CAMBRIDGE INTERNATIONAL EXAMINATIONS
Cambridge International Advanced Subsidiary and Advanced Level
MARK SCHEME for the October/November 2014 series
9707 BUSINESS STUDIES
9707/23 Paper 2 (Data Response), maximum raw mark 60
This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of
the examination. It shows the basis on which Examiners were instructed to award marks. It does not
indicate the details of the discussions that took place at an Examiners’ meeting before marking began,
which would have considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner
Report for Teachers.
Cambridge will not enter into discussions about these mark schemes.
Cambridge is publishing the mark schemes for the October/November 2014 series for
most Cambridge IGCSE®
, Cambridge International A and AS Level components and some
Cambridge O Level components.
Page 2 Mark Scheme Syllabus Paper
Cambridge International AS/A Level – October/November 2014 9707 23
© Cambridge International Examinations 2014
1 (a) Explain the following terms:
(i) capital intensive (line 11) [3]
Based on the use of machinery (1) rather than labour (1)
Additional marks likely to come from:
• This is when the production process is largely automated
• Advantages of capital intensity include
- increased efficiency and
- improved quality
- due to a standard product.
Level 2: Good explanation (2/3 marks)
Level 1: Partial explanation/understanding (1 mark)
(ii) balance sheet (line 14). [3]
This is a financial account/accounting statement (1) that shows the net worth of a
business (1).
Additional marks likely to come from:
• It essentially shows the assets and liabilities (and shareholder funds) of a business.
• Can be used to calculate ratios
• Can analyse the performance of a business.
• Used by lenders to determine the risk of lending
• One point in time/snapshot.
Level 2: Good explanation (2/3 marks)
Level 1: Partial explanation/understanding (1 mark)
Page 3 Mark Scheme Syllabus Paper
Cambridge International AS/A Level – October/November 2014 9707 23
© Cambridge International Examinations 2014
(b) (i) Calculate the value of X in Table 2. [3]
NPM = Profit before tax × 100 = $50000 × 100
Revenue $475000
= 10.53% (accept 10.52, 10.5% or 11%)
3 marks – correct answer
2 marks – right method (applies NPM formula but mistake) or no % sign
1 mark – attempt by using appropriate figures/knowledge of formula.
(ii) Using your answer to (b)(i) and Table 2, comment on the trend in CC’s net profit
margin. [3]
• Increased from 8.53% to 9.33% to 10.53%
• Consistent upward trend
• Likely as CC focuses on keeping costs at a minimum
• Economies of scale likely to be part of the reasons (bulk buying)
• Revenue increasing each year but at lower rate than NPM
• Allow correct use of figures in table 1 or table 2
• OFR from Q2bi
Knowledge and application
Level 2
Shows understanding of trends in GPM in context. (2–3 marks)
Level 1
Simple statements in relation to GPM. (1 mark)
Page 4 Mark Scheme Syllabus Paper
Cambridge International AS/A Level – October/November 2014 9707 23
© Cambridge International Examinations 2014
(c) Analyse the factors that the Finance Director should consider when deciding on a
suitable source of finance to purchase the new machines. (8)
Factors likely to come from:
Internal factors such as:
• Affordability
• Working capital
• Increasing profit/retained profit/revenue?
• Money tied up in stock
• 10 year lifetime of machines (long term)
• Ownership and control.
External factors:
• Difficulty in forecasting demand
• Lack of brand awareness of CC (supermarket own brands).
Contextual issues:
• Trends in the profit margin – this is likely persuade a lender to loan funds;
• Working capital positive but declining – how will a lender view this?
• Buy outright or are they interested in hire purchase? How much will they need to
borrow? Can use some of the net profit before tax?
• Length of borrowing period – will they want 10 years to match the life of the machine?
• Rate of interest – will they be able to negotiate a favourable rate?
Knowledge and Application Analysis
Level 2
Shows understanding of the factors
affecting sources of finance in
context. (3–4 marks)
Level 2
Analysis of factors affecting sources
of finance in context of the
business. (3–4 marks)
Level 1
Shows knowledge of sources of
finance. (1–2 marks)
Level 1
Analysis of factors affecting sources
of finance affecting sources of
finance. (1–2 marks)
Page 5 Mark Scheme Syllabus Paper
Cambridge International AS/A Level – October/November 2014 9707 23
© Cambridge International Examinations 2014
(d) Discuss the advantages and disadvantages to CC from introducing
Just in Time (JIT). (10)
Context/issues likely to come from:
Advantages:
• Cut costs of high levels of inventory at the end of the year (will help increase profits/profit
margin further)
• Will help keep costs low which is important as low mark up likely (supermarket and
shops own brand clothes)
• Makes them responsive in the fashion market when trends change quickly – difficulty in
