INTRODUCTON TO PROJECT
STAKEHOLDER MANAGEMENT




     Week 1
Lesson Outcome
   1.1 The needs to manage stakeholder
   1.2 Organizational stakeholder
   1.3 Project stakeholder
   1.4 Some examples of stakeholder influence
   1.5 Some examples of successful stakeholder
        management
Introduction

                           SUCCESSFUL
                         ORGANIZATION /
                            PROJECTS



 Bring project in on time, on             Meet all stakeholder
  budget and satisfying its                  expectations
 objectives for the customers
Stake
   A stake is an interest or a share in an undertaking.
   Example: If a group is planning to go out to dinner
    and a show for the evening, each person in the
    group has a stake, or interest, in the group‟s
    decision. No money is being invested yet but each
    member sees his / her interest (preference, taste,
    priority) in the decision.
   A stake is also a claim.
   A claim is a right to something. A claim is a
    demand for something due or believed to be due.
   Example: Stockholder has an interest in and an
    ownership of a share of a business.
Stakeholder
   Stakeholder is an individual or a group that has one
    or various kinds of stakes in a business.
   Stakeholders may be affected by the actions,
    decision, policies, or practices of the organization.
    Also, these stakeholders also may affect the
    organization‟s actions, decisions, policies, or
    practices.
   Therefore, there is a potential two-way interaction
    or exchange of influence between stakeholders and
    organization.
What is Stakeholder?
   Classic definition (Freeman, 1984):
       “Any group or individual who can affect or is affected
        by the achievement of the organization‟s objectives”
   Freeman, 2004:
       “Those groups who are vital to the         survival
        and success of the           organization”



                                                  R. Edward Freeman
                                                  (December 18, 1951-
                                                  Present)
                                                       Click Here
Stockholders

                The
              General                   Creditors
               Public



   Local                                            Employees
Communities

                            Type of
                         Stakeholders


  Competitors                                       Customers




               Unions                      Suppliers

                        Governments
Example of stakeholders and their
interests
Stakeholders   Examples of interests
               Participate in distribution of profits, election of board of directors,
Stockholders   additional rights as established in the contract with the
               corporation.
Creditors      Credit score, new contracts, liquidity.
Employees      Rates of pay, job security, compensation, respect.
Customers      Value, quality, customer care, ethical products.
               Providers of products and services used in the end product for the
Suppliers
               customer, equitable business opportunities.
Government     Taxation, low unemployment, social welfare.
Trade Unions   Product quality, staff protection.
               Norms established by society and the industry for competitive
Competitors
               conduct.
Community      Jobs, environmental protection, social protection.
The Need to Manage Stakeholder

   Stakeholders are individuals or groups that benefit
    from an organization.
   Stakeholders can affect an organization‟s
    functioning, goals, development and survival.
   They are beneficial when they help you achieve
    your goals and they are antagonistic when they
    oppose your mission.
   Therefore, stakeholders have power to be either a
    threat or a benefit to an organization (Gibson,
    2000).
The Need to Manage Stakeholder

   Their influence can be small or great and can be
    exercised either intentionally or incidentally.
   Individuals and organizations need to be wary of
    their stakeholders and their influences.
   If stakeholders have negative influence on us, why
    should we deal with or bother about them? WHY?
The Need to Manage Stakeholder

   Simply because organizations are depending on
    external stakeholders for resources, services and
    information.
   Stakeholders have claims, rights and expectations
    that ought to be honored and not taken lightly.
   Thus, stakeholders must be managed properly to
    avoid any negative influences, especially those that
    could contrary to the organization‟s objectives.
Organizational Stakeholder




Example of an organization‟s stakeholders (Caroll &Buchholtz, 1999)
   There are 2 steps for analyzing organizational
    stakeholders
    1. Step 1: Identify Stakeholders
       Think of all the people within the organization
         who are impacted by your work, who have
         influence over it, or have a stake in its successful
         completion.
    2. Step 2: Prioritize Stakeholders
       Which stakeholder influence or interest is at the
         highest priority.
   It is important that an organization understands it‟s
    stakeholders, strategies to satisfy all stakeholder‟s
    goal and objectives, along with a prediction of the
    future impact of that stakeholder‟s actions on a
    project‟s outcome.
Project Stakeholders
Project Stakeholders
   Each project has its own unique set of stakeholders.

