GENERAL INFORMATION FOR
          PRE-QUALIFICATION




       SEJIN TUBE TECH CO., LTD.
CONTENTS

 1.COMPANY INTRODUCTION
  1-1.Introduction & Contact Information
  1-2.Company History
  1-3.Company Overall View
  1-4.Organization
  1-5.Company Profile
  1-6.Main Customers
 2.PRODUCT INTRODUCTION
  2-1.Main Products
  2-2.Production Process
  2-3.Dimension & Tolerance (ASTM A249/JIS G3463/KS D3577)
  2-4.Dimension & Tolerance (ASTM A312/JIS G3459/KS D3576)
  2-5.Dimension & Tolerance (ASTM A269/JIS G3448/KS D3595)
  2-6.Manufacturing Facilities
  2-7.Testing Facilities
  2-8.Details of Each Facility
  2-9.Packing & Storage
 3.Q.C MANUAL
  3-1.Quality Management System
  3-2.Quality Management Process
  3-3.Quality Control Plan
 4.CERTIFICATES
 5.MAJOR SUPPLY RECORD
1. COMPANY INTRODUCTION




                          www.sejintube.co.kr   1
1-1. Introduction & Contact Information

  Introduction
 Sejin Tube Tech Co., Ltd. was established in 2005 and we are a manufacturer of Stainless Steel
 Tube for Boiler, Heat Exchanger, Ordinary piping, Machinery, Structure, Sanitary tubing, etc.
 We’ve been continuously grown through a good reputation and the endless technical development.
 Now we’re expanding our market to the international as we obtain the international certificates and
 the unique technologies.
 We, Sejin Tube Tech Co., Ltd. promise our customers to go ahead as a front-runner of the Stainless
 Steel Pipe Manufacturer in the world market as well as in the domestic market while collecting the
 accumulated Know-How and capability. Thank you.

  Contact Information
 • Company Name : Sejin Tube Tech Co., Ltd.
 • Representative : Myung Chol Kim
 • Address : 239-1, Gamno-ri, Sangdong-Myeon, Gimhae-si, Gyeong Nam, Korea 621-811
 • TEL : +82-55-337-0041    / FAX : +82-55-337-0042
 • Website : www.sejintube.co.kr
 • E-Mail : sejintube@sejintube.co.kr

                                                                                                 www.sejintube.co.kr   2
1-2. Company History


May. 2005   Established Sejin Tube Tech Co., Ltd.
May. 2005   Acquired Patent for Stainless Arc Welding
Jan. 2006   Acquired ISO 9001:2000 certificate
Feb. 2006   Extended the Line for Boiler & Heat Exchanger Tube (2 Lines)
Nov. 2006   Completion of the 2nd shop (Pipe Line & Off-Line Oxidized Heat Treatment)
Jan. 2007   Seamless Tube Line extension (Plug Draw Bench).
Jan. 2007   Registered as a member of Korea Standard Association.
Apr. 2007   Registered as a supplier to Jord International Pty Ltd.(Australia)
Jun. 2007   Registered as a supplier to Mitsubishi Heavy Industries, Ltd.(Japan)
Aug. 2007   Acquired KS mark certificates (KS D3595, KS D3577)
May. 2008   Registered as a supplier of Sungjin Geotec, Wooyang H.C.,TSM Tech,
            Hantech, Iljin Energy(Korea)
Nov. 2008   Registered as a supplier to DOW Chemical Company/Vectel
Mar. 2009   Registered as a supplier to Doosan Heavy Industries
Dec. 2010   Acquired PED Certificate

                                                                                   www.sejintube.co.kr   3
1-3. Company Overall View




                               Outside




      Shop #1 (Welded Pipes)             Shop #2 (Seamless Pipes)
                                                                www.sejintube.co.kr   4
1-4. Organization



                                       CEO



                                    Managing
                                    Director



                                               Management
      Sales Dpt.     Production Dpt.                               QC Dpt.
                                                  Dpt.


    Domestic Sales     Production              Accounting        Inspection

    Overseas Sales     Purchasing              General Affairs   Development

    Research




                                                                               www.sejintube.co.kr   5
1-5. Company Profile(1)


  Representative : Myung-Chol Kim
  Founded Date : May 9, 2005
  Number of Employees : Total 28 people
  • Office : 6 people
  • Engineer : 2 people
  • Factory : 20 people
  Capital(2010) : USD7,500,000
  Sales Amount(2010) : USD12,500,000
  Main Product : Welded Stainless Tube, Seamless Stainless Tube
  Usage : Boiler, Heat Exchanger, Anti-corrosion & Heat-resistant Pipes,
          Ordinary Piping, Sanitary Tubing, etc.
  Certificate : ISO9001, PED, KS D 3577 & KS D 3595


                                                                           www.sejintube.co.kr   6
1-5. Company Profile(2)

  Sales Growth                                                        Unit: 0.1 Million USD

                                                    140       200
                          200       130      130
                          150
                          100
                           50
                            0
                                  2008     2009    2010      2011


  Production Capacity
                                                                          Capacity
                    Product Range                         Line Q’ty
                                                                         (Ton/Year)

Stainless Steel Tube for boiler & heat exchanger             3              2000
Stainless Steel Pipe for general piping                      2              1200
Stainless Steel Seamless Tube                              1x3              1400

  Inspection Facilities : Universal Test Machine, Microscope, Hydrostatic Tester,
  Eddy Current Tester & Vickers Hardness Tester


                                                                                 www.sejintube.co.kr   7
1-6. Main Customers



  Domestic Customers                         Foreign Customers
▶ Doosan Heavy Industries & Construction   ▶ Mitsubishi Heavy Industries Ltd.(Japan)
▶ Doosan Mecatec                           ▶ Mitsubishi Chemical Corp.(Japan)
▶ Sungjin Geotec                           ▶ Jord International Pte. Ltd.(Australia)
▶ TSM Tech Co., Ltd.                       ▶ BHEL(India)
▶ Hantec Engineering Co., Ltd.             ▶ Aban Air Cooler Co.(Iran)
▶ Woo Yang H.C Co., Ltd.                   ▶ Aero Freeze System/GEA(Canada)
▶ Wonil T&I Co.,Ltd.                       ▶ Titan Metal Fabricators, Inc.(USA)
▶ Seoul Machinery Co.,Ltd.                 ▶ Intercol S.A./CBI/Reficar(Colombia)
▶ SEWON CELLONTECH Co., Ltd.               ▶ Tasha Manufacturing Co.(Iran)
▶ SC Engineering                           ▶ Patkor Public Company Ltd.(Thailand)
▶ JMC.

▶ DKT Co., Ltd.
                                                                                www.sejintube.co.kr   8
2. PRODUCT INTRODUCTION




                          www.sejintube.co.kr   9
2-1. Main Products(1)


 Steel Tube for Boiler & Heat Exchanger
• Standard: ASTM A249, JIS G3463, KS D3577
• Material: 304(L), 316(L), 321, 310S, 317(L), 347,
 Duplex(S31803,S32750), etc.
• Usage: Boiler, Superheater, Heat Exchanger,
 Condenser, etc.
• Dimension & Tolerance ☞p.13~14




                                                      Seamless Tube
                                                      • Standard: ASTM A213
                                                      • Material: 304(L), 316(L), 321, 310S, 317(L), 347,
                                                       Duplex(S31803,S32750), etc.
                                                      • Usage: Boiler, Superheater, Heat Exchanger,
                                                       Condenser, etc.



                                                                                              www.sejintube.co.kr   10
2-1. Main Products(2)



 Steel Pipe for Tubing
• Standard: ASTM A312, JIS G3459, KS D3576
• Material: 304(L), 316(L), 321, etc.
• Usage: Anti-corrosion & Heat-resistant Pipes
 for Oil & Gas Industries, Chemical Industries
 as like Pulp, Paper, Textile, etc.
• Dimension & Tolerance ☞p.15~16



                                                 Steel Pipe for Ordinary Tubing
                                                 • Standard: ASTM A269, JIS G3448, KS D3595
                                                 • Material: 304(L), 316(L), 321, etc.
                                                 • Usage: Hot/Cold Water Supply, Drainage, etc.
                                                 • Dimension & Tolerance ☞p.17




                                                                                         www.sejintube.co.kr   11
2-2. Production Process


Welded Tubes

                                              Bead
     Coil        Forming      Welding       Removing
                                                              Sizing

  Eddy Current                  End                          Bright
      Test       Picking       Facing
                                           Straightening
                                                            Annealing

   Marking       Re-sing      Inspection    Packing


Seamless Tubes                 Repeat


                               Cold
  Mother Tube    Pointing     Drawing
                                           Degreasing        Cutting

  Eddy Current                  End                           Off-Line
      Test       Picking       Facing
                                           Straightening
                                                           Heat Treatment

   Marking       Inspection   Packing


                                                                        www.sejintube.co.kr   12
2-3. Dimension & Tolerance (ASTM A249 / JIS G3463 / KS D3577)

   ASTM A249 / JIS G3463 / KS D3577

    • Material : 304(L), 316(L), 321, 310S, 317(L), 347, Duplex(S31803,S32750)

              W.T(mm)
    O.D(mm)               0.5       0.8       1.2       1.6        2        2.3   2.6   2.9

           15.88

           19.05

           21.7

           22.22

           25.4

           27.2

           31.8

              34

           38.1

              45

           50.8



                                                                                              www.sejintube.co.kr   13
2-3. Dimension & Tolerance (ASTM A249 / JIS G3463 / KS D3577)

   ASTM A249 / JIS G3463 / KS D3577
               Specification
                                    KS D3577(JIS G3463)                       ASTM A249
    Division
                                        D < 60            ±0.25
                                                                        D < 25.4           ±0.10
                                    60 ≤ D < 80           ±0.30     25.4 ≤ D < 38.1        ±0.15
                                   80 ≤ D < 100           ±0.40     38.1 < D < 50.8        ±0.20
                    Outer
                                                                    50.8 ≤ D < 63.5        ±0.25
                   Diameter                               +0.40
                                   100 ≤ D < 120                    63.5 ≤ D < 76.2        ±0.30
                                                          - 0.60    76.2 ≤ D ≤ 101.6       ±0.38
                                                          +0.40    101.6 < D ≤ 190.5
                                   120 ≤ D < 160                                        +0.38, -0.64
                                                          - 0.80
                                                           +0.4
                                                 t<2
     Tolerance                                              -0                                ±10%
                               D < 40
                      Wall                                +20%                                 or
                                                 t≥2                   All Size
                   Thickness                                -0                                +18%
                                                          +22%                                 -0
                               D ≥ 40    All Thickness
                                                            -0
                                            L ≤ 7000      +7.0
                               D ≤ 50                                                         +3.17
                                            L > 7000      +10.0        D < 50.8                -0
                    Length
                                            L ≤ 7000      +10.0        D ≥ 50.8               +4.76
                               D > 50                                                          -0
                                            L > 7000      +13.0
          Straightness           Shall be reasonably straight               Under 0.8 / 914
      Inside Bead Removal                 No removal                     Inside bead removal



                                                                                                      www.sejintube.co.kr   14
2-4. Dimension & Tolerance (ASTM A312 / JIS G3459 / KS D3576)

