Economic Scheduling the Construction of Electric Transmission/ Distribution Substations in Jeddah City  with Parametric Results  Said Ali El-Quliti1) and Mohammed RedaKabli2)   1) Professor, 2) Assistant Professor,  Department of Industrial Engineering,  King AbdulAziz University, Jeddah, Saudi Arabia.
On the Name  of God
1. INTRODUCTION ,[object Object]
Scope: The electricity field in Jeddah City; for a long-term time horizon (10 years).
Main Goal: minimizing the total cost and determining the installation time.,[object Object]
2. LITERATURE REVIEW The population forecast in Jeddah city is expected to increase with an increasing rate of 2.2% a year.  "Eighth Development Plan 2005 – 2009", Ministry of Planning, Kingdom of Saudi Arabia, 2004.
In a previous paper, A study to forecast the number of substations needed for the 10 years (2006 – 2015) is determined, and also the optimum scheduling of these substations. Said Ali Hassan ElQuliti, Ibrahim A. El-Darrab, and Mohammed Abdu Al-Ameer, "A Dynamic Programming Model for Scheduling the Electric Transmission/Distribution Substations in Jeddah City", WSEAS Intern. Conferences, Univ. of Cambridge, Cambridge, United Kingdom, 2009.
Parols A.G. et al,       found that an essential element of electric utility resource planning is forecasting of the future load demand.  Parols A.G., Esmaeil O., Muthusami J, Patton A. and Atiya A.F., “Development of an Intelligent Long-Term Electric Load Forecasting System”, Intelligent Systems Applications to Power Systems, Proceedings, ISAP International Conference, pp. 288 – 292, 1996.
     F.-C. Lu, and Y.-Y. Hsu       Investigate the reactive power/voltage control in a distribution substation. An approach based on dynamic programming is presented to reach the desired schedule. F.-C. Lu, Y.-Y. Hsu, " Reactive power/voltage control in a distribution substation using dynamic programming", IEE Proceedings, Generation, Transmission and Distribution, Volume 142, Issue 6, pp. 639-645, November 1995.
YixinYn et al,       Use dynamic programming for the optimal planning of substation locations which satisfy the load demands and minimize the investment and operating cost. YixinYn, Chengshan Wang, ShaoyunGe, Jun Xiao, Xuefei Yan, Chunhua Huang  "Models and Methods for Urban Distribution Planning", School of Electrical and Automation Engineering, Tianjin University, Perth, WA, Australia, 2000.
3. DATA COLLECTION SAUDI ELECTRICITY COMPANY    The single national company for generation, transmission and distribution of electricity all over Saudi Arabia. (Now it is divided into several Companies).
FORECASTING OF THE ELECTRIC LOAD    Time Series Data of the annual total electricity consumption in Jeddah city 32 years (1979-2010)were collected.
Forecasting The number of required substations to be built (from 2011 to 2020) is forecasted depending on results for forecasting annual total consumption of electricity .  The forecasting is done using Multiple Regression Analysis(Causal Methods) and Artificial Neural Networks (ANN).
4. THE DYNAMIC PROGRAMMING MODEL
THE MODEL    Decision variables: the number of transmission/distribution substations to build in each year (stage).  The states: the number of substations still required in remaining years.  The objective function: minimize the total cost of building (investment cost) and operating the substations in the coming ten years.  The constraints: the number of required substations, budget to maintain both the building and operating costs.
4.1 Recursive Relationship in Dynamic Programming Identifies the optimal policy for stage n, given the optimal policy for stage n + 1.
3 4 5 Stage  1 2 6 7 8 9 10 13 16 19 10 0 7 4 1 6 14 11 1 8 5 22 25 17 20 9 2 7 4 0 12 2 10 15 21 18 3 8 5 11 13 3 9 6 Network formulation for the problem  Required Substations: 3       1       3       3        2       2       2       3        3        3        Budget Constraints: Constructed number ≤ 3 substation/year
