UNIT - IV
PROJECT PREPARATION
4.1. Markets , Demand Analysis ; 4.2. Raw Materials and Supplies
4.3. Environment Impact Assessment (EIA)
4.4. Production Program and Plant Capacity
4.5. Technology Selection
4.6. Organizational and Human Resource
4.7. Financial and Economic Analysis
4.7.1. Initial investment cost , 4.7.2. Production cost
4.7.3. Marketing cost ; 4.7.4. Projection of cash flow
4.7.5. Financial evaluation
4.7.5.1. Net present value (NPV) ; 4.7.5.2. Internal rate of return (IRR)
4.7.5.3. Benefit cost ratio (BCR)
4.7.5.4. Payback period (PBP)
4.7.5.5. Accounting rate of return (ARR)
4.7.5.6. Break – even analysis (BEA)
Consequences of Poor Project Preparation
• The following points has shown that the consequence of
poor project preparation too many industrial projects suffer
in terms of:
• Low capacity utilization
• Heavy costs overruns
• Deteriorated / declined financial profitability
• Lingering (Slow ) illness or the sudden death syndrome (
condition )
• Overestimated/ miscalculated returns / profit
• Underestimated / under valued costs
• Omission of a necessary component
• Optimistic projection (Yield, date)
• Failure to consider the project related climate changes
• Optimistic calendar for implementation
Steps in Project analysis
First step :
Identifying the demand for the product
Identifying possible
Final step :
• Analysis towards determining the plant capacity taking
into account alternative levels of production
• Analysis towards Investment outlays and sales
revenue.
• The extensive and careful analysis of past, present and
future demand for the product and market
• Institutional and political forces influencing demand
and sales of the product.
Responsibilities of Project analyst
• A feasibility study should arrive definitive conclusions on all the basic
aspects of a project after considering various alternatives.
• The objective of feasibility study is to provide a final investment decision.
Therefore it should define all project features as precisely as possible.
• A feasibility study should be detailed and precise enough to enable
decisions.
• The description of the project components should be refined to use the
study as a guide for project implementation.
• The discussions and analysis required with engineers, economists, and
specialists in areas such as soils, geology, manufacturing, processing,
extension and management to make project more effective.
• There should have a sharp eye on the crucial aspects of a feasibility
study.
Feasibility study
• Estimation of size of the project
• Structure and development trends of demand for the product or
products,
• Careful analysis of determining variables of Project and their
market environment
• Demand forecasting and the ultimate goal of the procedures
towards project
• Sales volume and revenue projections.
• Detailed production program
• Various production process and their time limit.
• Production program
• Plant capacity
• Material and inputs choice
• Location
• Financial evaluation
• Ultimate marketing strategy
Important key areas of Market and demand analysis
1. General Characteristics
of the Economy:
 Economic prospective
 Production structure
 Foreign trade
 Economic policy
2. Product
 Characteristic features
 Substitutes and
complementary goods
3. Demand
 Sales and orders
 Buyer’s characteristics
 Demand determining
factors
 Purchasing power
4. Supply
 Supply potential
 Local production
 Imports and exports
 Competitor’s position
5. Marketing environment
(marketing strategy, marketing
mix)
 Price levels and trends
 Distribution channels
