The document outlines plans to reconstruct the Belle Harbor area of Queens, New York from Beach 127th Street to Beach 149th Street. It details the existing concrete header that will be replaced and proposes new beach access details at various street locations between Beach 130th and 149th streets. Martello bollards that are 23 inches high and 24 inches in diameter will be installed. Construction is projected to start in May 2015 and last 12 months, working Monday through Friday from 7am to 6pm and weekends from 8am to 6pm using multiple crews simultaneously at different locations. The presentation concludes by asking for any questions.