Contenu connexe
Similaire à Cisco Sustainable Packaging Update
Similaire à Cisco Sustainable Packaging Update (20)
Cisco Sustainable Packaging Update
- 1. Cisco at a Glance
Worldwide leader in networking Broad range of products
for the Internet and solutions:
Headquartered in San Jose, CA Networking Systems
Data Center
More than 67,000 employees
Collaboration, Voice and Video
in 75 Countries
Mobility/Wireless
$36.1B FY’09 revenue Security
© 2009 Cisco Systems, Inc. All rights reserved. 1
- 2. Customer Value Chain Management:
A Global Presence
Mission Team By the Numbers
Provide an unrivaled, ~8,000 employees* >1,000 suppliers
end-to-end experience 90+ locations / 32 4 contract
to our customers countries manufacturing partners
9 functional groups 95% of manufacturing
is outsourced
*includes Scientific Atlanta and Linksys
© 2009 Cisco Systems, Inc. All rights reserved. 2
- 3. Cisco’s Complex Value Chain
Hybrid Wide Range Most Breadth of Acquisition
Production of Products Products Customers Integration
Model Are (133 to date)
(95% Configured
Outsourced)
to Order
© 2009 Cisco Systems, Inc. All rights reserved. 3
- 4. Sustainable Value Chain Management:
Action Plan
Design & Power Efficiency in Design
Evolve
Products Transition to/Design with Lead-Free Solder
Materials Management: Controlled Substances Specification
Source &
Ozone Depleting Substances Program
Manufacture
Comprehensive Worldwide Battery Specification
Recyclable Packaging Materials
Package &
Packaging Design Efficiency
Transport
Volume/Weight = Transport = Carbon Emissions
Reverse Accessory Election = duplication = Cust. Sat.
Logistics Waste via reuse & refurbishment
© 2009 Cisco Systems, Inc. All rights reserved. 4
- 5. Collaborating on Sustainability:
Optics Module Packaging Innovation
Eng. Team Doc Team Pkg. Team Collaborative
Technical Document Packaging
Approach
Spec Reduction Reduction
Eco-conscious
Design with
Reduced
OLD
NEW Costs
© 2009 Cisco Systems, Inc. All rights reserved. 5
- 6. Collaboration on Sustainability:
Responding to Customer Feedback
Goal Volume Reduction & Customer Satisfaction
Target Packaging at the Design Stage!
Phase I: size of anti-static & doc. bags & boxes; green
Plan for bag material
Success Note: to date with 1 family of products
Phase 1: 2-2.5M/year
Plastic cut 50% (56k lbs); 33,429 lbs. of ESD bag waste
Savings recyclable material
Chargeable weight reduced ~ 60% ( transport savings)
© 2009 Cisco Systems, Inc. All rights reserved. 6
- 8. Sustainable Packaging Design:
Improving Efficiency
Goal Volume Reduction & Transport Efficiency
Reconfiguring Product Packing
Maximize carton capacity
Plan for e.g.: Use of multi-packs
Success
Innovative pre-installation of components
$1.82 M/year
Savings 31,260 lbs. carton material eliminated
Equivalent of 32 transport containers eliminated
© 2009 Cisco Systems, Inc. All rights reserved. 8
- 9. TelePresence CTS-3000 Example
New Design:
9 containers
vs. 83 cartons
Stackable
9 per truck vs.
2 per truck
© 2009 Cisco Systems, Inc. All rights reserved. 9
- 10. CRS Ship Configured: $2M savings
OLD MODEL
Containerize Packaged Cards
Build & Test Depopulate Cards Package All Cards
NEW MODEL
Build & Test Depopulate Cards Package All Cards
© 2009 Cisco Systems, Inc. All rights reserved. 10
- 11. Sustainable Package Design:
Minimizing Documentation
Goal Waste Reduction & Manufacturing Efficiency
Meet regulatory disclosure requirements while
reducing environmental impact to the greatest extent
possible
Migrate from paper to CD – Spring 2007
Plan for Optically reduce size of all documents 65% or more 8.5X11
Success becomes 5.X7.55 – Fall 2008
Move to “pointer docs” – January 2009
FY09 Savings
1.8 billion sheets of paper
Savings 53 million lbs. CO2 eliminated
200 million gallons waste water eliminated
17 million lbs. solid waste eliminated
© 2009 Cisco Systems, Inc. All rights reserved. 11
- 13. Sustainable Packaging Design:
End Cap Materials
Goal Volume Reduction & Materials Management
Replace Virgin Foam (petroleum based) with previously
used, 100% recycled plastic
Plan for Introduced on 8xx series product
Success Other Products to follow
Change @ 3 sites saves 50 cubic meters/mo. per site
Savings
Annualized savings = $765k (transport cost)