines for pile installation. The analysis is not intentionally aimed to predict the blow counts accurately. In this one dimensional wave equation analysis, the driving stresses and predicted blow counts are governed by the input SRD values taken from the geotechnical report. The static soil resistances can be estimated based on the followings: • API static soil capacity for unplugged condition = ∑ (Fsr A0 ) + ∑ (Fsr Ai ) + q c Aup • API static soil capacity for plugged condition = ∑ (Fsr A0 ) + q c A p Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 9 of 49
  • 10. PILE DRIVEABILITY ANALYSIS REPORT Where, Fsr = Unit skin friction calculated based on remolded shear strength qc = Toe resistance at the pile tip Ao = Outer pile shaft area Ai = Inner pile shaft area Ap = Plugged pile end bearing area Aup = Unplugged pile end bearing area The estimated SRD for continuous driving and soil set-up cases for either plugged or unplugged pile can be taken as per PLEM Design Basis, Document No.: TLDD- 0003-4JAW-A01-0001. Three (3) pile driving cases are considered in the analysis described as follows, a) Continues driving case Estimated SRD equals to 0.6 API static capacity. b) Soil set up case - Lower Bound case Assuming restart condition up to 12 hour delay, the estimated SRD is 0.9 API static capacity. c) Soil set up case - Upper Bound case Assuming the delays of few days, the estimated SRD is taken equal to API static capacity. The skin friction on the inside wall of the piles is considered for the continuous driving condition as per point a) above. The end bearing component of driving resistance is assumed to be less than static end bearing as recommended in PLEM Design Basis and assumed to be acting on the annular tip area. After delays depending on the delay duration, the internal friction is assumed to result in plugged driving, hence plugged condition is considered for the restart condition. The end bearing component of driving resistance is assumed to be equal to or less than static end bearing and assumed to be acting on the gross tip area in accordance PLEM Design Basis.. 3.4 HAMMER DATA The list of hammers and their properties have been tabulated in the below table 3.1: Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 10 of 49
  • 11. PILE DRIVEABILITY ANALYSIS REPORT Table 3.1: Hammer Data used in the Analysis Rated Ram Strole Hammer Hammer length Efficiency Energy weight Type (kJ) (kN) (m) (%) IHC S-500 496.544 246.085 2.018 95 3.5 WAVE AND CURRENT LOAD Wave and current forces act on the pile have been considered as per PLEM Design Basis [Ref.1]. No reduction due to wave kinematics and current blockage is considered. The installation sea state considered for the analysis is: Table 3.2: Wave and Current Parameters Wave height Wave period Current Velocity (m) (s) (m/s) 3 6 0.5 3.6 SOIL PROPERTIES Soil properties used for the wave equation analysis in the GRLWEAP program are tabulated in the table 3.3 and 3.4 bellow: Table 3.3: Soil Profile Input for Wave Equation Analysis Unit Skin Unit End Soil depth (m) Layer Soil type Friction (kPa) Bearing (kPa) From To Top Bottom Top Bottom Loose to medium 1 0 2.6 0 4.7 0 180 dense silty sand 2 2.6 4.6 Stiff Clayey silt 23.4 27.5 540 540 Medium dense sandy 3 4.6 6.6 12.3 18.1 510 750 silt 4 6.6 11.6 Stiff Clayey silt 37.5 47.1 720 720 5 11.6 30 Stiff Silty Clay 47.1 75.1 720 720 Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 11 of 49