   ASTM A312 / JIS G3459 / KS D3576

    • Material : 304(L), 316(L), 321
                                                                                                             (Unit : mm)
      Nominal                                                    Nominal Wall Thickness(SCH)
                   Outer Diameter
       Size                                   5S                 10S          20S          40S                80S
     A      B        KS     ASTM       KS          ASTM   KS        ASTM      KS     KS        ASTM     KS        ASTM
      8     1/4     13.8     13.72     1.2          -     1.65         1.65   2.0    2.2         2.24    -           -
     10     3/8     17.3     17.15     1.2          -     1.65         1.65   2.0    2.3         2.31    -           -
     15     1/2     21.7     21.34     1.65        1.65   2.1          2.11   2.5    2.8         2.77   3.7         3.73
     20     3/4     27.2     26.67     1.65        1.65   2.1          2.11   2.5    2.9         2.87   3.9         3.91
     25      1      34.0     33.4      1.65        1.65   2.8          2.77   3.0    3.4         3.38   4.5         4.55
     32    1 1/4    42.7     42.16     1.65        1.65   2.8          2.77   3.0    3.6         3.56   4.9         4.85
     40    1 1/2    48.6     48.26     1.65        1.65   2.8          2.77   3.0    3.7         3.68   5.1         5.08
     50      2      60.5     60.33     1.65        1.65   2.8          2.77   3.5    3.9         3.91   5.5         5.54
     65    2 1/2    76.3     73.03     2.1         2.11   3.0          3.05   3.5    5.2         5.16    -           -
     80      3      89.1     88.9      2.1         2.11   3.0          3.05   4.0    5.5         5.49    -           -
     90    3 1/2   101.6     101.6     2.1         2.11   3.0          3.05   4.0    5.7         5.74    -           -
    100      4     114.3     114.3     2.1         2.11   3.0          3.05   4.0    6.0         6.02    -           -



                                                                                                              www.sejintube.co.kr   15
2-4. Dimension & Tolerance (ASTM A312 / JIS G3459 / KS D3576)

   ASTM A312 / JIS G3459 / KS D3576
                                                                                               (Unit : mm)
                  Specification
                                       KS D3576(JIS G3459)                      ASTM A312
    Division

                                                                                                +0.4
                                     D < 30              ±0.30       10.29 ≤ D ≤ 48.26
                                                                                                - 0.8

                                                                     48.26 < D ≤ 114.3          ±0.8
                       Outer
                      Diameter                                                                  +1.6
                                      L ≥ 30              ±1%        114.4 < D ≤ 219.08
                                                                                                - 0.8

                                                                                                +2.4
      Tolerance                                                      219.08 < D ≤ 406.4
                                                                                                - 0.8

                                      t<2                ±0.20
                        Wall                                                                  All Size
                                                                          All Size
                     Thickness                                                              over -12.5%
                                      t≥2                ±10%

                                                                                                +6.4
                       Length     Longer than the specified length        All Size
                                                                                                - 0.0

           Straightness             Shall be practically straight       Shall be practically straight




                                                                                                    www.sejintube.co.kr   16
2-5. Dimension & Tolerance (ASTM A269 / JIS G3448 / KS D3595)

   ASTM A 269 / JIS G 3448 / KS D 3595
    • Material: 304(L), 316(L), 321


                     Outer Diameter (mm)      Wall Thickness (mm)         Weight (kg/m)
      Nominal
      Diameter
                      Size        Tolerance   Size       Tolerance   STS304TPD    STS316TPD


        13 SU         15.88                    0.8                     0.301         0.302

                                        0
        20 SU         22.22                    1.0                     0.529         0.532
                                      -0.37

        25 SU         28.58                    1.0                     0.687         0.691
                                                           ±0.12
        30 SU         34.00           ±0.34    1.2                     0.980         0.987


        40 SU         42.70           ±0.43    1.2                     1.240         1.250


        50 SU         48.60           ±0.49    1.2                     1.420         1.430


        60 SU         60.50           ±0.60    1.5         ±0.15       2.200         2.220




                                                                                             www.sejintube.co.kr   17
2-6. Manufacturing Facilities (List)

     Line
                  Descrption        Q’ty               Capacity             Origin
  (Process)
                                           O.D : 13.8mm ~ 60.5mm
                  Forming M/C        5                                      KOREA
                                           Welded Speed : 2M/Min ~ 4M/Max
               Non-oxidized heat
               treatment furnace     2     O.D : 13.8mm ~ 60.3mm            KOREA
                   (ON-LINE)
                                           O.D : 13.8mm ~ 60.5mm
               Straightnning M/C     4                                      KOREA
                                           Voltage : 50kw ~ 100kw
   WELDED      Auto Cutting & End
    PIPES                            1     O.D : 13.8mm ~ 114.3mm           KOREA
                   Facing M/C

              Auto End Facing M/C    1     O.D : 13.8mm ~ 60.5mm            KOREA

                                           O.D : 13.8mm ~ 60.5mm
                  Marking M/C        1                                      FRANCE
                                           LENGTH : 20M
                                           O.D : 13.8mm ~ 60.5mm
                 Manual Cutter       4                                       U.S.A
                                           LENGTH : 7M

                  Drawing M/C       1X3    O.D : 13.8mm ~ 60.5mm            KOREA
  SEAMLESS
                 Oxidized heat
    PIPES
               Treatment furnace     1     O.D : 13.8mm ~ 216.3mm           KOREA
                  (OFF-LINE)

                                                                             www.sejintube.co.kr   18
2-4. Manufacturing Facilities (Photo)




            Forming M/C                  Bright annealing furnace




           Straightening M/C            Auto Cutting & End Facing M/C
                                                                        www.sejintube.co.kr   19
2-6. Manufacturing Facilities (Photo)




             Marking M/C                    Cutting M/C




             Drawing M/C                Heat Treatment furnace
                                                                 www.sejintube.co.kr   20
2-7. Testing Facilities (List)

           Description           Q’ty       Availability        Origin

      Universal Test Machine      1            60 Ton           KOREA

        Microscope Tester         1          X50 ~ x500         KOREA

        Eddy Current Tester       1     O.D.: 13.8mm ~ 60.5mm   FRANCE

        Hydrostatic Tester        1         Max. 200kg/㎠        KOREA

      Vickers Hardness Tester     1           Max. 1HV          KOREA

          Mounting Press          1               -             KOREA

         Grinding Polisher        1               -             KOREA

           Belt Grinder           1               -             KOREA

     Precision cutting machine    1              -              KOREA

           Micro Meter            9           0 ~ 25mm          JAPAN

           Micro Meter            5          25 ~ 50mm          JAPAN

           Micro Meter            2          50 ~ 75mm          JAPAN

         Vernier Calipers         3          0 ~ 150mm          JAPAN

         Vernier Calipers         1          0 ~ 300mm          JAPAN

                                                                         www.sejintube.co.kr   21
2-7. Testing Facilities (Photo)




         Universal Test Machine   Micro Scope Tester




          Eddy Current Tester     Hydrostatic Tester
                                                       www.sejintube.co.kr   22
2-7. Testing Facilities (Photo)




         Vickers Hardness Tester      Mounting Press




            Grinding Polisher      Precision Cutting Machine
                                                               www.sejintube.co.kr   23
2-8. Details of Each Facility


             Description                                 Specification                 Origin

                                    1.   Type : Annealing
                                    2.   Heat source : Electricity
                Non-oxidized Heat   3.   Size range : O.D 15.88mm ~ 60.5mm
                                                                                       KOREA
                Treatment Furnace   4.   Quenching method : Rapidly cooled by carbon
                                    5.   Max. frequency : 100kHz
    Heat
                                    6.   Max. Temp. : 1500 ℃
 Treatment
  Furnace
                                    1.   Type : Annealing
                                    2.   Heat source : LPG Gas
                  Oxidized Heat
                                    3.   Size range : O.D 250mm Max.                   KOREA
                Treatment Furnace
                                    4.   Quenching method : Rapidly cooled by water
                                    5.   Max. Temp. : 1400 ℃

                                    1. Max. pressure : 20 Mpa
             Hydro Tester           2. Size range : O.D 15.88mm ~ 38.10mm              KOREA
                                    3. Max. Length : 4M ~ 18M

                                    1.   Max. pressure : 20 Mpa
                                    2.   Size range : O.D 12.70mm ~ 88.90mm
       Eddy Current Tester                                                             FRANCE
                                    3.   Max. Length : 24M Max.
                                    4.   Model name : CMS




                                                                                         www.sejintube.co.kr   24
2-9. Packing & Storage




      Carton Box                Wooden Box                    Carton Skid Box




                   Steel Bend                Square Wooden Bend
                                                                        www.sejintube.co.kr   25
3. Q.C MANUAL




                www.sejintube.co.kr   26
4-1. Quality Management System


                                                                           Order Control              Daily Plant
Customer                                                                                                                     Monthly Closing
                                                                             Process                   Operation
                                                                                                                                 Report
                                                                                                     Status Report

                                        Procurement Control                                                                                 Review Total
                                              Process                     Production Control
                                                                        Process (Tube Drawing)                                              Status Report
 Continuous Improvement Activity




                                      Inspection Control Process

                                      Supply Chain Management
                                              Process                     Delivery Control                                              Self-improvement
                                                                                                        Data
                                                                              Process                                                         Activity
                                                                                                    Collection &
                                                                                                     Analysis                          Select Theme
                                                                        Payment Collecting                                             Survey as-is, cause
                                                                         Control Process                                               Setting Target
                                                                                                                                       Plan/Do Actions
                                                                                                                                       Effect Analysis
                                                                         Customer’s Claim                                              Standardization
                                                                                                                       Running
                                                                          Control Process                                                 /Management
                                                                                                                   Suggestion System



                                                                                                                                                    IN
                                                                                                                                                   PUT

                                           OUT PUT                 Operation of Business Plan / Management Policy & Target Management




                                                                                                                                         www.sejintube.co.kr   27
4-2. Quality Management Process

        Order Control Process
                                                                        Process Map
Step                   Supervised Under            Co-operation with
         Customer                                                                   Manager                      Contents of Activities
                      Marketing Department           Q.C, Production

         Customer
 1         Order      Receive/Distribute ROQ                                                     Receiving and distribution of ROQ



 2                                                    Review Order                               Review ROQ


                                                                                                 Prepare Draft Quotation
 3                                                Prepare Draft Quotation                        (Including Delivery, Payment, Packing, and Heat
                                                                                                 Treatment Method)

                               Prepare/                                                          Prepare Quotation (Delivery, Payment Terms, Packing,
 4                       Distribute Quotation                                                    Heat Treatment Method, Effective Period)


 5                                                  Review Quotation
                                                                                                 Review Quotation



 6        Customer
                           Send Quotation
                                                                                                 Send Quotation – Achieve Customer’s Approval
          Approval


 7                     Receive/Distribute Order                             Production Control   Receive Customer’s Order, Distribute to Managers


                             Analysis of
                                                                                                 Based on Roll margin and Sales data, prepare Sales
 8                                                                                      Report
                          Sales Performance                                                      Performance Report to Managers


                                                                                                                                      www.sejintube.co.kr   28
4-2. Quality Management Process
         Production Control Process
                                                                        Process Map
Step                     Supervised Under           Co-operation with
           Customer                                                           Managers                   Contents of Activities
                          Production Dept.         QC, Marketing, Admin.


 1      Order Control   Receive Customer Order                                           Receive and register Customer Order from Marketing.

                                                                                         Record Customer, Volume, Delivery, Material,
 2                          Arrange Delivery
                                                                                         Specification, etc.

                                                                                         Check raw material and stock, and request purchase of
 3                          Check Inventory
                                                                                         shortage materials.
                                                         Procurement
                           Prepare/Adjust                   Control                      Prepare/adjust/distribute monthly production plan based
 4                      Monthly Production Plan                                          on status of delivery and raw materials.