 Physical distribution
network
 Promotion
6. Legal and political
environment
Important key areas of Market and demand analysis
- Market Segmentation
• Religion
• Nationality
• Social class
• Culture
3. Personality and behavior:
• Life – style
• Leadership
• Ambition
• Buying motive
• Service sensitivity
• Promotional sensitivity
1. Geographic:
• Administrative regions
• Geographic regions
• Climate
• City – size
• Rural district – size
2. Socio – Economic:
• Income
• Age
• Sex
• Occupation
• Education
• Family size
Key steps in Market and Demand Analysis
• Situational analysis
• Collection of secondary information
• Conduct of market survey (primary information)
• Description of the market
• Demand forecasting
• Market planning
Role of Market Analyst
Market research is a special stage in the feasibility study. Market
research usually ranks top in the sequence of the core chapters of a
feasibility study. The following aspects should be concentrated at the
time of market research :
• Capacity planning,
• Technology selection,
• Staffing the sales,
• Promotion and service department
• Working capital and
• Financial planning
• Revision of sales and demand forecasting
• Projection of future demand
• Behavior of customers , taste
It deals with the following :
market
market conditions
customer
supplier
product
service
demand
supply
elasticity of demand
price elasticity , Promotion , placement , pricing , production
and etc.,
I. MARKET AND DEMAND ANALYSIS
II. RAM MATERIAL AND SUPPLY STUDY
Raw material and supply study deals with the
following :
• Identifying the good quality of raw material
• Procuring the raw material
• Safeguarding raw material
• Reduction of production cost
• Reduction of distribution cost
• Effective utilization of Raw material and its
distribution channels
• Reduction of abnormal Wastages
III. LOCATION , SITE AND ENVIRONMENT IMPACT ASSESSMENT ( EIA )
It is concerned with Site or location Selection
• Identifying the correct and appropriate site
• Evaluation of the standards of the site
• Evaluation towards the cost of the land
• Analyzing the surrounding environment
• Analyzing the facilities available nearby the site or location
• Facilities like water, hospitals , hotel or restaurants , educational
institution
• Workers Availability
• Population size and other parameters
• Availability of the land
• Soil and Quality of the land
• Suitability of the land with the current project
• How the local environment creates an impact on current project
IV. PRODUCTION PROGRAM AND PLANT CAPACITY
It connects with the following aspects :
• Level of Production Capacity
• Availability of Existing Standard of Production and production level
• Production Quality standards
• Production Target
• Current Plant Capacity
• Capacity to be increased for the future
• Production Cost
• Production Cost Control Techniques
• Preparation of Comparative Production cost statement
• Availability of Produced products
• Products to be Produced
• Analysis towards current market trend
V. FINANCIAL AND ECONOMIC ANALYSIS
 All measures of financial evaluation of
project’s feasibility are based on estimates of
costs and revenues.
 An inaccurate or wrong demand and sales
projection, being the result of careless and
carefree attitude towards demand and market
analysis, may lead to ultimate project failure.
OBJECTIVE OF FINANCIAL AND ECONOMIC ANALYSIS
• To reduce Expenditure
• To apply control over the outlay of the project
• To increase efficiency of the project finance
• To make valid investment
• To avoid unwanted expenditures
• To increase financial efficiency
