Agenda - session 1Agenda - session 1
• This session will provide:
– An introduction to Codes and
Standards
– Objectives of Codes/ Standards.
– ASME Code System.
– Introduction To ASME Sec. VIII-1
• Approximate duration – 8.0 Hours
CODE
Credibility
Collective Knowledge
and Experience
2 S
Safety
(Plant, Personnel, People)
Standardization
2 C
WHY ADOPT CODES ?
Common pressure vessel codes
• ASME Sec VIII Div 1 and Div 2
• BS 5500
• IS 2825
• Ad Merk Blatter (German)
• AFNOR (French)
ASME Codes
Issue freq. : New edition every 3 years, on 1st
July
latest edition was on 1st July 04.
Addenda : In-between revisions, issued yearly
also on 1st July.
2004 Edn. & '04 add. --- 1st July '04
2005 Addenda --- 1st July '05
2006 Addenda --- 1st July '06
Again new edition - 2007 (1st July)
Applicability : Edition & Addendas effective 6 months from date of issue
(i.e. 1st
Jan of next year)
Issued by : American society of mechanical Engineers, New
York.
ASME SEC. VIII DIV. 1
Pressure vessels within scope:
• Vessels having inside diameter above 6 in.
• Vessels designed for pressures above 15 psig and not
exceeding 3000 psi.
• Unfired steam boilers, evaporators,
Heat exchangers
ASME Sec. VIII div.1--Excluded from scope
• Piping system & components beyond
battery limits.
• Vessels covered by other sections
• Vessels for human occupancy
• Pressure containers which are integral
part of rotating machinery.
ASME Boiler & Pressure Vessel Codes
ASME Codes give stipulations and guidelines for the design,
materials, manufacture and testing of pressure vessels. These are
issued by the American Society of Mechanical Engineers, New York.
The codes were first issued in 1915. Since then, many changes have
been made and new sections added to the code as need arose. It is
a LIVE code and is revised and updated periodically. It keeps pace
with time and is responsive to its users.
In its present from the ASME Code System is a follows
• Section I Power Boilers.
• Section II Material specifications.
 Part A Ferrous materials,
 Part B Non Ferrous Materials
 Part C Welding rods, electrodes,
filler metals.
 Part D Material properties.
CODE SYSTEM
CODE SYSTEM
• Section III Nuclear Power Plant Components.
Section IV Heating Boilers.
• Section V Non destructive Examinations.
• Section VI Care and operation of Heating Boilers.
• Section VII Rules for care of Power Boilers.
• Section VIII Division 1 - Pressure Vessels
Division 2 Alternative Rules ( Pr. Vessel)
Division 3 Rules for constructive of High
Pressure Vessels.
• Section IX Welding and Brazing Qualifications.
CODE SYSTEM, cont’d
Section X Fiber glass reinforced Plastic Pressure
Vessels.
Section XI Rules for in service inspection of Nuclear
Power Plant Components.
APPLICABILITY
The editions and addenda become applicable after
six months from date of issue. Thus, 1st
Jan. 2000,
the construction of Pressure Vessels shall be as per
1998 edition and 1999 addenda. However, for old
contracts spilling over beyond 1st
Jan 2000, the old
applicable edition and addenda are valid.
CODE INTERPRETATION
ASME issue written replies know as "Interpretations" to
the inquiries concerning technical aspects of the code
.These are issued twice in a year (July and December) and
are sent to "Edition - subscribers" as up-date service.
CODE CASES
Boiler and Pressure Vessels committee meets regularly to
consider
Proposed additions and revisions to the code. At the same
time it may formulate code cases to clarify ' Intent' of
existing requirements. These are published as code Case
books. It is published along with new editions and
supplements are automatically sent to subscribers of code
case book till new edition ispublished.
ASME Sec. VIII Div. 1 has five different parts
Part 1 : UG – General requirements (Design requirements)
Part 2 : Material Specific Requirements
UCS – Carbon steel & low alloy steel
UHA – High alloy steels
UNF – Non ferrous metallurgy
Part 3 : Fabrication method specific requirements
UW – Welded construction
UF – Forging construction
Part 4 : Mandatory Appendices &
Part 5 : Non mandatory Appendices
Types of vesselsTypes of vessels