forecasting demand.
Disadvantages:
• Some suppliers located a long way from CC's factory which may lead to having to find
new suppliers (will they be as reliable, what if they are further away?)
• Quality is very important in the industry – would JIT damage supplier quality? Will the
new suppliers have the same quality?
• Possible loss of bulk buying economies of scale – how will this impact on costs and CC’s
ability to be price competitive?
Knowledge and Application Analysis and Evaluation
Level 2
Shows understanding of JIT in
context. (3–4 marks)
Level 2
Evaluation of JIT in context. (3–6
marks)
Level 1
Shows understanding of JIT. (1–2
marks)
Level 1
Analysis of JIT. (1–2 marks)
Only advantages or disadvantages discussed in context, max 3 + 3 = 6
Page 6 Mark Scheme Syllabus Paper
Cambridge International AS/A Level – October/November 2014 9707 23
© Cambridge International Examinations 2014
2 (a) Explain the following terms:
(i) secondary sector (line 1) [3]
Firms that manufacture/process (1)
Additional marks likely to come from:
• This is the sector of industry that takes the raw materials extracted from the primary
sector
• Converts them into finished products ready for retail to the tertiary sector
• Adds values to the raw materials
• Example: manufacturing companies, building firms.
Level 2: Good explanation (2/3 marks)
Level 1: Partial explanation/understanding (1 mark)
(ii) leadership style (line 4). [3]
The way in which managers take decisions (1) and communicate/deal with staff (1)
Additional marks likely to come from:
• There are different styles such as; autocratic, paternalistic, democratic and laissez-
faire
• Development of a particular style
• Examples may be given when a style may be appropriate in a given situation.
Level 2: Good explanation (2/3 marks)
Level 1: Partial explanation/understanding (1 mark)
(b) (i) For Plan B, calculate the margin of safety if James sells the expected level of
tables and chairs. [2]
MoS = Expected Sales – BES
MoS = 1500–1250
MoS= 250 units/250 tables and chairs
2 marks – right answer i.e. 250
1 mark – attempt by using appropriate figures/stating formula
Page 7 Mark Scheme Syllabus Paper
Cambridge International AS/A Level – October/November 2014 9707 23
© Cambridge International Examinations 2014
(ii) Using your answer to (b)(i), briefly explain the importance to FF of the margin of
safety. [4]
Indication of how much production/sales could fall without the business making a loss
Context/Issues:
Importance i.e.
• New product
• No experience of production
• Needs new machinery
• Unsure of sales
• Based on estimates.
Knowledge and application
Level 2
Shows understanding of margin of safety in context. (3–4 marks)
Level 1
Simple statements in relation to margin of safety. (1–2 marks)
(c) Analyse the strengths and weaknesses to FF of being a family business. [8]
Context and strengths:
• Continuity and stability – FF likely to be less volatile as the brother likely to work together
and have high levels of control
• High employee loyalty as shown in FF – paternalistic style has lead to high levels of
training so employees will work hard for FF
• Culture has developed over time – James and brother very committed to FF.
Context and weaknesses:
• Difficult to remove family issues from business issues and the two brothers will find it
very difficult for example to do anything differently
• Family issues may get in the way, for example if they can’t agree on Plan A or Plan B or
a way forward.
Knowledge and Application Analysis
Level 2
Shows understanding of strength
and weakness of FF (which is a
family business). (3–4 marks)
Level 2
Analysis of strength and weakness
of FF (which is a family business).
(3–4 marks)
Level 1
Shows understanding of family
businesses. (1–2 marks)
Level 1
Analysis of family businesses.
(1–2 marks)
Page 8 Mark Scheme Syllabus Paper
Cambridge International AS/A Level – October/November 2014 9707 23
© Cambridge International Examinations 2014
(d) Discuss the human resource problems that could arise if Plan A is chosen. [10]
Context likely to come from:
• Labour turnover may rise and problems that will bring (their expertise and high levels of
training go to competitors)
• Ruin the high level of trust and morale – very difficult for this to be saved
• Employees may not work as hard so quality will suffer
but
• If James communicates well and is honest with the workers they may understand!
• The need for James to be open and honest with employees as Plan A will be very
difficult.
Evaluation likely to come from:
• Main problem and its main impact on FF
• How FF/James should deal with the problems/avoid them becoming bigger problems
Knowledge and Application Analysis and Evaluation
Level 2
Shows understanding of human
resource problems in context.
(3–4 marks)
Level 2
Evaluation of human resource
problems in context. (3–6 marks)
Level 1
Shows knowledge of human
resources. (1–2 marks)
Level 1
Analysis of human resource
problems. (1–2 marks)

