SlideShare une entreprise Scribd logo
1  sur  6
Télécharger pour lire hors ligne
100GE IN THE LAB
Rob Shakir (rob.shakir@cw.com)




© Copyright Cable&Wireless Worldwide 2010. All rights reserved.   1
beta

                                                                  IT WORKS!


© Copyright Cable&Wireless Worldwide 2010. All rights reserved.                  2
With some challenges…



                                                                    MPLS


                                                                           ETH




                           100GE Tester                              Existing       Limited Testing
                            Availability                          Fabric Capacity     Scenarios


© Copyright Cable&Wireless Worldwide 2010. All rights reserved.                                       3
Utilisation of                                                  Shared Fate    Inter-Op        Cost!


             10 x 10Gbps                                            50ms @       802.3ba      10 x 10Gbps
                  vs.                                              100Gbps =    compliant?         Or
             10 x 10Gbps                                             640MB                   ? x 100Gbps?




                                    And requires some consideration!

© Copyright Cable&Wireless Worldwide 2010. All rights reserved.                                             4
Where next?
                                                                  40GigE vs 100GigE?



© Copyright Cable&Wireless Worldwide 2010. All rights reserved.                    5
Thanks,
  questions?

© Copyright Cable&Wireless Worldwide 2010. All rights reserved.   6

Contenu connexe

Similaire à 100GE in the Lab - LINX 71

MPO To MPO High Density Breakout Cable Data Sheet By JTOPTICS
MPO To MPO High Density Breakout Cable Data Sheet By JTOPTICSMPO To MPO High Density Breakout Cable Data Sheet By JTOPTICS
MPO To MPO High Density Breakout Cable Data Sheet By JTOPTICS
Jayani Technologies Ltd
 
Request 100 g webcast presentation-june9_final
Request 100 g webcast presentation-june9_finalRequest 100 g webcast presentation-june9_final
Request 100 g webcast presentation-june9_final
dodesimo
 
Lte Small Cells Presentation Arrows
Lte Small Cells Presentation ArrowsLte Small Cells Presentation Arrows
Lte Small Cells Presentation Arrows
hmatthews1
 
Telco Evangelist Presentation Telefonica
Telco Evangelist Presentation TelefonicaTelco Evangelist Presentation Telefonica
Telco Evangelist Presentation Telefonica
hbolten
 
24 Fiber to 12 Fiber MPO Breakout Cable Data Sheet By JTOPTICS
24 Fiber to 12 Fiber MPO Breakout Cable Data Sheet By JTOPTICS24 Fiber to 12 Fiber MPO Breakout Cable Data Sheet By JTOPTICS
24 Fiber to 12 Fiber MPO Breakout Cable Data Sheet By JTOPTICS
Jayani Technologies Ltd
 

Similaire à 100GE in the Lab - LINX 71 (20)

MPO To MPO High Density Breakout Cable Data Sheet By JTOPTICS
MPO To MPO High Density Breakout Cable Data Sheet By JTOPTICSMPO To MPO High Density Breakout Cable Data Sheet By JTOPTICS
MPO To MPO High Density Breakout Cable Data Sheet By JTOPTICS
 
Everything you wanted to know about cabling but were afraid to ask
Everything you wanted to know about cabling but were afraid to askEverything you wanted to know about cabling but were afraid to ask
Everything you wanted to know about cabling but were afraid to ask
 
Request 100 g webcast presentation-june9_final
Request 100 g webcast presentation-june9_finalRequest 100 g webcast presentation-june9_final
Request 100 g webcast presentation-june9_final
 
The Missing Link: Dedicated End-to-End 10Gbps Optical Lightpaths for Clusters...
The Missing Link: Dedicated End-to-End 10Gbps Optical Lightpaths for Clusters...The Missing Link: Dedicated End-to-End 10Gbps Optical Lightpaths for Clusters...
The Missing Link: Dedicated End-to-End 10Gbps Optical Lightpaths for Clusters...
 
6G Training Course Part 5: 6G Requirements
6G Training Course Part 5: 6G Requirements6G Training Course Part 5: 6G Requirements
6G Training Course Part 5: 6G Requirements
 
Prezentáció: Alcatel-Lucent WiFi rendszerek és újdonságok
Prezentáció: Alcatel-Lucent WiFi rendszerek és újdonságokPrezentáció: Alcatel-Lucent WiFi rendszerek és újdonságok
Prezentáció: Alcatel-Lucent WiFi rendszerek és újdonságok
 
Lte Small Cells Presentation Arrows
Lte Small Cells Presentation ArrowsLte Small Cells Presentation Arrows
Lte Small Cells Presentation Arrows
 
Telco Evangelist Presentation Telefonica
Telco Evangelist Presentation TelefonicaTelco Evangelist Presentation Telefonica
Telco Evangelist Presentation Telefonica
 
Rec 12 073 Lte Small Cells Presentation Arrows
Rec 12 073 Lte  Small Cells Presentation ArrowsRec 12 073 Lte  Small Cells Presentation Arrows
Rec 12 073 Lte Small Cells Presentation Arrows
 
