Contenu connexe Plus de Sadashiv Borgaonkar (13) Simple Steps to Implement Kanban in Lean Manufacturing9. ®ACTSol & Associates (Avinash Consulting & Turnkey Solutions & Associates)
Website: www.actsol.in, E – Mail: connect@actsol.in Cell No: +91 94835 11055
Regd Off: Bangalore; Representations: Gulbarga (Admin) Hyderabad, Pune, New Delhi, Nagpur, Kolhapur, Cochin, Ahmedabad, UK (Cambridge), Barcelona (Spain) & South Africa (Johannesburg)
A Kanban is a Visual Information System established to maintain the
DISCIPLINE of a JIT System on the shop floor.
Kanban (Japanese) : Card or Visual Record.
In The Modern Lean Terminology……..,
A SIGNAL THAT AUTHORIZES PRODUCTION
11. ®ACTSol & Associates (Avinash Consulting & Turnkey Solutions & Associates)
Website: www.actsol.in, E – Mail: connect@actsol.in Cell No: +91 94835 11055
Regd Off: Bangalore; Representations: Gulbarga (Admin) Hyderabad, Pune, New Delhi, Nagpur, Kolhapur, Cochin, Ahmedabad, UK (Cambridge), Barcelona (Spain) & South Africa (Johannesburg)
Single Card Kanban
In a Single Card Kanban System, the operator of a down stream operations requires a
Production Card and the necessary Material to be authorized to begin processing.
He/she simply removes the Card and sends it back to the upstream process, signaling
production to replenish the material used by his/her station prior to processing the
job.
13. ®ACTSol & Associates (Avinash Consulting & Turnkey Solutions & Associates)
Website: www.actsol.in, E – Mail: connect@actsol.in Cell No: +91 94835 11055
Regd Off: Bangalore; Representations: Gulbarga (Admin) Hyderabad, Pune, New Delhi, Nagpur, Kolhapur, Cochin, Ahmedabad, UK (Cambridge), Barcelona (Spain) & South Africa (Johannesburg)
Two Card Kanban System
A Two Card Kanban is used when WIP cannot be effectively handed from one process
to the next, thus necessitating an Inbound Stock Point and an Outbound Stock Point for
processing stations. Mainly this system is utilized in heavy transaction, high complexity
parts (huge number of parts)
In this System Two Cards are used :
• Move (Conveyance) Card : To Authorize the Movement of material
• Production Card : To Authorize the Production.
15. ®ACTSol & Associates (Avinash Consulting & Turnkey Solutions & Associates)
Website: www.actsol.in, E – Mail: connect@actsol.in Cell No: +91 94835 11055
Regd Off: Bangalore; Representations: Gulbarga (Admin) Hyderabad, Pune, New Delhi, Nagpur, Kolhapur, Cochin, Ahmedabad, UK (Cambridge), Barcelona (Spain) & South Africa (Johannesburg)
PROCESS 1 PROCESS 2
1
New stock
moved into
Process 2
Move
kanban
detached
2
Move kanban
attached to
new stock
3
Production
kanbans
direct the
production
sequence
B
Production
kanban
attached
to finished
quantity
C
OUTBOUND
STOCK AREA
INBOUND
STOCK AREA
MOVE KANBAN (1-2-3)
Each process has an inbound and an outbound stock area. The inbound area contains raw materials used in the process. The outbound
area holds completed output from the process.
When Process 2 begins to consume the contents of a container, the Move Kanban is taken off the container and brought to the outbound
stock area of Process 1. There the Move Kanban is attached to a new, full container, which is taken back to the inbound stock area of
Process 2, ready for use.
Dispatch
Box
Production kanban
detached, placed
in dispatch box
A
17. ®ACTSol & Associates (Avinash Consulting & Turnkey Solutions & Associates)
Website: www.actsol.in, E – Mail: connect@actsol.in Cell No: +91 94835 11055
Regd Off: Bangalore; Representations: Gulbarga (Admin) Hyderabad, Pune, New Delhi, Nagpur, Kolhapur, Cochin, Ahmedabad, UK (Cambridge), Barcelona (Spain) & South Africa (Johannesburg)
PROCESS 1 PROCESS 2
1
New stock
moved into
Process 2
Move
kanban
detached
2
Move kanban
attached to
new stock
3
Production kanban
detached, placed
in dispatch box
A
Production
kanbans
direct the
production
sequence
B
Production
kanban
attached
to finished
quantity
C
OUTBOUND
STOCK AREA
INBOUND
STOCK AREADispatch
Box
PRODUCTION KANBAN (A-B-C)
A Production Kanban is attached to every container in the outbound stock area at Process 1. When Process 2 comes to remove a container
of parts, the Production Kanban is taken off and put in a dispatch box for Process 1.
Process 1 may make parts for several other processes, therefore, it builds the new parts in the order in which the kanban are placed in the
dispatch box. When a container is full, the Production Kanban is attached to it and it is placed in the outbound stock area ready for
withdrawal by Process 2.
39. ®ACTSol & Associates (Avinash Consulting & Turnkey Solutions & Associates)
Website: www.actsol.in, E – Mail: connect@actsol.in Cell No: +91 94835 11055
Regd Off: Bangalore; Representations: Gulbarga (Admin) Hyderabad, Pune, New Delhi, Nagpur, Kolhapur, Cochin, Ahmedabad, UK (Cambridge), Barcelona (Spain) & South Africa (Johannesburg)
Three Phases
Phase Particulars
Induction
Implementation
Evaluation
Model Area Selection, Training, Design of
Kanban and Board
5S, SMED, Multi Skilling, SPC and Operating
Rules.
Pilot Run, Evaluation against Set Values of
Parameters
41. • Website: www.actsol.in
• Email: connect@actsol.in
• Contact No: +919483511055
Feel free to write on connect@actsol.in
Visit website http://www.actsol.in/
Follow on:
LinkedIn Company Page
Facebook Company Page
Lots of free & informative stuff are posted regularly on LinkedIn & Facebook Pages.
Download firm’s Brochure from
Company Brochure
®ACTSol & Associates (Avinash Consulting & Turnkey Solutions & Associates)
Website: www.actsol.in, E – Mail: connect@actsol.in Cell No: +91 94835 11055
Regd Off: Bangalore; Representations: Gulbarga (Admin) Hyderabad, Pune, New Delhi, Nagpur, Kolhapur, Cochin, Ahmedabad, UK (Cambridge), Barcelona (Spain) & South Africa (Johannesburg)
• LinkedIn: http://in.linkedin.com/in/sadashivborgaonkar/
• Twitter: https://twitter.com/sada_borg11
• Facebook: facebook.com/sadashiv.avinash