Contenu connexe

Tendances (18)

9707 w14 ms_12
9707 w14 ms_129707 w14 ms_12
9707 w14 ms_12
 
9707 s14 ms_33
9707 s14 ms_339707 s14 ms_33
9707 s14 ms_33
 
9707 w14 ms_32
9707 w14 ms_329707 w14 ms_32
9707 w14 ms_32
 
9707 s14 ms_32
9707 s14 ms_329707 s14 ms_32
9707 s14 ms_32
 
9707 w14 qp_12
9707 w14 qp_129707 w14 qp_12
9707 w14 qp_12
 
9707 s14 qp_32
9707 s14 qp_329707 s14 qp_32
9707 s14 qp_32
 
9707 s14 ms_31
9707 s14 ms_319707 s14 ms_31
9707 s14 ms_31
 
9707 w14 ms_31
9707 w14 ms_319707 w14 ms_31
9707 w14 ms_31
 
9707 s14 qp_31
9707 s14 qp_319707 s14 qp_31
9707 s14 qp_31
 
9707 w14 qp_31
9707 w14 qp_319707 w14 qp_31
9707 w14 qp_31
 
Mb0045 financial management
Mb0045  financial managementMb0045  financial management
Mb0045 financial management
 
QUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerQUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 Reviewer
 
9609 s18 ms_32
9609 s18 ms_329609 s18 ms_32
9609 s18 ms_32
 
STRATMA REVIEWER
STRATMA REVIEWERSTRATMA REVIEWER
STRATMA REVIEWER
 
Mgm slim
Mgm   slimMgm   slim
Mgm slim
 
Aqa 2121-accn4-w-ms-june 11
Aqa 2121-accn4-w-ms-june 11Aqa 2121-accn4-w-ms-june 11
Aqa 2121-accn4-w-ms-june 11
 
Aqa 2121-accn3-w-ms-june 11
Aqa 2121-accn3-w-ms-june 11 Aqa 2121-accn3-w-ms-june 11
Aqa 2121-accn3-w-ms-june 11
 
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTSSMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
 

En vedette

ISTE Ignite Rushton Hurley
ISTE Ignite Rushton HurleyISTE Ignite Rushton Hurley
ISTE Ignite Rushton Hurley
Rushton Hurley
 
2 инкубатор волонтерских проектов приложения
2 инкубатор волонтерских проектов приложения2 инкубатор волонтерских проектов приложения
2 инкубатор волонтерских проектов приложения
allapolishchuk
 
Presentation1 voda
Presentation1 vodaPresentation1 voda
Presentation1 voda
ashish1afmi
 

En vedette (20)

Website tips & tricks
Website tips & tricksWebsite tips & tricks
Website tips & tricks
 
El verbo ir - Presentación
El verbo ir - PresentaciónEl verbo ir - Presentación
El verbo ir - Presentación
 
Reading Seriously Rocks
Reading Seriously RocksReading Seriously Rocks
Reading Seriously Rocks
 
Slideshare!
Slideshare!Slideshare!
Slideshare!
 
ISTE Ignite Rushton Hurley
ISTE Ignite Rushton HurleyISTE Ignite Rushton Hurley
ISTE Ignite Rushton Hurley
 
RFXOne - An Innovative Go To Market Approach
RFXOne -  An Innovative Go To Market ApproachRFXOne -  An Innovative Go To Market Approach
RFXOne - An Innovative Go To Market Approach
 
Kyurk story
Kyurk storyKyurk story
Kyurk story
 
ISNGI 2016 - Pitch: "Energy epidemiology in the existing Australia housing st...
ISNGI 2016 - Pitch: "Energy epidemiology in the existing Australia housing st...ISNGI 2016 - Pitch: "Energy epidemiology in the existing Australia housing st...
ISNGI 2016 - Pitch: "Energy epidemiology in the existing Australia housing st...
 