• To control office and administrative cost , sales and
distribution cost
• To control operational cost
• To achieve the financial goals of the organization
• To have effective and efficient cost administration
NPV , PV, PBP, ARR
(A) NET PRESENT VALUE
NPV = TOTAL PRESENT VALUE – INITIAL INVESTMENT
PRESENT VALUE = CASH INFLOW X DISCOUNT FACTOR
(B) PAY BACK PERIOD
It is a process of recovery of invested amount in fixed asset in how many
years is called pay back period
(C) ACCOUNTING RATE OF RETURN
• ARR = Average Income / Average Investment x100
• Average Income = Total Income / Total No of Years
• Average Investment = (Original cost of the Machine – Scrap Value /2 )+
Additional working Capital – Scrap Value
Pay back period (PBP)
 Even Cash inflow
Cash inflow / Cash inlay (In Birr ) :
1st year – 20000 , 2nd year – 20000 , 3 year – 20000 , 4th year –
20000
Cash out lay = 100000 birr
Formula : PBP = Average Annual Cash inflow / Cash out flow
PBP = 20000 / 100000 = 5 years
 Un Even Cash inflow
Cash inflow / Cash inlay (In Birr ) :
1st year – 20000 , 2nd year – 35000 , 3 year – 20000 , 4th year – 45000
PBP = 3 years + to be received / Actually received
PBP = 3 Years + 25000/ 45000
PBP = 3 Years + 0.56 = 3.56 Years
IF PAY BACK PERIOD IS LESS ACCEPT OTHERWISE REJECT WHEN YOU
COMPARE TWO PROJECTS.
NET PRESENT VALUE ( NPV )
YEAR CASH INFLOW
(Uneven )
DISCOUNT FACTOR (10%) PRESENT VALUE
1 20000 0.909 18180
2 40000 0.827 33080
3 55000 0.751 41305
4 35000 0.683 23905
5 30000 0.621 18630
Total 180000 Total Present Value 135100
Less : Initial Investment 100000
NPV 35100
RULE FOR ACCEPTANCE OR REJCECTION OF PROJECT BASED ON NPV :
NPV is Positive then Accept
NPV is Negative then Reject
NPV is Neutral Reject
Average / Accounting Rate of Return (ARR)
Question :
A project Requires initial Cash outlay of 100000 birr.
Scrap Value is 40000 birr. Additional investment
required for the project is 20000 birr and the same
was invested at the end of first year . The annual
cash inflow for 4 years given as follows. From the
following details you are requested to find ARR.
Annual Cash inflow :
1 year – 50000 , 2nd year – 25000 , 3rd year – 45000
, 4th year – 30000.
Calculation of ARR
Formula : ARR = Average income / Average investment x100
Average Income = Total income / No of years
Average income = 50000+25000+45000+30000 = 150000 /4
Average income = 37500 birr
Average Investment = (original investment – Scrap Value /2 ) + Additional
Investment - Scrap Value
Average Investment = (100000 – 40000/2)+ 20000+ 40000
Average Investment = 30000+20000+40000 = 90000 birr
ARR = 37500/90000 x100 = 41.66 %
IF ARR SHOWS POSITIVE VALUE ACCEPT OTHERWISE REJECT
THE PROJECT
RULE FOR CALCULATION OF NPV, PBP, ARR AND IRR
NPV , PBP , IRR – PROFIT BEFORE DEPRECIATION AFTER TAX TO BE CALCULATED
ARR – PROFIT AFTER DEPRECIATION AND AFTER TAX TO BE CONSIDERED
INTIAL INVESTMENT : 100000 BIRR
DEPRECIATION TO BE CHARGED ON STRAIGHT LINE BASIS METHOD
YEAR PBDBT DEP
(10%)
PADBT TAX
(20%)
PADAT PBDAT
1 2 3 = 1+2 4 5 = 3-4 6 = 5+2
1 20000 10000 10000 4000 6000 16000
2 30000 10000 20000 6000 14000 24000
3 20000 10000 10000 4000 6000 16000
4 40000 10000 30000 8000 22000 32000
From the following information find PBP, ARR, NPV
and suggest which project is preferable
Year Project A Project B
1 20000 40000
2 25000 35000
3 20000 20000
4 45000 35000
5 55000 42000
Initial investment 100000 100000
Discount factor 10% 10%
Additional Capital 20000 20000
Scrap Value 5000 5000
Pay Back period ? ?
Average Rate of Return ? ?
Net Present Value ? ?
THANK YOU
END OF UNIT - IV