• Cylindrical – Horizontal or Vertical
• Spherical
Steps in design -1Steps in design -1
• Find service conditions & metallurgy.
• Ensure ductility at service conditions
• Calculate thickness required (TR).
Steps in design -2Steps in design -2
• Design thickness = TR + Corr Allow
• Roundup to commercially available thickness
to get nominal thickness
• Find MAWP from nominal thickness
Solve a problem
Calculate the minimum thickness of a cylindrical shell of inside diameter
4000mm, tan to tan length of 8300mm and a design pr. of 100 Kg/sq cmg.
Design temperature of the vessel is 343 C
Material of construction – ASTM A 516 Gr 70
Allowable stress of vessel at 343 C = 16500 psi
Corrosion allowance = 3.0 mm
Efficiency of the weld joint – 1.0
24
25
26
UW – 3 : WELD JOINTS CATEGORIES.
UW – 3 : WELD JOINTS CATEGORIES.
Category A :
1 Longitudinal weld joints in main shell or nozzles.
2 Any welded joints in spherical shell.
3. Any welded joints in Dished Head.
4. Circumferential Seam , Hemisph. head to shell.
UW – 3 : WELD JOINTS CATEGORIES.
Category B :
1 Circumferential seam in main shell, or nozzle
2 Circumferential seam connecting formed head (other
than hemi-spherical head) to shell.
UW – 3 : WELD JOINTS CATEGORIES. Contd.
Category C :
• Weld joints connecting flanges, tube sheets, flat
head to main shell or Nozzles
(Flange Welds)
Category D:
• Welds joining communicating chamber or nozzle
to the main shell / heads.
(Attachment Welds).
Types of endsTypes of ends
FLAT HEADS :
– For low pressures up to 5 kg/sqcm
FORMED HEADS :
– Torispherical
• Generally used up to 15 kg/sqcm
– Ellipsoidal
• Generally used between 15 to 25 kg/sqcm
– Hemispherical
• Generally used above 25 kg/sqcm.
CONICAL HEADS : for Special purposes.
35
For spherical shells / head :
t = P x R / (2SE - 0.2P) ….for Thickness
P = 2SEt / (R + 0.2t)….for MAWP
FORMED HEADS
For Torisph. Heads : (L = Crown Rad., r = 0.06 x L)
t, = 0.885 x P x L / (SE - 0.1P)… for Thickness
P = SEt / ( 0.885L + 0.1 t ) … for MAWP
For Ellipsoidal Heads : ( 2 : 1 type)
t = P x D / (2SE - 0.2P) ….for Thickness
P = 2SEt / (D + 0.2t) ….for MAWP
UW-11 :RT and UT EXAMINATIONS
Full Radiography is required in following cases :
• All butt welds of vessels for lethal substances
• If thickness exceeds given in table UCS-57, UHA - 33,
• Butt welds of unfired boilers, with design pr. > 50 psi.
• For all other vessels, All cat. A welds full radiography .
Cat. B & C welds which intersect the Cat. A welds shall be
spot radiographed.
• Radiography is not required of category B and C butt
welds in nozzles less than NPS 10 or 1 1/8 in. thick.
UW-11 :RT and UT EXAMINATIONS…contd.
1 Spot Radiography : Spot RT of Butt joints if
design efficiency is selected for spot radiography.
2 No Radiography : No RT of weld joints if design efficiency is
selected for no radiography or vessel is designed for external
pressure
3 Ultrasonic examination : May be substituted for RT only for
the final closure seam of a pressure vessel.
41
42
v
v
v
v
43
44
45
46
UW – 12 :WELDED JOINT TYPES
UW – 12 :WELDED JOINT EFFICIENCY
RT – 1 : Full Radiography ( E=1) :
Full length radiography of all butt welds
RT – 2 : Full Radiography ( E=1):
Cat – A: Full length radiography
Cat – B: Spot RT per [UW – 11 (a) 5 (b)]
RT – 3 : Spot radiography ( E= 0.85)
RT – 4 : No radiography ( E= 0.7)
Some key points:Some key points:
55
Out of roundness of Shell
Difference between the maximum and minimum inside diameter measured at
any cross section of the vessel shall not exceed 1% of the nominal diameter at
that cross section under consideration.
The diameter can be measured from either inside or outside. If measured from
outside shall be corrected for the thickness at that cross section.
57
NOZZLE REINFORCEMENT
Required area of Reinforcement = d X tr
d= Diameter of finished opening
tr = Required thickness of shell or head.
Reinforcement is waived off for single openings if:
1. finished opening size is 3 1/2" or less diameter in shell or head of
thickness 3/8" or less; or
2. finished opening size 2 3/8" or less diameter
in shell or head of thickness over 3/8";
UCS-66 : IMPACT TESTING