PetaJakarta.org Student Presentation
PetaJakarta.org Student PresentationPetaJakarta.org Student Presentation
PetaJakarta.org Student Presentation
 
2 инкубатор волонтерских проектов приложения
2 инкубатор волонтерских проектов приложения2 инкубатор волонтерских проектов приложения
2 инкубатор волонтерских проектов приложения
 
Smau bologna2012
Smau bologna2012Smau bologna2012
Smau bologna2012
 
SMART PetaJakarta.org: Enabling civic co-management through GeoSocial Intelli...
SMART PetaJakarta.org: Enabling civic co-management through GeoSocial Intelli...SMART PetaJakarta.org: Enabling civic co-management through GeoSocial Intelli...
SMART PetaJakarta.org: Enabling civic co-management through GeoSocial Intelli...
 
Presentation1 voda
Presentation1 vodaPresentation1 voda
Presentation1 voda
 
SMART Seminar Series: Public Infrastructure Investment in the 2000s: Lessons ...
SMART Seminar Series: Public Infrastructure Investment in the 2000s: Lessons ...SMART Seminar Series: Public Infrastructure Investment in the 2000s: Lessons ...
SMART Seminar Series: Public Infrastructure Investment in the 2000s: Lessons ...
 
Collection highlights
Collection highlightsCollection highlights
Collection highlights
 
Onet m6 52 art
Onet m6 52  artOnet m6 52  art
Onet m6 52 art
 
Closed manual
Closed manualClosed manual
Closed manual
 
Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...
Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...
Submission to the NSW Parliamentary Inquiry into the utilisation of rail and ...
 
Pp 5
Pp 5Pp 5
Pp 5
 
SMART International Symposium for Next Generation Infrastructure: How do we e...
SMART International Symposium for Next Generation Infrastructure: How do we e...SMART International Symposium for Next Generation Infrastructure: How do we e...
SMART International Symposium for Next Generation Infrastructure: How do we e...
 

Similaire à 9707 w14 ms_23

WEEK 5 PROBLEM SET Due week 5 and worth 200 points. Yo.docx
WEEK 5 PROBLEM SET Due week 5 and worth 200 points.   Yo.docxWEEK 5 PROBLEM SET Due week 5 and worth 200 points.   Yo.docx
WEEK 5 PROBLEM SET Due week 5 and worth 200 points. Yo.docx
cockekeshia
 
Mk0010 sales, distribution and supply chain management
Mk0010  sales, distribution and supply chain managementMk0010  sales, distribution and supply chain management
Mk0010 sales, distribution and supply chain management
smumbahelp
 

Similaire à 9707 w14 ms_23 (18)

9707 s14 ms_22
9707 s14 ms_229707 s14 ms_22
9707 s14 ms_22
 
9707 w14 ms_33
9707 w14 ms_339707 w14 ms_33
9707 w14 ms_33
 
9707 s14 ms_23
9707 s14 ms_239707 s14 ms_23
9707 s14 ms_23
 
9707 s14 ms_21
9707 s14 ms_219707 s14 ms_21
9707 s14 ms_21
 
0450_s13_ms_11.pdf
0450_s13_ms_11.pdf0450_s13_ms_11.pdf
0450_s13_ms_11.pdf
 
9707 w14 ms_11
9707 w14 ms_119707 w14 ms_11
9707 w14 ms_11
 
WEEK 5 PROBLEM SET Due week 5 and worth 200 points. Yo.docx
WEEK 5 PROBLEM SET Due week 5 and worth 200 points.   Yo.docxWEEK 5 PROBLEM SET Due week 5 and worth 200 points.   Yo.docx
WEEK 5 PROBLEM SET Due week 5 and worth 200 points. Yo.docx
 
CMA (Certified Management Accountant)
CMA (Certified Management Accountant) CMA (Certified Management Accountant)
CMA (Certified Management Accountant)
 
