SlideShare une entreprise Scribd logo
1  sur  58
Merville, Parañaque City
The developer does not authorize any person to render any representation or warranty regarding the project/s mentioned herein.  The developer is subject to Philippine laws relative to the development and marketing of the project/s contained herein and the distribution of this material.  This material should neither be distributed nor viewed in countries, states and/or jurisdictions where relevant restrictions are being enforced.  Persons receiving this material are thus advised to inform themselves about and observe any such restrictions, and consult a lawyer, if necessary. Disclaimer
Location Map
Advantages of living in Merville, Parañaque  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Proximate Establishments  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Medical Facilities Educational Institutions
Site Development Plan
The Village Mall @ Woodsville  ,[object Object],[object Object],[object Object],[object Object],[object Object]
 
Building Facilities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Typical Residential Features
Themed Gardens Nature’s Orchestra The Oasis Nirvana Cove Poet’s Nook Picnic Grove Fun Park Fitness Cove **Building 6 is now renamed as Building 8
Nature’s Orchestra
The Oasis
Nirvana Cove
Poet’s Nook
Picnic Grove
Fun Park
Fitness Cove
Floor Description – Bldg 4 Floors Laundry Cages 2nd  – 14th Residential Units Ground Floor Parking
2 nd  to 9 th Residential Units Floor Description – Bldg 5 Ground Floor
2 nd  to 9 th Residential Units Floor Description – Bldg 6 Ground Floor
Project Update*   * As of July 8, 2008 BUILDING %  SOLD %  COMPLETION TURNOVER   DATE 1 99% 30% 31-Dec-08 2 94% 80% 30-Jun-08 3 88% 17% 31-Mar-09 4 65% 0% 30-Sep-09
Project Update*   * As of July 8, 2008 BUILDING %  SOLD %  COMPLETION TURNOVER   DATE 5 78% 0% 30-Apr-10 6 8% 0% 30-Nov-10 7 0% 0% VM  97%
Progress Photos* Bldg. 1 * As of September 16, 2008 View of Bldg.1 HALLWAY TILE INSTALLATION AT 5 TH  FLR . PLASTERING WORKS AT LEDGES FACING MAIN ENTRANCE
Progress Photos* Bldg. 2 and 3 * As of September 16, 2008 View of Bldg.2 Perspective of building 3  HALLWAY Building 2
Progress Photos* Building 4 PREPARATION OF SLAB ON FILL AT AREA 2 CONCRETED SUSPENDED SLAB - 2 ND  FLR.  * As of September 16, 2008
Progress Photos* Clubhouse * As of September 16, 2008 AERIAL VIEW A CLUBHOUSE CONCRETING OF SWIMMING POOL DECK
Progress Photos* * As of September 16, 2008 View at Main Entrance
Progress Photos* Village Mall Parking Area VIEW AT MAIN ENTRANCE FRONT VIEW * As of September 16, 2008
Typical Floor Plan – Building 1 A B D E F I H C G 2 elevators Seven 2-BR units Two 3-BR units 2 stairwells 1.3 m. wide hallway
Typical Floor Plan  - Building 2 A L B C E F G H J K D I Two Studio units Eight 2-BR units Two 3-BR units
Typical Floor Plan  - Building 3 A D E F I C G B H Five 2-BR units Four 3-BR units
Typical Floor Plan - Building 4  B H A I D E F C G Five 2-BR units Four 3-BR units Building 4 Typical Floor Plan 2 nd  – 14 th  Floor
Typical Floor Plan – BUILDING 5 Four (4)  - 1BR unit Three (3) - 2BR unit Two (2)  - 3BR unit A I D F B H E C G
Typical Floor Plan – BUILDING 6 Two (2)  - 1BR unit Four (4)  - 2BR unit Two (2)  - 3BR unit
