SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
A
A
A
A
A A A A
AA
A
C
CCC
B B B
B B B
B B B
B B B
B A
F
C
E E E E E E
D
S2
S1
108 m²
Lab 8
8250
850
3620
7320
1700
1700
5900
700 1500 1500 700
6650
2000
300
1000
850
1500
6850
400
500
250
597597
700
1500 1500 700
650
399
399
500
1400
1100
2000
1100
250
1100
88 88
88
100
200
750
750
5400
2000
1000
800
8320
100
100100100
2020
2200
525 525
T2
T1
600
5900
1100
500
400
100
90.00°
920
1000500100050010005001000500
1000 1000 1000 1000 1000 1000
1700 2000 2000
1700 2000 2000
Floor prepared in
acordance with BS5532
ash grey, polysafe
standard,
4540
on screed
Service
Voids
Knee space
Service
void
Knee
Space
Knee space
1000
Tiered seating area
170200
Fire extingusher
Vulcathene
pipe
Vulcathene
traps
Vulcathene SVP
550
017253700
1000
25mm silver grey, trespa toplab, T0340
end panels to the sides of casework
25mm si lver g rey, tr espa toplab, T0340,
back panels to enclose service void on all penisulars
25mm silver grey T0340 panel to block in service void
300
lighting
Switches
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
1 : 20
15/05/201522:51:43
lab layout plan
Project Number
Science Block
University of W-ton
Checker
SL015
Author 05/11/15
1 : 20
lab plan
1
White board secured to dot and dab wall 12.5 mm plasterboard Vulcathene pipi ng to join to
vul cathine 110mm SVP down pi pe
extra tall wall unit secured to 12.5mm plasterboard on dabs on 10 mm skimService voids to house gas, water waste pipes
see gas engineer plan for pipe work
Vulcathene trap at End of
penisular 1
Vulcathene trap 2 at end of
penisular
25mm end panel
2 coats of Dark grey RAL 7000 dulux tradin satin wood on fire door
on 1 coat primer
Ceiling is armstrong suspended from roof
rang: ultima+ board, grid face 24/35, white ,
600mmx600mm, mineral
Skirting and architrave
MDF Fibercill
14.5DX119HX5.4W
square edge
finish with Dulux trade white satin wood
door casting
MDF Fibercill, Rebate casting standard stock
150mm finished with dulux trade grey satin wood
Window
self finished aluminum powder coated
LED spot lighting
Please see electrical engineers plans
Heating to be vented through ceiling ducts
please see mechanical engineer
Lab fixtures and fittings supplyed by interface manufacture
Back of penisular
to be blocked with
25mm silver grey Trespa
toplab
T0340
Projector from ceiling
connection
Ceiling mounted speaks
Lighting connections
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Contenu connexe

Similaire à intergrated lab layouts 2s - Sheet - SL015 - lab layout plan

Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Nilfisk vacuum brochure
Nilfisk vacuum brochureNilfisk vacuum brochure
Nilfisk vacuum brochureRobert Johnson
 
Satellite TV antennas - Satelliitti vastaanotin- ja lähetinantennit
Satellite TV antennas - Satelliitti vastaanotin- ja lähetinantennitSatellite TV antennas - Satelliitti vastaanotin- ja lähetinantennit
Satellite TV antennas - Satelliitti vastaanotin- ja lähetinantennitAerial Oy
 
Recopilacion de medios 1
Recopilacion de medios 1Recopilacion de medios 1
Recopilacion de medios 1Earnest MH
 
Mauritius Freeport Development
Mauritius Freeport DevelopmentMauritius Freeport Development
Mauritius Freeport DevelopmentTrevain Bechan
 
Esm fiche-technique-2020-01-07-en
Esm fiche-technique-2020-01-07-enEsm fiche-technique-2020-01-07-en
Esm fiche-technique-2020-01-07-enNicolasSenn2
 
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01Trevain Bechan
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Projectcharliewynn_3
 