3 4 5 Stage  1 2 6 7 8 9 10 347.51 664.44 947.06 1198.62 138.00 731.88 1620.04 1422.11 419.68 1794.63 13 16 1010.09 19 10 0 7 4 1257.52 1 224.40 791.02 482.93 1477.17 1948.22 1671.49 2083.22 1842.73 6 0.00 1065.34 14 11 1 8 5 22 25 17 1309.41 20 9 301.61 866.49 2 563.69 7 1885.09 1716.81 1525.67 1135.88 4 1375.74 0 12 2 10 15 21 18 933.93 369.63 635.86 3 1198.91 8 5 11 13 3 993.34 699.44 9 6 Possible branches                     Branch of minimum total cost to the end node                     Branch on the optimum path Solution of the problem  The optimal Solution:        3 1      3      3      3      3      0      3      3       3 Required Substations: 3       1       3       3        2       2       2       3        3        3
PARAMETRIC RESULTS
6.1 Control Parameters Affecting the Solution The substation building cost (investment cost). The percentage of yearly increase in the substation building cost. The percentage of discount for buying more than one substation. Initial value of the operating cost (in the 1st. Year). The percentage of yearly increase in the operating cost..
The Same Optimal Solution The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3)
The Same Optimal Solution The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3) The substation building cost. The Total Optimal Value (TOV): Total Optimum Values for different initial building cost.
2. The percentage of yearly increase in the substation building cost. The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3) (TOV) for different increases in substation building cost.
3. The percentage of discount for buying more than one substation. The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3) (TOV) for different discounts for substation's cost.
4. Initial value of the operating cost. The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3) (TOV) for different initial operation cost.
5. The percentage of yearly increase in the operating cost. The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3) (TOV) for different % yearly increase in operation cost.
6.3 Changes in the Optimal Solution If changes in parameters are outside the range, a new optimal solution appears:
Optimal Solution (3, 1, 3, 3, 2, 2, 2, 3, 3, 3) 1. For substation building cost < 19.3 million Saudi Riyals: (TOV) for different substation building cost. 2. When there is no discount for buying more than one substation.
(TOV) for different initial operating cost. Initial operating cost Optimal Solution (3, 1, 3, 3, 2, 2, 2, 3, 3, 3)
A New Optimal Solution (3, 1, 3, 3, 3, 3, 3, 3, 3, 0) 1. Substation building cost: (51 – 53.5) million Saudi Riyals. (TOV) with different substation building cost.
Optimal Solution: (3, 1, 3, 3, 3, 3, 3, 3, 3, 0) (TOV) with different initial operation cost.
7. CONCLUSIONS The ability of NN’s to forecast within an error range of about 2 % only. Mean annual electricity consumption increase (2011 – 2020) = 3.49%. A backward model of dynamic programming approaches can be used. The solution procedure starts at the last year (stage n = 10) and then move backward to the initial stage (first year).
CONCLUSIONS    (Cont’d.) 5. The optimal solution is (3,1,3,3,3,3,0,3,3,3) in the years (2010 – 2020) with total cost of   SR. 2,083,220,000. 6. There are many parameters affecting the optimal solution: - Initial value of the substation building cost. - Percentage of yearly increase in the substation building cost. - Percentage of discount for buying more than one substation. - Initial value of the operation cost. - Percentage of yearly increase in the operation cost.  7. The parametric results gives the decision for different changes in the problem data.
8. POINTS FOR FUTURE RESEARCHES To prove analytically the parametric results. To analyze the sudden changes in the optimal values.   To study the time value of money. To study the parametric results for simultaneous changes in different parameters. To use the shortest route and other techniques. To generalize the method for other regions in the kingdom. To build a decision support system for such problems.