                              Considering the
                             potential influence
                              of the project‟s
                               stakeholders
                                                      Development of
     Identification of all                         strategies to facilitate
    project stakeholders                           the “management” of
      and their relevant                              the stakeholders
    stakes in the project.                         during the life cycle of
                                                         the project.


                               Successful
                                Project
                              Management
Example
   A    project    managers    who    must    make
    recommendation concerning the design of a new
    plant must be aware of the state and local land
    use, plant design, tax laws and the area’s likely
    pattern of growth.



                   Hmm…Is that all?
                    Are you sure?
    The project manager also must be aware of:
1.    Local political climate.
2.    Availability of a skilled labor force.
3.    Public attitudes towards the location of the plant in
      the community.
    Politics can also have profound impact on the outcome
     of a project.
1.    E.g.: The project manager who neglects the building
      and maintenance of alliances with key political
      stakeholders will soon find indifference or opposition
      to his/her project.
   The success of a project depends on taking into
    account the potential impact of project decisions on
    all stakeholders during the entire life of the project.
Stakeholder Influence
   Stakeholders will manifest the attributes of
    legitimacy and power (Carroll and Buchholts,
    2006).
   Legitimacy - validity of a claim to a stake
   Power - the capacity to induce or persuade the
    actions of others and is displayed when one part in
    a relationship is able to impose its will on the other
    part (Johnson et al.,2005).
Stakeholder Influence
   Power may be displayed through:
    1. Force (coercive power)

    2. Material or financial resources (utilitarian
       power)
    3. Symbolic resources (normative power)
Stakeholder Influence
   Therefore, stakeholders must be managed to avoid
    any of their influences contrary to an organization
    or project objectives.
   An ideal way is to optimize by maximizing the
    benefits from stakeholders while minimizing their
    potential negative impacts.
Example of Stakeholder Influence

    Example 1
   In a 1-million-square-foot addition to the New York
    Hospital, environment, political and social
    challenges existed.
     Over   45 agencies – „stakeholders‟ – Need to be
      satisfied even though no public money was involved in
      the project. Issues such as the highway, the river,
      working space, historical preservation and other issues
      need to be considered.
Example of Successful Stakeholder
Management
    Example 1
   James Webb and his colleagues at NASA practiced
    stakeholder management during the Apollo
    program.
     NASA  gained the support not only from the aerospace
     industry and related constitutions but also from the
     educational community, the basic sciences and weather
     forecast profession.
Example of Successful Stakeholder
Management
    Example 1
   The 12.5 miles, $490 million highway project
    through Glenwood Canyon in Colorado is one of the
    expensive nonurban sections of the interstate
    system.
     Required   more than 10 years to plan and 12 years to
      construct.
     Involved a high degree of cooperation among project
      team, environmentalists and tourists to create a major
      highway that preserved and enhanced the nation's
      premier natural settings.
 Theproject experienced fierce opposition initially,
 countless design changes and physical constraints but a
 remarkable cooperation between all stakeholders
 created a four-lane highway that even
 environmentalists love.




                                                                            NEXT
                              Glenwood Canyon highway (source: wikipedia)
Group Activity
   Gather one example of a successful and one
    example of a failure in the implementation of
    stakeholder management.