Lynca Meats - Pork Factory - Meyerton - Sections
Lynca Meats - Pork Factory - Meyerton - SectionsLynca Meats - Pork Factory - Meyerton - Sections
Lynca Meats - Pork Factory - Meyerton - SectionsTrevain Bechan
 
PLASTECH 2015 BROCHURE
PLASTECH 2015 BROCHUREPLASTECH 2015 BROCHURE
PLASTECH 2015 BROCHURELee Fifield
 
Ceramic Liners brochure
Ceramic Liners brochureCeramic Liners brochure
Ceramic Liners brochureSchiedel UK
 
section and detail sheet1
section and detail sheet1section and detail sheet1
section and detail sheet1Jacob Dobson
 
S-LINE Accoustic Pipes Suppliers in Sharjah,UAE
S-LINE Accoustic Pipes Suppliers in Sharjah,UAES-LINE Accoustic Pipes Suppliers in Sharjah,UAE
S-LINE Accoustic Pipes Suppliers in Sharjah,UAEJinoVarghese13
 
Ceramic Brochure
Ceramic BrochureCeramic Brochure
Ceramic BrochureSchiedel UK
 
MEHRABIsadaf175050x_DES20004
MEHRABIsadaf175050x_DES20004MEHRABIsadaf175050x_DES20004
MEHRABIsadaf175050x_DES20004Sadaf Mehrabi
 
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02Trevain Bechan
 
Endon Lighting Ltd 2012 13 pdf catalogue
Endon Lighting Ltd 2012   13 pdf catalogueEndon Lighting Ltd 2012   13 pdf catalogue
Endon Lighting Ltd 2012 13 pdf catalogueFEDERICO POSTORINO
 

Similaire à intergrated lab layouts 2s - Sheet - SL015 - lab layout plan (20)

dan palmer
dan palmerdan palmer
dan palmer
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Nilfisk vacuum brochure
Nilfisk vacuum brochureNilfisk vacuum brochure
Nilfisk vacuum brochure
 
Satellite TV antennas - Satelliitti vastaanotin- ja lähetinantennit
Satellite TV antennas - Satelliitti vastaanotin- ja lähetinantennitSatellite TV antennas - Satelliitti vastaanotin- ja lähetinantennit
Satellite TV antennas - Satelliitti vastaanotin- ja lähetinantennit
 
Recopilacion de medios 1
Recopilacion de medios 1Recopilacion de medios 1
Recopilacion de medios 1
 
Mauritius Freeport Development
Mauritius Freeport DevelopmentMauritius Freeport Development
Mauritius Freeport Development
 
All drawings
All drawingsAll drawings
All drawings
 
Esm fiche-technique-2020-01-07-en
Esm fiche-technique-2020-01-07-enEsm fiche-technique-2020-01-07-en
Esm fiche-technique-2020-01-07-en
 
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
 
Pearce avenue
Pearce avenuePearce avenue
Pearce avenue
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Project
 
Lynca Meats - Pork Factory - Meyerton - Sections
Lynca Meats - Pork Factory - Meyerton - SectionsLynca Meats - Pork Factory - Meyerton - Sections
Lynca Meats - Pork Factory - Meyerton - Sections
 
PLASTECH 2015 BROCHURE
PLASTECH 2015 BROCHUREPLASTECH 2015 BROCHURE
PLASTECH 2015 BROCHURE
 
Ceramic Liners brochure
Ceramic Liners brochureCeramic Liners brochure
Ceramic Liners brochure
 
section and detail sheet1
section and detail sheet1section and detail sheet1
section and detail sheet1
 
S-LINE Accoustic Pipes Suppliers in Sharjah,UAE
S-LINE Accoustic Pipes Suppliers in Sharjah,UAES-LINE Accoustic Pipes Suppliers in Sharjah,UAE
S-LINE Accoustic Pipes Suppliers in Sharjah,UAE
 
Ceramic Brochure
Ceramic BrochureCeramic Brochure
Ceramic Brochure
 
MEHRABIsadaf175050x_DES20004
MEHRABIsadaf175050x_DES20004MEHRABIsadaf175050x_DES20004
MEHRABIsadaf175050x_DES20004
 