Studio Unit Floor Plan (Bldg. 2) DESCRIPTION AREA (sq.m.) Living / Dining Room 13.18 Kitchen 5.52 Toilet & Bath 3.80 Total Area 22.50
Unit Mix (Bldg.5)
2 BR Unit Floor Plan (Bldg. 1-3) DESCRIPTION AREA (sq.m.) Living / Dining Room 14.44 Kitchen 4.86 Toilet & Bath 4.77 Maid’s Room 4.16 Bedroom 1 6.40 Master’s Bedroom 10.37 Total Area 45.00
3 BR Unit Floor Plan (Bldg. 1-3) DESCRIPTION AREA (sq.m.) Living / Dining Room 19.40 Kitchen 4.50 Toilet & Bath 1 3.24 Maid’s Room 4.50 Bedroom 1 7.40 Bedroom 2 7.10 Master’s T&B 4.00 Master’s Bedroom 9.86 Total Area 60.00
2-BR with Balcony (Bldg. 4)  Unit Area =  45.00 sq.m  Balcony =  6.00 sq.m
3-Bedroom with Balcony (Bldg. 4)  Unit Area =  60.00 sq.m  Balcony =  6.00 sq.m
1 Bedroom (Bldg. 5) units A & I  32.00 sqm.  units D & F
2 Bedroom (Bldg. 5) 45.00-sqm. unit + 3.60-sqm. balcony  Units B & H Unit E
3 Bedroom (Bldg. 5) 64.00-sqm. unit + 3.60-sqm. balcony  Units C & G
Unitized Floor Plan- 1 Bedroom units A & H - 37.05 sqm.
Unitized Floor Plan- 2 Bedroom (A) units D & E- 50.38 sqm.
Unitized Floor Plan- 2 Bedroom (B) units B & G- 50.87 sqm.
Unitized Floor Plan- 3 Bedroom units C & F- 68.38 sqm.
Unit Deliverables   Living/ Dining Kitchen BR Toilet Utility Flooring Ceramic Tiles Ceramic Tiles Laminated Wood Ceramic Tiles Ceramic Tiles Wall Plastered painted/ painted drywall Plastered painted/ painted drywall Plastered painted/ painted drywall Ceramic tiles and plastered painted Plastered painted/ painted drywall Ceiling Painted slab soffit/ Gypsum Bulkhead Painted slab soffit/ Gypsum Bulkhead Painted slab soffit/ Gypsum Bulkhead Painted gypsum board Painted slab soffit Others Incandescent lighting fixtures Base cabinet, stainless steel sink Incandescent lighting fixtures Water closet, lavatory Incandescent lighting fixtures
Principal Architect :   Albert S. Yu and Associates Structural Engineers : Aromin & Sy + Associates, Inc. Mechanical Engineers : L. R. Punzalan & Associates Electrical Engineers : Mar Alix and Associates Sanitary Engineers : NBF Consulting Engineers General Contractor : SPES Construction, Inc. Project Team
Development Timetable 2008 2007 2006 Construction of Bldg. 2 Pre-selling of Bldgs. 1,  2, 3 Turnover Bldg. 2 (06/30/2008) 2009 Turnover Bldg. 3 (5/31/2009) Construction of Bldg. 4 Pre-selling of Bldg. 4 Construction of Bldg. 3 Turnover Bldg. 4 (12/30/2009) Turnover Bldg. 1 (12/31/2008) Construction of Bldg. 1
Development Timetable 2009 2008 2007 Construction of Bldgs. 1, 2, 3 & 4 Turnover Bldgs. 1, 2, 3 & 4 Turnover Bldg. 5 (04/30/2010) 2010 Construction of Bldg. 5 Turnover Bldg. 8 (11/30/2010 ) Turnover Bldg. 6 (8/31/2011 )
Price Range Parking Slots   :  P400,000.00 Laundry Cages:  P125,000.00 UNIT PRICES* *Building 5 - as of March 05, 2008
Payment Terms CASH TERM * RF for Europe Sales – P25,000.00 for all unit types *
DEFERRED CASH – 20/80 Payment Terms
Sample Computation Cash Payment
THANK YOU!
Sample Computation Deferred Cash – Building 5

Contenu connexe

Tendances

Park McKinley West - McKinley Hill - PreSelling.com.ph
Park McKinley West - McKinley Hill - PreSelling.com.phPark McKinley West - McKinley Hill - PreSelling.com.ph
Park McKinley West - McKinley Hill - PreSelling.com.phPreSelling.com.ph
 