   Requirements (due date: 20/9/2012)
    1.   Work in a group of 5
    2.   Explain the background or purpose of the project.
    3.   Why is the project a successful / failure one.
    4.   Groups will be randomly picked to present their
         findings.
    Additional Requirement:
1.    Successful in Implementation (minimum 200 words).
2.    Failure in Implementation (minimum 200 words).
3.    Hard copy – Typed
4.    Presentation slides – Max 6 slides.
END

Contenu connexe

Tendances

Tendances (20)

Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
How to do Stakeholder Analysis
How to do Stakeholder AnalysisHow to do Stakeholder Analysis
How to do Stakeholder Analysis
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
10. Stakeholder Management
10. Stakeholder Management10. Stakeholder Management
10. Stakeholder Management
 
Project stakeholder management
Project stakeholder managementProject stakeholder management
Project stakeholder management
 
Stakeholder Engagement: The art & science of winning the SE snakes and ladder...
Stakeholder Engagement: The art & science of winning the SE snakes and ladder...Stakeholder Engagement: The art & science of winning the SE snakes and ladder...
Stakeholder Engagement: The art & science of winning the SE snakes and ladder...
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholder Engagement vs Stakeholder Management
Stakeholder Engagement vs Stakeholder ManagementStakeholder Engagement vs Stakeholder Management
Stakeholder Engagement vs Stakeholder Management
 
Stakeholder management - a short introduction
Stakeholder management - a short introduction Stakeholder management - a short introduction
Stakeholder management - a short introduction
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5
 
PMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewPMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management Overview
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Stakeholder Mapping
Stakeholder MappingStakeholder Mapping
Stakeholder Mapping
 
Project stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK SixthProject stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK Sixth
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Stage 2.1 Stakeholder Mapping
Stage 2.1 Stakeholder MappingStage 2.1 Stakeholder Mapping
Stage 2.1 Stakeholder Mapping
 

En vedette

Stakeholder Engagement Strategy - EN
Stakeholder Engagement Strategy - ENStakeholder Engagement Strategy - EN
Stakeholder Engagement Strategy - EN
Tania Sharon Gustini
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management
Serdar Temiz
 
Stakeholder theory
Stakeholder theoryStakeholder theory
Stakeholder theory
lwrigh5
 
An Introduction To Stakeholder Theory
An Introduction To Stakeholder TheoryAn Introduction To Stakeholder Theory
An Introduction To Stakeholder Theory
nturnbull
 

En vedette (19)

Project Stakeholder Management [read-only] [compatibility mode]
Project Stakeholder Management [read-only] [compatibility mode]Project Stakeholder Management [read-only] [compatibility mode]
Project Stakeholder Management [read-only] [compatibility mode]
 
Stakeholder Engagement: Avoid It At Your Own Risk
Stakeholder Engagement: Avoid It At Your Own Risk Stakeholder Engagement: Avoid It At Your Own Risk
Stakeholder Engagement: Avoid It At Your Own Risk
 
Stakeholder Engagement Strategy - EN
Stakeholder Engagement Strategy - ENStakeholder Engagement Strategy - EN
Stakeholder Engagement Strategy - EN
 
Stakeholder Engagement & Co-Creation: Reducing Project Risk
Stakeholder Engagement & Co-Creation: Reducing Project RiskStakeholder Engagement & Co-Creation: Reducing Project Risk
Stakeholder Engagement & Co-Creation: Reducing Project Risk
 
Brunswick Future of Stakeholder Engagement Report February 2013
Brunswick Future of Stakeholder Engagement Report February 2013Brunswick Future of Stakeholder Engagement Report February 2013
Brunswick Future of Stakeholder Engagement Report February 2013
 
PMBOK 5th edition Project Stakeholder Management
PMBOK 5th edition Project Stakeholder ManagementPMBOK 5th edition Project Stakeholder Management
PMBOK 5th edition Project Stakeholder Management
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management details
 
Four Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering ValueFour Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering Value
 
Stakeholder theory
Stakeholder theoryStakeholder theory
Stakeholder theory
 
Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder Analysis
 
Pmbok 4th edition chapter 11 - Project Risk Management
Pmbok 4th edition   chapter 11 - Project Risk ManagementPmbok 4th edition   chapter 11 - Project Risk Management
Pmbok 4th edition chapter 11 - Project Risk Management
 
