Project Life Cycle



 Team Members
 P.Saravanan (16) SS10-12/ISBE/Fin
 BalajiMurugan (21) SS10-12/ISBE/Fin
 Lilima James (8) SS10-12/IIPM/Fin
Project
• Project management is the discipline of planning,
  organizing, securing, and managing resources to
  achieve specific goals

• Project is a temporary endeavor with a
beginning and an end,
undertaken to meet unique goals and objectives,
To bring about beneficial change or added value.
Project lifecycle
• The sequence of phases through which the
  project will evolve is a project life cycle.

1.   Initiation
2.   Planning
3.   Execution
4.   Closure
Life cycle
Initiation
• Develop a business case
• Undertake a feasibility study
• Establish the project charter
• Appoint the project team
• Set up the project office
• Perform phase review
Planning
• Project plan         • Risk Plan

• Resource plan        • Acceptance Plan

• Financial Plan       • Communication Plan

• Quality Plan         • Procurement plan
Execution
• Time Management        • Issue Management

• Cost management        • Procurement

• Quality Management      Management

• Change Management      • Acceptance Management

• Risk Management        • Communications
                          Management
Closure
• Perform Project Closure

• Review Project Completion
Project Charter
Project Charter
• This defines the scope, objectives, deliverables
  and overall approach for the work to be
  completed.

• Absolute master document.

• Critical element for initiating, planning, execution
  and controlling the project.

• Acts as a contract between project team and
  sponsors
Contents Of A Charter
• Why are we doing this and what is the overall
  goal.
• What are the assumptions and constraints
  going in.
• When do we need to be finished.
• What deliverables must be made to get there.
• What things are not to be done.
Cont…
• When do the deliverables need to be
  completed and in what order.
• Who is going to actually do the tasks and
  where.
• What resources and money (budget) is
  needed.
• What risks are there likely to be along the way.
• How to keep things on target and monitor
  progress.
Details
• Deliverables out of scope can be incorporated.

• Project estimated costs of each and every
  deliverable.
Project conditions
• Assumptions

• Constraints

• Project interdependencies

• Organizational impact

• Project scope change process
- Request (C/B analysis and inputs regarding the
  change)
Risk management
Personnel Resource Planning
PRP cont…
Non-People resources
Case- Namma Metro
Bangalore Metro Rail Project
Project initiation

• The project was started
  in Augest 2005 and the
  first strectch between
  Baiyyappanahalli and
  M.G.Road was
  inaugurated on Oct
  20,2011
Divided into four parts
• Reach 1 : Now operational- Baiyyappanahalli
  and M.G.Road




• Reach 2 : Magadi Road to Mysore Road -
  ready by December 2012 or early 2013.

• Reach 3 : Yeshwantpur to Swastik -Nearing
  completion – will be operational by
  December, 2012

• Reach 4 : by 2013
Governance
• Bangalore Metro Rail project comes under the legal
  body of Bangalore Mass Rapid Transit Ltd(BMRTL).

• Chairman : Anil Bajilal,union urban development
  secretary

• Board of Directors: 5 from central government,5 from
  state government

• Participants : State,Central Governments, Financial
  Institutions
• Public sector BEML has been mandated for the
  supply of 150 metro coaches valued at Rs 1,672
  cr with a provision for supplying 63 more
  coaches.

• The companies involved in various tasks of the
  projects are:-
• Navayuga Engg Ltd,Hyderabad
• Nagarjuna Construction Pvt Ltd
• Afcons Infrastructure
• Punj Llyod Ltd
Phase I
Baiyyappanahalli - M.G.Road
Planning
• Routes : East-west(18.1 Km),North-south(14.9
  km)
• Total length of the project :43 kms
• Type : Elevated and underground
• No of stations : 41
• No of commuters per day :820,000
• Proposed fare : 1.33-1.66 times the bus fares
• Cost/Km Underground : Rs 250 crore
• Cost/km Elevated : Rs 80 crore
• Total cost : Rs 11,609 crore
Fund formula
•   State : Rs 2287 cr
•   Central/federal : Rs 1831 cr
•   Financial Institutions : Rs 3982 cr
Train Outline
• Each train consists of three coaches (2.88 m wide) to
  start with. The train can accommodate a total of 1000
  persons.

