SlideShare une entreprise Scribd logo
1  sur  22
STLC AND V-MODEL DESIGNED BY : SALIL KISHORE PUBLISHED ON : 16 DEC 2009  BRIEF DESCCRIPTION WITH FLOW DIAGRAM
[object Object]
INTRODUCTION ,[object Object],[object Object]
STLC CYCLE ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
FLOW DIAGRAM TEST PLANNING FINAL TESTING & IMPLEMENTATION TESTING CYCLES CONSTRUCTION & VERIFICATION TEST DESIGN TEST ANALYSIS POST IMPLEMENTATION E S S – Start E - End
This is the phase where Project Manager has to decide what things need to be tested, do I have the appropriate budget etc. Naturally proper planning at this stage would greatly reduce the risk of low quality software. This planning will be an ongoing process with no end point. Activities at this stage would include preparation of high level test plan-(according to IEEE test plan template The Software Test Plan (STP) is designed to prescribe the scope, approach, resources, and schedule of all testing activities. The plan must identify the items to be tested, the features to be tested, the types of testing to be performed, the personnel responsible for testing, the resources and schedule required to complete testing, and the risks associated with the plan.). Almost all of the activities done during this stage are included in this software test plan and revolve around a test plan.   Test Planning
Once test plan is made and decided upon, next step is to delve little more into the project and decide what types of testing should be carried out at different stages of SDLC, do we need or plan to automate, if yes then when the appropriate time to automate is, what type of specific documentation I need for testing. Proper and regular meetings should be held between testing teams, project managers, development teams, Business Analysts to check the progress of things which will give a fair idea of the movement of the project and ensure the completeness of the test plan created in the planning phase, which will further help in enhancing the right testing strategy created earlier. We will start creating test case formats and test cases itself. In this stage we need to develop Functional validation matrix based on Business Requirements to ensure that all system requirements are covered by one or more test cases, identify which test cases to automate, begin review of documentation, i.e. Functional Design, Business Requirements, Product Specifications, Product Externals etc. We also have to define areas for Stress and Performance testing. Test Analysis
Test plans and cases which were developed in the analysis phase are revised. Functional validation matrix is also revised and finalized. In this stage risk assessment criteria is developed. If you have thought of automation then you have to select which test cases to automate and begin writing scripts for them. Test data is prepared. Standards for unit testing and pass / fail criteria are defined here. Schedule for testing is revised (if necessary) & finalized and test environment is prepared. Test design
In this phase we have to complete all the test plans, test cases, complete the scripting of the automated test cases, Stress and Performance testing plans needs to be completed. We have to support the development team in their unit testing phase. And obviously bug reporting would be done as when the bugs are found. Integration tests are performed and errors (if any) are reported. Construction and verification
In this phase we have to complete testing cycles until test cases are executed without errors or a predefined condition is reached. Run test cases --> Report Bugs --> revise test cases (if needed) --> add new test cases (if needed) --> bug fixing --> retesting (test cycle 2, test cycle 3….).  Testing cycles
In this we have to execute remaining stress and performance test cases, documentation for testing is completed / updated, provide and complete different matrices for testing. Acceptance, load and recovery testing will also be conducted and the application needs to be verified under production conditions. Final testing and implementation
In this phase, the testing process is evaluated and lessons learnt from that testing process are documented. Line of attack to prevent similar problems in future projects is identified. Create plans to improve the processes. The recording of new errors and enhancements is an ongoing process. Cleaning up of test environment is done and test machines are restored to base lines in this stage Post implementation
ACTIVITIES AND outcome Plan for improvement of testing process Evaluate testing processes Post implementation Test results and different metrics on test efforts execute remaining stress and performance tests, complete documentation  Final testing Test results, Bug Reports complete testing cycles Testing cycles test procedures/Scripts, Drivers, test results, Bug reports. scripting of test cases to automate, Construction   revised test cases, test data sets, sets, risk assessment sheet test cases are revised; select which test cases to automate  Design    Revised Test Plan, Functional validation matrix, test cases Create detailed test plan, Functional Validation Matrix, test cases Analysis   Test plan, Refined Specification Create high level test plan Planning Outcome Activities Phase Software Testing Life Cycle
[object Object]
[object Object],[object Object],[object Object],[object Object],OVERVIEW
The V-model is a software development model which can be presumed to be the extension of the waterfall model. Instead of moving down in a linear way, the process steps are bent upwards after the coding phase, to form the typical V shape. The V-Model demonstrates the relationships between each phase of the development life cycle and its associated phase of testing.  ABOUT V-MODEL
V-model diagram
[object Object]
In this phase, the requirements of the proposed system are collected by analyzing the needs of the user(s).  phase is concerned about establishing what the ideal system has to perform. However, it does not determine how the software will be designed or built. Usually, the users are interviewed and a document called the user requirements document is generated. The user requirements document will typically describe the systems functional, physical, interface,  performance , data, security requirements etc as expected by the user. It is one which the business analysts use to communicate their understanding of the system back to the users. The users carefully review this document as this document would serve as the guideline for the system designers in the system design phase. The user acceptance tests are designed in this phase.  Requirement analysis
System engineers analyze and understand the  business  of the proposed system by studying the user requirements document. They figure out possibilities and techniques by which the user requirements can be implemented. If any of the requirements are not feasible, the user is informed of the issue. A resolution is found and the user requirement document is edited accordingly. The software specification document which serves as a blueprint for the development phase is generated. This document contains the general system organization, menu structures, data structures etc. It may also hold example business scenarios, sample windows, reports for the better understanding. Other technical documentation like entity diagrams, data dictionary will also be produced in this phase. The documents for system testing is prepared in this phase. System design
This phase can also be called as high-level design. The baseline in selecting the architecture is that it should realize all which typically consists of the list of modules, brief functionality of each module, their interface relationships, dependencies, database tables, architecture diagrams, technology details etc. The integration testing design is carried out in this phase. Architecture design
This phase can also be called as low-level design. The designed system is broken up in to smaller units or modules and each of them is explained so that the programmer can start coding directly. The low level design document or program specifications will contain a detailed functional logic of the module, in pseudocode - database tables, with all elements, including their type and size - all interface details with complete API references- all dependency issues- error message listings- complete input and outputs for a module. The unit test design is developed in this stage. Module design

