SKYLAB DISASTER
Lindsay Schwendel and Darien Morrison
AGENDA
• What was the purpose of Skylab?
• What went wrong?
• Why did Skylab fail?
• What were the effects of the Skylab disaster?
• How was the Skylab disaster handled?
PURPOSE OF SKYLAB
•   Skylab was used to study the Sun, long duration during space flights, how the human
    body reacted in space, to teach humans to live space, for microgravity research, and to
    function as a lab in orbit without the effects of Earth’s gravity.
•   Skylab consisted of 5 parts:
     • Orbital Workshop (Living workspace)
     • Airlock Module (Space walks)
     • Apollo Telescope Mount (ATM)
     • Multiple Docking Adapter
     • Saturn Instrument Unit (Navigation into orbit and life support system)
WHAT WENT WRONG
•   SKYLAB I: 63 seconds after liftoff, a
    meteoroid shield ripped off, along with
    2 solar panels, which prevented
    another panel from deploying properly.
    Ground Control maneuvered it to face
    the sun for as much electricity as
    possible, but since the meteoroid
    shield also acted as a sun shield,
    temperatures rose to 126˚ F.
WHAT WENT WRONG
•   SKYLAB II: A crew was sent to make
    repairs, which they did, but they had
    trouble making these repairs due to a
    lack of power and an insufficient
    amount of electricity for the first two
    weeks.
WHAT WENT WRONG
•   SKYLAB III: An astronaut noticed a
    piece of ice float by, which meant there
    was a leak in the engine. It was then
    discovered that this leak closed the
    isolation valves. People feared the
    astronauts would not return home.
WHY SKYLAB FAILED



 In Skylab I, the micrometeoroid shield deployed
     too early, causing temperatures to rise to
                 inhabitable levels.
WHY SKYLAB FAILED
•   There were not enough launch ships to send crews to fix Skylab’s problems in a timely
    manner.
•   Skylab did not fail the way it was meant to, but the effects of its failure were minimized
    with the maintenance from Skylab II and III.
HOW THE SKYLAB DISASTER WAS HANDLED
•   To solve the micrometeoroid shield problem from Skylab I, a manned crew (Skylab 2) was
    sent to install a solar shield to cool the inside temperatures.
•   Continued in-flight maintenance issues from Skylab I were repaired by Skylab II, III, and
    IV, all different manned missions serving different initial experimentation purposes.
THE EFFECTS OF THE SKYLAB DISASTER
•   Skylab ultimately cost $3.6 billion and never recovered to its initial conditions.
•   Over 300 experiments were performed in orbit to demonstrate the effects of life in space.
•   The total number of days Skylab spent in orbit was 2249, over 6 years.
•   After the first four missions were deemed unsuccessful, two previously planned missions
    were cancelled.
•   Once the crew returned safely to Earth, was shut down, and it fell back to Earth in 1977,
    leaving debris in the Indian Ocean near Western Australia.
WORKS CITED
4, June. "Skylab Space Station." Space Projects - Space Information - Space Shop. Web. 17

    Apr. 2011. <http://www.aerospaceguide.net/spacestation/skylab.html>.

"NASA - Skylab." NASA - Home. Web. 17 Apr. 2011.

    <http://www.nasa.gov/mission_pages/skylab/>.

"Top 10 Worst Engineering Disasters." Top 10 Lists - Listverse. 4 Dec. 2007. Web. 17 Apr.

    2011. <http://listverse.com/2007/12/04/top-10-worst-engineering-disasters/>.
QUESTIONS?

Contenu connexe

Similaire à Skylab

Rocketry Lesson PowerPoint, Build a Water Rocket
Rocketry Lesson PowerPoint, Build a Water RocketRocketry Lesson PowerPoint, Build a Water Rocket
Rocketry Lesson PowerPoint, Build a Water Rocket
www.sciencepowerpoint.com
 
The meer kat project
The meer kat projectThe meer kat project
The meer kat project
AnnaRoux23
 

Similaire à Skylab (12)

The challenger disaster Case Study
The challenger disaster Case StudyThe challenger disaster Case Study
The challenger disaster Case Study
 
solar sail
solar sailsolar sail
solar sail
 
XCOR Exploration Alternatives - Jeff Greason
XCOR Exploration Alternatives - Jeff GreasonXCOR Exploration Alternatives - Jeff Greason
XCOR Exploration Alternatives - Jeff Greason
 
Presentation On Basics Of Solar sail.
Presentation On Basics Of Solar sail.Presentation On Basics Of Solar sail.
Presentation On Basics Of Solar sail.
 