                                                                                         Prepare/adjust/distribute weekly tubing plan by each
                           Prepare/Adjust
 5                      Weekly Production Plan                                           machine based on inventory and incoming schedule of
                                                                                         raw materials.
                        Check incoming schedule                                          Check and adjust inventory and incoming schedule of
 6                       /inventory of materials
                                                                                         raw materials.

                            Issue Work Order
                                                                                         After checking details of customer order (MFG. Spec.,
 7                       (Tubing, Back-process)                                          Steel Spec., QTY, Delivery, and Packing method), issue
                                                                                         work order.
                                                                                         Control production according to MFG. Spec., and keep
                            Tubing Process
 8                                                             Inspection                recording of production performance and process
         Equip.                                                  Control                 inspection report.
         Control
                             Back-Process                                                Make sure to manufacture according to manufacturing
 9                                                                                       specification of work order.


10                             Labelling                                                 Check packing method and QTY, and attach tag.
                                                                                                                               www.sejintube.co.kr   29
4-2. Quality Management Process


                                                                  Process Map

Step                Supervised Under          Co-operation with
         Customer                                                            Managers                     Contents of Activities
                      Production Dept.       QC, Marketing, Admin.


                      Check production                                                   After checking steel model, order QTY, packing method,
11                                                        Delivery Control
                        performance                                                      MFG Spec., etc, and prepare product inspection report.

                                                                                         Store finished products at stacking area, and make
12                  Stack/Store Products                                                 delivery to customers by delivery schedule.

                                                                                         Collect recording data, and make analysis of yield ratio,
13                  Analysis of production                                      Report   Operation ratio, Production Performance ratio, etc, and
                        performance                                                      report to managers.




                                                                                                                                www.sejintube.co.kr   30
4-2. Quality Management Process

        Delivery Control Process
                                                                      Process Map
Step                   Supervised Under          Co-operation with
          Customer                                                           Managers                          Contents of Activities
                        Marketing Dept.          Q.C, Production
                                                  Production/Inspection                       Check customer order after completion of production.
 1                    Check Customer Order              Record
                                                                                              (Delivery and conforming of requirements)
                                                                            Procurement
                                                                              Control
         Customer      Notice to /Discuss with
 2                                                                                            Notice to /Discuss with customer about delivery plan.
                              customer


                         Receive Delivery                                                     Receive customer’s delivery request. (Reflection of
 3
                             Request                                                          Verbal or contents of customer order)

 4                         Delivery Order                                                     Delivery Order


 5                                                 Loading Products                           Loading of Products

                                                                                              Prepare Invoice and record name of staff responsible for
 6                          Issue Invoice                                                     delivery to designated customer.

 7                         Check Delivery                                                     Check Delivery


 8                        Receive Invoice                       Collecting Control            Receive customer-confirmed invoice.

                                                                                              Perform analysis of delivery based on delivery
 9                      Analysis of Delivery                                         Report
                                                                                              conforming ratio data, and report to managers.



                                                                                                                                    www.sejintube.co.kr   31
4-2. Quality Management Process
         Customer Claim Control Process
                                                                         Process Map
Step                      Supervised Under          Co-operation with
           Customer                                                              Managers                          Contents of Activities
                           Marketing Dept.           Q.C, Production

          Wire /Mail
 1      Customer Claim
                         Receive Customer Claim                                                  Receive customer claim thru wire. mail, and fax.


 2                                                  Report Customer Claim                        Report customer claim to production/QC department.

                                                                                    Customer
                                                       Check Inventory                           Check Claimed defect, and if claim is not defect, discuss
 3                                                                                 Master Book
                                                                                                 with customer, and record to customer master book.


 4                        Survey claim contents                                                  Start survey of customer claim details.

                               Meeting for                                                       Meeting with production and QC to find corrective
 5                           counter-measure                                                     actions based on survey report.

 6                        Check received defect                                                  Check defect sample for customer claim

                            Survey root cause                                                    Start to find root cause of defect after checking defect
 7
                                                                                                 sample.

                            Our responsibility           Discuss with                            If defect is found to be not from our responsibility out of
 8                                                        Customer
                                                                                                 root cause survey report, discuss with customer.

                           Action first, and then                                                If defect is from our responsibility, visit customer to
 9                        discuss with customer
                                                                                                 discuss and explain our prior actions.

                           Perform discussed                                                     Perform quick corrective actions discussed with
10                               actions
                                                                   Corrective action
                                                                                                 customer.
                                                                                                                                           www.sejintube.co.kr   32
4-2. Quality Management Process


                                                               Process Map
Step                Supervised Under    Co-operation with
         Customer                                                    Managers                     Contents of Activities
                     Marketing Dept.    Q.C, Production

11                                      Report to production                     Report discussions with customer to production


                         Analysis of                                             Collect recorded Data, and perform analysis of customer
12                                                                      Report
                       customer claim                                            defect ratio and quality cost, etc, and report to managers.




                                                                                                                         www.sejintube.co.kr   33
4-2. Quality Management Process
        Procurement Control Process
                                                                    Process Map
Step                  Supervised Under         Co-operation with
         Customer                                                         Managers                      Contents of Activities
                      Production Dept.          Q.C, Marketing

                     Calculate procurement        Check inventory                      Prepare raw material procurement plan after checking
 1                           volume               of raw material                      inventory of raw materials and finished goods according
                                                                                       to monthly production plan.
         Supplier      Prepare /Send ROQ                                               Check steel model, thickness, width, and QTY, and
 2
                                                                                       send ROQ to supplier.

                        Receive quotation                                              Receive quotations from each suppliers, and check
 3
                                                                                       delivery and price.

 4       Supplier       Review quotation                                               Arrange and confirm delivery and cost for each suppliers.

                                                                                       After confirming final delivery and price for each
 5                   Prepare Purchase Order
                                                                                       suppliers, prepare Purchase Order.

 6                                                                         Approval    Get approval of Purchase Order from President.


                         Send /Confirm                                                 Send Purchase Order to selected supplier, and confirm
 7
                         Purchase Order                                                receipt.

                                                                                       Control raw material incoming schedule by Production
 8                     Incoming Progress
                            Control
                                                                                       Plan and Purchase Order.
                                                      Inspection                       Check if incoming material conforms Purchase Order for
                                                        Control
 9                          Incoming                                                   QTY, Steel Model, Thickness, Width, and Product
                                                      Production                       Inspection Report.
                                                        Control

                                                                                       Collect recorded data, and perform analysis of incoming
10                   Analysis of Procurement                                  Report
                                                                                       schedule conforming ratio, and report to managers.
                                                                                                                                www.sejintube.co.kr   34
4-2. Quality Management Process
        Inspection Control Process
                                                                        Process Map
Step                    Supervised Under            Co-operation with
          Customer                                                            Managers                    Contents of Activities
                                 Q.C                Production Dept.
        Supply Chain
 1        Control           Incoming Info.                                               Check incoming date and QTY for raw materials.
        Procurement
           Control
                                                                                         Check Invoice and inspection report whenever raw
 2                      Check Purchase Order
                                                                                         material incoming arrives.

                                                                                         Before receipt of raw material, perform incoming
 3                       Incoming Inspection
                                                                                         inspection. (Weight, dimension)

                        Prepare /Notice to return                                        If incoming inspection finds defects, send notice to
 4
                       notice with return causes.                                        supplier.

           Report                                                                        Check defects with supplier, and if no good to input,
 5                          Check products
                                                               Production                make decision to return with agreement of supplier.
                                                                 Control
                          Tubing /back-process                                           Perform In-process inspection during Tubing /Back-
 6                             Inspection                                                process. (Dimension, inner/outer surface)

                                                                                         Search defect trend for defects found during in-process
 7                        Search defect trend
                                                                                         inspection.

 8                          Pass/No-Good                                                 Make decision if defect can be repaired.


 9                           Store /Identify                                             Store and identify defect goods.


10                          Re-inspection                                                Perform re-inspection

                                                                                                                                 www.sejintube.co.kr   35
4-2. Quality Management Process

                                                              Process Map
Step                Supervised Under      Co-operation with
         Customer                                                   Managers                     Contents of Activities
                           Q. C.          Production Dept.

                                                                                Send repaired defect to final inspection, and send non-
11                    Repair /Disposal           Inspection
                                                   Control
                                                                                repairable defect to disposal.

                                                                                Perform final inspection before product dispatch.
12                                             Final Inspection                 (Dimension, mechanical properties)

13                        Disposal                 Delivery                     Defects in final inspection shall be disposed.
                                                   Control
                                                                                Collect recorded data, and perform analysis of in-
14                       Analysis of                                   Report   process defect ratio, finished good defect ratio, and in-
                      Inspection result
                                                                                house quality cost, etc, and report to managers.




                                                                                                                        www.sejintube.co.kr   36
4-2. Quality Management Process
        Supply Chain Control Process
                                                                    Process Map
Step                  Supervised Under         Co-operation with
         Customer                                                         Managers                    Contents of Activities
                      Production dept.          Q.C, Marketing

                        Control Supplier          Order for back-                    Arrange incoming schedule with production completion
 1                                                Process request                    schedule of out-sourcing supplier.

 2                                                Logistics Plan
                                                                                     Check logistics plan of completed out-sourcing products.


 3                       Delivery Order                                              Delivery Order to out-sourcing supplier.


 4                          Loading                                                  Loading of out-sourcing product.


 5                       Check Delivery                                              Check dimension and QTY before delivery.


 6                        Issue Invoice                                              Issue Invoice.

         Receive
 7       Invoice      Supply to out-sourcing                                         Supply out-sourcing product to supplier.


                        Control incoming                                             Check incoming schedule of out-sourcing product thru
 8
                            progress                                                 wire.

 9                          Incoming                                                 Incoming of out-sourcing product.


                       Incoming Inspection                                           Upon incoming of out-sourcing product, perform
10
                                                                                     incoming inspection by QC inspector.
                                                                                                                            www.sejintube.co.kr   37
4-2. Quality Management Process


                                                              Process Map
Step                Supervised Under      Co-operation with
         Customer                                                   Managers                    Contents of Activities
                    Production dept.       Q.C, Marketing

                                                                                Input inspected out-sourcing product to in-process of
11                  Input to in-process
                                                                                production.

                       Analysis of                                     Report   Perform analysis of incoming schedule conforming ratio,
12
                       out-sourcing                                             pass-ratio, etc, and report to managers.




