The road to Efficiency and Reliability
ABB Global Consulting and Full Service
2. ABB Global Consulting
Our portfolio 1/2
Portfolio Activities Definition / Scope
Implementation and customization of CMMS System (SAP PM,INFOR EAM,
MAXIMO, ABB…..)
CMMS
Design and Implementations of communication interface between ERP and
CMMS System
Analysis and optimization of Warehouse management
Warehouse Management
(Safety Stocks, Rotation Index, Min/Max Stock,..)
Optimization
Coding and Standardization of Spare Parts
Efficiency Energy Efficiency audit
Energy Efficiency UNI EN 50001 Implementation
Improvement Feasibility Study (ROI & KPI’s Identification)
Improvement action and Energy Efficiency Credit Management (TEE)
Revamping Study of Electrical, Mechanical and Thermal Systems
Equipment and Process Assessment (Electrical, Mechanical and Thermal)
Engineering Activities
Machinery re-certification
Operational Engineering support
RAM’s Analysis (reliability, availability and maintainability)
Reliability Reliability Engineering RCM – RCA – RBI Analysis
Improvement actions
3. ABB Global Consulting
Our portfolio 2/2
Portfolio Activities Definition / Scope
Environmental Management System (ISO 14001)
Operational Health and Safety Management System (OHSAS 18000)
Safety & Environmental SIL - Safety Integrity Level
Risk Assessment
GxP Impact assessment (Good Laboratory / Manufacturing Practice)
Safety, Quality
Validation Process and Computer System Validation (GAMP 4 - Good Automated Manufacturing Practice)
Equipment DQ, IQ, OQ, PQ (Design, Installation, Operational & Performance Qualification)
and
Metrological laboratory & calibrations
Training
Internal and External training related to: Reliability Centered Maintenance – Asset
Criticality Analysis – OEE Analysis and Monitoring - Preventive Maintenance
Optimization – Condition Based Maintenance - Planning & Scheduling –- Autonomous
Training and Coaching Maintenance and 5S - Six Sigma methodology - Energy Efficiency Concept and
Implementation - Warehouse management and optimization - CMMS Computerized
Maintenance Management System
4. ABB Full Service
Our portfolio
Portfolio Activities Definition / Scope
Operation & Maintenance is a long-term performance based on
Operation & Maintenance partnership agreements on Lump Sum and KPI for all Maintenance and
Operation activities
Perfomance Full Service contract is a long-term performance based on partnership
Full Service
Based agreements based on Lump Sum and KPI for all Maintenance activities
Agreements Equipment Performance Full service o Global Service of Maintenance related to the specifics
Management Equipment (e.g.: Motor, Instruments.) based on Lump Sum and KPI
Asset Management for Fuel Global management of the activities directly and indirectly linked to the
Retail Stations Maintenance of fuel retail networks and of the relevant services
TAM (Turn-Around Maintenance) consists in all the cyclical and also
Turn-Around Maintenance
Maintenance extraordinary strategic maintenance activities planned and managed
(TAM)
Management & during the stop planned production.