Rec 12 073 Lte Small Cells Presentation Arrows
Rec 12 073 Lte  Small Cells Presentation ArrowsRec 12 073 Lte  Small Cells Presentation Arrows
Rec 12 073 Lte Small Cells Presentation Arrows
 
Data communication and network Chapter - 2
Data communication and network Chapter - 2Data communication and network Chapter - 2
Data communication and network Chapter - 2
 
Ontornet
OntornetOntornet
Ontornet
 
Hacia el Data Center virtualizado- Fabian Domínguez
Hacia el Data Center virtualizado- Fabian DomínguezHacia el Data Center virtualizado- Fabian Domínguez
Hacia el Data Center virtualizado- Fabian Domínguez
 
Next-Gen Access Technologies: PON and DSL
Next-Gen Access Technologies: PON and DSLNext-Gen Access Technologies: PON and DSL
Next-Gen Access Technologies: PON and DSL
 
Intelligent Mobile Broadband
Intelligent Mobile BroadbandIntelligent Mobile Broadband
Intelligent Mobile Broadband
 
24 Fiber to 12 Fiber MPO Breakout Cable Data Sheet By JTOPTICS
24 Fiber to 12 Fiber MPO Breakout Cable Data Sheet By JTOPTICS24 Fiber to 12 Fiber MPO Breakout Cable Data Sheet By JTOPTICS
24 Fiber to 12 Fiber MPO Breakout Cable Data Sheet By JTOPTICS
 
Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...
Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...
Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...
 
Metro High-Speed Product Line Manager
Metro High-Speed Product Line ManagerMetro High-Speed Product Line Manager
Metro High-Speed Product Line Manager
 
Accel Net Rates 2010
Accel Net Rates 2010Accel Net Rates 2010
Accel Net Rates 2010
 
Fiberstore's 10 gigabit ethernet transceivers and cables faq
Fiberstore's 10 gigabit ethernet transceivers and cables faqFiberstore's 10 gigabit ethernet transceivers and cables faq
Fiberstore's 10 gigabit ethernet transceivers and cables faq
 

Plus de Rob Shakir (8)

IETF87 - STATUS BoF: Performance Engineered LSPs
IETF87 - STATUS BoF: Performance Engineered LSPsIETF87 - STATUS BoF: Performance Engineered LSPs
IETF87 - STATUS BoF: Performance Engineered LSPs
 
BGP OPERATIONAL Message
BGP OPERATIONAL MessageBGP OPERATIONAL Message
BGP OPERATIONAL Message
 
Reinforcing the Kitchen Sink - Aligning BGP-4 Error Handling with Modern Netw...
Reinforcing the Kitchen Sink - Aligning BGP-4 Error Handling with Modern Netw...Reinforcing the Kitchen Sink - Aligning BGP-4 Error Handling with Modern Netw...
Reinforcing the Kitchen Sink - Aligning BGP-4 Error Handling with Modern Netw...
 
IETF80 - IDR/GROW BGP Error Handling Requirements
IETF80 - IDR/GROW BGP Error Handling RequirementsIETF80 - IDR/GROW BGP Error Handling Requirements
IETF80 - IDR/GROW BGP Error Handling Requirements
 
BGP Error Handling (NANOG 51)
BGP Error Handling (NANOG 51)BGP Error Handling (NANOG 51)
BGP Error Handling (NANOG 51)
 
BGP Error Handling - Developing an Operator-Led Approach in the IETF (UKNOF 18)
BGP Error Handling - Developing an Operator-Led Approach in the IETF (UKNOF 18)BGP Error Handling - Developing an Operator-Led Approach in the IETF (UKNOF 18)
BGP Error Handling - Developing an Operator-Led Approach in the IETF (UKNOF 18)
 
LINX65 - Handling BGP Attribute Errors (Rob Shakir)
LINX65 - Handling BGP Attribute Errors (Rob Shakir)LINX65 - Handling BGP Attribute Errors (Rob Shakir)
LINX65 - Handling BGP Attribute Errors (Rob Shakir)
 
UKNOF16 - Enhancing BGP
UKNOF16 - Enhancing BGPUKNOF16 - Enhancing BGP
UKNOF16 - Enhancing BGP
 

100GE in the Lab - LINX 71

  • 1. 100GE IN THE LAB Rob Shakir (rob.shakir@cw.com) © Copyright Cable&Wireless Worldwide 2010. All rights reserved. 1
  • 2. beta IT WORKS! © Copyright Cable&Wireless Worldwide 2010. All rights reserved. 2
  • 3. With some challenges… MPLS ETH 100GE Tester Existing Limited Testing Availability Fabric Capacity Scenarios © Copyright Cable&Wireless Worldwide 2010. All rights reserved. 3
  • 4. Utilisation of Shared Fate Inter-Op Cost! 10 x 10Gbps 50ms @ 802.3ba 10 x 10Gbps vs. 100Gbps = compliant? Or 10 x 10Gbps 640MB ? x 100Gbps? And requires some consideration! © Copyright Cable&Wireless Worldwide 2010. All rights reserved. 4
  • 5. Where next? 40GigE vs 100GigE? © Copyright Cable&Wireless Worldwide 2010. All rights reserved. 5
  • 6. Thanks, questions? © Copyright Cable&Wireless Worldwide 2010. All rights reserved. 6