Contenu connexe

Tendances

Capital adequacy and capital planning
Capital adequacy and capital planningCapital adequacy and capital planning
Capital adequacy and capital planning
Soniya Bhasin
 
STRATEGIC MANAGEMENT
STRATEGIC MANAGEMENTSTRATEGIC MANAGEMENT
STRATEGIC MANAGEMENT
Treesa Jos
 
Io & resource based model
Io & resource based modelIo & resource based model
Io & resource based model
Sagar Mistry
 
Introduction to capital markets
Introduction to capital marketsIntroduction to capital markets
Introduction to capital markets
Harpriya Chandar
 
Portfolio analysis selection; portfolio theory, return portfolio risk, effici...
Portfolio analysis selection; portfolio theory, return portfolio risk, effici...Portfolio analysis selection; portfolio theory, return portfolio risk, effici...
Portfolio analysis selection; portfolio theory, return portfolio risk, effici...
Ravi kumar
 
Strategy Analysis and Choice
Strategy Analysis and ChoiceStrategy Analysis and Choice
Strategy Analysis and Choice
Noel Buensuceso
 

Tendances (20)

Lease financing
Lease financingLease financing
Lease financing
 
Capital adequacy and capital planning
Capital adequacy and capital planningCapital adequacy and capital planning
Capital adequacy and capital planning
 
Derivatives
DerivativesDerivatives
Derivatives
 
STRATEGIC MANAGEMENT
STRATEGIC MANAGEMENTSTRATEGIC MANAGEMENT
STRATEGIC MANAGEMENT
 
Io & resource based model
Io & resource based modelIo & resource based model
Io & resource based model
 
Introduction to capital markets
Introduction to capital marketsIntroduction to capital markets
Introduction to capital markets
 
Strategic management etop-porter five forces
Strategic management etop-porter five forcesStrategic management etop-porter five forces
Strategic management etop-porter five forces
 
Capm and apt
Capm and aptCapm and apt
Capm and apt
 
Innovative sources of finance
Innovative sources of financeInnovative sources of finance
Innovative sources of finance
 
Portfolio analysis selection; portfolio theory, return portfolio risk, effici...
Portfolio analysis selection; portfolio theory, return portfolio risk, effici...Portfolio analysis selection; portfolio theory, return portfolio risk, effici...
Portfolio analysis selection; portfolio theory, return portfolio risk, effici...
 
Trade-off theory in capital structure
Trade-off theory in capital structureTrade-off theory in capital structure
Trade-off theory in capital structure
 
Effectuation presentation gc20151210 (4)
Effectuation presentation gc20151210 (4)Effectuation presentation gc20151210 (4)
Effectuation presentation gc20151210 (4)
 
Sreedhareeyam Ayurvedic Organizational study
Sreedhareeyam Ayurvedic Organizational studySreedhareeyam Ayurvedic Organizational study
Sreedhareeyam Ayurvedic Organizational study
 
Venture capital presentation
Venture capital presentationVenture capital presentation
Venture capital presentation
 
Mutual fund is the better investment plan
Mutual fund is the better investment planMutual fund is the better investment plan
Mutual fund is the better investment plan
 
Strategy Analysis and Choice
Strategy Analysis and ChoiceStrategy Analysis and Choice
Strategy Analysis and Choice
 
Medtronic
MedtronicMedtronic
Medtronic
 
Quantitative Investment And Risk Management PowerPoint Presentation Slides
Quantitative Investment And Risk Management PowerPoint Presentation SlidesQuantitative Investment And Risk Management PowerPoint Presentation Slides
Quantitative Investment And Risk Management PowerPoint Presentation Slides
 
short term financing
 short term financing short term financing
short term financing
 
Enterprise Objectives
Enterprise ObjectivesEnterprise Objectives
Enterprise Objectives
 

Similaire à MBA UNIT 4.pptx

Budgeting control ppt farah mam
Budgeting control ppt farah mamBudgeting control ppt farah mam
Budgeting control ppt farah mam
Ali Mujawar
 
Orientation Course Online Batch.pptx
Orientation Course Online Batch.pptxOrientation Course Online Batch.pptx
Orientation Course Online Batch.pptx
ReadxterHindu
 

Similaire à MBA UNIT 4.pptx (20)

Feasibility study Chapter 1
Feasibility study Chapter 1Feasibility study Chapter 1
Feasibility study Chapter 1
 
Feasibility Study Chapter 1
Feasibility Study Chapter 1Feasibility Study Chapter 1
Feasibility Study Chapter 1
 
product development process-Base Case model
product development  process-Base Case modelproduct development  process-Base Case model
product development process-Base Case model
 
MODULE 1.pptx
MODULE 1.pptxMODULE 1.pptx
MODULE 1.pptx
 
Unit viii preparation of project report
Unit viii preparation of project reportUnit viii preparation of project report
Unit viii preparation of project report
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
 
Fundamental Skills for Real Estate Development Professionals I. Financial An...
Fundamental Skills for Real Estate Development Professionals I.  Financial An...Fundamental Skills for Real Estate Development Professionals I.  Financial An...
Fundamental Skills for Real Estate Development Professionals I. Financial An...
 