Prestige Falcon City Case study by G.M.ARVINTH
Prestige Falcon City Case study by G.M.ARVINTHPrestige Falcon City Case study by G.M.ARVINTH
Prestige Falcon City Case study by G.M.ARVINTHArvinth GM
 
Price Increase Ahead! Fairlane Residences, Pasig City
Price Increase Ahead! Fairlane Residences, Pasig CityPrice Increase Ahead! Fairlane Residences, Pasig City
Price Increase Ahead! Fairlane Residences, Pasig CityEden DMCI
 
THREE CENTRAL " The Grand Showcase of your SUCCESS!"
THREE CENTRAL " The Grand Showcase of your SUCCESS!"THREE CENTRAL " The Grand Showcase of your SUCCESS!"
THREE CENTRAL " The Grand Showcase of your SUCCESS!"Michael Camato
 

Tendances (14)

Wind Residences
Wind ResidencesWind Residences
Wind Residences
 
The Trion Tower
The Trion TowerThe Trion Tower
The Trion Tower
 
Trion Towers Semi Furnish Unit
Trion Towers Semi Furnish UnitTrion Towers Semi Furnish Unit
Trion Towers Semi Furnish Unit
 
Park McKinley West - McKinley Hill - PreSelling.com.ph
Park McKinley West - McKinley Hill - PreSelling.com.phPark McKinley West - McKinley Hill - PreSelling.com.ph
Park McKinley West - McKinley Hill - PreSelling.com.ph
 
The Trion Tower at Bonifacio Global City
The Trion Tower at Bonifacio Global CityThe Trion Tower at Bonifacio Global City
The Trion Tower at Bonifacio Global City
 
Flair Towers (North Tower)
Flair Towers (North Tower)Flair Towers (North Tower)
Flair Towers (North Tower)
 
Trion Local V020508
Trion Local V020508Trion Local V020508
Trion Local V020508
 
Prestige Falcon City Case study by G.M.ARVINTH
Prestige Falcon City Case study by G.M.ARVINTHPrestige Falcon City Case study by G.M.ARVINTH
Prestige Falcon City Case study by G.M.ARVINTH
 
Solinea Technical Brief
Solinea Technical BriefSolinea Technical Brief
Solinea Technical Brief
 
Wind Residences - Tagaytay
Wind Residences - TagaytayWind Residences - Tagaytay
Wind Residences - Tagaytay
 
Price Increase Ahead! Fairlane Residences, Pasig City
Price Increase Ahead! Fairlane Residences, Pasig CityPrice Increase Ahead! Fairlane Residences, Pasig City
Price Increase Ahead! Fairlane Residences, Pasig City
 
The Veranda West Tower
The Veranda West TowerThe Veranda West Tower
The Veranda West Tower
 
The Trion Towers 1 Presentation Kit
The Trion Towers 1 Presentation KitThe Trion Towers 1 Presentation Kit
The Trion Towers 1 Presentation Kit
 
THREE CENTRAL " The Grand Showcase of your SUCCESS!"
THREE CENTRAL " The Grand Showcase of your SUCCESS!"THREE CENTRAL " The Grand Showcase of your SUCCESS!"
THREE CENTRAL " The Grand Showcase of your SUCCESS!"
 

En vedette (10)

What people do every day
What people do every dayWhat people do every day
What people do every day
 
Hope flex jjaep star chart results
Hope flex jjaep star chart resultsHope flex jjaep star chart results
Hope flex jjaep star chart results
 
Escalades
EscaladesEscalades
Escalades
 
Ic59f planc4b1-c3b6rnec49fi-4-ingilizce
Ic59f planc4b1-c3b6rnec49fi-4-ingilizceIc59f planc4b1-c3b6rnec49fi-4-ingilizce
Ic59f planc4b1-c3b6rnec49fi-4-ingilizce
 
Locums4you presentation-1
Locums4you   presentation-1Locums4you   presentation-1
Locums4you presentation-1
 
Introduction to digital_signage
Introduction to digital_signageIntroduction to digital_signage
Introduction to digital_signage
 
K:\presentacion famous people
K:\presentacion famous peopleK:\presentacion famous people
K:\presentacion famous people
 