9707 s14 ms_31
9707 s14 ms_319707 s14 ms_31
9707 s14 ms_31
 
9707 s14 ms_13
9707 s14 ms_139707 s14 ms_13
9707 s14 ms_13
 
9707 s14 ms_13
9707 s14 ms_139707 s14 ms_13
9707 s14 ms_13
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
Smu mba sem 2 spring 2017 assignments
Smu mba sem 2 spring 2017 assignmentsSmu mba sem 2 spring 2017 assignments
Smu mba sem 2 spring 2017 assignments
 
Om0018– technology management
Om0018– technology managementOm0018– technology management
Om0018– technology management
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations management
 
Smu mba sem 2 summer 2017 assignments
Smu mba sem 2 summer 2017 assignmentsSmu mba sem 2 summer 2017 assignments
Smu mba sem 2 summer 2017 assignments
 
IGNOU MBA SOLVED ASSIGNMENTS 2019
IGNOU MBA SOLVED ASSIGNMENTS 2019IGNOU MBA SOLVED ASSIGNMENTS 2019
IGNOU MBA SOLVED ASSIGNMENTS 2019
 
Mk0010 sales, distribution and supply chain management
Mk0010  sales, distribution and supply chain managementMk0010  sales, distribution and supply chain management
Mk0010 sales, distribution and supply chain management
 

Plus de Saadia Riaz

Plus de Saadia Riaz (20)

Guide to-writing-health-and-safety-documents
Guide to-writing-health-and-safety-documents Guide to-writing-health-and-safety-documents
Guide to-writing-health-and-safety-documents
 
9707 y10 sw_6_al
9707 y10 sw_6_al9707 y10 sw_6_al
9707 y10 sw_6_al
 
9707 y10 sw_5_as
9707 y10 sw_5_as9707 y10 sw_5_as
9707 y10 sw_5_as
 
9707 y10 sw_5_al
9707 y10 sw_5_al9707 y10 sw_5_al
9707 y10 sw_5_al
 
9707 y10 sw_4_as
9707 y10 sw_4_as9707 y10 sw_4_as
9707 y10 sw_4_as
 
9707 y10 sw_4_al
9707 y10 sw_4_al9707 y10 sw_4_al
9707 y10 sw_4_al
 
9707 y10 sw_3_al
9707 y10 sw_3_al9707 y10 sw_3_al
9707 y10 sw_3_al
 
9707 y10 sw_3_as
9707 y10 sw_3_as9707 y10 sw_3_as
9707 y10 sw_3_as
 
9707 y10 sw_2_al
9707 y10 sw_2_al9707 y10 sw_2_al
9707 y10 sw_2_al
 
9707 y10 sw_1_al
9707 y10 sw_1_al9707 y10 sw_1_al
9707 y10 sw_1_al
 
9707 y10 sw_1_as
9707 y10 sw_1_as9707 y10 sw_1_as
9707 y10 sw_1_as
 
9707 w14 qp_33
9707 w14 qp_339707 w14 qp_33
9707 w14 qp_33
 
9707 w14 qp_32
9707 w14 qp_329707 w14 qp_32
9707 w14 qp_32
 
9707 w14 qp_32 (1)
9707 w14 qp_32 (1)9707 w14 qp_32 (1)
9707 w14 qp_32 (1)
 