1 MDMT - Thickness point falls on or above the relevant
curve. Impact test is not required
(Curve UCS – 66 )
2 Impact test is must, if MDMT < 120 deg F, and:
Thickness Of welded part > 4”
Thickness for Non-welded part > 6”
3 Test normally required for MDMT < -55 deg. F
64
65
66
67
68
69
70
71
IMPACT TESTING EXEMPTION -- UG-20 (f) :
Impact test exempt for if,
Materials are P No 1, Gr. No. 1 and 2
1. Materials of curve A : thickness < 0.5 inch
2. Materials curve B, C, D : thickness < 1.0 inch
3. Hydrostatic test performed as required
4. Design temp = -20 deg F to 650deg.F
5. No cyclic or thermal shock loading
IMPACT TESTINGEXEMPTION…….contd.
1 UCS-68 (c) : If PWHT is performed when not a Code
requirement, reduction of 30 deg. F (17 0
C) in impact testing
exemption temp.(from Fig UCS-66) may be given for P No. 1
materials
2 If coincident ratio is < 1, Reduction to exemption temperature
may be given as per UCS-66.1
74
75
76
77
78
79
80
81
82
83
84
• PWHT temperature is higher of the two for dissimilar metal joints
UW-40 : POST-WELD HEAT TREATMENT
• PWHT is Code Requirement if thickness exceeds
those given in tables for respective materials .
• Furnace PWHT method is preferred .
• Min. Overlap for PWHT in multiple heats = 5 ft.
• Local PWHT : Min Soak Band = weld width + Lesser of
2’’ or t. and it shall extend full 360 deg for circ. Joint
· Still air cooling permitted below 800 deg .F.
UCS-56: POST-WELD HEAT TREATMENT
· Max. Loading temp in furnace = 800 deg .F
· Max. heating rate 400 deg F/hr/inch of thickness.
· Soaking period as per UCS-56 tables.
· Temp difference between hottest and coldest
parts of vessel shall not exceed 150 deg .F
· Max. cooling rate = 500 deg .F /hr/inch of thk.
· Max. offloading temp = 800 deg. F
88
89
90
91
92
93
94
95
96
Summary of NDT
NDE OF PRESSURE VESSELS
Selection of a particular NDT technique :
Applicable NDT methods / Welding Discontinuities
Discontinuities
Applicable NDT Methods
RT T PT MT VT ET
Porosity √ * √a *b
√a *
Slag Inclusion √ √ NA *b
NA *
Incomplete fusion * √ NA *b
NA *
Incomplete Penetration √ √ NA * NA *
Undercut √ * * * √ *
Overlap
NA
* √ √ * *
Cracks * √ √a
√b
√a
√
Laminations
NA
√
√a,c
√b,c
√a,c NA
Applicable NDT methods for Weld joint types
Joints
NDT Methods
RT UT PT MT VT ET
Butt √ √ √ √ √ √
Corner * √ √ √ √ *
T * √ √ √ √ *
Lap * * √ √ √ *
Note to NDT Table
a. Surface
b. Surface and slightly subsurface
c. Weld preparation or edge of base metal
√ Applicable method
* Marginal applicability depending on other factors.
101
102
103
104
105
106
107
108
109
110
UG-99 : HYDROSTATIC TEST
• Min. Inspection pressure = Test pressure / 1.3
• Hydrostatic Test pr. = 1.3 X MAWP X stress ratio
Stress ratio = Stress at test temp./Stress at design temp.
• Any non-hazardous liquid may be used for the test.
• Min. Test temp = MDMT + 30 deg. F ( 17 C )
• Inspection temperature <= 120 deg. F.
• The MAWP may be same as Design pr.
• Test gauge range = 1.5 to 4 times test pr.
UG-100 : PNEUMATIC TESTS
• Pneumatic test is used instead of hydro when:
• Vessels cannot be safely filled with water
• Vessels in service in which traces of
testing liquid cannot be tolerated
• Test pr = 1.1 X MAWP X stress ratio.
• Test temp shall exceed MDMT by 30 deg F.
• Pr. Gauge range = 1.5 to 4 times test pressure
Safety precautions for Pneumatic Test
• All welds around openings and attachment welds
with throat >= 6mm ( 0.25”) to be MT or PT tested
• The pr. shall be first raised to 50% of the test pr.
• The pressure then shall be reduced to a value of
test pressure /1.1 , to permit inspection.
• Then the pressure shall be raised in steps of
10% of test pr. To reach full test pressure
CODE STAMPING
Each pressure vessel shall be marked with the following :
1) The official Code U Symbol or the official UM Symbol.
2) Name of the Manufacturer of the pressure vessel
preceded by the words "certified by";
3) Max. allowable working pressure ---- psi at ---- 0
F.
4) Minimum design metal temperature ---- 0
F ----psi
5) Manufacturer's serial number;
6) Year built.
115
116
117
v
118
Thank You forThank You for
youryour
Time and AttentionTime and Attention