Contenu connexe

Tendances

System models of sdlc- v model
System models of sdlc- v modelSystem models of sdlc- v model
System models of sdlc- v model
Minal Kashyap
 
SDLC Model (Waterfall,Iterative Waterfall,Spiral)
SDLC Model (Waterfall,Iterative Waterfall,Spiral)SDLC Model (Waterfall,Iterative Waterfall,Spiral)
SDLC Model (Waterfall,Iterative Waterfall,Spiral)
Shaikh Kamrul Islam (Konok kamrul)
 
Prototype model and process
Prototype model  and processPrototype model  and process
Prototype model and process
Danish Musthafa
 

Tendances (20)

System models of sdlc- v model
System models of sdlc- v modelSystem models of sdlc- v model
System models of sdlc- v model
 
Spiral model
Spiral modelSpiral model
Spiral model
 
Notes on agile
Notes on agileNotes on agile
Notes on agile
 
waterfall model
waterfall modelwaterfall model
waterfall model
 
SDLC Model (Waterfall,Iterative Waterfall,Spiral)
SDLC Model (Waterfall,Iterative Waterfall,Spiral)SDLC Model (Waterfall,Iterative Waterfall,Spiral)
SDLC Model (Waterfall,Iterative Waterfall,Spiral)
 
Spiral model : System analysis and design
Spiral model : System analysis and designSpiral model : System analysis and design
Spiral model : System analysis and design
 
Prototype Model
Prototype ModelPrototype Model
Prototype Model
 
Vmodel
VmodelVmodel
Vmodel
 
Prototype model and process
Prototype model  and processPrototype model  and process
Prototype model and process
 
An Overview of User Acceptance Testing (UAT)
An Overview of User Acceptance Testing (UAT)An Overview of User Acceptance Testing (UAT)
An Overview of User Acceptance Testing (UAT)
 
Waterfall model
Waterfall modelWaterfall model
Waterfall model
 
Tiara Ramadhani - Program Studi S1 Sistem Informasi - Fakultas Sains dan Tekn...
Tiara Ramadhani - Program Studi S1 Sistem Informasi - Fakultas Sains dan Tekn...Tiara Ramadhani - Program Studi S1 Sistem Informasi - Fakultas Sains dan Tekn...
Tiara Ramadhani - Program Studi S1 Sistem Informasi - Fakultas Sains dan Tekn...
 