                                                                                                                      www.sejintube.co.kr   38
4-3. Quality Control Plan
      Welded tube & pipe
                                        Control Items and Quality Characteristics                                    Controlling
  Manufacturing Process
                                  Control Items                         Check Point                     Methods                      Number of Test

1. Material Receiving

                          1) Mill Certificate Review                                        1) Measuring by micrometer
2. Incoming Inspection                                                                                                             Each heat
                          2) Dimension &Surface                                             2) Visual Inspection

                                                          1) Welding Speed
3. Welding                1) Soundness of weld            2) Welding voltage and current    Manufacturing standard                 At any time
                                                          3) Gas quantity

                                                          1) Condition of the outside and
4. Removal of weld                                                                          1) Visual inspection
                          Dimension and surface              inside weld beads.                                                    At any time
   beads                                                                                    2) Measuring by micrometer
                                                          2) Outside diameter, thickness

                          Homogeneity of the weld and     1) Annealing temperature
5. Bright annealing                                                                         Manufacturing standard                 At any time
                          heat affected zone              2) Hold time

                                                                                            Manufacturing standard and
6. Straightening          Dimension                       Straightness                                                             Every working turn
                                                                                            Visual inspection

7. Cutting                Dimension                       Length                            1) Measuring by tape measure           At any time


8. End facing             Dimension                       Bevel angle                       Manufacturing standard                 Every working turn

                                                          1) Frequency 2) Sensitivity       Manufacturing standard and
9. Eddy current test      Soundness of the tube                                                                                    Each tube
                                                          3) Phase     4) Search coil       specification

                                                          1) Outside diameter, thickness,
                                                             length                         1) Measuring by micrometer and
                          1) Dimension
10. Final inspection                                      2) Tensile test                      tape measure                        Each lot
                          2) Mechanical properties
                                                          3) Hardness test                  2) Measuring by related spec.
                                                          4) Other test

                                                          1) Packing state
11. Packing                                                                                 Manufacturing standard
                                                          2) Shipping mark
                                                                                                                                    www.sejintube.co.kr   39
4-3. Quality Control Plan

     Seamless tube & pipe
                                         Control Items and Quality Characteristics                                    Controlling
  Manufacturing Process
                                    Control Items                        Check Point                      Methods                     Number of Test

1. Material Receiving

                          1) Mill Certificate Review                                         1) Measuring by micrometer
2. Incoming Inspection                                                                                                              Each heat
                          2) Dimension &Surface                                              2) Visual Inspection

                          1) Reduction ratio               1) Drawing Speed                  1) Manufacturing standard
3. Drawing                2) Dies & Plug                   2) Outside, thickness             2) Measuring by micrometer             At any time
                          3) Dimension                     3) Surface                        3) Visual Inspection

                          Homogeneity of the heat          1) Annealing temperature
4. Annealing                                                                                 Manufacturing standard                 At any time
                          affected zone                    2) Hold time

                                                                                             Manufacturing standard and
5. Straightening          Dimension                        Straightness                                                             Every working turn
                                                                                             Visual inspection

6. Cutting                Dimension                        Length                            1) Measuring by tape measure           At any time


7. End facing             Dimension                        Bevel angle                       Manufacturing standard                 Every working turn


8. Pickling               Surface                                                            Visual Inspection                      At any time

                                                           1) Frequency 2) Sensitivity       Manufacturing standard and
9. Eddy current test      Soundness of the tube                                                                                     Each tube
                                                           3) Phase     4) Search coil       specification

                                                           1) Outside diameter, thickness,
                                                              length                         1) Measuring by micrometer and
                          1) Dimension
10. Final inspection                                       2) Tensile test                      tape measure                        Each lot
                          2) Mechanical properties
                                                           3) Hardness test                  2) Measuring by related spec.
                                                           4) Other test

                                                           1) Packing state
11. Packing                                                                                  Manufacturing standard
                                                           2) Shipping mark

                                                                                                                                    www.sejintube.co.kr   40
4. CERTIFICATES




                  www.sejintube.co.kr   41
5. Certificates



             ISO 9001   CE PED




                                 www.sejintube.co.kr   42
5. Certificates


              KS D3577   KS D3595




                                    www.sejintube.co.kr   43
5. MAJOR SUPPLY RECORD




                         www.sejintube.co.kr   44
5. Major Supply Record

  Year            Plant/Project Name             Customer              Material         Q’ty(Ton)

                                             JORD International
2006. 09.     ATRHIT PLATIFORM PHASEⅡ                              ASTM A249 TP304         53.3
                                                 PTY.LTD

2007. 03.        SAMYANG Corporation           HANTEC Eng.         ASTM A249 TP304         42.8


2007. 03.            KOLON E&C              DAESUNG STAINLESS      ASTM A249 TP304          25

                                             JORD International
2007. 05.     PARAXYLENE REVAMP Project                            ASTM A249 TP304         53.3
                                                 PTY.LTD

2007. 11.     MITSUBISHI Heavy Industries    DONGHWA ENTEC        ASTM A249 TP316L          22

2007. 11.            HYUNDAI Eng               WOOYANG HC         ASME SA249 TP316L       120.3


2008. 01.   OXIDATION REACTOR CONDENSOR         TSM TECH          ASME SA249 TP316L        35.2


2008. 01.      MITSUBISHI Chemical Corp.         TAEBANG           ASTM A249 TP304         19.2

2008. 03.         PUERTO CORONEL             SUNGJIN GEOTEC       ASME SA249 TP304          24

2008. 03.     DESALINATION EVAPORATOR        SUNGJIN GEOTEC        ASTM A249 TP304         21.2

2008. 04.      LNG RECEIVING PROJECT            WONIL T&I          ASTM A249 TP304         16.7

                                                                                      www.sejintube.co.kr   45
5. Major Supply Record

  Year           Plant/Project Name            Customer              Material         Q’ty(Ton)

2008. 04.     LNG RECEIVING PROJECT            WONIL T&I        ASME SA249 TP316L         45

2008. 05.           DC Chemical                 UNIWEL           ASTM A249 TP304          23

2008. 05.         KAVIAN PROJECT          FATEH SANAT KIMIA     ASTM A213 TP316L        113.9

                                           JORD International
2008. 05.   BETARA GAS DEVELOPMENT PJT                           ASTM A249 TP304          112
                                               PTY.LTD

2008. 06.    TAWEEELAH A10 POWER PJT      SEWON CELLONTECH      ASTM A249 TP316L         19.5


2008. 06.          INCHEON LNG               FIN TUBE TEC       ASME SA249 TP316L         28

2008. 06.           DC Chemical               KDM TECH          ASME SA249 TP316L        26.2

2008. 06.     MITSUBISHI Chemical Corp.    DONGHWA ENTEC         ASTM A249 TP304          29

2008. 07.    GLOBAL SUPPLIES (UAE) FZE     SUNGJIN GEOTEC       ASTM A249 TP316L          27

                DONGNAM ELECTRIC
2008. 07.                                    MYCOMKOREA          ASTM A213 TP304         29.1
                  POWER STATION

2008. 07.         DCC P2 PROJECT          SEJIN SPECIAL STEEL   ASTM A213 TP316L         20.9

                                                                                    www.sejintube.co.kr   46
5. Major Supply Record

  Year          Plant/Project Name           Customer           Material         Q’ty(Ton)


2008. 07.      BECHTERL-JACOBS            SUNGJIN GEOTEC    ASTM A249 TP304          5.4


2008. 09.         LNG PROJECT                TSM TECH      ASTM A213 TP316L         17.3


2008. 09.        DCC P2 PROJECT            DONGIL TECH      ASTM A249 TP304         41.3


2008. 09.   MITSUBISHI Heavy Industries        SPC         ASTM A249 TP316L          17


2008. 10.             SODIF                DONGIL TECH     ASME SA249 TP316L         22


2008. 10.          KL-GUMI-004             HANMO CORP.     ASME SA249 TP316L         45


2008. 10.        MVR THICKENING            HANTEC ENG.      ASTM A249 TP304         60.2


2008. 11.     SIPCO CCPP PROJECT            TSM TECH       ASTM A249 TP316L          31


2008. 11.      AL – 17BT – L(CHILE)           SPICO        ASTM A249 TP304L         53.3


2008. 07.          POSCO E&C               HANTEC ENG.      ASTM A213 TP304         42.8


2009. 01.         HYUANDAI ENG              TSM TECH       ASTM A249 TP316L          25

                                                                               www.sejintube.co.kr   47
5. Major Supply Record


  Year         Plant/Project Name        Customer             Material         Q’ty(Ton)

2009. 01.      MA’ADEN PROJECT        DAEDONG ENTEC       ASTM A249 TP304          0.9

2009. 01.        DAEWOO ENG           SUNJIN METALEX     ASTM A213 TP304L          22

2009. 01.      QAFCO-FACIATIES           KORINOX         ASME SA249 TP316L       120.3

2009. 01.   JUBAIL EXPORT REFINERY       KORINOX          ASTM A249 TP304         35.2

2009. 03.        GP PROJECT              TSM TECH         ASTM A249 TP304         19.2

                                        SUNGDONG
2009. 03.            JMC                                  ASTM A249 TP304           6
                                        STAINLESS

2009. 03.   GRAND STEAM CONDENSER        TSM TECH         ASTM A249 TP304           7

              CHILE ANGAMOD HFO
2009. 04.                                  KPHE           ASTM A688 TP304          2.5
               SUCTION HEATER
                                        SUNGDONG
2009. 05.      BANG GWANG IND.                           ASTM A249 TP304L          130
                                        STAINLESS

2009. 06.        K2 PROJECT              TSM TECH        ASTM A249 TP316L         10.5

2009. 07.      KAVIAN PROJECT        FATEH SANAT KIMIA   ASTM A213 TP316L        101.3

                                                                             www.sejintube.co.kr   48
5. Major Supply Record

  Year            Plant/Project Name           Customer             Material        Q’ty(Ton)


2009.12.         AERO FEEZE SYSTEM         NEXGEN METAL INC.   ASTM A249 TP304L         70.6


2010. 05.   NATIONAL IRANIAN OIL COMPANY      TASHA MFG.       ASTM A249 TP316L         27.7


2010. 07.              PATKOL               SUNJIN METALEX      ASTM A249 TP304         136


2010. 07.        AERO FEEZE SYSTEM         NEXGEN METAL INC.   ASTM A249 TP304L         52.3


2010. 11.   HACCOGEN MACKAY SUGAR PLANT        TSM TECH        ASME SA249 TP304          12

                                               REFICAR/CBI        ASME SA249
2010. 11.   CARTAGENA REFINERY EXPANSION                                               188.7
                                             /INTERCOL S.A.       TP317L/304
                                           ABAN AIR COOLER
2011. 01.                 -                                    ASTM A213 TP316L        269.8
                                                 CO.
                                                TASHA
2011. 01.         GASTECH PROJECT                              ASME SA213 TP316L        42.3
                                            MANUFACTURING

2011. 09.       DAELIM / POCHEON LNG       TSM TECH CO.,LTD.   ASME SA249 TP304        205.8

2011. 12.    HYUNDAI ENGINEERING / UCHI2   TSM TECH CO.,LTD.   ASME SA249 TP316L        64.7

2012. 01.         TPSC KERAMASAN           TSM TECH CO.,LTD.   ASME SA249 TP316L        10.8

                                                                                   www.sejintube.co.kr   49
5. Major Supply Record

 Year            Plant/Project Name               Customer             Material        Q’ty(Ton)


2012.01      TOSHIBA / EASAR SALAYA           TSM TECH CO., LTD.   ASME SA688 TP304         1.4

                 WESTINGHOUSE /
2012.01                                       TSM TECH CO., LTD.   ASME SA688 TP304        16.5
          AP1000 ME2A SCANA2&3 & VOGTLE 3&4




                                                                                      www.sejintube.co.kr   50
Thank You.

