Comparison between
PMBOK4 and PMBOK5

C R E AT E D B Y:
S A Q I B J AV E D J O H N
( P M P, A C P, I T I L , S C J P, S C W C D )
High Level Comparison
PMBOK 4

PMBOK 5

Released in 2008

Released in 2013

5 Process Groups

5 Process Groups

9 Knowledge Areas

10 Knowledge Areas

42 Processes

47 Processes
Addition in Knowledge Areas
PMBOK 4

PMBOK 5

Integration Management

Integration Management

Scope Management

Scope Management

Time Management

Time Management

Cost Management

Cost Management

Quality Management

Quality Management

Human Resource Management

Human Resource Management

Communication Management

Communication Management

Risk Management

Risk Management

Procurement Management

Procurement Management
Stakeholder Management
Addition in Processes
PMBOK 4

PMBOK 5

I
Integration

P

E

M&C

C

1

1

1

2

1

I
Integration

P

E

M&C

C

1

1

1

2

1

Scope

3

2

Scope

4

2

Time

5

1

Time

6

1

Cost

2

1

Cost

3

1

Quality

1

1

1

Quality

1

1

Human Resource

1

3

Human Resource

1

3

1

2

1

1

Communications

1

1

1

Communications

1

Risk

5
1

1

1

0

1

Risk

5

Procurement

1

1

1

1

Procurement

20

8

10

2

Stakeholder

1

1

1

1

Processes (47)

2

24

8

11

Processes (42)

2

1

I=Initiation
P=Planning
E=Execution
M&E=Monitoring & Controlling

C=Closing

1

2
Integration Management

PMBOK 5

PMBOK 4

Initiation

Planning

Develop Project Develop Project
Charter
Management Plan

Execution

Direct & Manage
Project Execution

Monitoring & Controlling

Closing

• Monitor & Control Project
Work
Close Project or
• Perform Integrated Change
Phase
Control

No Change and its same as in PMBOK4
Scope Management

PMBOK 5

PMBOK 4

Initiation

Planning
• Collect Requirements

• Define scope
• Create WBS

Execution

Monitoring & Controlling

• Verify Scope
• Control Scope

• Plan Scope Management

• Validate Scope

• Collect Requirements

• Verify Scope

• Define scope
• Create WBS

• Control Scope

Closing
Time Management
Initiation

Planning

PMBOK 4

• Define Activities

Execution

Monitoring & Controlling
Control Schedule

• Sequence Activities
• Estimate Activity Resources
• Estimate Activity Duration
• Develop Schedule

PMBOK 5

• Plan Schedule Management
• Define Activities
• Sequence Activities
• Estimate Activity Resources
• Estimate Activity Duration
• Develop Schedule

Control Schedule

Closing
Cost Management

PMBOK 5

PMBOK 4

Initiation

Planning

• Estimate Costs
• Determine Budget

Execution

Monitoring & Controlling

Control Costs

• Plan Cost Management
• Estimate Costs
• Determine Budget

Control Costs

Closing
Quality Management

PMBOK 5

PMBOK 4

Initiation

Planning

Execution

Monitoring & Controlling

Plan Quality

Perform Quality
Assurance

Perform Quality Control

• Plan Quality Management

Perform Quality
Assurance

Perform Quality
Control Quality

Closing
Human Resource Management

PMBOK 5

PMBOK 4

Initiation Planning

Execution
• Acquire Project Team

Develop HR Plan

• Develop Project Team
• Manage Project Team

• Develop HR Plan
• Plan HR Management

• Acquire Project Team
• Develop Project Team
• Manage Project Team

Monitoring & Controlling

Closing
Communication Management

PMBOK 5

PMBOK 4

Initiation

Planning

Execution

Monitoring & Controlling Closing

• Distribute Information
Identify
Stakeholders

Plan Communication • Manage Stakeholders

Report Performance

Expectations

• Distribute Information
Identify
Stakeholders

Plan Communication • Manage Stakeholders

• Report Performance

Management

• Control Communication

Expectations
• Manage Communication
Risk Management
Initiation

Planning

Execution Monitoring & Controlling

PMBOK 4

• Plan Risk Management
• Identify Risks
• Perform Qualitative Risk Analysis

Monitor and Control Risks

• Perform Quantitative Risk Analysis
• Plan Risk Responses

PMBOK 5

• Plan Risk Management
• Identify Risks
• Perform Qualitative Risk Analysis
• Perform Quantitative Risk Analysis
• Plan Risk Responses