Comparison of waterfall model and prototype model
Comparison of waterfall model and prototype modelComparison of waterfall model and prototype model
Comparison of waterfall model and prototype model
 
TESTING IMPLEMENTATION SYSTEM
TESTING IMPLEMENTATION SYSTEMTESTING IMPLEMENTATION SYSTEM
TESTING IMPLEMENTATION SYSTEM
 
PROTOTYPE MODEL
PROTOTYPE MODELPROTOTYPE MODEL
PROTOTYPE MODEL
 
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
 
Rad model
Rad modelRad model
Rad model
 
Session 07 - Estimation Technique
Session 07 - Estimation TechniqueSession 07 - Estimation Technique
Session 07 - Estimation Technique
 
Waterfall model and spiral model
Waterfall model and spiral modelWaterfall model and spiral model
Waterfall model and spiral model
 
STLC (Software Testing Life Cycle)
STLC (Software Testing Life Cycle)STLC (Software Testing Life Cycle)
STLC (Software Testing Life Cycle)
 

En vedette (13)

V model Over View (Software Engineering)
V model Over View (Software Engineering) V model Over View (Software Engineering)
V model Over View (Software Engineering)
 
Presentation V Model
Presentation V ModelPresentation V Model
Presentation V Model
 
V model in SDLC
V model in SDLCV model in SDLC
V model in SDLC
 
Spiral model
Spiral modelSpiral model
Spiral model
 
Software Testing Life Cycle
Software Testing Life CycleSoftware Testing Life Cycle
Software Testing Life Cycle
 
PROTOTYPING
PROTOTYPINGPROTOTYPING
PROTOTYPING
 
Spiral model explanation
Spiral model  explanationSpiral model  explanation
Spiral model explanation
 
Spiral model presentation
Spiral model presentationSpiral model presentation
Spiral model presentation
 
Prototype model
Prototype modelPrototype model
Prototype model
 
Waterfall model ppt final
Waterfall model ppt  finalWaterfall model ppt  final
Waterfall model ppt final
 
Software testing life cycle
Software testing life cycleSoftware testing life cycle
Software testing life cycle
 
Prototype model
Prototype modelPrototype model
Prototype model
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similaire à Stlc&Vmodel Ppt

Mi0033 software engineering
Mi0033  software engineeringMi0033  software engineering
Mi0033 software engineering
smumbahelp
 
Chapter-2 ppt for the MBA 4rh seme6y.pdf
Chapter-2 ppt for the MBA 4rh seme6y.pdfChapter-2 ppt for the MBA 4rh seme6y.pdf
Chapter-2 ppt for the MBA 4rh seme6y.pdf
VikasRai405977
 

Similaire à Stlc&Vmodel Ppt (20)

Stlc ppt
Stlc pptStlc ppt
Stlc ppt
 
QACampus PPT (STLC)
QACampus PPT (STLC)QACampus PPT (STLC)
QACampus PPT (STLC)
 
Quality Assurance Process
Quality Assurance ProcessQuality Assurance Process
Quality Assurance Process
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
 
SYSTEM DEVELOPMENT LIFE CYCLE
SYSTEM DEVELOPMENT LIFE CYCLESYSTEM DEVELOPMENT LIFE CYCLE
SYSTEM DEVELOPMENT LIFE CYCLE
 
Mi0033 software engineering
Mi0033  software engineeringMi0033  software engineering
Mi0033 software engineering
 
Software Testing Life Cycle – A Beginner’s Guide
Software Testing Life Cycle – A Beginner’s GuideSoftware Testing Life Cycle – A Beginner’s Guide
Software Testing Life Cycle – A Beginner’s Guide
 
STLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxSTLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptx
 
4 sdlc and stlc
4 sdlc and stlc4 sdlc and stlc
4 sdlc and stlc
 
Stlc phases.
Stlc phases.Stlc phases.
Stlc phases.
 