  • 12. PILE DRIVEABILITY ANALYSIS REPORT Table 3.4: Soil Dynamic Properties for Wave Equation Analysis Parameters Clay Sand Side Quake (mm) 2.5 2.5 Point Quake (mm) 2.5 2.5 Side Damping (m/s) 0.33 0.16 Point Damping (m/s) 0.5 0.5 3.7 RESULTS OF DRIVEABILITY ANALYSIS For the driveability assessment, two criteria are evaluated to determine the selection of the hammer for the pile installation as below: • Maximum pile dynamic stress during driving • Pile refusal 3.7.1 Pile Driveability Analysis Results The wave equation analysis for the PLEM Pile - Combination Lower Bound, Upper Bound Condition and Continuous Condition for the selected hammer IHC S-400 performed. The material used for piles in this project is the high tensile steel (type II) with a minimum yield stress (Fy) of 345 MPa. The dynamic axial stress due to the driving is limited to 0.9Fy according to the API RP 2A. The results is tabulated in Table 3.5 and Table 3.6. For detailed results, refer to the GRLWEAP output files. Table 3.5: Pile Drivability Result Summary for TL PLEM Maximum Maximum Target blow count/m Allowable Dynamic Unity Condition penetration to target Stress Stress check depth (m) penetration (Mpa) depth (Mpa) Continuous Plug 13 3.9 118.7 310.5 0.382 Driving Unplug 13 2.5 120.4 310.5 0.388 Set up Plug 13 6.7 111.4 310.5 0.359 Lower bound Unplug 13 3.4 122 310.5 0.393 Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 12 of 49
  • 13. PILE DRIVEABILITY ANALYSIS REPORT Maximum Maximum Target blow count/m Allowable Dynamic Unity Condition penetration to target Stress Stress check depth (m) penetration (Mpa) (Mpa) depth Set up Plug 13 6.4 119.4 310.5 0.385 Upper bound Unplug 13 3.7 121.4 310.5 0.39 Table 3.6: Pile Drivability Result Summary for DD PLEM Maximum Maximum Target blow count/m Allowable Dynamic Unity Condition penetration to target Stress Stress check depth (m) penetration (Mpa) depth (Mpa) Continuous Plug 15 8.2 122.1 310.5 0.393 Driving Unplug 15 5 121.4 310.5 0.391 Set up Lower Plug 15 7.9 120 310.5 0.386 bound Unplug 15 4.2 124.6 310.5 0.4 Set up Upper Plug 15 8.6 125.3 310.5 0.41 bound Unplug 15 4.7 124.6 310.5 0.4 3.7.2 Estimate Self-penetration From the soil properties provided, the estimated self penetration of the piles with respective pile self weight and hammer weight are calculated. The calculation for the pile self weight and the self penetration estimation is present in Appendix A1 and B1. The summary of the self penetration calculation results are tabulated in table 3.7 bellow: Table 3.7: Pile Self-penetration Minimum Description Hammer Self-penetration (m) TL PLEM Pile IHC S-500 5.5 DD PLEM Pile IHC S-500 5.2 Note: The estimated self weight includes the pile weight, hammer and pile helmet. Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 13 of 49
  • 14. PILE DRIVEABILITY ANALYSIS REPORT 4.0 PILE MAKE-UP DESIGN 4.1 PILE UP-ENDING The calculation results are shown in the report TLDD-0003-4JAW-A07-0001 “PLEM Foundation Design” – Section 4.5. 4.2 PILE STICK-UP The maximum pile stick up length at different installation stages is calculated to ensure that the acting stresses are within the allowable stress limit during stick-up above the pile guide. The maximum permissible stick-up length along with pile self- penetration with and without the hammer system is used to predict stickup length from the skirt pile guide. During pile driving operation, the following stress check applies for pile stickup section: • Static stresses are compared with allowable stresses as per API-RP-2A. • Combined stresses = (Static Stresses + Dynamic Stresses) Table 4.1: Pile Stress Unity Check Stress Unity Allowable Stress Stress check Static Dynamic fd/0.9Fy 0.9Fy Static + Dynamic Fy The pile stick up static analysis subject to installation wave and current using SACS package program provides member stress unity check. The analysis results are attached in Appendix A2 and B2. The pile stick up dynamic analysis due to hammer impact energy is calculated using GLRWEAP to obtain pile dynamic stress. The analysis results are attached in Appendix A3 and B3. Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 14 of 49