• Monitor and Control Risks
• Control Risks

Closing
Procurement Management

PMBOK 5

PMBOK 4

Initiation Planning

Plan Procurement

Plan Procurement
Management

Execution

Monitoring & Controlling

Closing

Conduct Procurements

Administer Procurement

Close Procurement

• Administer Procurement

Close
Procurement

Conduct Procurements

• Control Procurement
Stakeholder Management

PMBOK 5

PMBOK 4

Initiation

Planning

Execution

Monitoring & Controlling Closing

Stakeholder Management as a separate knowledge area was not the part of PMBOK4

Identify

Plan Stakeholder

Manage Stakeholder

Control Stakeholder

Stakeholder

Management

Engagement

Management
Comparison between PMBOK4 and PMBOK5

Contenu connexe

Tendances

Project managemenet knowledge areas
Project managemenet knowledge areasProject managemenet knowledge areas
Project managemenet knowledge areas
linajarruti
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Anand Bobade
 
1 project & project cycle management
1   project & project cycle management1   project & project cycle management
1 project & project cycle management
Sundasmushtaq
 
Pm processes, groups and k areas map and domains
Pm processes, groups and k areas map and domainsPm processes, groups and k areas map and domains
Pm processes, groups and k areas map and domains
Mannay88
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2
test prod1
 
File 3 removed 5 words 2
File 3 removed 5 words 2File 3 removed 5 words 2
File 3 removed 5 words 2
test prod1
 

Tendances (19)

2019 August - Jad Abou Ibrahim
2019 August - Jad Abou Ibrahim2019 August - Jad Abou Ibrahim
2019 August - Jad Abou Ibrahim
 
Project Management Process Groups 101
Project Management Process Groups 101Project Management Process Groups 101
Project Management Process Groups 101
 
PMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge AreasPMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge Areas
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
Project managemenet knowledge areas
Project managemenet knowledge areasProject managemenet knowledge areas
Project managemenet knowledge areas
 
Project management
Project managementProject management
Project management
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Project management
Project managementProject management
Project management
 
Integrating project life cycle with process groups
Integrating project life cycle with process groupsIntegrating project life cycle with process groups
Integrating project life cycle with process groups
 
Project Management
Project Management Project Management
Project Management
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
Project Management Class ( based on PMBOK) - Day 3
Project Management Class ( based on PMBOK) - Day 3Project Management Class ( based on PMBOK) - Day 3
Project Management Class ( based on PMBOK) - Day 3
 
Pmp in summary
Pmp in summaryPmp in summary
Pmp in summary
 
1 project & project cycle management
1   project & project cycle management1   project & project cycle management
1 project & project cycle management
 
Pm processes, groups and k areas map and domains
Pm processes, groups and k areas map and domainsPm processes, groups and k areas map and domains
Pm processes, groups and k areas map and domains
 
Project Management: Knowledge Areas
Project Management: Knowledge Areas Project Management: Knowledge Areas
Project Management: Knowledge Areas
 
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project ManagementDiscussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2
 
File 3 removed 5 words 2
File 3 removed 5 words 2File 3 removed 5 words 2
File 3 removed 5 words 2
 

Similaire à Comparison between PMBOK4 and PMBOK5

Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...
Simplilearn
 
PmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalPmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit Payal
AMIT PAYAL
 

Similaire à Comparison between PMBOK4 and PMBOK5 (20)

Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
All4pm 4판5판-비교
All4pm 4판5판-비교All4pm 4판5판-비교
All4pm 4판5판-비교
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
9.1 Plan Resource Management
9.1 Plan Resource Management9.1 Plan Resource Management
9.1 Plan Resource Management
 
5.1 Plan Scope Management
5.1 Plan Scope Management5.1 Plan Scope Management
5.1 Plan Scope Management
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Management
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
 
Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...
 