Contenu connexe

Tendances

Resume- Harold Sreshta
Resume- Harold SreshtaResume- Harold Sreshta
Resume- Harold Sreshta
Harold Sreshta
 
Simonis Group - Olivier Verhoyen
Simonis Group - Olivier VerhoyenSimonis Group - Olivier Verhoyen
Simonis Group - Olivier Verhoyen
Themadagen
 
China geruisept12presentation
China geruisept12presentationChina geruisept12presentation
China geruisept12presentation
Company Spotlight
 
Hifly Valve Catalog
Hifly Valve CatalogHifly Valve Catalog
Hifly Valve Catalog
ycbusan
 
American Boa Overview
American Boa OverviewAmerican Boa Overview
American Boa Overview
TonyBonadio
 

Tendances (20)

Resume- Harold Sreshta
Resume- Harold SreshtaResume- Harold Sreshta
Resume- Harold Sreshta
 
As 4822 2008 external field joint coatings for steel pipelines
As 4822 2008 external field joint coatings for steel pipelinesAs 4822 2008 external field joint coatings for steel pipelines
As 4822 2008 external field joint coatings for steel pipelines
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Simonis Group - Olivier Verhoyen
Simonis Group - Olivier VerhoyenSimonis Group - Olivier Verhoyen
Simonis Group - Olivier Verhoyen
 
Cbct rods fdf
Cbct rods fdfCbct rods fdf
Cbct rods fdf
 
Pipe Flange Manufacturing, Testing ,Inspection and Marking
Pipe Flange Manufacturing, Testing ,Inspection and MarkingPipe Flange Manufacturing, Testing ,Inspection and Marking
Pipe Flange Manufacturing, Testing ,Inspection and Marking
 
China geruisept12presentation
China geruisept12presentationChina geruisept12presentation
China geruisept12presentation
 
IRJET- An Experimental Study on High Strength Self-Compaction Concrete with P...
IRJET- An Experimental Study on High Strength Self-Compaction Concrete with P...IRJET- An Experimental Study on High Strength Self-Compaction Concrete with P...
IRJET- An Experimental Study on High Strength Self-Compaction Concrete with P...
 
Testing/Manufacture/Automobile, Paint & Plating Testing Equipments
Testing/Manufacture/Automobile, Paint & Plating Testing EquipmentsTesting/Manufacture/Automobile, Paint & Plating Testing Equipments
Testing/Manufacture/Automobile, Paint & Plating Testing Equipments
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvement
 
IRJET- Minimization of Casting Defects of Double Beat Valve (Bonnet)
IRJET- Minimization of Casting Defects of Double Beat Valve (Bonnet)IRJET- Minimization of Casting Defects of Double Beat Valve (Bonnet)
IRJET- Minimization of Casting Defects of Double Beat Valve (Bonnet)
 
Malleable iron pipe fittings from Hebei Jianzhi Casting Group
Malleable iron pipe fittings from Hebei Jianzhi Casting Group   Malleable iron pipe fittings from Hebei Jianzhi Casting Group
Malleable iron pipe fittings from Hebei Jianzhi Casting Group
 
Hifly Valve Catalog
Hifly Valve CatalogHifly Valve Catalog
Hifly Valve Catalog
 
Manufacturing engineering and technology - Schmid and Kalpakjian
Manufacturing engineering and technology - Schmid and KalpakjianManufacturing engineering and technology - Schmid and Kalpakjian
Manufacturing engineering and technology - Schmid and Kalpakjian
 
Flanges general-for-dummies
Flanges general-for-dummiesFlanges general-for-dummies
Flanges general-for-dummies
 
Forging Lubricants For The Hot Forging Of Steels
Forging Lubricants For The Hot Forging Of SteelsForging Lubricants For The Hot Forging Of Steels
Forging Lubricants For The Hot Forging Of Steels
 
High Speed Servo Robot Spot Welding With Quality
High Speed Servo Robot Spot Welding With QualityHigh Speed Servo Robot Spot Welding With Quality
High Speed Servo Robot Spot Welding With Quality
 
2016 Company Presentation
2016 Company Presentation2016 Company Presentation
2016 Company Presentation
 
PCD Inserts (PCD Blade)
PCD Inserts (PCD Blade)PCD Inserts (PCD Blade)
PCD Inserts (PCD Blade)
 
American Boa Overview
American Boa OverviewAmerican Boa Overview
American Boa Overview
 

En vedette

Ch 6 development plan and quality plan
Ch 6 development plan and quality planCh 6 development plan and quality plan
Ch 6 development plan and quality plan
Kittitouch Suteeca
 
Ppap training-presentation
Ppap training-presentationPpap training-presentation
Ppap training-presentation
Ranvijay Akela
 

En vedette (9)

Quality Management
Quality ManagementQuality Management
Quality Management
 
Ch 6 development plan and quality plan
Ch 6 development plan and quality planCh 6 development plan and quality plan
Ch 6 development plan and quality plan
 
Quality Assurance in PEB - Pre Engineered steel buildings
Quality Assurance in PEB - Pre Engineered steel buildingsQuality Assurance in PEB - Pre Engineered steel buildings
Quality Assurance in PEB - Pre Engineered steel buildings
 
Process fmea
Process fmea Process fmea
Process fmea
 
Ppap training-presentation
Ppap training-presentationPpap training-presentation
Ppap training-presentation
 
Toyota Part Approval (PA) Process
Toyota Part Approval (PA) ProcessToyota Part Approval (PA) Process
Toyota Part Approval (PA) Process
 
Quality Assurance in Hospitals
Quality Assurance in HospitalsQuality Assurance in Hospitals
Quality Assurance in Hospitals
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assurance
 
Software Quality Plan
Software Quality PlanSoftware Quality Plan
Software Quality Plan
 

Similaire à Se Jin Tube Tech E Catalogue

ERSTE CATALOGUE
ERSTE CATALOGUEERSTE CATALOGUE
ERSTE CATALOGUE
Alex Erste
 
BOBPIPE 20160816
BOBPIPE 20160816BOBPIPE 20160816
BOBPIPE 20160816
勃 鲍
 
Company profile nst eng. 14.02.20
Company profile   nst eng. 14.02.20Company profile   nst eng. 14.02.20
Company profile nst eng. 14.02.20
gibunjjang
 
DALONG introduction
DALONG introductionDALONG introduction
DALONG introduction
Queenie H
 
Pipe fittings
Pipe fittingsPipe fittings
Pipe fittings
Yang Coco
 
Baoti's presentation
Baoti's presentation Baoti's presentation
Baoti's presentation
Rachel yao
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Sachin Patil
 

Similaire à Se Jin Tube Tech E Catalogue (20)

Technical data handbook_of_tk_corporation
Technical data handbook_of_tk_corporationTechnical data handbook_of_tk_corporation
Technical data handbook_of_tk_corporation
 
aurum-alloys
aurum-alloys aurum-alloys
aurum-alloys
 
ERSTE CATALOGUE
ERSTE CATALOGUEERSTE CATALOGUE
ERSTE CATALOGUE
 
BOBPIPE 20160816
BOBPIPE 20160816BOBPIPE 20160816
BOBPIPE 20160816
 
ABS Coated Pipe - by Technovision Engineers Pvt. Ltd. Pune
ABS Coated Pipe - by Technovision Engineers Pvt. Ltd. PuneABS Coated Pipe - by Technovision Engineers Pvt. Ltd. Pune
ABS Coated Pipe - by Technovision Engineers Pvt. Ltd. Pune
 
Technovision pipe & joints catalogue
Technovision pipe & joints catalogueTechnovision pipe & joints catalogue
Technovision pipe & joints catalogue
 
Erw Steel Pipe Tom Lv
Erw Steel Pipe Tom LvErw Steel Pipe Tom Lv
Erw Steel Pipe Tom Lv
 
Copper Mould
Copper MouldCopper Mould
Copper Mould
 
Company profile nst eng. 14.02.20
Company profile   nst eng. 14.02.20Company profile   nst eng. 14.02.20
Company profile nst eng. 14.02.20
 
DALONG introduction
DALONG introductionDALONG introduction
DALONG introduction
 
Pipe fittings
Pipe fittingsPipe fittings
Pipe fittings
 
Pipes Joints System - Technovision Catalouge
Pipes Joints System - Technovision CatalougePipes Joints System - Technovision Catalouge
Pipes Joints System - Technovision Catalouge
 
Yucheng Unik Machinery Co.,Ltd
Yucheng Unik Machinery Co.,LtdYucheng Unik Machinery Co.,Ltd
Yucheng Unik Machinery Co.,Ltd
 
Reliable TMT Bar
Reliable TMT BarReliable TMT Bar
Reliable TMT Bar
 
Graphite electrodes thread gage catalog 2020
Graphite electrodes thread gage catalog 2020Graphite electrodes thread gage catalog 2020
Graphite electrodes thread gage catalog 2020
 
hd_steel_AR2007
hd_steel_AR2007hd_steel_AR2007
hd_steel_AR2007
 
Baoti's presentation
Baoti's presentation Baoti's presentation
Baoti's presentation
 
Steelcast limited industrial training report
Steelcast limited industrial training reportSteelcast limited industrial training report
Steelcast limited industrial training report
 
Pt. stainless steel primavalve majubersama company profile 2020
Pt. stainless steel primavalve majubersama   company profile 2020Pt. stainless steel primavalve majubersama   company profile 2020
Pt. stainless steel primavalve majubersama company profile 2020
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
 