Project Management-Project procurement Management
Project Management-Project procurement ManagementProject Management-Project procurement Management
Project Management-Project procurement Management
 
Project risk management - Methodology and application
Project risk management - Methodology and applicationProject risk management - Methodology and application
Project risk management - Methodology and application
 
An Introduction To Stakeholder Theory
An Introduction To Stakeholder TheoryAn Introduction To Stakeholder Theory
An Introduction To Stakeholder Theory
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5
 
Chap12 project procurement management
Chap12 project procurement managementChap12 project procurement management
Chap12 project procurement management
 
Big-tent UX (UX Camp West 2016)
Big-tent UX (UX Camp West 2016)Big-tent UX (UX Camp West 2016)
Big-tent UX (UX Camp West 2016)
 

Similaire à Chapter 1 -_intro_to_project_stakeholder_management[1]

Include a diagram supported by a detailed discussion explaining whic.pdf
Include a diagram supported by a detailed discussion explaining whic.pdfInclude a diagram supported by a detailed discussion explaining whic.pdf
Include a diagram supported by a detailed discussion explaining whic.pdf
artimagein
 
CH -11 CORPORATE GOVERNANCE AND OTHER STAKEHOLDERS
CH -11 CORPORATE  GOVERNANCE AND  OTHER  STAKEHOLDERSCH -11 CORPORATE  GOVERNANCE AND  OTHER  STAKEHOLDERS
CH -11 CORPORATE GOVERNANCE AND OTHER STAKEHOLDERS
Bibek Prajapati
 
1 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_051 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_05
Mohammadsadegh1365
 
1 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_051 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_05
kbharadwaj811
 
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docxDPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
jacksnathalie
 
Relationship Between Stakeholders And Stakeholders
Relationship Between Stakeholders And StakeholdersRelationship Between Stakeholders And Stakeholders
Relationship Between Stakeholders And Stakeholders
Amanda Reed
 
2.13 stakeholder management 1
2.13  stakeholder management 12.13  stakeholder management 1
2.13 stakeholder management 1
reddvise
 
10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt
ItcHcm1
 
Best_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_ExpectationsBest_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_Expectations
Patricia J. Williams, PMP
 
Stakeholder engagement - online training resource for adaptation
Stakeholder engagement - online training resource for adaptationStakeholder engagement - online training resource for adaptation
Stakeholder engagement - online training resource for adaptation
Vestlandsforsking WRNI
 
STAKEHOLDERS : their role and influence in public policy
STAKEHOLDERS : their role and influence in public policySTAKEHOLDERS : their role and influence in public policy
STAKEHOLDERS : their role and influence in public policy
Deanne Mitzi Somollo
 
The biggest corporation, like the humblest citizen, must be h.docx
The biggest corporation, like the humblest citizen, must be h.docxThe biggest corporation, like the humblest citizen, must be h.docx
The biggest corporation, like the humblest citizen, must be h.docx
mehek4
 

Similaire à Chapter 1 -_intro_to_project_stakeholder_management[1] (20)

Include a diagram supported by a detailed discussion explaining whic.pdf
Include a diagram supported by a detailed discussion explaining whic.pdfInclude a diagram supported by a detailed discussion explaining whic.pdf
Include a diagram supported by a detailed discussion explaining whic.pdf
 
CH -11 CORPORATE GOVERNANCE AND OTHER STAKEHOLDERS
CH -11 CORPORATE  GOVERNANCE AND  OTHER  STAKEHOLDERSCH -11 CORPORATE  GOVERNANCE AND  OTHER  STAKEHOLDERS
CH -11 CORPORATE GOVERNANCE AND OTHER STAKEHOLDERS
 
1 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_051 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_05
 
1 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_051 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_05
 
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docxDPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
 
590769 Software Testing To Be Or Not To Be
590769 Software Testing To Be Or Not To Be590769 Software Testing To Be Or Not To Be
590769 Software Testing To Be Or Not To Be
 