Contenu connexe

Tendances

Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfdeckyantony
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipeAlireza Niakani
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2Jithu John
 
Fabrication of storage buffer vessel
Fabrication of storage buffer vesselFabrication of storage buffer vessel
Fabrication of storage buffer vesselNishant Rao Boddeda
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingVarun Patel
 
fundamentals of Piping engineering
fundamentals of Piping engineeringfundamentals of Piping engineering
fundamentals of Piping engineeringMobinVarghese8
 
Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselAnalyzeForSafety
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Gaurav Singh Rajput
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wireImran Jamil
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1BHARAT BELLAD
 
Slip on flange welding according TO asme b31.3
Slip on flange welding according TO asme b31.3Slip on flange welding according TO asme b31.3
Slip on flange welding according TO asme b31.3Amr Soliman
 

Tendances (20)

Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdf
 
Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipe
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
 
asme sec ix w
 asme sec ix w asme sec ix w
asme sec ix w
 
Piping Material Specification
Piping Material Specification Piping Material Specification
Piping Material Specification
 
Fabrication of storage buffer vessel
Fabrication of storage buffer vesselFabrication of storage buffer vessel
Fabrication of storage buffer vessel
 
Piping ppt1
Piping ppt1Piping ppt1
Piping ppt1
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
 
fundamentals of Piping engineering
fundamentals of Piping engineeringfundamentals of Piping engineering
fundamentals of Piping engineering
 
Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vessel
 
QC Welding Inspector Interview Question & Answers.pdf
QC Welding Inspector Interview Question & Answers.pdfQC Welding Inspector Interview Question & Answers.pdf
QC Welding Inspector Interview Question & Answers.pdf
 
Pwht1
Pwht1Pwht1
Pwht1
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1
 
Pressure vessel
Pressure vesselPressure vessel
Pressure vessel
 
Inspection of-pressure-vessels
Inspection of-pressure-vesselsInspection of-pressure-vessels
Inspection of-pressure-vessels
 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping code
 
Slip on flange welding according TO asme b31.3
Slip on flange welding according TO asme b31.3Slip on flange welding according TO asme b31.3
Slip on flange welding according TO asme b31.3
 

Similaire à Asme sec viii div 1 icb

Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Versli Lietuva (Enterprise Lithuania)
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Denis Senin
 
Min ambient temp considerations
Min ambient temp considerationsMin ambient temp considerations
Min ambient temp considerationsRajendra Chakole
 
office final ppt [7760835] final update
office final ppt [7760835] final updateoffice final ppt [7760835] final update
office final ppt [7760835] final updateAashish Soin
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc DRP Joint
 
02 custodie eng
02 custodie eng02 custodie eng
02 custodie engHai Pham
 
Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Mattia Agnoletto
 
Weld Improvement Example in Offshore Oil & Gas
Weld Improvement Example in Offshore Oil & GasWeld Improvement Example in Offshore Oil & Gas
Weld Improvement Example in Offshore Oil & GasImran Choudury
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingAbhishek Srivastav
 
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02Carlos Filho
 
06612 iec zerti_rz11_e
06612 iec zerti_rz11_e06612 iec zerti_rz11_e
06612 iec zerti_rz11_eCesar Chilet
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel designMASUKUMARA1
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear StandardsBryan Johnson
 