Se Jin Tube Tech E Catalogue

  • 1. GENERAL INFORMATION FOR PRE-QUALIFICATION SEJIN TUBE TECH CO., LTD.
  • 2. CONTENTS 1.COMPANY INTRODUCTION 1-1.Introduction & Contact Information 1-2.Company History 1-3.Company Overall View 1-4.Organization 1-5.Company Profile 1-6.Main Customers 2.PRODUCT INTRODUCTION 2-1.Main Products 2-2.Production Process 2-3.Dimension & Tolerance (ASTM A249/JIS G3463/KS D3577) 2-4.Dimension & Tolerance (ASTM A312/JIS G3459/KS D3576) 2-5.Dimension & Tolerance (ASTM A269/JIS G3448/KS D3595) 2-6.Manufacturing Facilities 2-7.Testing Facilities 2-8.Details of Each Facility 2-9.Packing & Storage 3.Q.C MANUAL 3-1.Quality Management System 3-2.Quality Management Process 3-3.Quality Control Plan 4.CERTIFICATES 5.MAJOR SUPPLY RECORD
  • 3. 1. COMPANY INTRODUCTION www.sejintube.co.kr 1
  • 4. 1-1. Introduction & Contact Information Introduction Sejin Tube Tech Co., Ltd. was established in 2005 and we are a manufacturer of Stainless Steel Tube for Boiler, Heat Exchanger, Ordinary piping, Machinery, Structure, Sanitary tubing, etc. We’ve been continuously grown through a good reputation and the endless technical development. Now we’re expanding our market to the international as we obtain the international certificates and the unique technologies. We, Sejin Tube Tech Co., Ltd. promise our customers to go ahead as a front-runner of the Stainless Steel Pipe Manufacturer in the world market as well as in the domestic market while collecting the accumulated Know-How and capability. Thank you. Contact Information • Company Name : Sejin Tube Tech Co., Ltd. • Representative : Myung Chol Kim • Address : 239-1, Gamno-ri, Sangdong-Myeon, Gimhae-si, Gyeong Nam, Korea 621-811 • TEL : +82-55-337-0041 / FAX : +82-55-337-0042 • Website : www.sejintube.co.kr • E-Mail : sejintube@sejintube.co.kr www.sejintube.co.kr 2
  • 5. 1-2. Company History May. 2005 Established Sejin Tube Tech Co., Ltd. May. 2005 Acquired Patent for Stainless Arc Welding Jan. 2006 Acquired ISO 9001:2000 certificate Feb. 2006 Extended the Line for Boiler & Heat Exchanger Tube (2 Lines) Nov. 2006 Completion of the 2nd shop (Pipe Line & Off-Line Oxidized Heat Treatment) Jan. 2007 Seamless Tube Line extension (Plug Draw Bench). Jan. 2007 Registered as a member of Korea Standard Association. Apr. 2007 Registered as a supplier to Jord International Pty Ltd.(Australia) Jun. 2007 Registered as a supplier to Mitsubishi Heavy Industries, Ltd.(Japan) Aug. 2007 Acquired KS mark certificates (KS D3595, KS D3577) May. 2008 Registered as a supplier of Sungjin Geotec, Wooyang H.C.,TSM Tech, Hantech, Iljin Energy(Korea) Nov. 2008 Registered as a supplier to DOW Chemical Company/Vectel Mar. 2009 Registered as a supplier to Doosan Heavy Industries Dec. 2010 Acquired PED Certificate www.sejintube.co.kr 3
  • 6. 1-3. Company Overall View Outside Shop #1 (Welded Pipes) Shop #2 (Seamless Pipes) www.sejintube.co.kr 4
  • 7. 1-4. Organization CEO Managing Director Management Sales Dpt. Production Dpt. QC Dpt. Dpt. Domestic Sales Production Accounting Inspection Overseas Sales Purchasing General Affairs Development Research www.sejintube.co.kr 5
  • 8. 1-5. Company Profile(1) Representative : Myung-Chol Kim Founded Date : May 9, 2005 Number of Employees : Total 28 people • Office : 6 people • Engineer : 2 people • Factory : 20 people Capital(2010) : USD7,500,000 Sales Amount(2010) : USD12,500,000 Main Product : Welded Stainless Tube, Seamless Stainless Tube Usage : Boiler, Heat Exchanger, Anti-corrosion & Heat-resistant Pipes, Ordinary Piping, Sanitary Tubing, etc. Certificate : ISO9001, PED, KS D 3577 & KS D 3595 www.sejintube.co.kr 6
  • 9. 1-5. Company Profile(2) Sales Growth Unit: 0.1 Million USD 140 200 200 130 130 150 100 50 0 2008 2009 2010 2011 Production Capacity Capacity Product Range Line Q’ty (Ton/Year) Stainless Steel Tube for boiler & heat exchanger 3 2000 Stainless Steel Pipe for general piping 2 1200 Stainless Steel Seamless Tube 1x3 1400 Inspection Facilities : Universal Test Machine, Microscope, Hydrostatic Tester, Eddy Current Tester & Vickers Hardness Tester www.sejintube.co.kr 7
  • 10. 1-6. Main Customers Domestic Customers Foreign Customers ▶ Doosan Heavy Industries & Construction ▶ Mitsubishi Heavy Industries Ltd.(Japan) ▶ Doosan Mecatec ▶ Mitsubishi Chemical Corp.(Japan) ▶ Sungjin Geotec ▶ Jord International Pte. Ltd.(Australia) ▶ TSM Tech Co., Ltd. ▶ BHEL(India) ▶ Hantec Engineering Co., Ltd. ▶ Aban Air Cooler Co.(Iran) ▶ Woo Yang H.C Co., Ltd. ▶ Aero Freeze System/GEA(Canada) ▶ Wonil T&I Co.,Ltd. ▶ Titan Metal Fabricators, Inc.(USA) ▶ Seoul Machinery Co.,Ltd. ▶ Intercol S.A./CBI/Reficar(Colombia) ▶ SEWON CELLONTECH Co., Ltd. ▶ Tasha Manufacturing Co.(Iran) ▶ SC Engineering ▶ Patkor Public Company Ltd.(Thailand) ▶ JMC. ▶ DKT Co., Ltd. www.sejintube.co.kr 8
  • 11. 2. PRODUCT INTRODUCTION www.sejintube.co.kr 9
  • 12. 2-1. Main Products(1) Steel Tube for Boiler & Heat Exchanger • Standard: ASTM A249, JIS G3463, KS D3577 • Material: 304(L), 316(L), 321, 310S, 317(L), 347, Duplex(S31803,S32750), etc. • Usage: Boiler, Superheater, Heat Exchanger, Condenser, etc. • Dimension & Tolerance ☞p.13~14 Seamless Tube • Standard: ASTM A213 • Material: 304(L), 316(L), 321, 310S, 317(L), 347, Duplex(S31803,S32750), etc. • Usage: Boiler, Superheater, Heat Exchanger, Condenser, etc. www.sejintube.co.kr 10
  • 13. 2-1. Main Products(2) Steel Pipe for Tubing • Standard: ASTM A312, JIS G3459, KS D3576 • Material: 304(L), 316(L), 321, etc. • Usage: Anti-corrosion & Heat-resistant Pipes for Oil & Gas Industries, Chemical Industries as like Pulp, Paper, Textile, etc. • Dimension & Tolerance ☞p.15~16 Steel Pipe for Ordinary Tubing • Standard: ASTM A269, JIS G3448, KS D3595 • Material: 304(L), 316(L), 321, etc. • Usage: Hot/Cold Water Supply, Drainage, etc. • Dimension & Tolerance ☞p.17 www.sejintube.co.kr 11
  • 14. 2-2. Production Process Welded Tubes Bead Coil Forming Welding Removing Sizing Eddy Current End Bright Test Picking Facing Straightening Annealing Marking Re-sing Inspection Packing Seamless Tubes Repeat Cold Mother Tube Pointing Drawing Degreasing Cutting Eddy Current End Off-Line Test Picking Facing Straightening Heat Treatment Marking Inspection Packing www.sejintube.co.kr 12
  • 15. 2-3. Dimension & Tolerance (ASTM A249 / JIS G3463 / KS D3577) ASTM A249 / JIS G3463 / KS D3577 • Material : 304(L), 316(L), 321, 310S, 317(L), 347, Duplex(S31803,S32750) W.T(mm) O.D(mm) 0.5 0.8 1.2 1.6 2 2.3 2.6 2.9 15.88 19.05 21.7 22.22 25.4 27.2 31.8 34 38.1 45 50.8 www.sejintube.co.kr 13
  • 16. 2-3. Dimension & Tolerance (ASTM A249 / JIS G3463 / KS D3577) ASTM A249 / JIS G3463 / KS D3577 Specification KS D3577(JIS G3463) ASTM A249 Division D < 60 ±0.25 D < 25.4 ±0.10 60 ≤ D < 80 ±0.30 25.4 ≤ D < 38.1 ±0.15 80 ≤ D < 100 ±0.40 38.1 < D < 50.8 ±0.20 Outer 50.8 ≤ D < 63.5 ±0.25 Diameter +0.40 100 ≤ D < 120 63.5 ≤ D < 76.2 ±0.30 - 0.60 76.2 ≤ D ≤ 101.6 ±0.38 +0.40 101.6 < D ≤ 190.5 120 ≤ D < 160 +0.38, -0.64 - 0.80 +0.4 t<2 Tolerance -0 ±10% D < 40 Wall +20% or t≥2 All Size Thickness -0 +18% +22% -0 D ≥ 40 All Thickness -0 L ≤ 7000 +7.0 D ≤ 50 +3.17 L > 7000 +10.0 D < 50.8 -0 Length L ≤ 7000 +10.0 D ≥ 50.8 +4.76 D > 50 -0 L > 7000 +13.0 Straightness Shall be reasonably straight Under 0.8 / 914 Inside Bead Removal No removal Inside bead removal www.sejintube.co.kr 14
  • 17. 2-4. Dimension & Tolerance (ASTM A312 / JIS G3459 / KS D3576) ASTM A312 / JIS G3459 / KS D3576 • Material : 304(L), 316(L), 321 (Unit : mm) Nominal Nominal Wall Thickness(SCH) Outer Diameter Size 5S 10S 20S 40S 80S A B KS ASTM KS ASTM KS ASTM KS KS ASTM KS ASTM 8 1/4 13.8 13.72 1.2 - 1.65 1.65 2.0 2.2 2.24 - - 10 3/8 17.3 17.15 1.2 - 1.65 1.65 2.0 2.3 2.31 - - 15 1/2 21.7 21.34 1.65 1.65 2.1 2.11 2.5 2.8 2.77 3.7 3.73 20 3/4 27.2 26.67 1.65 1.65 2.1 2.11 2.5 2.9 2.87 3.9 3.91 25 1 34.0 33.4 1.65 1.65 2.8 2.77 3.0 3.4 3.38 4.5 4.55 32 1 1/4 42.7 42.16 1.65 1.65 2.8 2.77 3.0 3.6 3.56 4.9 4.85 40 1 1/2 48.6 48.26 1.65 1.65 2.8 2.77 3.0 3.7 3.68 5.1 5.08 50 2 60.5 60.33 1.65 1.65 2.8 2.77 3.5 3.9 3.91 5.5 5.54 65 2 1/2 76.3 73.03 2.1 2.11 3.0 3.05 3.5 5.2 5.16 - - 80 3 89.1 88.9 2.1 2.11 3.0 3.05 4.0 5.5 5.49 - - 90 3 1/2 101.6 101.6 2.1 2.11 3.0 3.05 4.0 5.7 5.74 - - 100 4 114.3 114.3 2.1 2.11 3.0 3.05 4.0 6.0 6.02 - - www.sejintube.co.kr 15
  • 18. 2-4. Dimension & Tolerance (ASTM A312 / JIS G3459 / KS D3576) ASTM A312 / JIS G3459 / KS D3576 (Unit : mm) Specification KS D3576(JIS G3459) ASTM A312 Division +0.4 D < 30 ±0.30 10.29 ≤ D ≤ 48.26 - 0.8 48.26 < D ≤ 114.3 ±0.8 Outer Diameter +1.6 L ≥ 30 ±1% 114.4 < D ≤ 219.08 - 0.8 +2.4 Tolerance 219.08 < D ≤ 406.4 - 0.8 t<2 ±0.20 Wall All Size All Size Thickness over -12.5% t≥2 ±10% +6.4 Length Longer than the specified length All Size - 0.0 Straightness Shall be practically straight Shall be practically straight www.sejintube.co.kr 16
  • 19. 2-5. Dimension & Tolerance (ASTM A269 / JIS G3448 / KS D3595) ASTM A 269 / JIS G 3448 / KS D 3595 • Material: 304(L), 316(L), 321 Outer Diameter (mm) Wall Thickness (mm) Weight (kg/m) Nominal Diameter Size Tolerance Size Tolerance STS304TPD STS316TPD 13 SU 15.88 0.8 0.301 0.302 0 20 SU 22.22 1.0 0.529 0.532 -0.37 25 SU 28.58 1.0 0.687 0.691 ±0.12 30 SU 34.00 ±0.34 1.2 0.980 0.987 40 SU 42.70 ±0.43 1.2 1.240 1.250 50 SU 48.60 ±0.49 1.2 1.420 1.430 60 SU 60.50 ±0.60 1.5 ±0.15 2.200 2.220 www.sejintube.co.kr 17
  • 20. 2-6. Manufacturing Facilities (List) Line Descrption Q’ty Capacity Origin (Process) O.D : 13.8mm ~ 60.5mm Forming M/C 5 KOREA Welded Speed : 2M/Min ~ 4M/Max Non-oxidized heat treatment furnace 2 O.D : 13.8mm ~ 60.3mm KOREA (ON-LINE) O.D : 13.8mm ~ 60.5mm Straightnning M/C 4 KOREA Voltage : 50kw ~ 100kw WELDED Auto Cutting & End PIPES 1 O.D : 13.8mm ~ 114.3mm KOREA Facing M/C Auto End Facing M/C 1 O.D : 13.8mm ~ 60.5mm KOREA O.D : 13.8mm ~ 60.5mm Marking M/C 1 FRANCE LENGTH : 20M O.D : 13.8mm ~ 60.5mm Manual Cutter 4 U.S.A LENGTH : 7M Drawing M/C 1X3 O.D : 13.8mm ~ 60.5mm KOREA SEAMLESS Oxidized heat PIPES Treatment furnace 1 O.D : 13.8mm ~ 216.3mm KOREA (OFF-LINE) www.sejintube.co.kr 18
  • 21. 2-4. Manufacturing Facilities (Photo) Forming M/C Bright annealing furnace Straightening M/C Auto Cutting & End Facing M/C www.sejintube.co.kr 19