Relationship Between Stakeholders And Stakeholders
Relationship Between Stakeholders And StakeholdersRelationship Between Stakeholders And Stakeholders
Relationship Between Stakeholders And Stakeholders
 
STAKEHOLDER MANAGEMENT IN PROJECTS
STAKEHOLDER MANAGEMENT IN PROJECTSSTAKEHOLDER MANAGEMENT IN PROJECTS
STAKEHOLDER MANAGEMENT IN PROJECTS
 
2.13 stakeholder management 1
2.13  stakeholder management 12.13  stakeholder management 1
2.13 stakeholder management 1
 
10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt
 
Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders
 
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxFinal Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
 
Best_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_ExpectationsBest_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_Expectations
 
Salience Model-Supply Chain Management
Salience Model-Supply Chain ManagementSalience Model-Supply Chain Management
Salience Model-Supply Chain Management
 
Stakeholder engagement - online training resource for adaptation
Stakeholder engagement - online training resource for adaptationStakeholder engagement - online training resource for adaptation
Stakeholder engagement - online training resource for adaptation
 
STAKEHOLDERS : their role and influence in public policy
STAKEHOLDERS : their role and influence in public policySTAKEHOLDERS : their role and influence in public policy
STAKEHOLDERS : their role and influence in public policy
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
The biggest corporation, like the humblest citizen, must be h.docx
The biggest corporation, like the humblest citizen, must be h.docxThe biggest corporation, like the humblest citizen, must be h.docx
The biggest corporation, like the humblest citizen, must be h.docx
 
Project PC Lecture-7 Project Stakeholder Planning.pptx
Project PC Lecture-7   Project Stakeholder Planning.pptxProject PC Lecture-7   Project Stakeholder Planning.pptx
Project PC Lecture-7 Project Stakeholder Planning.pptx
 
STAKEHOLDER-IDENTIFICATION.pptx
STAKEHOLDER-IDENTIFICATION.pptxSTAKEHOLDER-IDENTIFICATION.pptx
STAKEHOLDER-IDENTIFICATION.pptx
 

Plus de Saddan Juhari

Wk 4 technology life cycle
Wk 4   technology life cycleWk 4   technology life cycle
Wk 4 technology life cycle
Saddan Juhari
 
Wk 3 critical factors in managing technology
Wk 3   critical factors in managing technologyWk 3   critical factors in managing technology
Wk 3 critical factors in managing technology
Saddan Juhari
 
Wk 2 role of technology
Wk 2   role of technologyWk 2   role of technology
Wk 2 role of technology
Saddan Juhari
 
Wk 1 technology mgmt.
Wk 1   technology mgmt.Wk 1   technology mgmt.
Wk 1 technology mgmt.
Saddan Juhari
 
Chapter 4 balancing stakeholders
Chapter 4   balancing stakeholdersChapter 4   balancing stakeholders
Chapter 4 balancing stakeholders
Saddan Juhari
 
Chapter 2b project stakeholder management process
Chapter 2b   project stakeholder management processChapter 2b   project stakeholder management process
Chapter 2b project stakeholder management process
Saddan Juhari
 
Chapter 2a project stakeholder management process
Chapter 2a   project stakeholder management processChapter 2a   project stakeholder management process
Chapter 2a project stakeholder management process
Saddan Juhari
 

Plus de Saddan Juhari (9)

Bpp 3213 lecture 2
Bpp 3213 lecture 2Bpp 3213 lecture 2
Bpp 3213 lecture 2
 
Bpp 3213 lecture 1
Bpp 3213 lecture 1Bpp 3213 lecture 1
Bpp 3213 lecture 1
 
Wk 4 technology life cycle
Wk 4   technology life cycleWk 4   technology life cycle
Wk 4 technology life cycle
 
Wk 3 critical factors in managing technology
Wk 3   critical factors in managing technologyWk 3   critical factors in managing technology
Wk 3 critical factors in managing technology
 
Wk 2 role of technology
Wk 2   role of technologyWk 2   role of technology
Wk 2 role of technology
 
Wk 1 technology mgmt.
Wk 1   technology mgmt.Wk 1   technology mgmt.
Wk 1 technology mgmt.
 