Pipelines welding handbook_welding_techn
Pipelines welding handbook_welding_technPipelines welding handbook_welding_techn
Pipelines welding handbook_welding_technAshraf Shaikh
 
A New Standard for FRP Piping
A New Standard for FRP PipingA New Standard for FRP Piping
A New Standard for FRP PipingNathan Dolbear
 

Similaire à Asme sec viii div 1 icb (20)

pipe-stress-analysis-work.ppt
pipe-stress-analysis-work.pptpipe-stress-analysis-work.ppt
pipe-stress-analysis-work.ppt
 
API_510_for_Exam.pdf
API_510_for_Exam.pdfAPI_510_for_Exam.pdf
API_510_for_Exam.pdf
 
Borusan Mannesmann
Borusan MannesmannBorusan Mannesmann
Borusan Mannesmann
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
Min ambient temp considerations
Min ambient temp considerationsMin ambient temp considerations
Min ambient temp considerations
 
office final ppt [7760835] final update
office final ppt [7760835] final updateoffice final ppt [7760835] final update
office final ppt [7760835] final update
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc
 
02 custodie eng
02 custodie eng02 custodie eng
02 custodie eng
 
Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08
 
Weld Improvement Example in Offshore Oil & Gas
Weld Improvement Example in Offshore Oil & GasWeld Improvement Example in Offshore Oil & Gas
Weld Improvement Example in Offshore Oil & Gas
 
06 - MCCB & ACB - Fuji Electric
06 - MCCB & ACB - Fuji Electric06 - MCCB & ACB - Fuji Electric
06 - MCCB & ACB - Fuji Electric
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and Working
 
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
 
06612 iec zerti_rz11_e
06612 iec zerti_rz11_e06612 iec zerti_rz11_e
06612 iec zerti_rz11_e
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel design
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards
 
Pipelines welding handbook_welding_techn
Pipelines welding handbook_welding_technPipelines welding handbook_welding_techn
Pipelines welding handbook_welding_techn
 
A New Standard for FRP Piping
A New Standard for FRP PipingA New Standard for FRP Piping
A New Standard for FRP Piping
 

Dernier

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Dernier (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