Supervision Maintenance Management Maintenance Management & Supervision consists in the leading
& Supervision Maintenance workforce and supervisor of the work
Improve OEE, reduce Maintenance spend, optimize resources and stock
Maintenance & Maintenance & Productivity
inventory, minimize risk, RCA, FMECA analysis, CMMS Implementation
Productivity Implementation
and management
Implementation
and EEI Energy Efficiency Feasibility Study on electrical and thermodynamic equipment and
Improvement implementation projects with performance based contract (EPC)
5. ABB Efficiency and Reliability
The approach
Energy Plant Spare Parts Safety &
Efficiency Reliability Optimization Environment
Costs optimization
Energy Saving Down Time Reduction Capex Reduction Safety & environment
SW for Maintenance & Reliability
SW for Energy Efficiency SW for Spare Parts
Design: EMDS (Engineering Safety & environmental
Implementation: E2P Optimization: ISPO
Maintenance Design services, Process
(Energy Efficiency Platform) (Inventory Spare Parts
System), FMEA+CA (Failure Validation, Remediation,
E2AM (Energy Efficiency Optimization), CODE
mode Effects & Criticality Decommissioning,
Asset Management) Analysis); SW for Maintenance MAKER (coding for spare Technical Training Path
cpmPlus (Energy parts)
Management: CMMS
Management System) (Enterprise Asset Management)
Training
© ABB Group
April 3, 2013 | Slide 5
6. ABB Efficiency and Reliability
Energy Efficiency
ABB’s portfolio includes:
Analysis and energy balance of the vectors
Measurement/analysis of historical trends and identification of the optimal
consumption profile
Thermal balance verification for systems and subsystems
Rationalization and optimization of processes and energy systems
Identification of improvement areas and implementation of technical solutions for
energy efficiency and for use of renewable energy sources
Turn key solutions for energy efficiency and verification of reached results
Implementation of EnMS – ISO 50001:2011 system
With the aim to reach the following results:
Energy consumption/costs reduction, CO2 reduction
Energy waste reduction
Optimization of overall plant energy consumption
Energy supply contract optimization
© ABB Group
April 3, 2013 | Slide 6
7. ABB global approach to Energy Efficiency
A complete process from analysis to implementation
(EN 15900:2010)
Energy Mapping Feasibility Realization
Check-Up Flash Audit Detailed Measure and
PHASE e
Measurement
Study Design of Verification
Analysis of the Areas Analysis of Equipments Solution of Results
Building Utilities
Utilities Building Utilities
Utilities
Utilities Building Utilities
Edifici Utilities Building Utilities
Utilities Building Utilities
Utilities Building Utilities
Utilities Building Utilities
Utilities
AREA
Prod. Prod. Prod. Prod. Organiz. Prod. Prod. Prod.
Organiz. Organiz. Organiz. Organiz. Organiz. Organiz.
Area Area Area Area Area Area Area
Check-up Flash Feasibility Activities Description of
Report Audit
OUTPUT Energy Mapping Study Design and Supervision the energy
Report Report scenario
(Sankey diagram) technical Realization of
specification achieved
Solution
Gap
Return of
Improvement identification
Potential Investment
Master Plan and analysis
Carried out by the Customer Opportunity Trends
in complete independence Portfolio analysis (*)
Carried out by the Customer (*) In the absence of data, ABB
With support of ABB specialists offers a measurement service for Improvement
any vector personalized for the Opportunity
Carried out by ABB specialists
real needs of the Customer. Sheets
Preliminary
Energy Audit Implementation Verification
Analysis
© ABB Group
April 2012 | Slide 7
8. ABB Efficiency and Reliability
Plant Reliability
ABB supports Customers offering a wide range of maintenance solutions, that
can be sized on Customer needs: from consultancy services, dedicated to
specific areas, to long-term performance based agreements for outsourcing
maintenance.