Chapter 4 balancing stakeholders
Chapter 4   balancing stakeholdersChapter 4   balancing stakeholders
Chapter 4 balancing stakeholders
 
Chapter 2b project stakeholder management process
Chapter 2b   project stakeholder management processChapter 2b   project stakeholder management process
Chapter 2b project stakeholder management process
 
Chapter 2a project stakeholder management process
Chapter 2a   project stakeholder management processChapter 2a   project stakeholder management process
Chapter 2a project stakeholder management process
 

Chapter 1 -_intro_to_project_stakeholder_management[1]

  • 2. Lesson Outcome  1.1 The needs to manage stakeholder  1.2 Organizational stakeholder  1.3 Project stakeholder  1.4 Some examples of stakeholder influence  1.5 Some examples of successful stakeholder management
  • 3. Introduction SUCCESSFUL ORGANIZATION / PROJECTS Bring project in on time, on Meet all stakeholder budget and satisfying its expectations objectives for the customers
  • 4. Stake  A stake is an interest or a share in an undertaking.  Example: If a group is planning to go out to dinner and a show for the evening, each person in the group has a stake, or interest, in the group‟s decision. No money is being invested yet but each member sees his / her interest (preference, taste, priority) in the decision.
  • 5. A stake is also a claim.  A claim is a right to something. A claim is a demand for something due or believed to be due.  Example: Stockholder has an interest in and an ownership of a share of a business.
  • 6. Stakeholder  Stakeholder is an individual or a group that has one or various kinds of stakes in a business.  Stakeholders may be affected by the actions, decision, policies, or practices of the organization. Also, these stakeholders also may affect the organization‟s actions, decisions, policies, or practices.  Therefore, there is a potential two-way interaction or exchange of influence between stakeholders and organization.
  • 7. What is Stakeholder?  Classic definition (Freeman, 1984):  “Any group or individual who can affect or is affected by the achievement of the organization‟s objectives”  Freeman, 2004:  “Those groups who are vital to the survival and success of the organization” R. Edward Freeman (December 18, 1951- Present) Click Here
  • 8. Stockholders The General Creditors Public Local Employees Communities Type of Stakeholders Competitors Customers Unions Suppliers Governments
  • 9. Example of stakeholders and their interests Stakeholders Examples of interests Participate in distribution of profits, election of board of directors, Stockholders additional rights as established in the contract with the corporation. Creditors Credit score, new contracts, liquidity. Employees Rates of pay, job security, compensation, respect. Customers Value, quality, customer care, ethical products. Providers of products and services used in the end product for the Suppliers customer, equitable business opportunities. Government Taxation, low unemployment, social welfare. Trade Unions Product quality, staff protection. Norms established by society and the industry for competitive Competitors conduct. Community Jobs, environmental protection, social protection.
  • 10. The Need to Manage Stakeholder  Stakeholders are individuals or groups that benefit from an organization.  Stakeholders can affect an organization‟s functioning, goals, development and survival.  They are beneficial when they help you achieve your goals and they are antagonistic when they oppose your mission.  Therefore, stakeholders have power to be either a threat or a benefit to an organization (Gibson, 2000).
  • 11. The Need to Manage Stakeholder  Their influence can be small or great and can be exercised either intentionally or incidentally.  Individuals and organizations need to be wary of their stakeholders and their influences.  If stakeholders have negative influence on us, why should we deal with or bother about them? WHY?
  • 12. The Need to Manage Stakeholder  Simply because organizations are depending on external stakeholders for resources, services and information.  Stakeholders have claims, rights and expectations that ought to be honored and not taken lightly.  Thus, stakeholders must be managed properly to avoid any negative influences, especially those that could contrary to the organization‟s objectives.
  • 13. Organizational Stakeholder Example of an organization‟s stakeholders (Caroll &Buchholtz, 1999)