TEAM PHOTOS.ppt
TEAM PHOTOS.pptTEAM PHOTOS.ppt
TEAM PHOTOS.ppt
 
Rocketry Lesson PowerPoint, Build a Water Rocket
Rocketry Lesson PowerPoint, Build a Water RocketRocketry Lesson PowerPoint, Build a Water Rocket
Rocketry Lesson PowerPoint, Build a Water Rocket
 
The meer kat project
The meer kat projectThe meer kat project
The meer kat project
 
The Operation Of Space Shuttle
The Operation Of Space ShuttleThe Operation Of Space Shuttle
The Operation Of Space Shuttle
 
Space Based Solar Power
Space Based Solar PowerSpace Based Solar Power
Space Based Solar Power
 
Jeff Greason NewSpace 2014
Jeff Greason NewSpace 2014Jeff Greason NewSpace 2014
Jeff Greason NewSpace 2014
 
Chandrayaan and space stations
Chandrayaan and space stationsChandrayaan and space stations
Chandrayaan and space stations
 
ACT Science Coffee - Robert Swinney
ACT Science Coffee  - Robert SwinneyACT Science Coffee  - Robert Swinney
ACT Science Coffee - Robert Swinney
 

Dernier

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Dernier (20)

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 

Skylab

  • 1. SKYLAB DISASTER Lindsay Schwendel and Darien Morrison
  • 2. AGENDA • What was the purpose of Skylab? • What went wrong? • Why did Skylab fail? • What were the effects of the Skylab disaster? • How was the Skylab disaster handled?
  • 3. PURPOSE OF SKYLAB • Skylab was used to study the Sun, long duration during space flights, how the human body reacted in space, to teach humans to live space, for microgravity research, and to function as a lab in orbit without the effects of Earth’s gravity. • Skylab consisted of 5 parts: • Orbital Workshop (Living workspace) • Airlock Module (Space walks) • Apollo Telescope Mount (ATM) • Multiple Docking Adapter • Saturn Instrument Unit (Navigation into orbit and life support system)
  • 4. WHAT WENT WRONG • SKYLAB I: 63 seconds after liftoff, a meteoroid shield ripped off, along with 2 solar panels, which prevented another panel from deploying properly. Ground Control maneuvered it to face the sun for as much electricity as possible, but since the meteoroid shield also acted as a sun shield, temperatures rose to 126˚ F.
  • 5. WHAT WENT WRONG • SKYLAB II: A crew was sent to make repairs, which they did, but they had trouble making these repairs due to a lack of power and an insufficient amount of electricity for the first two weeks.
  • 6. WHAT WENT WRONG • SKYLAB III: An astronaut noticed a piece of ice float by, which meant there was a leak in the engine. It was then discovered that this leak closed the isolation valves. People feared the astronauts would not return home.
  • 7. WHY SKYLAB FAILED In Skylab I, the micrometeoroid shield deployed too early, causing temperatures to rise to inhabitable levels.
  • 8. WHY SKYLAB FAILED • There were not enough launch ships to send crews to fix Skylab’s problems in a timely manner. • Skylab did not fail the way it was meant to, but the effects of its failure were minimized with the maintenance from Skylab II and III.
  • 9. HOW THE SKYLAB DISASTER WAS HANDLED • To solve the micrometeoroid shield problem from Skylab I, a manned crew (Skylab 2) was sent to install a solar shield to cool the inside temperatures. • Continued in-flight maintenance issues from Skylab I were repaired by Skylab II, III, and IV, all different manned missions serving different initial experimentation purposes.
  • 10. THE EFFECTS OF THE SKYLAB DISASTER • Skylab ultimately cost $3.6 billion and never recovered to its initial conditions. • Over 300 experiments were performed in orbit to demonstrate the effects of life in space. • The total number of days Skylab spent in orbit was 2249, over 6 years. • After the first four missions were deemed unsuccessful, two previously planned missions were cancelled. • Once the crew returned safely to Earth, was shut down, and it fell back to Earth in 1977, leaving debris in the Indian Ocean near Western Australia.
  • 11. WORKS CITED 4, June. "Skylab Space Station." Space Projects - Space Information - Space Shop. Web. 17 Apr. 2011. <http://www.aerospaceguide.net/spacestation/skylab.html>. "NASA - Skylab." NASA - Home. Web. 17 Apr. 2011. <http://www.nasa.gov/mission_pages/skylab/>. "Top 10 Worst Engineering Disasters." Top 10 Lists - Listverse. 4 Dec. 2007. Web. 17 Apr. 2011. <http://listverse.com/2007/12/04/top-10-worst-engineering-disasters/>.