Presentación daily actions
Presentación daily actionsPresentación daily actions
Presentación daily actions
 
Is plani dosyasi
Is plani dosyasiIs plani dosyasi
Is plani dosyasi
 
Iş plan
Iş planIş plan
Iş plan
 

Similaire à Merville Living Details

ORTIGAS CONDOMINIUM - THE EXCHANGE REGENCY
ORTIGAS CONDOMINIUM - THE EXCHANGE REGENCYORTIGAS CONDOMINIUM - THE EXCHANGE REGENCY
ORTIGAS CONDOMINIUM - THE EXCHANGE REGENCYMaria Delgado
 
Aurora heights first homes final
Aurora heights first homes finalAurora heights first homes final
Aurora heights first homes finalReggie Refugio
 
Aurora heights first homes final
Aurora heights first homes finalAurora heights first homes final
Aurora heights first homes finalReggie Refugio
 
TER Project Briefing for Fil-Estate
TER Project Briefing for Fil-EstateTER Project Briefing for Fil-Estate
TER Project Briefing for Fil-Estateannethmanibo
 
SMDC Sea Residences
SMDC Sea Residences SMDC Sea Residences
SMDC Sea Residences Jr Rob
 
SOLSTICE at CIRCUIT MAKATI
SOLSTICE at CIRCUIT MAKATISOLSTICE at CIRCUIT MAKATI
SOLSTICE at CIRCUIT MAKATImj oak
 
Residential Apartment Project in Bangalore | DNR Arista | DNR Group
Residential Apartment Project in Bangalore | DNR Arista | DNR GroupResidential Apartment Project in Bangalore | DNR Arista | DNR Group
Residential Apartment Project in Bangalore | DNR Arista | DNR GroupDNR Group
 
Breeze Residences Technical Briefing
Breeze Residences Technical BriefingBreeze Residences Technical Briefing
Breeze Residences Technical Briefingsevenseaspropertycorp
 
Marquee Residences an Alveo Ayala Land Project in Pampanga
Marquee Residences an Alveo Ayala Land Project in PampangaMarquee Residences an Alveo Ayala Land Project in Pampanga
Marquee Residences an Alveo Ayala Land Project in PampangaIrish Simeon
 
For Sonata Tower 2 Briefing
For Sonata Tower 2 BriefingFor Sonata Tower 2 Briefing
For Sonata Tower 2 BriefingRobinsons Land
 
SMDC AIR Residences
SMDC AIR ResidencesSMDC AIR Residences
SMDC AIR ResidencesKirk Go
 

Similaire à Merville Living Details (20)

ORTIGAS CONDOMINIUM - THE EXCHANGE REGENCY
ORTIGAS CONDOMINIUM - THE EXCHANGE REGENCYORTIGAS CONDOMINIUM - THE EXCHANGE REGENCY
ORTIGAS CONDOMINIUM - THE EXCHANGE REGENCY
 
Aurora heights first homes final
Aurora heights first homes finalAurora heights first homes final
Aurora heights first homes final
 
Aurora heights first homes final
Aurora heights first homes finalAurora heights first homes final
Aurora heights first homes final
 
TER Project Briefing for Fil-Estate
TER Project Briefing for Fil-EstateTER Project Briefing for Fil-Estate
TER Project Briefing for Fil-Estate
 
SMDC Sea Residences
SMDC Sea Residences SMDC Sea Residences
SMDC Sea Residences
 
Solstice Tower 2 2014 0218
Solstice Tower 2 2014 0218Solstice Tower 2 2014 0218
Solstice Tower 2 2014 0218
 
Vertica 8th Avenue Presentation Kit
Vertica 8th Avenue Presentation KitVertica 8th Avenue Presentation Kit
Vertica 8th Avenue Presentation Kit
 
SOLSTICE at CIRCUIT MAKATI
SOLSTICE at CIRCUIT MAKATISOLSTICE at CIRCUIT MAKATI
SOLSTICE at CIRCUIT MAKATI
 
Vertica
VerticaVertica
Vertica
 
Amisa 2 Presentation
Amisa 2 PresentationAmisa 2 Presentation
Amisa 2 Presentation
 
