3. A systematic approach
October 2011
January 2011
July 2011
Kickoff Fast Forward
Regional Transit
System Plan
Draft Plan presented
for public review
Mobile Outreach Bus
119 locations
2000 citizens
February 2013
January 2012
July 2012
Kickoff Peoria
Alternatives Analysis
Data collection for
Peoria Route 105 and
8 other routes
April 2012
Peoria BRT adopted
as locally preferred
alternative
Public Meetings along
corridor (Round 1)
Public meetings and
targeted outreach
(Round 2)
January 2013
Regional Transit
System Plan adopted
4. Adopted Regional Transit System
Plan
Peoria/Riverside
Corridor
Residents: 69,000
Jobs: 37,000
5,700 daily trips to
downtown
10/21/2013
4
13. 36 stations
15 min peak frequency
Real-time arrival info
Off-board fare payment
Easy boarding
Signature branding
$37 M in economic impact
14. CONNECTS TO…
5 grocery stores
10 other bus routes
Tulsa Tech – Peoria Campus
Utica Square
Downtown
Brookside
St. John/Hillcrest
Cityplex Towers
Gathering Place
ORU/ Mabee Center
Shoppes on
Cherry Street
20. Station Concept Examples
•32 ft Concrete platform
•Station canopy and structural framing support
•LED lighting beneath station canopy
•Benches and / or leaning rails, bicycle racks, trash cans
•Branded, BRT signage and passenger information
•Allowance for public art incorporated into amenities