Contenu connexe

Tendances

WCSMO-Vidmap-2015
WCSMO-Vidmap-2015WCSMO-Vidmap-2015
WCSMO-Vidmap-2015OptiModel
 
MOWF_WCSMO_2013_Weiyang
MOWF_WCSMO_2013_WeiyangMOWF_WCSMO_2013_Weiyang
MOWF_WCSMO_2013_WeiyangMDO_Lab
 
WCSMO-WFLO-2015-mehmani
WCSMO-WFLO-2015-mehmaniWCSMO-WFLO-2015-mehmani
WCSMO-WFLO-2015-mehmaniOptiModel
 
IRJET- Optimal Power Flow Solution of Transmission Line Network of Electric p...
IRJET- Optimal Power Flow Solution of Transmission Line Network of Electric p...IRJET- Optimal Power Flow Solution of Transmission Line Network of Electric p...
IRJET- Optimal Power Flow Solution of Transmission Line Network of Electric p...IRJET Journal
 
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...TELKOMNIKA JOURNAL
 
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...IJECEIAES
 
Optimization for-power-sy-8631549
Optimization for-power-sy-8631549Optimization for-power-sy-8631549
Optimization for-power-sy-8631549Kannan Kathiravan
 
A Generalized Multistage Economic Planning Model for Distribution System Cont...
A Generalized Multistage Economic Planning Model for Distribution System Cont...A Generalized Multistage Economic Planning Model for Distribution System Cont...
A Generalized Multistage Economic Planning Model for Distribution System Cont...IJERD Editor
 
WFSA_IDETC_2013_Weiyang
WFSA_IDETC_2013_WeiyangWFSA_IDETC_2013_Weiyang
WFSA_IDETC_2013_WeiyangMDO_Lab
 
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...IRJET Journal
 
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...Satyendra Singh
 
Enhancing the Electric Grid Reliability through Data Analytics
Enhancing the Electric Grid Reliability through Data Analytics Enhancing the Electric Grid Reliability through Data Analytics
Enhancing the Electric Grid Reliability through Data Analytics Mrinalini Sharma
 
A Critical Review on Employed Techniques for Short Term Load Forecasting
A Critical Review on Employed Techniques for Short Term Load ForecastingA Critical Review on Employed Techniques for Short Term Load Forecasting
A Critical Review on Employed Techniques for Short Term Load ForecastingIRJET Journal
 
Firefly Algorithm to Opmimal Distribution of Reactive Power Compensation Units
Firefly Algorithm to Opmimal Distribution of Reactive Power Compensation Units Firefly Algorithm to Opmimal Distribution of Reactive Power Compensation Units
Firefly Algorithm to Opmimal Distribution of Reactive Power Compensation Units IJECEIAES
 
Compromising between-eld-&amp;-eed-using-gatool-matlab
Compromising between-eld-&amp;-eed-using-gatool-matlabCompromising between-eld-&amp;-eed-using-gatool-matlab
Compromising between-eld-&amp;-eed-using-gatool-matlabSubhankar Sau
 
IRJET- Novel based Stock Value Prediction Method
IRJET- Novel based Stock Value Prediction MethodIRJET- Novel based Stock Value Prediction Method
IRJET- Novel based Stock Value Prediction MethodIRJET Journal
 
Optimization of Economic Load Dispatch with Unit Commitment on Multi Machine
Optimization of Economic Load Dispatch with Unit Commitment on Multi MachineOptimization of Economic Load Dispatch with Unit Commitment on Multi Machine
Optimization of Economic Load Dispatch with Unit Commitment on Multi MachineIJAPEJOURNAL
 

Tendances (19)

WCSMO-Vidmap-2015
WCSMO-Vidmap-2015WCSMO-Vidmap-2015
WCSMO-Vidmap-2015
 
MOWF_WCSMO_2013_Weiyang
MOWF_WCSMO_2013_WeiyangMOWF_WCSMO_2013_Weiyang
MOWF_WCSMO_2013_Weiyang
 
WCSMO-WFLO-2015-mehmani
WCSMO-WFLO-2015-mehmaniWCSMO-WFLO-2015-mehmani
WCSMO-WFLO-2015-mehmani
 
IRJET- Optimal Power Flow Solution of Transmission Line Network of Electric p...
IRJET- Optimal Power Flow Solution of Transmission Line Network of Electric p...IRJET- Optimal Power Flow Solution of Transmission Line Network of Electric p...
IRJET- Optimal Power Flow Solution of Transmission Line Network of Electric p...
 
Psat toolbox-8631349
Psat toolbox-8631349Psat toolbox-8631349
Psat toolbox-8631349
 
arq3-3_power
arq3-3_powerarq3-3_power
arq3-3_power
 
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
Optimal Expenditure and Benefit Cost Based Location, Size and Type of DGs in ...
 
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
 
Optimization for-power-sy-8631549
Optimization for-power-sy-8631549Optimization for-power-sy-8631549
Optimization for-power-sy-8631549
 
A Generalized Multistage Economic Planning Model for Distribution System Cont...
A Generalized Multistage Economic Planning Model for Distribution System Cont...A Generalized Multistage Economic Planning Model for Distribution System Cont...
A Generalized Multistage Economic Planning Model for Distribution System Cont...
 
WFSA_IDETC_2013_Weiyang
WFSA_IDETC_2013_WeiyangWFSA_IDETC_2013_Weiyang
WFSA_IDETC_2013_Weiyang
 
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
 
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...
 