9707 w14 qp_23
9707 w14 qp_239707 w14 qp_23
9707 w14 qp_23
 
9707 w14 qp_22
9707 w14 qp_229707 w14 qp_22
9707 w14 qp_22
 
9707 w14 qp_13
9707 w14 qp_139707 w14 qp_13
9707 w14 qp_13
 
9707 w14 qp_11
9707 w14 qp_119707 w14 qp_11
9707 w14 qp_11
 
9707 w14 ms_13
9707 w14 ms_139707 w14 ms_13
9707 w14 ms_13
 
9707 s14 qp_33
9707 s14 qp_339707 s14 qp_33
9707 s14 qp_33
 

9707 w14 ms_23

  • 1. ® IGCSE is the registered trademark of Cambridge International Examinations. CAMBRIDGE INTERNATIONAL EXAMINATIONS Cambridge International Advanced Subsidiary and Advanced Level MARK SCHEME for the October/November 2014 series 9707 BUSINESS STUDIES 9707/23 Paper 2 (Data Response), maximum raw mark 60 This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the details of the discussions that took place at an Examiners’ meeting before marking began, which would have considered the acceptability of alternative answers. Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for Teachers. Cambridge will not enter into discussions about these mark schemes. Cambridge is publishing the mark schemes for the October/November 2014 series for most Cambridge IGCSE® , Cambridge International A and AS Level components and some Cambridge O Level components.
  • 2. Page 2 Mark Scheme Syllabus Paper Cambridge International AS/A Level – October/November 2014 9707 23 © Cambridge International Examinations 2014 1 (a) Explain the following terms: (i) capital intensive (line 11) [3] Based on the use of machinery (1) rather than labour (1) Additional marks likely to come from: • This is when the production process is largely automated • Advantages of capital intensity include - increased efficiency and - improved quality - due to a standard product. Level 2: Good explanation (2/3 marks) Level 1: Partial explanation/understanding (1 mark) (ii) balance sheet (line 14). [3] This is a financial account/accounting statement (1) that shows the net worth of a business (1). Additional marks likely to come from: • It essentially shows the assets and liabilities (and shareholder funds) of a business. • Can be used to calculate ratios • Can analyse the performance of a business. • Used by lenders to determine the risk of lending • One point in time/snapshot. Level 2: Good explanation (2/3 marks) Level 1: Partial explanation/understanding (1 mark)
  • 3. Page 3 Mark Scheme Syllabus Paper Cambridge International AS/A Level – October/November 2014 9707 23 © Cambridge International Examinations 2014 (b) (i) Calculate the value of X in Table 2. [3] NPM = Profit before tax × 100 = $50000 × 100 Revenue $475000 = 10.53% (accept 10.52, 10.5% or 11%) 3 marks – correct answer 2 marks – right method (applies NPM formula but mistake) or no % sign 1 mark – attempt by using appropriate figures/knowledge of formula. (ii) Using your answer to (b)(i) and Table 2, comment on the trend in CC’s net profit margin. [3] • Increased from 8.53% to 9.33% to 10.53% • Consistent upward trend • Likely as CC focuses on keeping costs at a minimum • Economies of scale likely to be part of the reasons (bulk buying) • Revenue increasing each year but at lower rate than NPM • Allow correct use of figures in table 1 or table 2 • OFR from Q2bi Knowledge and application Level 2 Shows understanding of trends in GPM in context. (2–3 marks) Level 1 Simple statements in relation to GPM. (1 mark)
  • 4. Page 4 Mark Scheme Syllabus Paper Cambridge International AS/A Level – October/November 2014 9707 23 © Cambridge International Examinations 2014 (c) Analyse the factors that the Finance Director should consider when deciding on a suitable source of finance to purchase the new machines. (8) Factors likely to come from: Internal factors such as: • Affordability • Working capital • Increasing profit/retained profit/revenue? • Money tied up in stock • 10 year lifetime of machines (long term) • Ownership and control. External factors: • Difficulty in forecasting demand • Lack of brand awareness of CC (supermarket own brands). Contextual issues: • Trends in the profit margin – this is likely persuade a lender to loan funds; • Working capital positive but declining – how will a lender view this? • Buy outright or are they interested in hire purchase? How much will they need to borrow? Can use some of the net profit before tax? • Length of borrowing period – will they want 10 years to match the life of the machine? • Rate of interest – will they be able to negotiate a favourable rate? Knowledge and Application Analysis Level 2 Shows understanding of the factors affecting sources of finance in context. (3–4 marks) Level 2 Analysis of factors affecting sources of finance in context of the business. (3–4 marks) Level 1 Shows knowledge of sources of finance. (1–2 marks) Level 1 Analysis of factors affecting sources of finance affecting sources of finance. (1–2 marks)