Softwareenggineering lab manual
Softwareenggineering lab manualSoftwareenggineering lab manual
Softwareenggineering lab manual
 
Some Commonly Asked Question For Software Testing
Some Commonly Asked Question For Software TestingSome Commonly Asked Question For Software Testing
Some Commonly Asked Question For Software Testing
 
Qa analyst training
Qa analyst training Qa analyst training
Qa analyst training
 
Software_Build__Release___UAT_Phases (1).PDF
Software_Build__Release___UAT_Phases (1).PDFSoftware_Build__Release___UAT_Phases (1).PDF
Software_Build__Release___UAT_Phases (1).PDF
 
stlc
stlcstlc
stlc
 
Best SQA Document.pdf
Best SQA Document.pdfBest SQA Document.pdf
Best SQA Document.pdf
 
SDET UNIT 3.pptx
SDET UNIT 3.pptxSDET UNIT 3.pptx
SDET UNIT 3.pptx
 
Software testing & Quality Assurance
Software testing & Quality Assurance Software testing & Quality Assurance
Software testing & Quality Assurance
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )
 
Chapter-2 ppt for the MBA 4rh seme6y.pdf
Chapter-2 ppt for the MBA 4rh seme6y.pdfChapter-2 ppt for the MBA 4rh seme6y.pdf
Chapter-2 ppt for the MBA 4rh seme6y.pdf
 

Dernier

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Dernier (20)

Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 

Stlc&Vmodel Ppt

  • 1. STLC AND V-MODEL DESIGNED BY : SALIL KISHORE PUBLISHED ON : 16 DEC 2009 BRIEF DESCCRIPTION WITH FLOW DIAGRAM
  • 2.
  • 3.
  • 4.
  • 5. FLOW DIAGRAM TEST PLANNING FINAL TESTING & IMPLEMENTATION TESTING CYCLES CONSTRUCTION & VERIFICATION TEST DESIGN TEST ANALYSIS POST IMPLEMENTATION E S S – Start E - End
  • 6. This is the phase where Project Manager has to decide what things need to be tested, do I have the appropriate budget etc. Naturally proper planning at this stage would greatly reduce the risk of low quality software. This planning will be an ongoing process with no end point. Activities at this stage would include preparation of high level test plan-(according to IEEE test plan template The Software Test Plan (STP) is designed to prescribe the scope, approach, resources, and schedule of all testing activities. The plan must identify the items to be tested, the features to be tested, the types of testing to be performed, the personnel responsible for testing, the resources and schedule required to complete testing, and the risks associated with the plan.). Almost all of the activities done during this stage are included in this software test plan and revolve around a test plan. Test Planning
  • 7. Once test plan is made and decided upon, next step is to delve little more into the project and decide what types of testing should be carried out at different stages of SDLC, do we need or plan to automate, if yes then when the appropriate time to automate is, what type of specific documentation I need for testing. Proper and regular meetings should be held between testing teams, project managers, development teams, Business Analysts to check the progress of things which will give a fair idea of the movement of the project and ensure the completeness of the test plan created in the planning phase, which will further help in enhancing the right testing strategy created earlier. We will start creating test case formats and test cases itself. In this stage we need to develop Functional validation matrix based on Business Requirements to ensure that all system requirements are covered by one or more test cases, identify which test cases to automate, begin review of documentation, i.e. Functional Design, Business Requirements, Product Specifications, Product Externals etc. We also have to define areas for Stress and Performance testing. Test Analysis
  • 8. Test plans and cases which were developed in the analysis phase are revised. Functional validation matrix is also revised and finalized. In this stage risk assessment criteria is developed. If you have thought of automation then you have to select which test cases to automate and begin writing scripts for them. Test data is prepared. Standards for unit testing and pass / fail criteria are defined here. Schedule for testing is revised (if necessary) & finalized and test environment is prepared. Test design
  • 9. In this phase we have to complete all the test plans, test cases, complete the scripting of the automated test cases, Stress and Performance testing plans needs to be completed. We have to support the development team in their unit testing phase. And obviously bug reporting would be done as when the bugs are found. Integration tests are performed and errors (if any) are reported. Construction and verification
  • 10. In this phase we have to complete testing cycles until test cases are executed without errors or a predefined condition is reached. Run test cases --> Report Bugs --> revise test cases (if needed) --> add new test cases (if needed) --> bug fixing --> retesting (test cycle 2, test cycle 3….). Testing cycles
  • 11. In this we have to execute remaining stress and performance test cases, documentation for testing is completed / updated, provide and complete different matrices for testing. Acceptance, load and recovery testing will also be conducted and the application needs to be verified under production conditions. Final testing and implementation
  • 12. In this phase, the testing process is evaluated and lessons learnt from that testing process are documented. Line of attack to prevent similar problems in future projects is identified. Create plans to improve the processes. The recording of new errors and enhancements is an ongoing process. Cleaning up of test environment is done and test machines are restored to base lines in this stage Post implementation
  • 13. ACTIVITIES AND outcome Plan for improvement of testing process Evaluate testing processes Post implementation Test results and different metrics on test efforts execute remaining stress and performance tests, complete documentation Final testing Test results, Bug Reports complete testing cycles Testing cycles test procedures/Scripts, Drivers, test results, Bug reports. scripting of test cases to automate, Construction   revised test cases, test data sets, sets, risk assessment sheet test cases are revised; select which test cases to automate Design   Revised Test Plan, Functional validation matrix, test cases Create detailed test plan, Functional Validation Matrix, test cases Analysis   Test plan, Refined Specification Create high level test plan Planning Outcome Activities Phase Software Testing Life Cycle
  • 14.
  • 15.
  • 16. The V-model is a software development model which can be presumed to be the extension of the waterfall model. Instead of moving down in a linear way, the process steps are bent upwards after the coding phase, to form the typical V shape. The V-Model demonstrates the relationships between each phase of the development life cycle and its associated phase of testing. ABOUT V-MODEL
  • 18.
  • 19. In this phase, the requirements of the proposed system are collected by analyzing the needs of the user(s). phase is concerned about establishing what the ideal system has to perform. However, it does not determine how the software will be designed or built. Usually, the users are interviewed and a document called the user requirements document is generated. The user requirements document will typically describe the systems functional, physical, interface, performance , data, security requirements etc as expected by the user. It is one which the business analysts use to communicate their understanding of the system back to the users. The users carefully review this document as this document would serve as the guideline for the system designers in the system design phase. The user acceptance tests are designed in this phase. Requirement analysis
  • 20. System engineers analyze and understand the business of the proposed system by studying the user requirements document. They figure out possibilities and techniques by which the user requirements can be implemented. If any of the requirements are not feasible, the user is informed of the issue. A resolution is found and the user requirement document is edited accordingly. The software specification document which serves as a blueprint for the development phase is generated. This document contains the general system organization, menu structures, data structures etc. It may also hold example business scenarios, sample windows, reports for the better understanding. Other technical documentation like entity diagrams, data dictionary will also be produced in this phase. The documents for system testing is prepared in this phase. System design
  • 21. This phase can also be called as high-level design. The baseline in selecting the architecture is that it should realize all which typically consists of the list of modules, brief functionality of each module, their interface relationships, dependencies, database tables, architecture diagrams, technology details etc. The integration testing design is carried out in this phase. Architecture design
  • 22. This phase can also be called as low-level design. The designed system is broken up in to smaller units or modules and each of them is explained so that the programmer can start coding directly. The low level design document or program specifications will contain a detailed functional logic of the module, in pseudocode - database tables, with all elements, including their type and size - all interface details with complete API references- all dependency issues- error message listings- complete input and outputs for a module. The unit test design is developed in this stage. Module design