Asme sec viii div 1 icb

  • 1. Welcome to Training Program on GUIDED TOUR OF ASMETraining Program on GUIDED TOUR OF ASME CODESCODES Presented byPresented by P. S. KULKARNIP. S. KULKARNI
  • 2. Agenda - session 1Agenda - session 1 • This session will provide: – An introduction to Codes and Standards – Objectives of Codes/ Standards. – ASME Code System. – Introduction To ASME Sec. VIII-1 • Approximate duration – 8.0 Hours
  • 3. CODE Credibility Collective Knowledge and Experience 2 S Safety (Plant, Personnel, People) Standardization 2 C WHY ADOPT CODES ?
  • 4. Common pressure vessel codes • ASME Sec VIII Div 1 and Div 2 • BS 5500 • IS 2825 • Ad Merk Blatter (German) • AFNOR (French)
  • 5. ASME Codes Issue freq. : New edition every 3 years, on 1st July latest edition was on 1st July 04. Addenda : In-between revisions, issued yearly also on 1st July. 2004 Edn. & '04 add. --- 1st July '04 2005 Addenda --- 1st July '05 2006 Addenda --- 1st July '06 Again new edition - 2007 (1st July) Applicability : Edition & Addendas effective 6 months from date of issue (i.e. 1st Jan of next year) Issued by : American society of mechanical Engineers, New York.
  • 6. ASME SEC. VIII DIV. 1 Pressure vessels within scope: • Vessels having inside diameter above 6 in. • Vessels designed for pressures above 15 psig and not exceeding 3000 psi. • Unfired steam boilers, evaporators, Heat exchangers
  • 7. ASME Sec. VIII div.1--Excluded from scope • Piping system & components beyond battery limits. • Vessels covered by other sections • Vessels for human occupancy • Pressure containers which are integral part of rotating machinery.
  • 8.
  • 9. ASME Boiler & Pressure Vessel Codes ASME Codes give stipulations and guidelines for the design, materials, manufacture and testing of pressure vessels. These are issued by the American Society of Mechanical Engineers, New York. The codes were first issued in 1915. Since then, many changes have been made and new sections added to the code as need arose. It is a LIVE code and is revised and updated periodically. It keeps pace with time and is responsive to its users.
  • 10. In its present from the ASME Code System is a follows • Section I Power Boilers. • Section II Material specifications.  Part A Ferrous materials,  Part B Non Ferrous Materials  Part C Welding rods, electrodes, filler metals.  Part D Material properties. CODE SYSTEM
  • 11. CODE SYSTEM • Section III Nuclear Power Plant Components. Section IV Heating Boilers. • Section V Non destructive Examinations. • Section VI Care and operation of Heating Boilers. • Section VII Rules for care of Power Boilers. • Section VIII Division 1 - Pressure Vessels Division 2 Alternative Rules ( Pr. Vessel) Division 3 Rules for constructive of High Pressure Vessels. • Section IX Welding and Brazing Qualifications.
  • 12. CODE SYSTEM, cont’d Section X Fiber glass reinforced Plastic Pressure Vessels. Section XI Rules for in service inspection of Nuclear Power Plant Components.
  • 13. APPLICABILITY The editions and addenda become applicable after six months from date of issue. Thus, 1st Jan. 2000, the construction of Pressure Vessels shall be as per 1998 edition and 1999 addenda. However, for old contracts spilling over beyond 1st Jan 2000, the old applicable edition and addenda are valid.
  • 14. CODE INTERPRETATION ASME issue written replies know as "Interpretations" to the inquiries concerning technical aspects of the code .These are issued twice in a year (July and December) and are sent to "Edition - subscribers" as up-date service.
  • 15. CODE CASES Boiler and Pressure Vessels committee meets regularly to consider Proposed additions and revisions to the code. At the same time it may formulate code cases to clarify ' Intent' of existing requirements. These are published as code Case books. It is published along with new editions and supplements are automatically sent to subscribers of code case book till new edition ispublished.
  • 16. ASME Sec. VIII Div. 1 has five different parts Part 1 : UG – General requirements (Design requirements) Part 2 : Material Specific Requirements UCS – Carbon steel & low alloy steel UHA – High alloy steels UNF – Non ferrous metallurgy Part 3 : Fabrication method specific requirements UW – Welded construction UF – Forging construction Part 4 : Mandatory Appendices & Part 5 : Non mandatory Appendices
  • 17.
  • 18. Types of vesselsTypes of vessels • Cylindrical – Horizontal or Vertical • Spherical