  • 15. PILE DRIVEABILITY ANALYSIS REPORT Combined stress analysis result is tabulated in table 4.2 and table 4.3 below: Table 4.2: TP PLEM Pile Stick Up Length & Combined Static and Dynamic UC Stick-up Static Dynamic Yield Static Dynamic Combine Case length Stress Stress Stress Fy UC UC UC (m) (MPa) (MPa) (MPa) TL 5.5 7.74 122 345 0.172 0.442 0.4 Pile Table 4.3: DD PLEM Pile Stick Up Length & Combined Static and Dynamic UC Stick-up Static Dynamic Yield Static Dynamic Combine Case length Stress Stress Stress Fy UC UC UC (m) (MPa) (MPa) (MPa) DD 5.2 7.9 125 345 0.222 0.453 0.41 Pile Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 15 of 49
  • 16. PILE DRIVEABILITY ANALYSIS REPORT APPENDIX A. TL PLEM PILE DRIVEABILITY ANALYSIS RESULTS Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 16 of 49
  • 17. PILE DRIVEABILITY ANALYSIS REPORT APPENDIX A1. PILE SELF-PENETRATION CALCULATION Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 17 of 49
  • 18. PILE DRIVEABILITY ANALYSIS REPORT Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 18 of 49
  • 19. PILE DRIVEABILITY ANALYSIS REPORT APPENDIX A2. PILE STICK-UP CALCULATION Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 19 of 49
  • 20. PILE DRIVEABILITY ANALYSIS REPORT Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 20 of 49
  • 21. PILE DRIVEABILITY ANALYSIS REPORT SACs Model LDOPT SFINOP +Z 1.025 7.85 -66.00 66.00GLOBMN MPTNPNP K PILE DD PLEM OPTIONS MN SD 1 1 LCSEL CB01 CB02 CB03 CB04 CB05 CB06 CB07 CB08 GRUP GRUP PIL 61.000 2.060 21.00 8.0034.50 1 1.001.00 0.50F 7.850 MEMBER MEMBER 1 3 PIL MEMBER 2 1 PIL JOINT JOINT 1 0.000 0.000-66.000 110000 JOINT 2 -0.015 -0.015 -71. 111111 JOINT 3 0.086 0.086-52.000 CDM CDM 10.00 0.683 1.680 1.102 1.260 CDM 200.00 0.683 1.680 1.102 1.260 MGROV MGROV 0.000 6.000 4.500 1.300 MGROV 6.000 16.000 5.500 1.300 LOAD LOADCN 1 LOADLB 1PLEM SUBMERGED SELF WEIGHT DEAD DEAD -Z M BML LOADCN 2 LOADLB 2HAMMER WEIGHT LOAD 3 -250. GLOB JOIN * OPERATION SEA CONDITION LOADCN 21 LOADLB 21OPER WAVE 0 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 0.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 0.000 0.850 US LN CURR 33.000 0.500 0.000 CURR 66.000 0.500 0.000 LOADCN 22 LOADLB 22OPER WAVE 45 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 45.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 45.000 0.850 US LN CURR 33.000 0.500 45.000 CURR 66.000 0.500 45.000 LOADCN 23 Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 21 of 49
  • 22. PILE DRIVEABILITY ANALYSIS REPORT LOADLB 23OPER WAVE 90 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 90.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 90.000 0.850 US LN CURR 33.000 0.500 90.000 CURR 66.000 0.500 90.000 LOADCN 24 LOADLB 24OPER WAVE 135 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 135.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 135.000 0.850 US LN CURR 33.000 0.500 135.000 CURR 66.000 0.500 135.000 LOADCN 25 LOADLB 25OPER WAVE 180 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 180.