  • 22. 2-6. Manufacturing Facilities (Photo) Marking M/C Cutting M/C Drawing M/C Heat Treatment furnace www.sejintube.co.kr 20
  • 23. 2-7. Testing Facilities (List) Description Q’ty Availability Origin Universal Test Machine 1 60 Ton KOREA Microscope Tester 1 X50 ~ x500 KOREA Eddy Current Tester 1 O.D.: 13.8mm ~ 60.5mm FRANCE Hydrostatic Tester 1 Max. 200kg/㎠ KOREA Vickers Hardness Tester 1 Max. 1HV KOREA Mounting Press 1 - KOREA Grinding Polisher 1 - KOREA Belt Grinder 1 - KOREA Precision cutting machine 1 - KOREA Micro Meter 9 0 ~ 25mm JAPAN Micro Meter 5 25 ~ 50mm JAPAN Micro Meter 2 50 ~ 75mm JAPAN Vernier Calipers 3 0 ~ 150mm JAPAN Vernier Calipers 1 0 ~ 300mm JAPAN www.sejintube.co.kr 21
  • 24. 2-7. Testing Facilities (Photo) Universal Test Machine Micro Scope Tester Eddy Current Tester Hydrostatic Tester www.sejintube.co.kr 22
  • 25. 2-7. Testing Facilities (Photo) Vickers Hardness Tester Mounting Press Grinding Polisher Precision Cutting Machine www.sejintube.co.kr 23
  • 26. 2-8. Details of Each Facility Description Specification Origin 1. Type : Annealing 2. Heat source : Electricity Non-oxidized Heat 3. Size range : O.D 15.88mm ~ 60.5mm KOREA Treatment Furnace 4. Quenching method : Rapidly cooled by carbon 5. Max. frequency : 100kHz Heat 6. Max. Temp. : 1500 ℃ Treatment Furnace 1. Type : Annealing 2. Heat source : LPG Gas Oxidized Heat 3. Size range : O.D 250mm Max. KOREA Treatment Furnace 4. Quenching method : Rapidly cooled by water 5. Max. Temp. : 1400 ℃ 1. Max. pressure : 20 Mpa Hydro Tester 2. Size range : O.D 15.88mm ~ 38.10mm KOREA 3. Max. Length : 4M ~ 18M 1. Max. pressure : 20 Mpa 2. Size range : O.D 12.70mm ~ 88.90mm Eddy Current Tester FRANCE 3. Max. Length : 24M Max. 4. Model name : CMS www.sejintube.co.kr 24
  • 27. 2-9. Packing & Storage Carton Box Wooden Box Carton Skid Box Steel Bend Square Wooden Bend www.sejintube.co.kr 25
  • 28. 3. Q.C MANUAL www.sejintube.co.kr 26
  • 29. 4-1. Quality Management System Order Control Daily Plant Customer Monthly Closing Process Operation Report Status Report Procurement Control Review Total Process Production Control Process (Tube Drawing) Status Report Continuous Improvement Activity Inspection Control Process Supply Chain Management Process Delivery Control Self-improvement Data Process Activity Collection & Analysis Select Theme Payment Collecting Survey as-is, cause Control Process Setting Target Plan/Do Actions Effect Analysis Customer’s Claim Standardization Running Control Process /Management Suggestion System IN PUT OUT PUT Operation of Business Plan / Management Policy & Target Management www.sejintube.co.kr 27
  • 30. 4-2. Quality Management Process Order Control Process Process Map Step Supervised Under Co-operation with Customer Manager Contents of Activities Marketing Department Q.C, Production Customer 1 Order Receive/Distribute ROQ Receiving and distribution of ROQ 2 Review Order Review ROQ Prepare Draft Quotation 3 Prepare Draft Quotation (Including Delivery, Payment, Packing, and Heat Treatment Method) Prepare/ Prepare Quotation (Delivery, Payment Terms, Packing, 4 Distribute Quotation Heat Treatment Method, Effective Period) 5 Review Quotation Review Quotation 6 Customer Send Quotation Send Quotation – Achieve Customer’s Approval Approval 7 Receive/Distribute Order Production Control Receive Customer’s Order, Distribute to Managers Analysis of Based on Roll margin and Sales data, prepare Sales 8 Report Sales Performance Performance Report to Managers www.sejintube.co.kr 28
  • 31. 4-2. Quality Management Process Production Control Process Process Map Step Supervised Under Co-operation with Customer Managers Contents of Activities Production Dept. QC, Marketing, Admin. 1 Order Control Receive Customer Order Receive and register Customer Order from Marketing. Record Customer, Volume, Delivery, Material, 2 Arrange Delivery Specification, etc. Check raw material and stock, and request purchase of 3 Check Inventory shortage materials. Procurement Prepare/Adjust Control Prepare/adjust/distribute monthly production plan based 4 Monthly Production Plan on status of delivery and raw materials. Prepare/adjust/distribute weekly tubing plan by each Prepare/Adjust 5 Weekly Production Plan machine based on inventory and incoming schedule of raw materials. Check incoming schedule Check and adjust inventory and incoming schedule of 6 /inventory of materials raw materials. Issue Work Order After checking details of customer order (MFG. Spec., 7 (Tubing, Back-process) Steel Spec., QTY, Delivery, and Packing method), issue work order. Control production according to MFG. Spec., and keep Tubing Process 8 Inspection recording of production performance and process Equip. Control inspection report. Control Back-Process Make sure to manufacture according to manufacturing 9 specification of work order. 10 Labelling Check packing method and QTY, and attach tag. www.sejintube.co.kr 29
  • 32. 4-2. Quality Management Process Process Map Step Supervised Under Co-operation with Customer Managers Contents of Activities Production Dept. QC, Marketing, Admin. Check production After checking steel model, order QTY, packing method, 11 Delivery Control performance MFG Spec., etc, and prepare product inspection report. Store finished products at stacking area, and make 12 Stack/Store Products delivery to customers by delivery schedule. Collect recording data, and make analysis of yield ratio, 13 Analysis of production Report Operation ratio, Production Performance ratio, etc, and performance report to managers. www.sejintube.co.kr 30
  • 33. 4-2. Quality Management Process Delivery Control Process Process Map Step Supervised Under Co-operation with Customer Managers Contents of Activities Marketing Dept. Q.C, Production Production/Inspection Check customer order after completion of production. 1 Check Customer Order Record (Delivery and conforming of requirements) Procurement Control Customer Notice to /Discuss with 2 Notice to /Discuss with customer about delivery plan. customer Receive Delivery Receive customer’s delivery request. (Reflection of 3 Request Verbal or contents of customer order) 4 Delivery Order Delivery Order 5 Loading Products Loading of Products Prepare Invoice and record name of staff responsible for 6 Issue Invoice delivery to designated customer. 7 Check Delivery Check Delivery 8 Receive Invoice Collecting Control Receive customer-confirmed invoice. Perform analysis of delivery based on delivery 9 Analysis of Delivery Report conforming ratio data, and report to managers. www.sejintube.co.kr 31
  • 34. 4-2. Quality Management Process Customer Claim Control Process Process Map Step Supervised Under Co-operation with Customer Managers Contents of Activities Marketing Dept. Q.C, Production Wire /Mail 1 Customer Claim Receive Customer Claim Receive customer claim thru wire. mail, and fax. 2 Report Customer Claim Report customer claim to production/QC department. Customer Check Inventory Check Claimed defect, and if claim is not defect, discuss 3 Master Book with customer, and record to customer master book. 4 Survey claim contents Start survey of customer claim details. Meeting for Meeting with production and QC to find corrective 5 counter-measure actions based on survey report. 6 Check received defect Check defect sample for customer claim Survey root cause Start to find root cause of defect after checking defect 7 sample. Our responsibility Discuss with If defect is found to be not from our responsibility out of 8 Customer root cause survey report, discuss with customer. Action first, and then If defect is from our responsibility, visit customer to 9 discuss with customer discuss and explain our prior actions. Perform discussed Perform quick corrective actions discussed with 10 actions Corrective action customer. www.sejintube.co.kr 32
  • 35. 4-2. Quality Management Process Process Map Step Supervised Under Co-operation with Customer Managers Contents of Activities Marketing Dept. Q.C, Production 11 Report to production Report discussions with customer to production Analysis of Collect recorded Data, and perform analysis of customer 12 Report customer claim defect ratio and quality cost, etc, and report to managers. www.sejintube.co.kr 33
  • 36. 4-2. Quality Management Process Procurement Control Process Process Map Step Supervised Under Co-operation with Customer Managers Contents of Activities Production Dept. Q.C, Marketing Calculate procurement Check inventory Prepare raw material procurement plan after checking 1 volume of raw material inventory of raw materials and finished goods according to monthly production plan. Supplier Prepare /Send ROQ Check steel model, thickness, width, and QTY, and 2 send ROQ to supplier. Receive quotation Receive quotations from each suppliers, and check 3 delivery and price. 4 Supplier Review quotation Arrange and confirm delivery and cost for each suppliers. After confirming final delivery and price for each 5 Prepare Purchase Order suppliers, prepare Purchase Order. 6 Approval Get approval of Purchase Order from President. Send /Confirm Send Purchase Order to selected supplier, and confirm 7 Purchase Order receipt. Control raw material incoming schedule by Production 8 Incoming Progress Control Plan and Purchase Order. Inspection Check if incoming material conforms Purchase Order for Control 9 Incoming QTY, Steel Model, Thickness, Width, and Product Production Inspection Report. Control Collect recorded data, and perform analysis of incoming 10 Analysis of Procurement Report schedule conforming ratio, and report to managers. www.sejintube.co.kr 34