• Later, it will run six coaches - the carrying capacity of a
  six coach train will be 2068 passengers

• Wi-Fi enabled

• Coaches have stainless steel covering, air-conditioned
  and automated doors.
Project Execution
• Ground-level preparations for the ambitious metro rail
  project in bangalore was made with the state
  government freezing development activity in 247
  premises and buildings it tentatively identified for this
  purpose

• Bangalore metro have a standard guage and will take
  cover under the 100-year old Mysore tramways
  Act,which required some amendments by the state
  government to suit the present day needs.With
  this,BMRTL avoided going to the railway ministry for all
  sanctions.
Phase I - Project closure
• Phase 1 has come to live on October 20
  th,2011
Phase II
• Covering a span of 70 kilometres

• phase II is an extension of all the four Reaches and
  will reduce road traffic by 35 per cent.

• The estimated project cost is Rs 25,000 crore.

• The Second Phase of the project will begin in 2012

• The number of passengers expected to travel on the
  metro everyday is estimated 16.10 lakh by 2021
Bibliography
• www.bmrc.co.in
• http://www.rediff.com/business/slide-
  show/slide-show-1-bangalore-swanky-metro-
  rail/20111020.html
• http://www.kayoprojectmanagement.com/Sa
  mple%20Project%20Charter.pdf
• www.wikipedia.org
Thank you

Contenu connexe

Tendances

Tendances (20)

Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project cost management-slides
Project cost management-slidesProject cost management-slides
Project cost management-slides
 
Project Management 101 Briefing
Project Management 101 BriefingProject Management 101 Briefing
Project Management 101 Briefing
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
Project management
Project managementProject management
Project management
 
PMO-Framework
PMO-FrameworkPMO-Framework
PMO-Framework
 
2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2
 
Project Management Principles and Process
Project Management Principles and ProcessProject Management Principles and Process
Project Management Principles and Process
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project management
Project managementProject management
Project management
 
Project Quality Management - PMBOK
Project Quality Management - PMBOKProject Quality Management - PMBOK
Project Quality Management - PMBOK
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
PMP_Project Cost Management
PMP_Project Cost ManagementPMP_Project Cost Management
PMP_Project Cost Management
 
Project Planning & Management
Project Planning & Management Project Planning & Management
Project Planning & Management
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 

En vedette

En vedette (13)

Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
 
Artifacts
ArtifactsArtifacts
Artifacts
 
software project management Artifact set(spm)
software project management Artifact set(spm)software project management Artifact set(spm)
software project management Artifact set(spm)
 
Entrepreneur development
Entrepreneur developmentEntrepreneur development
Entrepreneur development
 
Artefacts
ArtefactsArtefacts
Artefacts
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Frequency distribution, central tendency, measures of dispersion
Frequency distribution, central tendency, measures of dispersionFrequency distribution, central tendency, measures of dispersion
Frequency distribution, central tendency, measures of dispersion
 
Central level institutions supporting entrepreneurs
Central level institutions supporting entrepreneursCentral level institutions supporting entrepreneurs
Central level institutions supporting entrepreneurs
 
Project cycle
Project cycleProject cycle
Project cycle
 
The role of creativity in entrepreneurship
The role of creativity in entrepreneurshipThe role of creativity in entrepreneurship
The role of creativity in entrepreneurship
 
Project cycle
Project cycleProject cycle
Project cycle
 
Procedure to start small scale industries
Procedure to start small scale industriesProcedure to start small scale industries
Procedure to start small scale industries
 
Creativity and innovation in entrepreneurship
Creativity and innovation  in entrepreneurshipCreativity and innovation  in entrepreneurship
Creativity and innovation in entrepreneurship
 