  • 19.
  • 20. Steps in design -1Steps in design -1 • Find service conditions & metallurgy. • Ensure ductility at service conditions • Calculate thickness required (TR).
  • 21. Steps in design -2Steps in design -2 • Design thickness = TR + Corr Allow • Roundup to commercially available thickness to get nominal thickness • Find MAWP from nominal thickness
  • 22.
  • 23. Solve a problem Calculate the minimum thickness of a cylindrical shell of inside diameter 4000mm, tan to tan length of 8300mm and a design pr. of 100 Kg/sq cmg. Design temperature of the vessel is 343 C Material of construction – ASTM A 516 Gr 70 Allowable stress of vessel at 343 C = 16500 psi Corrosion allowance = 3.0 mm Efficiency of the weld joint – 1.0
  • 24. 24
  • 25. 25
  • 26. 26
  • 27. UW – 3 : WELD JOINTS CATEGORIES.
  • 28. UW – 3 : WELD JOINTS CATEGORIES. Category A : 1 Longitudinal weld joints in main shell or nozzles. 2 Any welded joints in spherical shell. 3. Any welded joints in Dished Head. 4. Circumferential Seam , Hemisph. head to shell.
  • 29. UW – 3 : WELD JOINTS CATEGORIES. Category B : 1 Circumferential seam in main shell, or nozzle 2 Circumferential seam connecting formed head (other than hemi-spherical head) to shell.
  • 30. UW – 3 : WELD JOINTS CATEGORIES. Contd. Category C : • Weld joints connecting flanges, tube sheets, flat head to main shell or Nozzles (Flange Welds) Category D: • Welds joining communicating chamber or nozzle to the main shell / heads. (Attachment Welds).
  • 31. Types of endsTypes of ends FLAT HEADS : – For low pressures up to 5 kg/sqcm FORMED HEADS : – Torispherical • Generally used up to 15 kg/sqcm – Ellipsoidal • Generally used between 15 to 25 kg/sqcm – Hemispherical • Generally used above 25 kg/sqcm. CONICAL HEADS : for Special purposes.
  • 32.
  • 33.
  • 34.
  • 35. 35
  • 36. For spherical shells / head : t = P x R / (2SE - 0.2P) ….for Thickness P = 2SEt / (R + 0.2t)….for MAWP FORMED HEADS For Torisph. Heads : (L = Crown Rad., r = 0.06 x L) t, = 0.885 x P x L / (SE - 0.1P)… for Thickness P = SEt / ( 0.885L + 0.1 t ) … for MAWP For Ellipsoidal Heads : ( 2 : 1 type) t = P x D / (2SE - 0.2P) ….for Thickness P = 2SEt / (D + 0.2t) ….for MAWP
  • 37.
  • 38.
  • 39. UW-11 :RT and UT EXAMINATIONS Full Radiography is required in following cases : • All butt welds of vessels for lethal substances • If thickness exceeds given in table UCS-57, UHA - 33, • Butt welds of unfired boilers, with design pr. > 50 psi. • For all other vessels, All cat. A welds full radiography . Cat. B & C welds which intersect the Cat. A welds shall be spot radiographed. • Radiography is not required of category B and C butt welds in nozzles less than NPS 10 or 1 1/8 in. thick.
  • 40. UW-11 :RT and UT EXAMINATIONS…contd. 1 Spot Radiography : Spot RT of Butt joints if design efficiency is selected for spot radiography. 2 No Radiography : No RT of weld joints if design efficiency is selected for no radiography or vessel is designed for external pressure 3 Ultrasonic examination : May be substituted for RT only for the final closure seam of a pressure vessel.
  • 41. 41
  • 43. 43
  • 44. 44
  • 45. 45
  • 46. 46
  • 47.
  • 48. UW – 12 :WELDED JOINT TYPES
  • 49. UW – 12 :WELDED JOINT EFFICIENCY RT – 1 : Full Radiography ( E=1) : Full length radiography of all butt welds RT – 2 : Full Radiography ( E=1): Cat – A: Full length radiography Cat – B: Spot RT per [UW – 11 (a) 5 (b)] RT – 3 : Spot radiography ( E= 0.85) RT – 4 : No radiography ( E= 0.7)
  • 50.
  • 51.
  • 52. Some key points:Some key points:
  • 53.
  • 54.
  • 55. 55
  • 56. Out of roundness of Shell Difference between the maximum and minimum inside diameter measured at any cross section of the vessel shall not exceed 1% of the nominal diameter at that cross section under consideration. The diameter can be measured from either inside or outside. If measured from outside shall be corrected for the thickness at that cross section.
  • 57. 57
  • 58. NOZZLE REINFORCEMENT Required area of Reinforcement = d X tr d= Diameter of finished opening tr = Required thickness of shell or head. Reinforcement is waived off for single openings if: 1. finished opening size is 3 1/2" or less diameter in shell or head of thickness 3/8" or less; or 2. finished opening size 2 3/8" or less diameter in shell or head of thickness over 3/8";
  • 59.
  • 60.
  • 61.
  • 62.