Inno feas basic
Inno feas basicInno feas basic
Inno feas basic
 
Pm assignment
Pm assignmentPm assignment
Pm assignment
 
Fiscal planning
Fiscal planningFiscal planning
Fiscal planning
 
Agribusiness planning
Agribusiness planningAgribusiness planning
Agribusiness planning
 
Cost benefit analysis
Cost benefit analysis Cost benefit analysis
Cost benefit analysis
 
Role profile M.Mwatha 2015
Role profile M.Mwatha 2015Role profile M.Mwatha 2015
Role profile M.Mwatha 2015
 
Introduction to Feasibility Study lecture
Introduction to Feasibility Study lectureIntroduction to Feasibility Study lecture
Introduction to Feasibility Study lecture
 
Intro to Feasibility PT1.pdf
Intro to Feasibility PT1.pdfIntro to Feasibility PT1.pdf
Intro to Feasibility PT1.pdf
 
3 capital budgeting
3 capital budgeting3 capital budgeting
3 capital budgeting
 
Budgeting control ppt farah mam
Budgeting control ppt farah mamBudgeting control ppt farah mam
Budgeting control ppt farah mam
 
3. Project Procurement Planning..pptx
3. Project Procurement Planning..pptx3. Project Procurement Planning..pptx
3. Project Procurement Planning..pptx
 
Inno feas first class
Inno feas first classInno feas first class
Inno feas first class
 
Orientation Course Online Batch.pptx
Orientation Course Online Batch.pptxOrientation Course Online Batch.pptx
Orientation Course Online Batch.pptx
 

Plus de selam49 (20)

Yom_DATA MANAGEMENT.ppt
Yom_DATA MANAGEMENT.pptYom_DATA MANAGEMENT.ppt
Yom_DATA MANAGEMENT.ppt
 
Stata Training_EEA.ppt
Stata Training_EEA.pptStata Training_EEA.ppt
Stata Training_EEA.ppt
 
Performance appraisal CH.7.ppt
Performance appraisal CH.7.pptPerformance appraisal CH.7.ppt
Performance appraisal CH.7.ppt
 
Integration and maintenance chapter-9.ppt
Integration and maintenance chapter-9.pptIntegration and maintenance chapter-9.ppt
Integration and maintenance chapter-9.ppt
 
Compensation ch 8.ppt
Compensation ch 8.pptCompensation ch 8.ppt
Compensation ch 8.ppt
 
CH-1&2-introduction-of-hrm...ppt
CH-1&2-introduction-of-hrm...pptCH-1&2-introduction-of-hrm...ppt
CH-1&2-introduction-of-hrm...ppt
 
MBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docMBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.doc
 
CONTENT 3.doc
CONTENT 3.docCONTENT 3.doc
CONTENT 3.doc
 
CONTENT 2.doc
CONTENT 2.docCONTENT 2.doc
CONTENT 2.doc
 
MBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docMBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.doc
 
MBA UNIT 6.pptx
MBA UNIT 6.pptxMBA UNIT 6.pptx
MBA UNIT 6.pptx
 
MBA UNIT 5.pptx
MBA UNIT 5.pptxMBA UNIT 5.pptx
MBA UNIT 5.pptx
 
MBA UNIT 3.pptx
MBA UNIT 3.pptxMBA UNIT 3.pptx
MBA UNIT 3.pptx
 
MBA UNIT 2.pptx
MBA UNIT 2.pptxMBA UNIT 2.pptx
MBA UNIT 2.pptx
 
MBA UNIT 1.pptx
MBA UNIT 1.pptxMBA UNIT 1.pptx
MBA UNIT 1.pptx
 
Chapter 3 Final.ppt
Chapter 3 Final.pptChapter 3 Final.ppt
Chapter 3 Final.ppt
 
Chapter 2 Final.ppt
Chapter 2 Final.pptChapter 2 Final.ppt
Chapter 2 Final.ppt
 
Chapter 1 Final.ppt
Chapter 1 Final.pptChapter 1 Final.ppt
Chapter 1 Final.ppt
 
Leadership for RRS - 2014.pdf
Leadership for RRS - 2014.pdfLeadership for RRS - 2014.pdf
Leadership for RRS - 2014.pdf
 
BSC for Refugees and Returnees Service Ginbot 2014.pptx
BSC for Refugees and Returnees Service Ginbot 2014.pptxBSC for Refugees and Returnees Service Ginbot 2014.pptx
BSC for Refugees and Returnees Service Ginbot 2014.pptx
 

Dernier

VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
amitlee9823
 
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort : 9352852248 Make on-demand Arrangements Near yOU
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
dipikadinghjn ( Why You Choose Us? ) Escorts
 

Dernier (20)

Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...
Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...
Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...
 