Sunny Ridge Residences.pdf
Sunny Ridge Residences.pdfSunny Ridge Residences.pdf
Sunny Ridge Residences.pdf
 
Residential Apartment Project in Bangalore | DNR Arista | DNR Group
Residential Apartment Project in Bangalore | DNR Arista | DNR GroupResidential Apartment Project in Bangalore | DNR Arista | DNR Group
Residential Apartment Project in Bangalore | DNR Arista | DNR Group
 
Breeze Residences Technical Briefing
Breeze Residences Technical BriefingBreeze Residences Technical Briefing
Breeze Residences Technical Briefing
 
Marquee Residences an Alveo Ayala Land Project in Pampanga
Marquee Residences an Alveo Ayala Land Project in PampangaMarquee Residences an Alveo Ayala Land Project in Pampanga
Marquee Residences an Alveo Ayala Land Project in Pampanga
 
For Sonata Tower 2 Briefing
For Sonata Tower 2 BriefingFor Sonata Tower 2 Briefing
For Sonata Tower 2 Briefing
 
Escalades Revised
Escalades RevisedEscalades Revised
Escalades Revised
 
Air saleskit final
Air saleskit finalAir saleskit final
Air saleskit final
 
Air Residences
Air Residences Air Residences
Air Residences
 
SMDC AIR Residences
SMDC AIR ResidencesSMDC AIR Residences
SMDC AIR Residences
 
Axis
AxisAxis
Axis
 

Merville Living Details

  • 2. The developer does not authorize any person to render any representation or warranty regarding the project/s mentioned herein. The developer is subject to Philippine laws relative to the development and marketing of the project/s contained herein and the distribution of this material.  This material should neither be distributed nor viewed in countries, states and/or jurisdictions where relevant restrictions are being enforced. Persons receiving this material are thus advised to inform themselves about and observe any such restrictions, and consult a lawyer, if necessary. Disclaimer
  • 4.
  • 5.
  • 7.
  • 8.  
  • 9.
  • 10.
  • 11. Themed Gardens Nature’s Orchestra The Oasis Nirvana Cove Poet’s Nook Picnic Grove Fun Park Fitness Cove **Building 6 is now renamed as Building 8
  • 19. Floor Description – Bldg 4 Floors Laundry Cages 2nd – 14th Residential Units Ground Floor Parking
  • 20. 2 nd to 9 th Residential Units Floor Description – Bldg 5 Ground Floor
  • 21. 2 nd to 9 th Residential Units Floor Description – Bldg 6 Ground Floor
  • 22. Project Update* * As of July 8, 2008 BUILDING % SOLD % COMPLETION TURNOVER DATE 1 99% 30% 31-Dec-08 2 94% 80% 30-Jun-08 3 88% 17% 31-Mar-09 4 65% 0% 30-Sep-09
  • 23. Project Update* * As of July 8, 2008 BUILDING % SOLD % COMPLETION TURNOVER DATE 5 78% 0% 30-Apr-10 6 8% 0% 30-Nov-10 7 0% 0% VM 97%
  • 24. Progress Photos* Bldg. 1 * As of September 16, 2008 View of Bldg.1 HALLWAY TILE INSTALLATION AT 5 TH FLR . PLASTERING WORKS AT LEDGES FACING MAIN ENTRANCE
  • 25. Progress Photos* Bldg. 2 and 3 * As of September 16, 2008 View of Bldg.2 Perspective of building 3 HALLWAY Building 2
  • 26. Progress Photos* Building 4 PREPARATION OF SLAB ON FILL AT AREA 2 CONCRETED SUSPENDED SLAB - 2 ND FLR. * As of September 16, 2008
  • 27. Progress Photos* Clubhouse * As of September 16, 2008 AERIAL VIEW A CLUBHOUSE CONCRETING OF SWIMMING POOL DECK