Enhancing the Electric Grid Reliability through Data Analytics
Enhancing the Electric Grid Reliability through Data Analytics Enhancing the Electric Grid Reliability through Data Analytics
Enhancing the Electric Grid Reliability through Data Analytics
 
A Critical Review on Employed Techniques for Short Term Load Forecasting
A Critical Review on Employed Techniques for Short Term Load ForecastingA Critical Review on Employed Techniques for Short Term Load Forecasting
A Critical Review on Employed Techniques for Short Term Load Forecasting
 
Firefly Algorithm to Opmimal Distribution of Reactive Power Compensation Units
Firefly Algorithm to Opmimal Distribution of Reactive Power Compensation Units Firefly Algorithm to Opmimal Distribution of Reactive Power Compensation Units
Firefly Algorithm to Opmimal Distribution of Reactive Power Compensation Units
 
Compromising between-eld-&amp;-eed-using-gatool-matlab
Compromising between-eld-&amp;-eed-using-gatool-matlabCompromising between-eld-&amp;-eed-using-gatool-matlab
Compromising between-eld-&amp;-eed-using-gatool-matlab
 
IRJET- Novel based Stock Value Prediction Method
IRJET- Novel based Stock Value Prediction MethodIRJET- Novel based Stock Value Prediction Method
IRJET- Novel based Stock Value Prediction Method
 
Optimization of Economic Load Dispatch with Unit Commitment on Multi Machine
Optimization of Economic Load Dispatch with Unit Commitment on Multi MachineOptimization of Economic Load Dispatch with Unit Commitment on Multi Machine
Optimization of Economic Load Dispatch with Unit Commitment on Multi Machine
 

Similaire à Siad el quliti economic scheduling the construction of electric transmission

Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...
Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...
Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...IJERA Editor
 
Economic Dispatch using Quantum Evolutionary Algorithm in Electrical Power S...
Economic Dispatch  using Quantum Evolutionary Algorithm in Electrical Power S...Economic Dispatch  using Quantum Evolutionary Algorithm in Electrical Power S...
Economic Dispatch using Quantum Evolutionary Algorithm in Electrical Power S...IJECEIAES
 
COSTMODEL_IDETC_2010_Jie
COSTMODEL_IDETC_2010_JieCOSTMODEL_IDETC_2010_Jie
COSTMODEL_IDETC_2010_JieMDO_Lab
 
Multi objective economic load dispatch using hybrid fuzzy, bacterial
Multi objective economic load dispatch using hybrid fuzzy, bacterialMulti objective economic load dispatch using hybrid fuzzy, bacterial
Multi objective economic load dispatch using hybrid fuzzy, bacterialIAEME Publication
 
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...IRJET Journal
 
Optimal power flow based congestion management using enhanced genetic algorithms
Optimal power flow based congestion management using enhanced genetic algorithmsOptimal power flow based congestion management using enhanced genetic algorithms
Optimal power flow based congestion management using enhanced genetic algorithmsIJECEIAES
 
Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...IJECEIAES
 
IRJET- Swarm Optimization Technique for Economic Load Dispatch
IRJET- Swarm Optimization Technique for Economic Load DispatchIRJET- Swarm Optimization Technique for Economic Load Dispatch
IRJET- Swarm Optimization Technique for Economic Load DispatchIRJET Journal
 
Determining the Pareto front of distributed generator and static VAR compens...
Determining the Pareto front of distributed generator and static  VAR compens...Determining the Pareto front of distributed generator and static  VAR compens...
Determining the Pareto front of distributed generator and static VAR compens...IJECEIAES
 
Inclusion of environmental constraints into siting and sizing
Inclusion of environmental constraints into siting and sizingInclusion of environmental constraints into siting and sizing
Inclusion of environmental constraints into siting and sizingIAEME Publication
 
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...IRJET Journal
 
IRJET- Optimal Generation Scheduling for Thermal Units
IRJET- Optimal Generation Scheduling for Thermal UnitsIRJET- Optimal Generation Scheduling for Thermal Units
IRJET- Optimal Generation Scheduling for Thermal UnitsIRJET Journal
 
IRJET- Optimal Generation Scheduling for Thermal Units
IRJET-  	  Optimal Generation Scheduling for Thermal UnitsIRJET-  	  Optimal Generation Scheduling for Thermal Units
IRJET- Optimal Generation Scheduling for Thermal UnitsIRJET Journal
 
Optimal Siting of Distributed Generators in a Distribution Network using Arti...
Optimal Siting of Distributed Generators in a Distribution Network using Arti...Optimal Siting of Distributed Generators in a Distribution Network using Arti...
Optimal Siting of Distributed Generators in a Distribution Network using Arti...IJECEIAES
 
Optimum Location of DG Units Considering Operation Conditions
Optimum Location of DG Units Considering Operation ConditionsOptimum Location of DG Units Considering Operation Conditions
Optimum Location of DG Units Considering Operation ConditionsEditor IJCATR
 