  • 5. Page 5 Mark Scheme Syllabus Paper Cambridge International AS/A Level – October/November 2014 9707 23 © Cambridge International Examinations 2014 (d) Discuss the advantages and disadvantages to CC from introducing Just in Time (JIT). (10) Context/issues likely to come from: Advantages: • Cut costs of high levels of inventory at the end of the year (will help increase profits/profit margin further) • Will help keep costs low which is important as low mark up likely (supermarket and shops own brand clothes) • Makes them responsive in the fashion market when trends change quickly – difficulty in forecasting demand. Disadvantages: • Some suppliers located a long way from CC's factory which may lead to having to find new suppliers (will they be as reliable, what if they are further away?) • Quality is very important in the industry – would JIT damage supplier quality? Will the new suppliers have the same quality? • Possible loss of bulk buying economies of scale – how will this impact on costs and CC’s ability to be price competitive? Knowledge and Application Analysis and Evaluation Level 2 Shows understanding of JIT in context. (3–4 marks) Level 2 Evaluation of JIT in context. (3–6 marks) Level 1 Shows understanding of JIT. (1–2 marks) Level 1 Analysis of JIT. (1–2 marks) Only advantages or disadvantages discussed in context, max 3 + 3 = 6
  • 6. Page 6 Mark Scheme Syllabus Paper Cambridge International AS/A Level – October/November 2014 9707 23 © Cambridge International Examinations 2014 2 (a) Explain the following terms: (i) secondary sector (line 1) [3] Firms that manufacture/process (1) Additional marks likely to come from: • This is the sector of industry that takes the raw materials extracted from the primary sector • Converts them into finished products ready for retail to the tertiary sector • Adds values to the raw materials • Example: manufacturing companies, building firms. Level 2: Good explanation (2/3 marks) Level 1: Partial explanation/understanding (1 mark) (ii) leadership style (line 4). [3] The way in which managers take decisions (1) and communicate/deal with staff (1) Additional marks likely to come from: • There are different styles such as; autocratic, paternalistic, democratic and laissez- faire • Development of a particular style • Examples may be given when a style may be appropriate in a given situation. Level 2: Good explanation (2/3 marks) Level 1: Partial explanation/understanding (1 mark) (b) (i) For Plan B, calculate the margin of safety if James sells the expected level of tables and chairs. [2] MoS = Expected Sales – BES MoS = 1500–1250 MoS= 250 units/250 tables and chairs 2 marks – right answer i.e. 250 1 mark – attempt by using appropriate figures/stating formula
  • 7. Page 7 Mark Scheme Syllabus Paper Cambridge International AS/A Level – October/November 2014 9707 23 © Cambridge International Examinations 2014 (ii) Using your answer to (b)(i), briefly explain the importance to FF of the margin of safety. [4] Indication of how much production/sales could fall without the business making a loss Context/Issues: Importance i.e. • New product • No experience of production • Needs new machinery • Unsure of sales • Based on estimates. Knowledge and application Level 2 Shows understanding of margin of safety in context. (3–4 marks) Level 1 Simple statements in relation to margin of safety. (1–2 marks) (c) Analyse the strengths and weaknesses to FF of being a family business. [8] Context and strengths: • Continuity and stability – FF likely to be less volatile as the brother likely to work together and have high levels of control • High employee loyalty as shown in FF – paternalistic style has lead to high levels of training so employees will work hard for FF • Culture has developed over time – James and brother very committed to FF. Context and weaknesses: • Difficult to remove family issues from business issues and the two brothers will find it very difficult for example to do anything differently • Family issues may get in the way, for example if they can’t agree on Plan A or Plan B or a way forward. Knowledge and Application Analysis Level 2 Shows understanding of strength and weakness of FF (which is a family business). (3–4 marks) Level 2 Analysis of strength and weakness of FF (which is a family business). (3–4 marks) Level 1 Shows understanding of family businesses. (1–2 marks) Level 1 Analysis of family businesses. (1–2 marks)
  • 8. Page 8 Mark Scheme Syllabus Paper Cambridge International AS/A Level – October/November 2014 9707 23 © Cambridge International Examinations 2014 (d) Discuss the human resource problems that could arise if Plan A is chosen. [10] Context likely to come from: • Labour turnover may rise and problems that will bring (their expertise and high levels of training go to competitors) • Ruin the high level of trust and morale – very difficult for this to be saved • Employees may not work as hard so quality will suffer but • If James communicates well and is honest with the workers they may understand! • The need for James to be open and honest with employees as Plan A will be very difficult. Evaluation likely to come from: • Main problem and its main impact on FF • How FF/James should deal with the problems/avoid them becoming bigger problems Knowledge and Application Analysis and Evaluation Level 2 Shows understanding of human resource problems in context. (3–4 marks) Level 2 Evaluation of human resource problems in context. (3–6 marks) Level 1 Shows knowledge of human resources. (1–2 marks) Level 1 Analysis of human resource problems. (1–2 marks)