  • 14. There are 2 steps for analyzing organizational stakeholders 1. Step 1: Identify Stakeholders  Think of all the people within the organization who are impacted by your work, who have influence over it, or have a stake in its successful completion. 2. Step 2: Prioritize Stakeholders  Which stakeholder influence or interest is at the highest priority.
  • 15. It is important that an organization understands it‟s stakeholders, strategies to satisfy all stakeholder‟s goal and objectives, along with a prediction of the future impact of that stakeholder‟s actions on a project‟s outcome.
  • 17. Project Stakeholders  Each project has its own unique set of stakeholders. Considering the potential influence of the project‟s stakeholders Development of Identification of all strategies to facilitate project stakeholders the “management” of and their relevant the stakeholders stakes in the project. during the life cycle of the project. Successful Project Management
  • 18. Example  A project managers who must make recommendation concerning the design of a new plant must be aware of the state and local land use, plant design, tax laws and the area’s likely pattern of growth. Hmm…Is that all? Are you sure?
  • 19. The project manager also must be aware of: 1. Local political climate. 2. Availability of a skilled labor force. 3. Public attitudes towards the location of the plant in the community.  Politics can also have profound impact on the outcome of a project. 1. E.g.: The project manager who neglects the building and maintenance of alliances with key political stakeholders will soon find indifference or opposition to his/her project.
  • 20. The success of a project depends on taking into account the potential impact of project decisions on all stakeholders during the entire life of the project.
  • 21. Stakeholder Influence  Stakeholders will manifest the attributes of legitimacy and power (Carroll and Buchholts, 2006).  Legitimacy - validity of a claim to a stake  Power - the capacity to induce or persuade the actions of others and is displayed when one part in a relationship is able to impose its will on the other part (Johnson et al.,2005).
  • 22. Stakeholder Influence  Power may be displayed through: 1. Force (coercive power) 2. Material or financial resources (utilitarian power) 3. Symbolic resources (normative power)
  • 23. Stakeholder Influence  Therefore, stakeholders must be managed to avoid any of their influences contrary to an organization or project objectives.  An ideal way is to optimize by maximizing the benefits from stakeholders while minimizing their potential negative impacts.
  • 24. Example of Stakeholder Influence Example 1  In a 1-million-square-foot addition to the New York Hospital, environment, political and social challenges existed.  Over 45 agencies – „stakeholders‟ – Need to be satisfied even though no public money was involved in the project. Issues such as the highway, the river, working space, historical preservation and other issues need to be considered.
  • 25. Example of Successful Stakeholder Management Example 1  James Webb and his colleagues at NASA practiced stakeholder management during the Apollo program.  NASA gained the support not only from the aerospace industry and related constitutions but also from the educational community, the basic sciences and weather forecast profession.
  • 26. Example of Successful Stakeholder Management Example 1  The 12.5 miles, $490 million highway project through Glenwood Canyon in Colorado is one of the expensive nonurban sections of the interstate system.  Required more than 10 years to plan and 12 years to construct.  Involved a high degree of cooperation among project team, environmentalists and tourists to create a major highway that preserved and enhanced the nation's premier natural settings.
  • 27.  Theproject experienced fierce opposition initially, countless design changes and physical constraints but a remarkable cooperation between all stakeholders created a four-lane highway that even environmentalists love. NEXT Glenwood Canyon highway (source: wikipedia)
  • 28. Group Activity  Gather one example of a successful and one example of a failure in the implementation of stakeholder management.  Requirements (due date: 20/9/2012) 1. Work in a group of 5 2. Explain the background or purpose of the project. 3. Why is the project a successful / failure one. 4. Groups will be randomly picked to present their findings.
  • 29. Additional Requirement: 1. Successful in Implementation (minimum 200 words). 2. Failure in Implementation (minimum 200 words). 3. Hard copy – Typed 4. Presentation slides – Max 6 slides.
  • 30. END