Diva-Thane European Call Girls Number-9833754194-Diva Busty Professional Call...
Diva-Thane European Call Girls Number-9833754194-Diva Busty Professional Call...Diva-Thane European Call Girls Number-9833754194-Diva Busty Professional Call...
Diva-Thane European Call Girls Number-9833754194-Diva Busty Professional Call...
 
Top Rated Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated  Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...Top Rated  Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
 
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
 
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
 
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
 
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
 
(INDIRA) Call Girl Srinagar Call Now 8617697112 Srinagar Escorts 24x7
(INDIRA) Call Girl Srinagar Call Now 8617697112 Srinagar Escorts 24x7(INDIRA) Call Girl Srinagar Call Now 8617697112 Srinagar Escorts 24x7
(INDIRA) Call Girl Srinagar Call Now 8617697112 Srinagar Escorts 24x7
 
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
 
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
 
Top Rated Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
Top Rated Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated  Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...Top Rated  Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
 

MBA UNIT 4.pptx

  • 1. UNIT - IV PROJECT PREPARATION 4.1. Markets , Demand Analysis ; 4.2. Raw Materials and Supplies 4.3. Environment Impact Assessment (EIA) 4.4. Production Program and Plant Capacity 4.5. Technology Selection 4.6. Organizational and Human Resource 4.7. Financial and Economic Analysis 4.7.1. Initial investment cost , 4.7.2. Production cost 4.7.3. Marketing cost ; 4.7.4. Projection of cash flow 4.7.5. Financial evaluation 4.7.5.1. Net present value (NPV) ; 4.7.5.2. Internal rate of return (IRR) 4.7.5.3. Benefit cost ratio (BCR) 4.7.5.4. Payback period (PBP) 4.7.5.5. Accounting rate of return (ARR) 4.7.5.6. Break – even analysis (BEA)
  • 2. Consequences of Poor Project Preparation • The following points has shown that the consequence of poor project preparation too many industrial projects suffer in terms of: • Low capacity utilization • Heavy costs overruns • Deteriorated / declined financial profitability • Lingering (Slow ) illness or the sudden death syndrome ( condition ) • Overestimated/ miscalculated returns / profit • Underestimated / under valued costs • Omission of a necessary component • Optimistic projection (Yield, date) • Failure to consider the project related climate changes • Optimistic calendar for implementation
  • 3. Steps in Project analysis First step : Identifying the demand for the product Identifying possible Final step : • Analysis towards determining the plant capacity taking into account alternative levels of production • Analysis towards Investment outlays and sales revenue. • The extensive and careful analysis of past, present and future demand for the product and market • Institutional and political forces influencing demand and sales of the product.
  • 4. Responsibilities of Project analyst • A feasibility study should arrive definitive conclusions on all the basic aspects of a project after considering various alternatives. • The objective of feasibility study is to provide a final investment decision. Therefore it should define all project features as precisely as possible. • A feasibility study should be detailed and precise enough to enable decisions. • The description of the project components should be refined to use the study as a guide for project implementation. • The discussions and analysis required with engineers, economists, and specialists in areas such as soils, geology, manufacturing, processing, extension and management to make project more effective. • There should have a sharp eye on the crucial aspects of a feasibility study.