Similaire à Project LlifeCycle

KMRL_VIVA_PPT.pptx
KMRL_VIVA_PPT.pptxKMRL_VIVA_PPT.pptx
KMRL_VIVA_PPT.pptx
SwaragNP
 
10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx
Janak82
 
Consultant profile
Consultant profileConsultant profile
Consultant profile
Arijit Basu
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE
S. Sathishkumar
 
Online PMP Exam Certification Training - 35 Hours
Online PMP Exam Certification Training - 35 HoursOnline PMP Exam Certification Training - 35 Hours
Online PMP Exam Certification Training - 35 Hours
Resit Gulec, MBA, PMP®, ITIL®
 

Similaire à Project LlifeCycle (20)

Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad
 
The indus glory cruise
The indus glory cruiseThe indus glory cruise
The indus glory cruise
 
659193
659193659193
659193
 
KMRL_VIVA_PPT.pptx
KMRL_VIVA_PPT.pptxKMRL_VIVA_PPT.pptx
KMRL_VIVA_PPT.pptx
 
10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx
 
Consultant profile
Consultant profileConsultant profile
Consultant profile
 
final ppt.pptx
final ppt.pptxfinal ppt.pptx
final ppt.pptx
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE
 
MODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction ManagementMODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction Management
 
gas pipe line project report.
gas pipe line project report.gas pipe line project report.
gas pipe line project report.
 
Project Management
Project  ManagementProject  Management
Project Management
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 
mumbai metro PPP model.pptx
mumbai metro PPP model.pptxmumbai metro PPP model.pptx
mumbai metro PPP model.pptx
 
Workshop B, Agile P3M benefits, by Steve Messenger
Workshop B, Agile P3M benefits, by Steve MessengerWorkshop B, Agile P3M benefits, by Steve Messenger
Workshop B, Agile P3M benefits, by Steve Messenger
 
Online PMP Exam Certification Training - 35 Hours
Online PMP Exam Certification Training - 35 HoursOnline PMP Exam Certification Training - 35 Hours
Online PMP Exam Certification Training - 35 Hours
 
Rageet bundela
Rageet bundelaRageet bundela
Rageet bundela
 
PM Unit - 1.pptx
PM Unit - 1.pptxPM Unit - 1.pptx
PM Unit - 1.pptx
 
Development Planning and Project Management.pdf
Development Planning and Project Management.pdfDevelopment Planning and Project Management.pdf
Development Planning and Project Management.pdf
 
PM Project group 4.pptx
PM Project group 4.pptxPM Project group 4.pptx
PM Project group 4.pptx
 
Chapter 1- Overview of Project Management.pdf
Chapter 1- Overview of Project Management.pdfChapter 1- Overview of Project Management.pdf
Chapter 1- Overview of Project Management.pdf
 

Plus de Saravanan rulez

Politics behind fdi in retail in india
Politics behind fdi in retail in indiaPolitics behind fdi in retail in india
Politics behind fdi in retail in india
Saravanan rulez
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
Saravanan rulez
 
BCG,GE matrix for ITC & Bajaj auto
BCG,GE matrix for ITC & Bajaj autoBCG,GE matrix for ITC & Bajaj auto
BCG,GE matrix for ITC & Bajaj auto
Saravanan rulez
 
Branding Management of Clinic all clear
Branding Management of Clinic all clearBranding Management of Clinic all clear
Branding Management of Clinic all clear
Saravanan rulez
 
Advertising Management of Clinic All Clear
Advertising Management of Clinic All Clear Advertising Management of Clinic All Clear
Advertising Management of Clinic All Clear
Saravanan rulez
 
Analysis of HR department
Analysis of HR departmentAnalysis of HR department
Analysis of HR department
Saravanan rulez
 
Global aid for development1
Global aid for development1Global aid for development1
Global aid for development1
Saravanan rulez
 
Education Service - Primary and Secondary School
Education Service - Primary and Secondary School Education Service - Primary and Secondary School
Education Service - Primary and Secondary School
Saravanan rulez
 