Pmbok5 changes v2
Pmbok5 changes v2Pmbok5 changes v2
Pmbok5 changes v2
 
11.5 Plan Risk Responses
11.5 Plan Risk Responses11.5 Plan Risk Responses
11.5 Plan Risk Responses
 
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
 
PMBok and Essentials of Stakeholder Management
PMBok and Essentials of Stakeholder ManagementPMBok and Essentials of Stakeholder Management
PMBok and Essentials of Stakeholder Management
 
pmi project management principles.pptx
pmi project management principles.pptxpmi project management principles.pptx
pmi project management principles.pptx
 
Integrating project life cycle with process groups
Integrating project life cycle with process groupsIntegrating project life cycle with process groups
Integrating project life cycle with process groups
 
PmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalPmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit Payal
 
Project Management Course slide 1
Project Management Course slide 1Project Management Course slide 1
Project Management Course slide 1
 
Organizational project maturity model (opm3)
Organizational project maturity model (opm3)Organizational project maturity model (opm3)
Organizational project maturity model (opm3)
 
PMP PREPARATION IN GDAŃSK
PMP PREPARATION IN GDAŃSKPMP PREPARATION IN GDAŃSK
PMP PREPARATION IN GDAŃSK
 
Integration Management Presentation
Integration Management Presentation Integration Management Presentation
Integration Management Presentation
 

Plus de Saqib Javed John (8)

Learn to Turn
Learn to TurnLearn to Turn
Learn to Turn
 
Agile or Traditional - How to Choose
Agile or Traditional - How to ChooseAgile or Traditional - How to Choose
Agile or Traditional - How to Choose
 
Why Agile
Why AgileWhy Agile
Why Agile
 
Agile vs Traditional Project Management
Agile vs Traditional Project ManagementAgile vs Traditional Project Management
Agile vs Traditional Project Management
 
Agile Project Management - Part 2
Agile Project Management - Part 2Agile Project Management - Part 2
Agile Project Management - Part 2
 
Agile Project Management - Part 1
Agile Project Management - Part 1Agile Project Management - Part 1
Agile Project Management - Part 1
 
ITIL V3F Overview Part II
ITIL V3F Overview Part II ITIL V3F Overview Part II
ITIL V3F Overview Part II
 
ITIL V3F Overview Part I
ITIL V3F Overview Part IITIL V3F Overview Part I
ITIL V3F Overview Part I
 

Dernier

Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 

Dernier (20)

Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 

Comparison between PMBOK4 and PMBOK5

  • 1. Comparison between PMBOK4 and PMBOK5 C R E AT E D B Y: S A Q I B J AV E D J O H N ( P M P, A C P, I T I L , S C J P, S C W C D )
  • 2. High Level Comparison PMBOK 4 PMBOK 5 Released in 2008 Released in 2013 5 Process Groups 5 Process Groups 9 Knowledge Areas 10 Knowledge Areas 42 Processes 47 Processes
  • 3. Addition in Knowledge Areas PMBOK 4 PMBOK 5 Integration Management Integration Management Scope Management Scope Management Time Management Time Management Cost Management Cost Management Quality Management Quality Management Human Resource Management Human Resource Management Communication Management Communication Management Risk Management Risk Management Procurement Management Procurement Management Stakeholder Management
  • 4. Addition in Processes PMBOK 4 PMBOK 5 I Integration P E M&C C 1 1 1 2 1 I Integration P E M&C C 1 1 1 2 1 Scope 3 2 Scope 4 2 Time 5 1 Time 6 1 Cost 2 1 Cost 3 1 Quality 1 1 1 Quality 1 1 Human Resource 1 3 Human Resource 1 3 1 2 1 1 Communications 1 1 1 Communications 1 Risk 5 1 1 1 0 1 Risk 5 Procurement 1 1 1 1 Procurement 20 8 10 2 Stakeholder 1 1 1 1 Processes (47) 2 24 8 11 Processes (42) 2 1 I=Initiation P=Planning E=Execution M&E=Monitoring & Controlling C=Closing 1 2
  • 5. Integration Management PMBOK 5 PMBOK 4 Initiation Planning Develop Project Develop Project Charter Management Plan Execution Direct & Manage Project Execution Monitoring & Controlling Closing • Monitor & Control Project Work Close Project or • Perform Integrated Change Phase Control No Change and its same as in PMBOK4
  • 6. Scope Management PMBOK 5 PMBOK 4 Initiation Planning • Collect Requirements • Define scope • Create WBS Execution Monitoring & Controlling • Verify Scope • Control Scope • Plan Scope Management • Validate Scope • Collect Requirements • Verify Scope • Define scope • Create WBS • Control Scope Closing
  • 7. Time Management Initiation Planning PMBOK 4 • Define Activities Execution Monitoring & Controlling Control Schedule • Sequence Activities • Estimate Activity Resources • Estimate Activity Duration • Develop Schedule PMBOK 5 • Plan Schedule Management • Define Activities • Sequence Activities • Estimate Activity Resources • Estimate Activity Duration • Develop Schedule Control Schedule Closing
  • 8. Cost Management PMBOK 5 PMBOK 4 Initiation Planning • Estimate Costs • Determine Budget Execution Monitoring & Controlling Control Costs • Plan Cost Management • Estimate Costs • Determine Budget Control Costs Closing
  • 9. Quality Management PMBOK 5 PMBOK 4 Initiation Planning Execution Monitoring & Controlling Plan Quality Perform Quality Assurance Perform Quality Control • Plan Quality Management Perform Quality Assurance Perform Quality Control Quality Closing
  • 10. Human Resource Management PMBOK 5 PMBOK 4 Initiation Planning Execution • Acquire Project Team Develop HR Plan • Develop Project Team • Manage Project Team • Develop HR Plan • Plan HR Management • Acquire Project Team • Develop Project Team • Manage Project Team Monitoring & Controlling Closing
  • 11. Communication Management PMBOK 5 PMBOK 4 Initiation Planning Execution Monitoring & Controlling Closing • Distribute Information Identify Stakeholders Plan Communication • Manage Stakeholders Report Performance Expectations • Distribute Information Identify Stakeholders Plan Communication • Manage Stakeholders • Report Performance Management • Control Communication Expectations • Manage Communication
  • 12. Risk Management Initiation Planning Execution Monitoring & Controlling PMBOK 4 • Plan Risk Management • Identify Risks • Perform Qualitative Risk Analysis Monitor and Control Risks • Perform Quantitative Risk Analysis • Plan Risk Responses PMBOK 5 • Plan Risk Management • Identify Risks • Perform Qualitative Risk Analysis • Perform Quantitative Risk Analysis • Plan Risk Responses • Monitor and Control Risks • Control Risks Closing
  • 13. Procurement Management PMBOK 5 PMBOK 4 Initiation Planning Plan Procurement Plan Procurement Management Execution Monitoring & Controlling Closing Conduct Procurements Administer Procurement Close Procurement • Administer Procurement Close Procurement Conduct Procurements • Control Procurement
  • 14. Stakeholder Management PMBOK 5 PMBOK 4 Initiation Planning Execution Monitoring & Controlling Closing Stakeholder Management as a separate knowledge area was not the part of PMBOK4 Identify Plan Stakeholder Manage Stakeholder Control Stakeholder Stakeholder Management Engagement Management