  • 5. Feasibility study • Estimation of size of the project • Structure and development trends of demand for the product or products, • Careful analysis of determining variables of Project and their market environment • Demand forecasting and the ultimate goal of the procedures towards project • Sales volume and revenue projections. • Detailed production program • Various production process and their time limit. • Production program • Plant capacity • Material and inputs choice • Location • Financial evaluation • Ultimate marketing strategy
  • 6. Important key areas of Market and demand analysis 1. General Characteristics of the Economy:  Economic prospective  Production structure  Foreign trade  Economic policy 2. Product  Characteristic features  Substitutes and complementary goods 3. Demand  Sales and orders  Buyer’s characteristics  Demand determining factors  Purchasing power 4. Supply  Supply potential  Local production  Imports and exports  Competitor’s position 5. Marketing environment (marketing strategy, marketing mix)  Price levels and trends  Distribution channels  Physical distribution network  Promotion 6. Legal and political environment
  • 7. Important key areas of Market and demand analysis - Market Segmentation • Religion • Nationality • Social class • Culture 3. Personality and behavior: • Life – style • Leadership • Ambition • Buying motive • Service sensitivity • Promotional sensitivity 1. Geographic: • Administrative regions • Geographic regions • Climate • City – size • Rural district – size 2. Socio – Economic: • Income • Age • Sex • Occupation • Education • Family size
  • 8. Key steps in Market and Demand Analysis • Situational analysis • Collection of secondary information • Conduct of market survey (primary information) • Description of the market • Demand forecasting • Market planning
  • 9. Role of Market Analyst Market research is a special stage in the feasibility study. Market research usually ranks top in the sequence of the core chapters of a feasibility study. The following aspects should be concentrated at the time of market research : • Capacity planning, • Technology selection, • Staffing the sales, • Promotion and service department • Working capital and • Financial planning • Revision of sales and demand forecasting • Projection of future demand • Behavior of customers , taste
  • 10. It deals with the following : market market conditions customer supplier product service demand supply elasticity of demand price elasticity , Promotion , placement , pricing , production and etc., I. MARKET AND DEMAND ANALYSIS
  • 11. II. RAM MATERIAL AND SUPPLY STUDY Raw material and supply study deals with the following : • Identifying the good quality of raw material • Procuring the raw material • Safeguarding raw material • Reduction of production cost • Reduction of distribution cost • Effective utilization of Raw material and its distribution channels • Reduction of abnormal Wastages
  • 12. III. LOCATION , SITE AND ENVIRONMENT IMPACT ASSESSMENT ( EIA ) It is concerned with Site or location Selection • Identifying the correct and appropriate site • Evaluation of the standards of the site • Evaluation towards the cost of the land • Analyzing the surrounding environment • Analyzing the facilities available nearby the site or location • Facilities like water, hospitals , hotel or restaurants , educational institution • Workers Availability • Population size and other parameters • Availability of the land • Soil and Quality of the land • Suitability of the land with the current project • How the local environment creates an impact on current project
  • 13. IV. PRODUCTION PROGRAM AND PLANT CAPACITY It connects with the following aspects : • Level of Production Capacity • Availability of Existing Standard of Production and production level • Production Quality standards • Production Target • Current Plant Capacity • Capacity to be increased for the future • Production Cost • Production Cost Control Techniques • Preparation of Comparative Production cost statement • Availability of Produced products • Products to be Produced • Analysis towards current market trend