Main target of these activities is the plant reliability and efficiency
improvement, the increase of plant life cycle and the maintenance costs
optimization. The proposed activities are the folowing:
Operation & Maintenance
Full Service
Equipment performance management
Asset management for fuel retail stations
Turn-around maintenance (TAM)
CMMS implementation & customization
Reliability engineering
© ABB Group
April 3, 2013 | Slide 8
9. ABB Efficiency and Reliability
Spare Parts Optimization
ABB helps its Customers in optimizing the warehouse management by
standardizing the spare parts coding, categorizing spare parts basing on their
criticality and setting new indicators with the aim to reduce fixed assets and to
improve the spare parts procurement process. ABB’s offer is composed by the
following activities:
Spare parts classification and standardization
Vendor rating
Definition and monitoring of stock turnover index
Definition and monitoring of reorder points and safety stocks
© ABB Group
April 3, 2013 | Slide 9
10. ABB Efficiency and Reliability
Material Management and Optimization
Roadmap – ABB Material Management and Optimization Model
Commitment
Mutual
Pre-Analysis Performances Warehouse Warehouse Continuous
Criticality Analysis Optimization
Assessment Management Improvement Program
ISPO – Inventory Spare Parts Optimization WMA WCI
CONTINUOUS
DESIGN & OPTIMIZATION MANAGEMENT
MPROVEMENT
Pre – Analysis Performances Assessment Criticality analysis Optimization Material Management WCI Program
• Warehouse • Suppliers and Catalog analysis • Categories spares • Critical Spare • Trainings and Coaching of • Web Hosting Service for
organization codification and Identification Warehouse Management stock analysis
• Spares and Equipment
• ERP / CMMS attribution
relationships analysis • Inventory Indexes • Warehouse automations (RF- • Safety Stock
systems • Modeling of Cost of Calculation RFID, standard barcode, QR..) management (min/max,
• Spare Codification Design
• Inventory data Stock Out of Q, EOQ, SS)
• Safety Stock • Spare Part Tracking
• Materials Management System Material (by FMECA,
(last 3-years) definition by • Inventory yearly analysis
analysis: goods Data collection (store investment, process and • Warehouse Management:
Classes / Spare & revisions
utilization db, inventory turnover,..) functionality, costs, Material handling, Purchasing,
receipts, (Module B – D,
safety & quality) virtual storage…. • Cost of stock out
purchase orders, • Inventory Data collection: min/max, Q,
consumption…. analysis and remediation
Material List • Critical Classes of EOQ,SS) • Supply chain management
• Failure Lead Time Materials Analysis (web-based) • FMECA analysis
• Database
Price (Module A–B)
Equipment updating • Spare parts standardization • Spare criticality
Consumption
records • Critical Spare Parts and codification redefinitions
Plant Downtime cost • Reporting design
• Spare parts and Analysis
• Stock levels Monitoring (min / • Inventory Assessment
Equipment • Material Models Design (Module C–D)
max, Q, EOQ,Ss)
relationships
© ABB Group
April 3, 2013 | Slide 10
11. ABB Efficiency and Reliability
Safety & Environment
Quality, safety and environmental care are very important values for ABB.
ABB consultancy services in these fields include:
Implementation of ISO 14001 environment management system
Implementation of OHSAS 18000 safety management system
SIL (Safety Integrity Level) analysis
Risk assessment for safety and environment
Remediation and decommisssioning services, such as:
Environmental risk assessment
Underground tank remediation
Industrial remediation (preventive and emergency)
Decommissioning
Service for validation and calibration, such as:
GxP impact assessment
Computerized system validation
DQ, IQ, OQ, PQ
Metrological laboratory analysis and calibration
© ABB Group
April 3, 2013 | Slide 11
12. ABB Efficiency and Reliability
Training
For each operational area, ABB provides an high quality complete technical
training, to be choosen inside the wide training catalogue: ABB offers the
possibility to create, for each technical profile, a highly professional training
path.
These are the training areas:
Reliability
Planning and scheduling
Preventive and predictive maintenance
Assets criticality and process mapping
Warehouse management
Maintenance methodologies
5S
Six Sigma
CMMS
Energy efficiency
© ABB Group
April 3, 2013 | Slide 12
13. ABB Efficiency and Reliability
The road to efficiency and reliability - Assessment
Energy Plant Spare Parts Safety &
Efficiency Reliability Optimization Environment
Check Up/
Safety &
Opportunity Feasibility Warehouse
Environment
Identification/ Study Assessment
Assessment
Master Plan
Energy Efficiency Performance Based Warehouse mgmt & Process
Improvement Agreements Optimization Validation
Maintenence Mgmt & Remediation &
Supervision Decommissioning
CMMS & Engineering
Activities
Reliability
Engineering
Training
© ABB Group
April 3, 2013 | Slide 13
14. ABB Efficiency and Reliability
Roadmap Overview
Roadmap - Efficiency and Reliability
Commitment
Commitment
Mutual
Maintenance Performance
Mutual
Design Implementation Follow-up Management Based
& Supervision Agreements
MPI (Maintenance & Productivity Implementation) + EEI MMS / TAM EPM/AMF/FS/O&M
from Design to Performance Based Agreements……….