Hybrid method for achieving Pareto front on economic emission dispatch
Hybrid method for achieving Pareto front on economic  emission dispatch Hybrid method for achieving Pareto front on economic  emission dispatch
Hybrid method for achieving Pareto front on economic emission dispatch IJECEIAES
 
Optimal Configuration of Wind Farms in Radial Distribution System Using Parti...
Optimal Configuration of Wind Farms in Radial Distribution System Using Parti...Optimal Configuration of Wind Farms in Radial Distribution System Using Parti...
Optimal Configuration of Wind Farms in Radial Distribution System Using Parti...journalBEEI
 
IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...
IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...
IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...IRJET Journal
 
COST_MAO_2010_Jie
COST_MAO_2010_JieCOST_MAO_2010_Jie
COST_MAO_2010_JieMDO_Lab
 

Similaire à Siad el quliti economic scheduling the construction of electric transmission (20)

Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...
Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...
Cost Aware Expansion Planning with Renewable DGs using Particle Swarm Optimiz...
 
Economic Dispatch using Quantum Evolutionary Algorithm in Electrical Power S...
Economic Dispatch  using Quantum Evolutionary Algorithm in Electrical Power S...Economic Dispatch  using Quantum Evolutionary Algorithm in Electrical Power S...
Economic Dispatch using Quantum Evolutionary Algorithm in Electrical Power S...
 
COSTMODEL_IDETC_2010_Jie
COSTMODEL_IDETC_2010_JieCOSTMODEL_IDETC_2010_Jie
COSTMODEL_IDETC_2010_Jie
 
Multi objective economic load dispatch using hybrid fuzzy, bacterial
Multi objective economic load dispatch using hybrid fuzzy, bacterialMulti objective economic load dispatch using hybrid fuzzy, bacterial
Multi objective economic load dispatch using hybrid fuzzy, bacterial
 
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
 
Optimal power flow based congestion management using enhanced genetic algorithms
Optimal power flow based congestion management using enhanced genetic algorithmsOptimal power flow based congestion management using enhanced genetic algorithms
Optimal power flow based congestion management using enhanced genetic algorithms
 
Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
 
IRJET- Swarm Optimization Technique for Economic Load Dispatch
IRJET- Swarm Optimization Technique for Economic Load DispatchIRJET- Swarm Optimization Technique for Economic Load Dispatch
IRJET- Swarm Optimization Technique for Economic Load Dispatch
 
Determining the Pareto front of distributed generator and static VAR compens...
Determining the Pareto front of distributed generator and static  VAR compens...Determining the Pareto front of distributed generator and static  VAR compens...
Determining the Pareto front of distributed generator and static VAR compens...
 
Inclusion of environmental constraints into siting and sizing
Inclusion of environmental constraints into siting and sizingInclusion of environmental constraints into siting and sizing
Inclusion of environmental constraints into siting and sizing
 
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
 
40220140507005
4022014050700540220140507005
40220140507005
 
IRJET- Optimal Generation Scheduling for Thermal Units
IRJET- Optimal Generation Scheduling for Thermal UnitsIRJET- Optimal Generation Scheduling for Thermal Units
IRJET- Optimal Generation Scheduling for Thermal Units
 
IRJET- Optimal Generation Scheduling for Thermal Units
IRJET-  	  Optimal Generation Scheduling for Thermal UnitsIRJET-  	  Optimal Generation Scheduling for Thermal Units
IRJET- Optimal Generation Scheduling for Thermal Units
 
Optimal Siting of Distributed Generators in a Distribution Network using Arti...
Optimal Siting of Distributed Generators in a Distribution Network using Arti...Optimal Siting of Distributed Generators in a Distribution Network using Arti...
Optimal Siting of Distributed Generators in a Distribution Network using Arti...
 
Optimum Location of DG Units Considering Operation Conditions
Optimum Location of DG Units Considering Operation ConditionsOptimum Location of DG Units Considering Operation Conditions
Optimum Location of DG Units Considering Operation Conditions
 
Hybrid method for achieving Pareto front on economic emission dispatch
Hybrid method for achieving Pareto front on economic  emission dispatch Hybrid method for achieving Pareto front on economic  emission dispatch
Hybrid method for achieving Pareto front on economic emission dispatch
 
Optimal Configuration of Wind Farms in Radial Distribution System Using Parti...
Optimal Configuration of Wind Farms in Radial Distribution System Using Parti...Optimal Configuration of Wind Farms in Radial Distribution System Using Parti...
Optimal Configuration of Wind Farms in Radial Distribution System Using Parti...
 
IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...
IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...
IRJET- A Genetic based Stochastic Approach for Solving Thermal Unit Commitmen...
 
COST_MAO_2010_Jie
COST_MAO_2010_JieCOST_MAO_2010_Jie
COST_MAO_2010_Jie
 

Plus de sarah7887

Sadeq abdulwahab management of electrical safety
Sadeq abdulwahab  management of electrical safetySadeq abdulwahab  management of electrical safety
Sadeq abdulwahab management of electrical safetysarah7887
 
Sabah elmasarawy power quality harmonics
Sabah elmasarawy   power quality harmonicsSabah elmasarawy   power quality harmonics
Sabah elmasarawy power quality harmonicssarah7887
 
Kiomars dabbagh use of photovoltaic modules in desert climates
Kiomars dabbagh   use of photovoltaic modules in desert climatesKiomars dabbagh   use of photovoltaic modules in desert climates
Kiomars dabbagh use of photovoltaic modules in desert climatessarah7887
 
Khaled el naggar high impedance faults detection in electrical power systems
Khaled el naggar  high impedance faults detection in electrical power systemsKhaled el naggar  high impedance faults detection in electrical power systems
Khaled el naggar high impedance faults detection in electrical power systemssarah7887
 
Jassim al hamad open substation automation system for oil & gas industry
Jassim al hamad  open substation automation system for oil & gas industryJassim al hamad  open substation automation system for oil & gas industry
Jassim al hamad open substation automation system for oil & gas industrysarah7887
 
Ibrahim makki saudi cable company
Ibrahim makki  saudi cable companyIbrahim makki  saudi cable company
Ibrahim makki saudi cable companysarah7887
 
Hussam al amin retrofilling with ester based transofmer dielectric fluid to...
Hussam al amin   retrofilling with ester based transofmer dielectric fluid to...Hussam al amin   retrofilling with ester based transofmer dielectric fluid to...
Hussam al amin retrofilling with ester based transofmer dielectric fluid to...sarah7887
 
Huda al khaldee & lulwa al sharhan achievements of mew
Huda al khaldee & lulwa al sharhan   achievements of mewHuda al khaldee & lulwa al sharhan   achievements of mew
Huda al khaldee & lulwa al sharhan achievements of mewsarah7887
 
Fabio scatiggio understanding and management of sulphur corrosion form insu...
Fabio scatiggio   understanding and management of sulphur corrosion form insu...Fabio scatiggio   understanding and management of sulphur corrosion form insu...
Fabio scatiggio understanding and management of sulphur corrosion form insu...sarah7887
 
Safiya & suad & ghadeer the energy conservation measures in government & pr...
Safiya & suad & ghadeer   the energy conservation measures in government & pr...Safiya & suad & ghadeer   the energy conservation measures in government & pr...
Safiya & suad & ghadeer the energy conservation measures in government & pr...sarah7887
 

Plus de sarah7887 (10)

Sadeq abdulwahab management of electrical safety
Sadeq abdulwahab  management of electrical safetySadeq abdulwahab  management of electrical safety
Sadeq abdulwahab management of electrical safety
 
Sabah elmasarawy power quality harmonics
Sabah elmasarawy   power quality harmonicsSabah elmasarawy   power quality harmonics
Sabah elmasarawy power quality harmonics
 
Kiomars dabbagh use of photovoltaic modules in desert climates
Kiomars dabbagh   use of photovoltaic modules in desert climatesKiomars dabbagh   use of photovoltaic modules in desert climates
Kiomars dabbagh use of photovoltaic modules in desert climates
 
Khaled el naggar high impedance faults detection in electrical power systems
Khaled el naggar  high impedance faults detection in electrical power systemsKhaled el naggar  high impedance faults detection in electrical power systems
Khaled el naggar high impedance faults detection in electrical power systems
 
Jassim al hamad open substation automation system for oil & gas industry
Jassim al hamad  open substation automation system for oil & gas industryJassim al hamad  open substation automation system for oil & gas industry
Jassim al hamad open substation automation system for oil & gas industry
 
Ibrahim makki saudi cable company
Ibrahim makki  saudi cable companyIbrahim makki  saudi cable company
Ibrahim makki saudi cable company
 
Hussam al amin retrofilling with ester based transofmer dielectric fluid to...
Hussam al amin   retrofilling with ester based transofmer dielectric fluid to...Hussam al amin   retrofilling with ester based transofmer dielectric fluid to...
Hussam al amin retrofilling with ester based transofmer dielectric fluid to...
 