Attitude & Job Satisfaction
Attitude & Job SatisfactionAttitude & Job Satisfaction
Attitude & Job Satisfaction
Saravanan rulez
 
HDFC Bank recruitment process
HDFC Bank recruitment processHDFC Bank recruitment process
HDFC Bank recruitment process
Saravanan rulez
 

Plus de Saravanan rulez (20)

Politics behind fdi in retail in india
Politics behind fdi in retail in indiaPolitics behind fdi in retail in india
Politics behind fdi in retail in india
 
FDI in retail in INDIA
FDI in retail in INDIAFDI in retail in INDIA
FDI in retail in INDIA
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
 
BCG,GE matrix for ITC & Bajaj auto
BCG,GE matrix for ITC & Bajaj autoBCG,GE matrix for ITC & Bajaj auto
BCG,GE matrix for ITC & Bajaj auto
 
Branding Management of Clinic all clear
Branding Management of Clinic all clearBranding Management of Clinic all clear
Branding Management of Clinic all clear
 
Advertising Management of Clinic All Clear
Advertising Management of Clinic All Clear Advertising Management of Clinic All Clear
Advertising Management of Clinic All Clear
 
Attrition in HCL
Attrition in HCLAttrition in HCL
Attrition in HCL
 
Analysis of HR department
Analysis of HR departmentAnalysis of HR department
Analysis of HR department
 
MIS-KM of HCL
MIS-KM of HCLMIS-KM of HCL
MIS-KM of HCL
 
Global aid for development1
Global aid for development1Global aid for development1
Global aid for development1
 
M&A of Vodafone
M&A of Vodafone M&A of Vodafone
M&A of Vodafone
 
Trade unions in india
Trade unions in indiaTrade unions in india
Trade unions in india
 
Star TV
Star TVStar TV
Star TV
 
Education Service - Primary and Secondary School
Education Service - Primary and Secondary School Education Service - Primary and Secondary School
Education Service - Primary and Secondary School
 
Attitude & Job Satisfaction
Attitude & Job SatisfactionAttitude & Job Satisfaction
Attitude & Job Satisfaction
 
Metrocity car
Metrocity carMetrocity car
Metrocity car
 
Vedanta Acquired Cairn
Vedanta Acquired Cairn Vedanta Acquired Cairn
Vedanta Acquired Cairn
 
HDFC Bank recruitment process
HDFC Bank recruitment processHDFC Bank recruitment process
HDFC Bank recruitment process
 
Pyaaas
PyaaasPyaaas
Pyaaas
 
Eyecare service
Eyecare serviceEyecare service
Eyecare service
 

Dernier

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 

Dernier (20)