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 180.000 0.850 US LN CURR 33.000 0.500 180.000 CURR 66.000 0.500 180.000 LOADCN 26 LOADLB 26OPER WAVE 225 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 225.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 225.000 0.850 US LN CURR 33.000 0.500 225.000 CURR 66.000 0.500 225.000 LOADCN 27 LOADLB 27OPER WAVE 270 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 270.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 270.000 0.850 US LN CURR 33.000 0.500 270.000 CURR 66.000 0.500 270.000 LOADCN 28 LOADLB 28OPER WAVE 315 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 315.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 315.000 0.850 US LN CURR 33.000 0.500 315.000 CURR 66.000 0.500 315.000 Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 22 of 49
  • 23. PILE DRIVEABILITY ANALYSIS REPORT *LOAD COMBINATION LCOMB LCOMB CB01 1 1.150 2 1.000 21 1.100 LCOMB CB02 1 1.150 2 1.000 22 1.100 LCOMB CB03 1 1.150 2 1.000 23 1.100 LCOMB CB04 1 1.150 2 1.000 24 1.100 LCOMB CB05 1 1.150 2 1.000 25 1.100 LCOMB CB06 1 1.150 2 1.000 26 1.100 LCOMB CB07 1 1.150 2 1.000 27 1.100 LCOMB CB08 1 1.150 2 1.000 28 1.100 END Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 23 of 49
  • 24. PILE DRIVEABILITY ANALYSIS REPORT Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 24 of 49
  • 25. PILE DRIVEABILITY ANALYSIS REPORT SACs Results PILE DD PLEM DATE 03-FEB-2012 TIME 07:26:46 PST PAGE 8 SACS-IV SYSTEM MEMBER DETAIL REPORT DIST MAX MEMBER GRP LOAD FROM FORCE MOMENT MOMENT SHEAR SHEAR TORSION AXIAL BENDING STRESS COMB. SHEAR CRIT. COMB. CASE END FX MY MZ FY FZ MX STRESS Y Z STRESS STRESS COND. UNITY M KN KN-M KN-M KN KN KN-M N/MM2 N/MM2 N/MM2 N/MM2 N/MM2 CHECK 1- 3 PIL CB01 0.00 -294.5 -38.9 -5.7 0.8 3.3 0.0 -7.72 -7.15 -1.04 -14.95 0.18 C<.15 0.08 CB02 -294.5 -41.2 0.0 0.0 3.7 0.0 -7.72 -7.58 0.00 -15.30 0.19 C<.15 0.08 CB03 -294.5 -38.9 5.7 -0.8 3.3 0.0 -7.72 -7.15 1.04 -14.95 0.18 C<.15 0.08 CB04 -294.5 -33.2 8.0 -1.1 2.6 0.0 -7.72 -6.11 1.48 -14.00 0.15 C<.15 0.08 CB05 -294.5 -27.5 5.7 -0.8 1.8 0.0 -7.72 -5.06 1.04 -12.89 0.10 C<.15 0.07 CB06 -294.5 -25.2 0.0 0.0 1.5 0.0 -7.72 -4.63 0.00 -12.35 0.08 C<.15 0.07 CB07 -294.5 -27.5 -5.7 0.8 1.8 0.0 -7.72 -5.06 -1.04 -12.89 0.10 C<.15 0.07 CB08 -294.5 -33.2 -8.0 1.1 2.6 0.0 -7.72 -6.11 -1.48 -14.00 0.15 C<.15 0.08 CB0114.00 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04 CB02 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04 CB03 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04 CB04 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04 CB05 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04 CB06 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04 CB07 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04 CB08 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04 Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 25 of 49
  • 26. PILE DRIVEABILITY ANALYSIS REPORT APPENDIX A3. DRIVEABILITY RESULTS Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 26 of 49
  • 27. PILE DRIVEABILITY ANALYSIS REPORT Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 27 of 49
  • 28. PILE DRIVEABILITY ANALYSIS REPORT Continuous Driving (Plug) 3500 3000 2500 SDR (kPa) 2000 1500 SDR 1000 500 0 0 2 4 6 8 10 12 Depth (m) Set up Lower Bound (Plug) 6000 5000 SDR (kPa) 4000 3000 SDR 2000 1000 0 0 5 10 15 20 25 Depth (m) Set up Upper Bound (Plug) 6000 5000 SDR (kPa) 4000 3000 SDR 2000 1000 0 0 5 10 15 20 25 Depth (m) Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 28 of 49