  • 14. V. FINANCIAL AND ECONOMIC ANALYSIS  All measures of financial evaluation of project’s feasibility are based on estimates of costs and revenues.  An inaccurate or wrong demand and sales projection, being the result of careless and carefree attitude towards demand and market analysis, may lead to ultimate project failure.
  • 15. OBJECTIVE OF FINANCIAL AND ECONOMIC ANALYSIS • To reduce Expenditure • To apply control over the outlay of the project • To increase efficiency of the project finance • To make valid investment • To avoid unwanted expenditures • To increase financial efficiency • To control office and administrative cost , sales and distribution cost • To control operational cost • To achieve the financial goals of the organization • To have effective and efficient cost administration
  • 16. NPV , PV, PBP, ARR (A) NET PRESENT VALUE NPV = TOTAL PRESENT VALUE – INITIAL INVESTMENT PRESENT VALUE = CASH INFLOW X DISCOUNT FACTOR (B) PAY BACK PERIOD It is a process of recovery of invested amount in fixed asset in how many years is called pay back period (C) ACCOUNTING RATE OF RETURN • ARR = Average Income / Average Investment x100 • Average Income = Total Income / Total No of Years • Average Investment = (Original cost of the Machine – Scrap Value /2 )+ Additional working Capital – Scrap Value
  • 17. Pay back period (PBP)  Even Cash inflow Cash inflow / Cash inlay (In Birr ) : 1st year – 20000 , 2nd year – 20000 , 3 year – 20000 , 4th year – 20000 Cash out lay = 100000 birr Formula : PBP = Average Annual Cash inflow / Cash out flow PBP = 20000 / 100000 = 5 years  Un Even Cash inflow Cash inflow / Cash inlay (In Birr ) : 1st year – 20000 , 2nd year – 35000 , 3 year – 20000 , 4th year – 45000 PBP = 3 years + to be received / Actually received PBP = 3 Years + 25000/ 45000 PBP = 3 Years + 0.56 = 3.56 Years IF PAY BACK PERIOD IS LESS ACCEPT OTHERWISE REJECT WHEN YOU COMPARE TWO PROJECTS.
  • 18. NET PRESENT VALUE ( NPV ) YEAR CASH INFLOW (Uneven ) DISCOUNT FACTOR (10%) PRESENT VALUE 1 20000 0.909 18180 2 40000 0.827 33080 3 55000 0.751 41305 4 35000 0.683 23905 5 30000 0.621 18630 Total 180000 Total Present Value 135100 Less : Initial Investment 100000 NPV 35100 RULE FOR ACCEPTANCE OR REJCECTION OF PROJECT BASED ON NPV : NPV is Positive then Accept NPV is Negative then Reject NPV is Neutral Reject
  • 19. Average / Accounting Rate of Return (ARR) Question : A project Requires initial Cash outlay of 100000 birr. Scrap Value is 40000 birr. Additional investment required for the project is 20000 birr and the same was invested at the end of first year . The annual cash inflow for 4 years given as follows. From the following details you are requested to find ARR. Annual Cash inflow : 1 year – 50000 , 2nd year – 25000 , 3rd year – 45000 , 4th year – 30000.
  • 20. Calculation of ARR Formula : ARR = Average income / Average investment x100 Average Income = Total income / No of years Average income = 50000+25000+45000+30000 = 150000 /4 Average income = 37500 birr Average Investment = (original investment – Scrap Value /2 ) + Additional Investment - Scrap Value Average Investment = (100000 – 40000/2)+ 20000+ 40000 Average Investment = 30000+20000+40000 = 90000 birr ARR = 37500/90000 x100 = 41.66 % IF ARR SHOWS POSITIVE VALUE ACCEPT OTHERWISE REJECT THE PROJECT
  • 21. RULE FOR CALCULATION OF NPV, PBP, ARR AND IRR NPV , PBP , IRR – PROFIT BEFORE DEPRECIATION AFTER TAX TO BE CALCULATED ARR – PROFIT AFTER DEPRECIATION AND AFTER TAX TO BE CONSIDERED INTIAL INVESTMENT : 100000 BIRR DEPRECIATION TO BE CHARGED ON STRAIGHT LINE BASIS METHOD YEAR PBDBT DEP (10%) PADBT TAX (20%) PADAT PBDAT 1 2 3 = 1+2 4 5 = 3-4 6 = 5+2 1 20000 10000 10000 4000 6000 16000 2 30000 10000 20000 6000 14000 24000 3 20000 10000 10000 4000 6000 16000 4 40000 10000 30000 8000 22000 32000
  • 22. From the following information find PBP, ARR, NPV and suggest which project is preferable Year Project A Project B 1 20000 40000 2 25000 35000 3 20000 20000 4 45000 35000 5 55000 42000 Initial investment 100000 100000 Discount factor 10% 10% Additional Capital 20000 20000 Scrap Value 5000 5000 Pay Back period ? ? Average Rate of Return ? ? Net Present Value ? ?
  • 23. THANK YOU END OF UNIT - IV