The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 

Project LlifeCycle

  • 1. Project Life Cycle Team Members P.Saravanan (16) SS10-12/ISBE/Fin BalajiMurugan (21) SS10-12/ISBE/Fin Lilima James (8) SS10-12/IIPM/Fin
  • 2. Project • Project management is the discipline of planning, organizing, securing, and managing resources to achieve specific goals • Project is a temporary endeavor with a beginning and an end, undertaken to meet unique goals and objectives, To bring about beneficial change or added value.
  • 3. Project lifecycle • The sequence of phases through which the project will evolve is a project life cycle. 1. Initiation 2. Planning 3. Execution 4. Closure
  • 5. Initiation • Develop a business case • Undertake a feasibility study • Establish the project charter • Appoint the project team • Set up the project office • Perform phase review
  • 6. Planning • Project plan • Risk Plan • Resource plan • Acceptance Plan • Financial Plan • Communication Plan • Quality Plan • Procurement plan
  • 7. Execution • Time Management • Issue Management • Cost management • Procurement • Quality Management Management • Change Management • Acceptance Management • Risk Management • Communications Management
  • 8. Closure • Perform Project Closure • Review Project Completion
  • 10. Project Charter • This defines the scope, objectives, deliverables and overall approach for the work to be completed. • Absolute master document. • Critical element for initiating, planning, execution and controlling the project. • Acts as a contract between project team and sponsors
  • 11. Contents Of A Charter • Why are we doing this and what is the overall goal. • What are the assumptions and constraints going in. • When do we need to be finished. • What deliverables must be made to get there. • What things are not to be done.
  • 12. Cont… • When do the deliverables need to be completed and in what order. • Who is going to actually do the tasks and where. • What resources and money (budget) is needed. • What risks are there likely to be along the way. • How to keep things on target and monitor progress.
  • 13.
  • 14.
  • 15.
  • 16. Details • Deliverables out of scope can be incorporated. • Project estimated costs of each and every deliverable.
  • 17. Project conditions • Assumptions • Constraints • Project interdependencies • Organizational impact • Project scope change process - Request (C/B analysis and inputs regarding the change)
  • 22.
  • 25. Project initiation • The project was started in Augest 2005 and the first strectch between Baiyyappanahalli and M.G.Road was inaugurated on Oct 20,2011
  • 26. Divided into four parts • Reach 1 : Now operational- Baiyyappanahalli and M.G.Road • Reach 2 : Magadi Road to Mysore Road - ready by December 2012 or early 2013. • Reach 3 : Yeshwantpur to Swastik -Nearing completion – will be operational by December, 2012 • Reach 4 : by 2013
  • 27. Governance • Bangalore Metro Rail project comes under the legal body of Bangalore Mass Rapid Transit Ltd(BMRTL). • Chairman : Anil Bajilal,union urban development secretary • Board of Directors: 5 from central government,5 from state government • Participants : State,Central Governments, Financial Institutions
  • 28. • Public sector BEML has been mandated for the supply of 150 metro coaches valued at Rs 1,672 cr with a provision for supplying 63 more coaches. • The companies involved in various tasks of the projects are:- • Navayuga Engg Ltd,Hyderabad • Nagarjuna Construction Pvt Ltd • Afcons Infrastructure • Punj Llyod Ltd
  • 30.
  • 31. Planning • Routes : East-west(18.1 Km),North-south(14.9 km) • Total length of the project :43 kms • Type : Elevated and underground • No of stations : 41 • No of commuters per day :820,000 • Proposed fare : 1.33-1.66 times the bus fares • Cost/Km Underground : Rs 250 crore • Cost/km Elevated : Rs 80 crore • Total cost : Rs 11,609 crore
  • 32. Fund formula • State : Rs 2287 cr • Central/federal : Rs 1831 cr • Financial Institutions : Rs 3982 cr
  • 33. Train Outline • Each train consists of three coaches (2.88 m wide) to start with. The train can accommodate a total of 1000 persons. • Later, it will run six coaches - the carrying capacity of a six coach train will be 2068 passengers • Wi-Fi enabled • Coaches have stainless steel covering, air-conditioned and automated doors.
  • 34. Project Execution • Ground-level preparations for the ambitious metro rail project in bangalore was made with the state government freezing development activity in 247 premises and buildings it tentatively identified for this purpose • Bangalore metro have a standard guage and will take cover under the 100-year old Mysore tramways Act,which required some amendments by the state government to suit the present day needs.With this,BMRTL avoided going to the railway ministry for all sanctions.
  • 35. Phase I - Project closure • Phase 1 has come to live on October 20 th,2011
  • 36. Phase II • Covering a span of 70 kilometres • phase II is an extension of all the four Reaches and will reduce road traffic by 35 per cent. • The estimated project cost is Rs 25,000 crore. • The Second Phase of the project will begin in 2012 • The number of passengers expected to travel on the metro everyday is estimated 16.10 lakh by 2021
  • 37. Bibliography • www.bmrc.co.in • http://www.rediff.com/business/slide- show/slide-show-1-bangalore-swanky-metro- rail/20111020.html • http://www.kayoprojectmanagement.com/Sa mple%20Project%20Charter.pdf • www.wikipedia.org