  • 29. PILE DRIVEABILITY ANALYSIS REPORT Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 29 of 49
  • 30. PILE DRIVEABILITY ANALYSIS REPORT Continuous Driving Case Plug Condition Unplug Condition Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 30 of 49
  • 31. PILE DRIVEABILITY ANALYSIS REPORT Lower Bound Case Plug Condition Unplug Condition Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 31 of 49
  • 32. PILE DRIVEABILITY ANALYSIS REPORT Upper Bound Case Plug Condition Unplug Condition Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 32 of 49
  • 33. PILE DRIVEABILITY ANALYSIS REPORT APPENDIX B. DD PLEM PILE DRIVEABILITY ANALYSIS RESULTS Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 33 of 49
  • 34. PILE DRIVEABILITY ANALYSIS REPORT APPENDIX B1. PILE SELF-PENETRATION CALCULATION Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 34 of 49
  • 35. PILE DRIVEABILITY ANALYSIS REPORT Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 35 of 49
  • 36. PILE DRIVEABILITY ANALYSIS REPORT APPENDIX B2. PILE STICK-UP CALCULATION Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 36 of 49
  • 37. PILE DRIVEABILITY ANALYSIS REPORT Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 37 of 49
  • 38. PILE DRIVEABILITY ANALYSIS REPORT SACs Model LDOPT SFINOP +Z 1.025 7.85 -66.00 66.00GLOBMN MPTNPNP K PILE DD PLEM OPTIONS MN SD 1 1 LCSEL CB01 CB02 CB03 CB04 CB05 CB06 CB07 CB08 GRUP GRUP PIL 61.000 2.060 21.00 8.0034.50 1 1.001.00 0.50F 7.850 MEMBER MEMBER 1 3 PIL MEMBER 2 1 PIL JOINT JOINT 1 0.000 0.000-66.000 110000 JOINT 2 -0.015 -0.015 -71. 111111 JOINT 3 0.083 0.083-50.000 CDM CDM 10.00 0.683 1.680 1.102 1.260 CDM 200.00 0.683 1.680 1.102 1.260 MGROV MGROV 0.000 6.000 4.500 1.300 MGROV 6.000 16.000 5.500 1.300 LOAD LOADCN 1 LOADLB 1PLEM SUBMERGED SELF WEIGHT DEAD DEAD -Z M BML LOADCN 2 LOADLB 2HAMMER WEIGHT LOAD 3 -250. GLOB JOIN * OPERATION SEA CONDITION LOADCN 21 LOADLB 21OPER WAVE 0 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 0.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 0.000 0.850 US LN CURR 33.000 0.500 0.000 CURR 66.000 0.500 0.000 LOADCN 22 LOADLB 22OPER WAVE 45 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 45.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 45.000 0.850 US LN CURR 33.000 0.500 45.000 CURR 66.000 0.500 45.000 LOADCN 23 Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 38 of 49
  • 39. PILE DRIVEABILITY ANALYSIS REPORT LOADLB 23OPER WAVE 90 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 90.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 90.000 0.850 US LN CURR 33.000 0.500 90.000 CURR 66.000 0.500 90.000 LOADCN 24 LOADLB 24OPER WAVE 135 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 135.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 135.000 0.850 US LN CURR 33.000 0.500 135.000 CURR 66.000 0.500 135.000 LOADCN 25 LOADLB 25OPER WAVE 180 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 180.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 180.000 0.850 US LN CURR 33.000 0.500 180.000 CURR 66.000 0.500 180.000 LOADCN 26 LOADLB 26OPER WAVE 225 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 225.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 225.000 0.850 US LN CURR 33.000 0.500 225.000 CURR 66.000 0.500 225.000 LOADCN 27 LOADLB 27OPER WAVE 270 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 270.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 270.000 0.850 US LN CURR 33.000 0.500 270.000 CURR 66.000 0.500 270.000 LOADCN 28 LOADLB 28OPER WAVE 315 DEGREE WAVE WAVE0.90STOK 3.00 71.75 6.00 315.00 D 0.00 18.00 20MS10 1 0 CURR CURR 0.000 0.500 315.000 0.850 US LN CURR 33.000 0.500 315.000 CURR 66.000 0.500 315.000 Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 39 of 49