Huda al khaldee & lulwa al sharhan achievements of mew
Huda al khaldee & lulwa al sharhan   achievements of mewHuda al khaldee & lulwa al sharhan   achievements of mew
Huda al khaldee & lulwa al sharhan achievements of mew
 
Fabio scatiggio understanding and management of sulphur corrosion form insu...
Fabio scatiggio   understanding and management of sulphur corrosion form insu...Fabio scatiggio   understanding and management of sulphur corrosion form insu...
Fabio scatiggio understanding and management of sulphur corrosion form insu...
 
Safiya & suad & ghadeer the energy conservation measures in government & pr...
Safiya & suad & ghadeer   the energy conservation measures in government & pr...Safiya & suad & ghadeer   the energy conservation measures in government & pr...
Safiya & suad & ghadeer the energy conservation measures in government & pr...
 

Siad el quliti economic scheduling the construction of electric transmission

  • 1. Economic Scheduling the Construction of Electric Transmission/ Distribution Substations in Jeddah City with Parametric Results Said Ali El-Quliti1) and Mohammed RedaKabli2)   1) Professor, 2) Assistant Professor, Department of Industrial Engineering, King AbdulAziz University, Jeddah, Saudi Arabia.
  • 2. On the Name of God
  • 3.
  • 4. Scope: The electricity field in Jeddah City; for a long-term time horizon (10 years).
  • 5.
  • 6. 2. LITERATURE REVIEW The population forecast in Jeddah city is expected to increase with an increasing rate of 2.2% a year. "Eighth Development Plan 2005 – 2009", Ministry of Planning, Kingdom of Saudi Arabia, 2004.
  • 7. In a previous paper, A study to forecast the number of substations needed for the 10 years (2006 – 2015) is determined, and also the optimum scheduling of these substations. Said Ali Hassan ElQuliti, Ibrahim A. El-Darrab, and Mohammed Abdu Al-Ameer, "A Dynamic Programming Model for Scheduling the Electric Transmission/Distribution Substations in Jeddah City", WSEAS Intern. Conferences, Univ. of Cambridge, Cambridge, United Kingdom, 2009.
  • 8. Parols A.G. et al, found that an essential element of electric utility resource planning is forecasting of the future load demand. Parols A.G., Esmaeil O., Muthusami J, Patton A. and Atiya A.F., “Development of an Intelligent Long-Term Electric Load Forecasting System”, Intelligent Systems Applications to Power Systems, Proceedings, ISAP International Conference, pp. 288 – 292, 1996.
  • 9. F.-C. Lu, and Y.-Y. Hsu Investigate the reactive power/voltage control in a distribution substation. An approach based on dynamic programming is presented to reach the desired schedule. F.-C. Lu, Y.-Y. Hsu, " Reactive power/voltage control in a distribution substation using dynamic programming", IEE Proceedings, Generation, Transmission and Distribution, Volume 142, Issue 6, pp. 639-645, November 1995.
  • 10. YixinYn et al, Use dynamic programming for the optimal planning of substation locations which satisfy the load demands and minimize the investment and operating cost. YixinYn, Chengshan Wang, ShaoyunGe, Jun Xiao, Xuefei Yan, Chunhua Huang "Models and Methods for Urban Distribution Planning", School of Electrical and Automation Engineering, Tianjin University, Perth, WA, Australia, 2000.
  • 11. 3. DATA COLLECTION SAUDI ELECTRICITY COMPANY The single national company for generation, transmission and distribution of electricity all over Saudi Arabia. (Now it is divided into several Companies).
  • 12. FORECASTING OF THE ELECTRIC LOAD Time Series Data of the annual total electricity consumption in Jeddah city 32 years (1979-2010)were collected.
  • 13. Forecasting The number of required substations to be built (from 2011 to 2020) is forecasted depending on results for forecasting annual total consumption of electricity . The forecasting is done using Multiple Regression Analysis(Causal Methods) and Artificial Neural Networks (ANN).
  • 14. 4. THE DYNAMIC PROGRAMMING MODEL
  • 15. THE MODEL Decision variables: the number of transmission/distribution substations to build in each year (stage). The states: the number of substations still required in remaining years. The objective function: minimize the total cost of building (investment cost) and operating the substations in the coming ten years. The constraints: the number of required substations, budget to maintain both the building and operating costs.