  • 37. 4-2. Quality Management Process Inspection Control Process Process Map Step Supervised Under Co-operation with Customer Managers Contents of Activities Q.C Production Dept. Supply Chain 1 Control Incoming Info. Check incoming date and QTY for raw materials. Procurement Control Check Invoice and inspection report whenever raw 2 Check Purchase Order material incoming arrives. Before receipt of raw material, perform incoming 3 Incoming Inspection inspection. (Weight, dimension) Prepare /Notice to return If incoming inspection finds defects, send notice to 4 notice with return causes. supplier. Report Check defects with supplier, and if no good to input, 5 Check products Production make decision to return with agreement of supplier. Control Tubing /back-process Perform In-process inspection during Tubing /Back- 6 Inspection process. (Dimension, inner/outer surface) Search defect trend for defects found during in-process 7 Search defect trend inspection. 8 Pass/No-Good Make decision if defect can be repaired. 9 Store /Identify Store and identify defect goods. 10 Re-inspection Perform re-inspection www.sejintube.co.kr 35
  • 38. 4-2. Quality Management Process Process Map Step Supervised Under Co-operation with Customer Managers Contents of Activities Q. C. Production Dept. Send repaired defect to final inspection, and send non- 11 Repair /Disposal Inspection Control repairable defect to disposal. Perform final inspection before product dispatch. 12 Final Inspection (Dimension, mechanical properties) 13 Disposal Delivery Defects in final inspection shall be disposed. Control Collect recorded data, and perform analysis of in- 14 Analysis of Report process defect ratio, finished good defect ratio, and in- Inspection result house quality cost, etc, and report to managers. www.sejintube.co.kr 36
  • 39. 4-2. Quality Management Process Supply Chain Control Process Process Map Step Supervised Under Co-operation with Customer Managers Contents of Activities Production dept. Q.C, Marketing Control Supplier Order for back- Arrange incoming schedule with production completion 1 Process request schedule of out-sourcing supplier. 2 Logistics Plan Check logistics plan of completed out-sourcing products. 3 Delivery Order Delivery Order to out-sourcing supplier. 4 Loading Loading of out-sourcing product. 5 Check Delivery Check dimension and QTY before delivery. 6 Issue Invoice Issue Invoice. Receive 7 Invoice Supply to out-sourcing Supply out-sourcing product to supplier. Control incoming Check incoming schedule of out-sourcing product thru 8 progress wire. 9 Incoming Incoming of out-sourcing product. Incoming Inspection Upon incoming of out-sourcing product, perform 10 incoming inspection by QC inspector. www.sejintube.co.kr 37
  • 40. 4-2. Quality Management Process Process Map Step Supervised Under Co-operation with Customer Managers Contents of Activities Production dept. Q.C, Marketing Input inspected out-sourcing product to in-process of 11 Input to in-process production. Analysis of Report Perform analysis of incoming schedule conforming ratio, 12 out-sourcing pass-ratio, etc, and report to managers. www.sejintube.co.kr 38
  • 41. 4-3. Quality Control Plan Welded tube & pipe Control Items and Quality Characteristics Controlling Manufacturing Process Control Items Check Point Methods Number of Test 1. Material Receiving 1) Mill Certificate Review 1) Measuring by micrometer 2. Incoming Inspection Each heat 2) Dimension &Surface 2) Visual Inspection 1) Welding Speed 3. Welding 1) Soundness of weld 2) Welding voltage and current Manufacturing standard At any time 3) Gas quantity 1) Condition of the outside and 4. Removal of weld 1) Visual inspection Dimension and surface inside weld beads. At any time beads 2) Measuring by micrometer 2) Outside diameter, thickness Homogeneity of the weld and 1) Annealing temperature 5. Bright annealing Manufacturing standard At any time heat affected zone 2) Hold time Manufacturing standard and 6. Straightening Dimension Straightness Every working turn Visual inspection 7. Cutting Dimension Length 1) Measuring by tape measure At any time 8. End facing Dimension Bevel angle Manufacturing standard Every working turn 1) Frequency 2) Sensitivity Manufacturing standard and 9. Eddy current test Soundness of the tube Each tube 3) Phase 4) Search coil specification 1) Outside diameter, thickness, length 1) Measuring by micrometer and 1) Dimension 10. Final inspection 2) Tensile test tape measure Each lot 2) Mechanical properties 3) Hardness test 2) Measuring by related spec. 4) Other test 1) Packing state 11. Packing Manufacturing standard 2) Shipping mark www.sejintube.co.kr 39
  • 42. 4-3. Quality Control Plan Seamless tube & pipe Control Items and Quality Characteristics Controlling Manufacturing Process Control Items Check Point Methods Number of Test 1. Material Receiving 1) Mill Certificate Review 1) Measuring by micrometer 2. Incoming Inspection Each heat 2) Dimension &Surface 2) Visual Inspection 1) Reduction ratio 1) Drawing Speed 1) Manufacturing standard 3. Drawing 2) Dies & Plug 2) Outside, thickness 2) Measuring by micrometer At any time 3) Dimension 3) Surface 3) Visual Inspection Homogeneity of the heat 1) Annealing temperature 4. Annealing Manufacturing standard At any time affected zone 2) Hold time Manufacturing standard and 5. Straightening Dimension Straightness Every working turn Visual inspection 6. Cutting Dimension Length 1) Measuring by tape measure At any time 7. End facing Dimension Bevel angle Manufacturing standard Every working turn 8. Pickling Surface Visual Inspection At any time 1) Frequency 2) Sensitivity Manufacturing standard and 9. Eddy current test Soundness of the tube Each tube 3) Phase 4) Search coil specification 1) Outside diameter, thickness, length 1) Measuring by micrometer and 1) Dimension 10. Final inspection 2) Tensile test tape measure Each lot 2) Mechanical properties 3) Hardness test 2) Measuring by related spec. 4) Other test 1) Packing state 11. Packing Manufacturing standard 2) Shipping mark www.sejintube.co.kr 40
  • 43. 4. CERTIFICATES www.sejintube.co.kr 41
  • 44. 5. Certificates ISO 9001 CE PED www.sejintube.co.kr 42
  • 45. 5. Certificates KS D3577 KS D3595 www.sejintube.co.kr 43
  • 46. 5. MAJOR SUPPLY RECORD www.sejintube.co.kr 44
  • 47. 5. Major Supply Record Year Plant/Project Name Customer Material Q’ty(Ton) JORD International 2006. 09. ATRHIT PLATIFORM PHASEⅡ ASTM A249 TP304 53.3 PTY.LTD 2007. 03. SAMYANG Corporation HANTEC Eng. ASTM A249 TP304 42.8 2007. 03. KOLON E&C DAESUNG STAINLESS ASTM A249 TP304 25 JORD International 2007. 05. PARAXYLENE REVAMP Project ASTM A249 TP304 53.3 PTY.LTD 2007. 11. MITSUBISHI Heavy Industries DONGHWA ENTEC ASTM A249 TP316L 22 2007. 11. HYUNDAI Eng WOOYANG HC ASME SA249 TP316L 120.3 2008. 01. OXIDATION REACTOR CONDENSOR TSM TECH ASME SA249 TP316L 35.2 2008. 01. MITSUBISHI Chemical Corp. TAEBANG ASTM A249 TP304 19.2 2008. 03. PUERTO CORONEL SUNGJIN GEOTEC ASME SA249 TP304 24 2008. 03. DESALINATION EVAPORATOR SUNGJIN GEOTEC ASTM A249 TP304 21.2 2008. 04. LNG RECEIVING PROJECT WONIL T&I ASTM A249 TP304 16.7 www.sejintube.co.kr 45
  • 48. 5. Major Supply Record Year Plant/Project Name Customer Material Q’ty(Ton) 2008. 04. LNG RECEIVING PROJECT WONIL T&I ASME SA249 TP316L 45 2008. 05. DC Chemical UNIWEL ASTM A249 TP304 23 2008. 05. KAVIAN PROJECT FATEH SANAT KIMIA ASTM A213 TP316L 113.9 JORD International 2008. 05. BETARA GAS DEVELOPMENT PJT ASTM A249 TP304 112 PTY.LTD 2008. 06. TAWEEELAH A10 POWER PJT SEWON CELLONTECH ASTM A249 TP316L 19.5 2008. 06. INCHEON LNG FIN TUBE TEC ASME SA249 TP316L 28 2008. 06. DC Chemical KDM TECH ASME SA249 TP316L 26.2 2008. 06. MITSUBISHI Chemical Corp. DONGHWA ENTEC ASTM A249 TP304 29 2008. 07. GLOBAL SUPPLIES (UAE) FZE SUNGJIN GEOTEC ASTM A249 TP316L 27 DONGNAM ELECTRIC 2008. 07. MYCOMKOREA ASTM A213 TP304 29.1 POWER STATION 2008. 07. DCC P2 PROJECT SEJIN SPECIAL STEEL ASTM A213 TP316L 20.9 www.sejintube.co.kr 46
  • 49. 5. Major Supply Record Year Plant/Project Name Customer Material Q’ty(Ton) 2008. 07. BECHTERL-JACOBS SUNGJIN GEOTEC ASTM A249 TP304 5.4 2008. 09. LNG PROJECT TSM TECH ASTM A213 TP316L 17.3 2008. 09. DCC P2 PROJECT DONGIL TECH ASTM A249 TP304 41.3 2008. 09. MITSUBISHI Heavy Industries SPC ASTM A249 TP316L 17 2008. 10. SODIF DONGIL TECH ASME SA249 TP316L 22 2008. 10. KL-GUMI-004 HANMO CORP. ASME SA249 TP316L 45 2008. 10. MVR THICKENING HANTEC ENG. ASTM A249 TP304 60.2 2008. 11. SIPCO CCPP PROJECT TSM TECH ASTM A249 TP316L 31 2008. 11. AL – 17BT – L(CHILE) SPICO ASTM A249 TP304L 53.3 2008. 07. POSCO E&C HANTEC ENG. ASTM A213 TP304 42.8 2009. 01. HYUANDAI ENG TSM TECH ASTM A249 TP316L 25 www.sejintube.co.kr 47
  • 50. 5. Major Supply Record Year Plant/Project Name Customer Material Q’ty(Ton) 2009. 01. MA’ADEN PROJECT DAEDONG ENTEC ASTM A249 TP304 0.9 2009. 01. DAEWOO ENG SUNJIN METALEX ASTM A213 TP304L 22 2009. 01. QAFCO-FACIATIES KORINOX ASME SA249 TP316L 120.3 2009. 01. JUBAIL EXPORT REFINERY KORINOX ASTM A249 TP304 35.2 2009. 03. GP PROJECT TSM TECH ASTM A249 TP304 19.2 SUNGDONG 2009. 03. JMC ASTM A249 TP304 6 STAINLESS 2009. 03. GRAND STEAM CONDENSER TSM TECH ASTM A249 TP304 7 CHILE ANGAMOD HFO 2009. 04. KPHE ASTM A688 TP304 2.5 SUCTION HEATER SUNGDONG 2009. 05. BANG GWANG IND. ASTM A249 TP304L 130 STAINLESS 2009. 06. K2 PROJECT TSM TECH ASTM A249 TP316L 10.5 2009. 07. KAVIAN PROJECT FATEH SANAT KIMIA ASTM A213 TP316L 101.3 www.sejintube.co.kr 48
  • 51. 5. Major Supply Record Year Plant/Project Name Customer Material Q’ty(Ton) 2009.12. AERO FEEZE SYSTEM NEXGEN METAL INC. ASTM A249 TP304L 70.6 2010. 05. NATIONAL IRANIAN OIL COMPANY TASHA MFG. ASTM A249 TP316L 27.7 2010. 07. PATKOL SUNJIN METALEX ASTM A249 TP304 136 2010. 07. AERO FEEZE SYSTEM NEXGEN METAL INC. ASTM A249 TP304L 52.3 2010. 11. HACCOGEN MACKAY SUGAR PLANT TSM TECH ASME SA249 TP304 12 REFICAR/CBI ASME SA249 2010. 11. CARTAGENA REFINERY EXPANSION 188.7 /INTERCOL S.A. TP317L/304 ABAN AIR COOLER 2011. 01. - ASTM A213 TP316L 269.8 CO. TASHA 2011. 01. GASTECH PROJECT ASME SA213 TP316L 42.3 MANUFACTURING 2011. 09. DAELIM / POCHEON LNG TSM TECH CO.,LTD. ASME SA249 TP304 205.8 2011. 12. HYUNDAI ENGINEERING / UCHI2 TSM TECH CO.,LTD. ASME SA249 TP316L 64.7 2012. 01. TPSC KERAMASAN TSM TECH CO.,LTD. ASME SA249 TP316L 10.8 www.sejintube.co.kr 49
  • 52. 5. Major Supply Record Year Plant/Project Name Customer Material Q’ty(Ton) 2012.01 TOSHIBA / EASAR SALAYA TSM TECH CO., LTD. ASME SA688 TP304 1.4 WESTINGHOUSE / 2012.01 TSM TECH CO., LTD. ASME SA688 TP304 16.5 AP1000 ME2A SCANA2&3 & VOGTLE 3&4 www.sejintube.co.kr 50