…..in order to achieve:
• productivity increase;
• maintenance costs reduction;
• energy efficiency;
• Quality and HSE improvements;
and much more…..
© ABB Group
April 3, 2013 | Slide 14
15. ABB Efficiency and Reliability
Mutual Commitment
Roadmap - Efficiency and Reliability
Commitment
Commitment
Mutual
Maintenance Performance
Mutual
Design Implementation Follow-up Management Based
& Supervision Agreements
MPI (Maintenance & Productivity Implementation) + EEI MMS / TAM EPM/AMF/FS/O&M
Agreement
• Assessment
and
Project
definition
© ABB Group
April 3, 2013 | Slide 15
16. ABB Efficiency and Reliability
Design
Roadmap - Efficiency and Reliability
Commitment
Commitment
Mutual
Maintenance Performance
Mutual
Design Implementation Follow-up Management Based
& Supervision Agreements
MPI (Maintenance & Productivity Implementation) + EEI MMS / TAM EPM/AMF/FS/O&M
Module 1
• As is analysis
• Strategy
definition
• Measurement
system
definition and
implementat.
• Reliability
analysis and
Implementat.
© ABB Group
April 3, 2013 | Slide 16
17. ABB Efficiency and Reliability
Implementation
Roadmap - Efficiency and Reliability
Commitment
Commitment
Mutual
Maintenance Performance
Mutual
Design Implementation Follow-up Management Based
& Supervision Agreements
MPI (Maintenance & Productivity Implementation) + EEI MMS / TAM EPM/AMF/FS/O&M
Module 2
• Computerized
Maintenance
Management
System Impl.
Module 3
Module 4
© ABB Group
April 3, 2013 | Slide 17
18. ABB Efficiency and Reliability
Implementation
Roadmap - Efficiency and Reliability
Commitment
Commitment
Mutual
Maintenance Performance
Mutual
Design Implementation Follow-up Management Based
& Supervision Agreements
MPI (Maintenance & Productivity Implementation) + EEI MMS / TAM EPM/AMF/FS/O&M
Module 5
Module 6
© ABB Group
April 3, 2013 | Slide 18
19. ABB Efficiency and Reliability
Implementation
Roadmap - Efficiency and Reliability
Commitment
Commitment
Mutual
Maintenance Performance
Mutual
Design Implementation Follow-up Management Based
& Supervision Agreements
MPI (Maintenance & Productivity Implementation) + EEI MMS / TAM EPM/AMF/FS/O&M
Module 7
© ABB Group
April 3, 2013 | Slide 19
20. ABB Efficiency and Reliability
Follow-up – Coaching and training on the job
Roadmap - Efficiency and Reliability
Commitment
Commitment
Mutual
Maintenance Performance
Mutual
Design Implementation Follow-up Management Based
& Supervision Agreements
MPI (Maintenance & Productivity Implementation) + EEI MMS / TAM EPM /AMF/FS/O&M
Module 8
© ABB Group
April 3, 2013 | Slide 20
21. ABB Efficiency and Reliability
Maintenance Management & Supervision
Roadmap - Efficiency and Reliability
Commitment
Commitment
Mutual
Maintenance Performance
Mutual
Design Implementation Follow-up Management Based
& Supervision Agreements
MPI (Maintenance & Productivity Implementation) + EEI MMS / TAM EPM/AMF/FS/O&M
Maintenance Management & Supervision Work
consists in leading Maintenance workforce
Supervision
and supervising the work.