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02
 
Endon Lighting Ltd 2012 13 pdf catalogue
Endon Lighting Ltd 2012   13 pdf catalogueEndon Lighting Ltd 2012   13 pdf catalogue
Endon Lighting Ltd 2012 13 pdf catalogue
 

Plus de samson oakley

Plus de samson oakley (9)

GF-0105
GF-0105GF-0105
GF-0105
 
GF-0104
GF-0104GF-0104
GF-0104
 
GA-0012
GA-0012GA-0012
GA-0012
 
a1 boards
a1 boardsa1 boards
a1 boards
 
SL010 - Roof Plan
SL010 - Roof PlanSL010 - Roof Plan
SL010 - Roof Plan
 
SL011 - Drainage Plan
SL011 - Drainage PlanSL011 - Drainage Plan
SL011 - Drainage Plan
 
SL020 & SL022 - sections
SL020 & SL022 - sectionsSL020 & SL022 - sections
SL020 & SL022 - sections
 
SL015 - second and third Floor
SL015 - second and third FloorSL015 - second and third Floor
SL015 - second and third Floor
 
SL014 - ground and first floor
SL014 - ground and first floorSL014 - ground and first floor
SL014 - ground and first floor
 

intergrated lab layouts 2s - Sheet - SL015 - lab layout plan

  • 1. A A A A A A A A AA A C CCC B B B B B B B B B B B B B A F C E E E E E E D S2 S1 108 m² Lab 8 8250 850 3620 7320 1700 1700 5900 700 1500 1500 700 6650 2000 300 1000 850 1500 6850 400 500 250 597597 700 1500 1500 700 650 399 399 500 1400 1100 2000 1100 250 1100 88 88 88 100 200 750 750 5400 2000 1000 800 8320 100 100100100 2020 2200 525 525 T2 T1 600 5900 1100 500 400 100 90.00° 920 1000500100050010005001000500 1000 1000 1000 1000 1000 1000 1700 2000 2000 1700 2000 2000 Floor prepared in acordance with BS5532 ash grey, polysafe standard, 4540 on screed Service Voids Knee space Service void Knee Space Knee space 1000 Tiered seating area 170200 Fire extingusher Vulcathene pipe Vulcathene traps Vulcathene SVP 550 017253700 1000 25mm silver grey, trespa toplab, T0340 end panels to the sides of casework 25mm si lver g rey, tr espa toplab, T0340, back panels to enclose service void on all penisulars 25mm silver grey T0340 panel to block in service void 300 lighting Switches www.autodesk.com/revit SCALE (@ A1) CHECKED BY TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER REV DRAWN BY DATE 1 : 20 15/05/201522:51:43 lab layout plan Project Number Science Block University of W-ton Checker SL015 Author 05/11/15 1 : 20 lab plan 1 White board secured to dot and dab wall 12.5 mm plasterboard Vulcathene pipi ng to join to vul cathine 110mm SVP down pi pe extra tall wall unit secured to 12.5mm plasterboard on dabs on 10 mm skimService voids to house gas, water waste pipes see gas engineer plan for pipe work Vulcathene trap at End of penisular 1 Vulcathene trap 2 at end of penisular 25mm end panel 2 coats of Dark grey RAL 7000 dulux tradin satin wood on fire door on 1 coat primer Ceiling is armstrong suspended from roof rang: ultima+ board, grid face 24/35, white , 600mmx600mm, mineral Skirting and architrave MDF Fibercill 14.5DX119HX5.4W square edge finish with Dulux trade white satin wood door casting MDF Fibercill, Rebate casting standard stock 150mm finished with dulux trade grey satin wood Window self finished aluminum powder coated LED spot lighting Please see electrical engineers plans Heating to be vented through ceiling ducts please see mechanical engineer Lab fixtures and fittings supplyed by interface manufacture Back of penisular to be blocked with 25mm silver grey Trespa toplab T0340 Projector from ceiling connection Ceiling mounted speaks Lighting connections You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)