  • 40. PILE DRIVEABILITY ANALYSIS REPORT *LOAD COMBINATION LCOMB LCOMB CB01 1 1.150 2 1.000 21 1.100 LCOMB CB02 1 1.150 2 1.000 22 1.100 LCOMB CB03 1 1.150 2 1.000 23 1.100 LCOMB CB04 1 1.150 2 1.000 24 1.100 LCOMB CB05 1 1.150 2 1.000 25 1.100 LCOMB CB06 1 1.150 2 1.000 26 1.100 LCOMB CB07 1 1.150 2 1.000 27 1.100 LCOMB CB08 1 1.150 2 1.000 28 1.100 END Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 40 of 49
  • 41. PILE DRIVEABILITY ANALYSIS REPORT Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 41 of 49
  • 42. PILE DRIVEABILITY ANALYSIS REPORT SACs Results PILE DD PLEM DATE 02-FEB-2012 TIME 17:44:55 PST PAGE 6 SACS-IV SYSTEM MEMBER DETAIL REPORT DIST MAX MEMBER GRP LOAD FROM FORCE MOMENT MOMENT SHEAR SHEAR TORSION AXIAL BENDING STRESS COMB. SHEAR CRIT. COMB. CASE END FX MY MZ FY FZ MX STRESS Y Z STRESS STRESS COND. UNITY M KN KN-M KN-M KN KN KN-M N/MM2 N/MM2 N/MM2 N/MM2 N /MM2 CHECK 1- 3 PIL CB01 0.00 -301.0 -40.7 -7.4 0.9 3.2 0.0 -7.89 -7.48 -1.37 -15.49 0.17 C<.15 0.09 CB02 -301.0 -43.7 0.0 0.0 3.5 0.0 -7.89 -8.04 0.00 -15.93 0.19 C<.15 0.09 CB03 -301.0 -40.7 7.4 -0.9 3.2 0.0 -7.89 -7.48 1.37 -15.49 0.17 C<.15 0.09 CB04 -301.0 -33.2 10.5 -1.3 2.3 0.0 -7.89 -6.11 1.94 -14.30 0.14 C<.15 0.08 CB05 -301.0 -25.8 7.4 -0.9 1.4 0.0 -7.89 -4.74 1.37 -12.82 0.09 C<.15 0.08 CB06 -301.0 -22.7 0.0 0.0 1.0 0.0 -7.89 -4.17 0.00 -12.06 0.05 C<.15 0.07 CB07 -301.0 -25.8 -7.4 0.9 1.4 0.0 -7.89 -4.74 -1.37 -12.82 0.09 C<.15 0.08 CB08 -301.0 -33.2 -10.5 1.3 2.3 0.0 -7.89 -6.11 -1.94 -14.30 0.14 C<.15 0.08 CB01 16.00 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05 CB02 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05 CB03 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05 CB04 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05 CB05 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05 CB06 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05 CB07 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05 CB08 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05 Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 42 of 49
  • 43. PILE DRIVEABILITY ANALYSIS REPORT APPENDIX A3. DRIVEABILITY RESULTS Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 43 of 49
  • 44. PILE DRIVEABILITY ANALYSIS REPORT Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 44 of 49
  • 45. PILE DRIVEABILITY ANALYSIS REPORT Continuous Driving (Plug) 3500 3000 2500 SDR (kPa) 2000 1500 SDR 1000 500 0 0 2 4 6 8 10 12 Depth (m) Set up Lower Bound (Plug) 6000 5000 SDR (kPa) 4000 3000 SDR 2000 1000 0 0 5 10 15 20 25 Depth (m) Set up Upper Bound (Plug) 6000 5000 SDR (kPa) 4000 3000 SDR 2000 1000 0 0 5 10 15 20 25 Depth (m) Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 45 of 49
  • 46. PILE DRIVEABILITY ANALYSIS REPORT Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 46 of 49
  • 47. PILE DRIVEABILITY ANALYSIS REPORT Continuous Driving Case Plug Condition Unplug Condition Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 47 of 49
  • 48. PILE DRIVEABILITY ANALYSIS REPORT Lower Bound Case Plug Condition UnPlug Condition Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 48 of 49
  • 49. PILE DRIVEABILITY ANALYSIS REPORT Upper Bound Case Plug Condition Unplug Condition Document No.: TLDD-0003-4JAW-A07-0006 Revision A1 Page No.: 49 of 49