These modules include the following activities:
planning & scheduling, works supervision and
management, Maintenance Engineering analysis, Maintenance
improvement design, performance monitoring, Management
HSE and Quality management.
Turn-Around Maintenance consists in all the
cyclical and also extraordinary strategic Turn-Around
maintenance activities planned and managed Maintenance
during the stop planned production.
© ABB Group
April 3, 2013 | Slide 21
22. ABB Efficiency and Reliability
Performance Based Agreements
Roadmap - Efficiency and Reliability
Commitment
Commitment
Mutual
Maintenance Performance
Mutual
Design Implementation Follow-up Management Based
& Supervision Agreements
MPI (Maintenance & Productivity Implementation) + EEI MMS / TAM EPM/AMF/FS/O&M
EPM Equipment Performance Management is specific Global Service of Maintenance
related to specific Categories of Equipment (e.g.: cogenerations, motors, instruments, EPM
drives, etc...) The Contract is based on Lump Sum price and KPIs.
Asset Management for Fuel Retail Stations is involved in global management of the
activities directly and indirectly linked to the Maintenance of fuel retail networks and of the AMF
relevant services
ABB Full Service® Contract is a long-term performance based partnership agreement (Lump
Sum price and KPIs) for all Maintenance activities (Industries: Pulp & Paper, Metals, Minerals & Full Service
Mining, Oil & Gas, Petrochemical, Manufacturing, Chemical, Crane & Harbor, etc…)
Operation & Maintenance Contract is a long-term performance based partnership
agreement (Lump Sum price and KPIs) for all Operation and Maintenance activities Operation &
(specifically for Power and Utility plants and industries) Maintenance
© ABB Group
April 3, 2013 | Slide 22
23. ABB Efficiency and Reliability
Software and Application Tools
Roadmap - Efficiency and Reliability
Commitment
Commitment
Mutual
Maintenance Performance
Mutual
Design Implementation Follow-up Management Based
& Supervision Agreements
MPI (Maintenance & Productivity Implementation) + EEI MMS / TAM EPM/AMF/FS/O&M
Software for Maintenance Software for Spare Software for Energy Software for Software for
and Reliability Design: Parts Efficiency Productivity Maintenance
Optimization: Implementation: Management Management:
EMDS ISPO
(Engineering Maintenance (Inventory Spare Parts
E2P CPM+ CMMS
(Energy Efficiency (Real-Time Production (Enterprise Asset
Design System) Optimization)
Platform) Intelligence) Management)
FMEA + CA CODE MAKER
(Failure Mode Effects and
(Coding of spare parts)
E2AM OEE Rec
Criticality Analysis) (Overall Equipment
(Energy Efficiency Asset
Effectiveness Recorder)
Management)
© ABB Group
April 3, 2013 | Slide 23
24. ABB Efficiency and Reliability
Web-based platform
Internet
CUSTOMER
ABB H.Q.
EMDS FMEA CA ISPO CODE OEE E2P E2AM CMMS eSOMS
MAKER REC (CPM+)
ABB Reliability & Maintainability platform ABB Energy ABB O&M platform
Efficiency platform
Software for Maintenance Software for Spare Software for Energy Software for Software for
and Reliability Design: Parts Efficiency Productivity Maintenance
EMDS Optimization: Implementation: Management Management:
(Engineering Maintenance ISPO CPM+ CMMS
Design System) (Inventory Spare Parts E2P (Real-Time Production (Enterprise Asset
FMEA + CA Optimization) (Energy Efficiency Intelligence) Management)
(Failure Mode Effects and Criticality Platform)
Analysis) CODE E2AM OEE Rec eSOMS
(Energy Efficiency Asset (Overall Equipment (Electronic shift
MAKER Management) Effectiveness Recorder) Operat. Maint.
(Coding of spare parts) System)
© ABB Group
April 3, 2013 | Slide 24
25. ABB Reliability & Maintainability platform
Key relationships
© ABB Group
April 3, 2013 | Slide 25