  • 63. UCS-66 : IMPACT TESTING 1 MDMT - Thickness point falls on or above the relevant curve. Impact test is not required (Curve UCS – 66 ) 2 Impact test is must, if MDMT < 120 deg F, and: Thickness Of welded part > 4” Thickness for Non-welded part > 6” 3 Test normally required for MDMT < -55 deg. F
  • 64. 64
  • 65. 65
  • 66. 66
  • 67. 67
  • 68. 68
  • 69. 69
  • 70. 70
  • 71. 71
  • 72. IMPACT TESTING EXEMPTION -- UG-20 (f) : Impact test exempt for if, Materials are P No 1, Gr. No. 1 and 2 1. Materials of curve A : thickness < 0.5 inch 2. Materials curve B, C, D : thickness < 1.0 inch 3. Hydrostatic test performed as required 4. Design temp = -20 deg F to 650deg.F 5. No cyclic or thermal shock loading
  • 73. IMPACT TESTINGEXEMPTION…….contd. 1 UCS-68 (c) : If PWHT is performed when not a Code requirement, reduction of 30 deg. F (17 0 C) in impact testing exemption temp.(from Fig UCS-66) may be given for P No. 1 materials 2 If coincident ratio is < 1, Reduction to exemption temperature may be given as per UCS-66.1
  • 74. 74
  • 75. 75
  • 76. 76
  • 77. 77
  • 78. 78
  • 79. 79
  • 80. 80
  • 81. 81
  • 82. 82
  • 83. 83
  • 84. 84
  • 85. • PWHT temperature is higher of the two for dissimilar metal joints UW-40 : POST-WELD HEAT TREATMENT • PWHT is Code Requirement if thickness exceeds those given in tables for respective materials . • Furnace PWHT method is preferred . • Min. Overlap for PWHT in multiple heats = 5 ft. • Local PWHT : Min Soak Band = weld width + Lesser of 2’’ or t. and it shall extend full 360 deg for circ. Joint
  • 86. · Still air cooling permitted below 800 deg .F. UCS-56: POST-WELD HEAT TREATMENT · Max. Loading temp in furnace = 800 deg .F · Max. heating rate 400 deg F/hr/inch of thickness. · Soaking period as per UCS-56 tables. · Temp difference between hottest and coldest parts of vessel shall not exceed 150 deg .F · Max. cooling rate = 500 deg .F /hr/inch of thk. · Max. offloading temp = 800 deg. F
  • 87.
  • 88. 88
  • 89. 89
  • 90. 90
  • 91. 91
  • 92. 92
  • 93. 93
  • 94. 94
  • 95. 95
  • 96. 96
  • 98. NDE OF PRESSURE VESSELS Selection of a particular NDT technique : Applicable NDT methods / Welding Discontinuities Discontinuities Applicable NDT Methods RT T PT MT VT ET Porosity √ * √a *b √a * Slag Inclusion √ √ NA *b NA * Incomplete fusion * √ NA *b NA * Incomplete Penetration √ √ NA * NA * Undercut √ * * * √ * Overlap NA * √ √ * * Cracks * √ √a √b √a √ Laminations NA √ √a,c √b,c √a,c NA
  • 99. Applicable NDT methods for Weld joint types Joints NDT Methods RT UT PT MT VT ET Butt √ √ √ √ √ √ Corner * √ √ √ √ * T * √ √ √ √ * Lap * * √ √ √ *
  • 100. Note to NDT Table a. Surface b. Surface and slightly subsurface c. Weld preparation or edge of base metal √ Applicable method * Marginal applicability depending on other factors.
  • 101. 101
  • 102. 102
  • 103. 103
  • 104. 104
  • 105. 105
  • 106. 106
  • 107. 107
  • 108. 108
  • 109. 109
  • 110. 110
  • 111. UG-99 : HYDROSTATIC TEST • Min. Inspection pressure = Test pressure / 1.3 • Hydrostatic Test pr. = 1.3 X MAWP X stress ratio Stress ratio = Stress at test temp./Stress at design temp. • Any non-hazardous liquid may be used for the test. • Min. Test temp = MDMT + 30 deg. F ( 17 C ) • Inspection temperature <= 120 deg. F. • The MAWP may be same as Design pr. • Test gauge range = 1.5 to 4 times test pr.
  • 112. UG-100 : PNEUMATIC TESTS • Pneumatic test is used instead of hydro when: • Vessels cannot be safely filled with water • Vessels in service in which traces of testing liquid cannot be tolerated • Test pr = 1.1 X MAWP X stress ratio. • Test temp shall exceed MDMT by 30 deg F. • Pr. Gauge range = 1.5 to 4 times test pressure
  • 113. Safety precautions for Pneumatic Test • All welds around openings and attachment welds with throat >= 6mm ( 0.25”) to be MT or PT tested • The pr. shall be first raised to 50% of the test pr. • The pressure then shall be reduced to a value of test pressure /1.1 , to permit inspection. • Then the pressure shall be raised in steps of 10% of test pr. To reach full test pressure
  • 114. CODE STAMPING Each pressure vessel shall be marked with the following : 1) The official Code U Symbol or the official UM Symbol. 2) Name of the Manufacturer of the pressure vessel preceded by the words "certified by"; 3) Max. allowable working pressure ---- psi at ---- 0 F. 4) Minimum design metal temperature ---- 0 F ----psi 5) Manufacturer's serial number; 6) Year built.