  • 16. 4.1 Recursive Relationship in Dynamic Programming Identifies the optimal policy for stage n, given the optimal policy for stage n + 1.
  • 17. 3 4 5 Stage 1 2 6 7 8 9 10 13 16 19 10 0 7 4 1 6 14 11 1 8 5 22 25 17 20 9 2 7 4 0 12 2 10 15 21 18 3 8 5 11 13 3 9 6 Network formulation for the problem Required Substations: 3 1 3 3 2 2 2 3 3 3 Budget Constraints: Constructed number ≤ 3 substation/year
  • 18. 3 4 5 Stage 1 2 6 7 8 9 10 347.51 664.44 947.06 1198.62 138.00 731.88 1620.04 1422.11 419.68 1794.63 13 16 1010.09 19 10 0 7 4 1257.52 1 224.40 791.02 482.93 1477.17 1948.22 1671.49 2083.22 1842.73 6 0.00 1065.34 14 11 1 8 5 22 25 17 1309.41 20 9 301.61 866.49 2 563.69 7 1885.09 1716.81 1525.67 1135.88 4 1375.74 0 12 2 10 15 21 18 933.93 369.63 635.86 3 1198.91 8 5 11 13 3 993.34 699.44 9 6 Possible branches Branch of minimum total cost to the end node Branch on the optimum path Solution of the problem The optimal Solution: 3 1 3 3 3 3 0 3 3 3 Required Substations: 3 1 3 3 2 2 2 3 3 3
  • 20. 6.1 Control Parameters Affecting the Solution The substation building cost (investment cost). The percentage of yearly increase in the substation building cost. The percentage of discount for buying more than one substation. Initial value of the operating cost (in the 1st. Year). The percentage of yearly increase in the operating cost..
  • 21. The Same Optimal Solution The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3)
  • 22. The Same Optimal Solution The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3) The substation building cost. The Total Optimal Value (TOV): Total Optimum Values for different initial building cost.
  • 23. 2. The percentage of yearly increase in the substation building cost. The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3) (TOV) for different increases in substation building cost.
  • 24. 3. The percentage of discount for buying more than one substation. The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3) (TOV) for different discounts for substation's cost.
  • 25. 4. Initial value of the operating cost. The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3) (TOV) for different initial operation cost.
  • 26. 5. The percentage of yearly increase in the operating cost. The optimal Solution: (3, 1, 3, 3, 3, 3, 0, 3, 3, 3) (TOV) for different % yearly increase in operation cost.
  • 27. 6.3 Changes in the Optimal Solution If changes in parameters are outside the range, a new optimal solution appears:
  • 28. Optimal Solution (3, 1, 3, 3, 2, 2, 2, 3, 3, 3) 1. For substation building cost < 19.3 million Saudi Riyals: (TOV) for different substation building cost. 2. When there is no discount for buying more than one substation.
  • 29. (TOV) for different initial operating cost. Initial operating cost Optimal Solution (3, 1, 3, 3, 2, 2, 2, 3, 3, 3)
  • 30. A New Optimal Solution (3, 1, 3, 3, 3, 3, 3, 3, 3, 0) 1. Substation building cost: (51 – 53.5) million Saudi Riyals. (TOV) with different substation building cost.
  • 31. Optimal Solution: (3, 1, 3, 3, 3, 3, 3, 3, 3, 0) (TOV) with different initial operation cost.
  • 32. 7. CONCLUSIONS The ability of NN’s to forecast within an error range of about 2 % only. Mean annual electricity consumption increase (2011 – 2020) = 3.49%. A backward model of dynamic programming approaches can be used. The solution procedure starts at the last year (stage n = 10) and then move backward to the initial stage (first year).
  • 33. CONCLUSIONS (Cont’d.) 5. The optimal solution is (3,1,3,3,3,3,0,3,3,3) in the years (2010 – 2020) with total cost of SR. 2,083,220,000. 6. There are many parameters affecting the optimal solution: - Initial value of the substation building cost. - Percentage of yearly increase in the substation building cost. - Percentage of discount for buying more than one substation. - Initial value of the operation cost. - Percentage of yearly increase in the operation cost. 7. The parametric results gives the decision for different changes in the problem data.
  • 34. 8. POINTS FOR FUTURE RESEARCHES To prove analytically the parametric results. To analyze the sudden changes in the optimal values. To study the time value of money. To study the parametric results for simultaneous changes in different parameters. To use the shortest route and other techniques. To generalize the method for other regions in the kingdom. To build a decision support system for such problems.