  • 28. Progress Photos* * As of September 16, 2008 View at Main Entrance
  • 29. Progress Photos* Village Mall Parking Area VIEW AT MAIN ENTRANCE FRONT VIEW * As of September 16, 2008
  • 30. Typical Floor Plan – Building 1 A B D E F I H C G 2 elevators Seven 2-BR units Two 3-BR units 2 stairwells 1.3 m. wide hallway
  • 31. Typical Floor Plan - Building 2 A L B C E F G H J K D I Two Studio units Eight 2-BR units Two 3-BR units
  • 32. Typical Floor Plan - Building 3 A D E F I C G B H Five 2-BR units Four 3-BR units
  • 33. Typical Floor Plan - Building 4 B H A I D E F C G Five 2-BR units Four 3-BR units Building 4 Typical Floor Plan 2 nd – 14 th Floor
  • 34. Typical Floor Plan – BUILDING 5 Four (4) - 1BR unit Three (3) - 2BR unit Two (2) - 3BR unit A I D F B H E C G
  • 35. Typical Floor Plan – BUILDING 6 Two (2) - 1BR unit Four (4) - 2BR unit Two (2) - 3BR unit
  • 36. Studio Unit Floor Plan (Bldg. 2) DESCRIPTION AREA (sq.m.) Living / Dining Room 13.18 Kitchen 5.52 Toilet & Bath 3.80 Total Area 22.50
  • 38. 2 BR Unit Floor Plan (Bldg. 1-3) DESCRIPTION AREA (sq.m.) Living / Dining Room 14.44 Kitchen 4.86 Toilet & Bath 4.77 Maid’s Room 4.16 Bedroom 1 6.40 Master’s Bedroom 10.37 Total Area 45.00
  • 39. 3 BR Unit Floor Plan (Bldg. 1-3) DESCRIPTION AREA (sq.m.) Living / Dining Room 19.40 Kitchen 4.50 Toilet & Bath 1 3.24 Maid’s Room 4.50 Bedroom 1 7.40 Bedroom 2 7.10 Master’s T&B 4.00 Master’s Bedroom 9.86 Total Area 60.00
  • 40. 2-BR with Balcony (Bldg. 4) Unit Area = 45.00 sq.m Balcony = 6.00 sq.m
  • 41. 3-Bedroom with Balcony (Bldg. 4) Unit Area = 60.00 sq.m Balcony = 6.00 sq.m
  • 42. 1 Bedroom (Bldg. 5) units A & I 32.00 sqm. units D & F
  • 43. 2 Bedroom (Bldg. 5) 45.00-sqm. unit + 3.60-sqm. balcony Units B & H Unit E
  • 44. 3 Bedroom (Bldg. 5) 64.00-sqm. unit + 3.60-sqm. balcony Units C & G
  • 45. Unitized Floor Plan- 1 Bedroom units A & H - 37.05 sqm.
  • 46. Unitized Floor Plan- 2 Bedroom (A) units D & E- 50.38 sqm.
  • 47. Unitized Floor Plan- 2 Bedroom (B) units B & G- 50.87 sqm.
  • 48. Unitized Floor Plan- 3 Bedroom units C & F- 68.38 sqm.
  • 49. Unit Deliverables   Living/ Dining Kitchen BR Toilet Utility Flooring Ceramic Tiles Ceramic Tiles Laminated Wood Ceramic Tiles Ceramic Tiles Wall Plastered painted/ painted drywall Plastered painted/ painted drywall Plastered painted/ painted drywall Ceramic tiles and plastered painted Plastered painted/ painted drywall Ceiling Painted slab soffit/ Gypsum Bulkhead Painted slab soffit/ Gypsum Bulkhead Painted slab soffit/ Gypsum Bulkhead Painted gypsum board Painted slab soffit Others Incandescent lighting fixtures Base cabinet, stainless steel sink Incandescent lighting fixtures Water closet, lavatory Incandescent lighting fixtures
  • 50. Principal Architect : Albert S. Yu and Associates Structural Engineers : Aromin & Sy + Associates, Inc. Mechanical Engineers : L. R. Punzalan & Associates Electrical Engineers : Mar Alix and Associates Sanitary Engineers : NBF Consulting Engineers General Contractor : SPES Construction, Inc. Project Team
  • 51. Development Timetable 2008 2007 2006 Construction of Bldg. 2 Pre-selling of Bldgs. 1, 2, 3 Turnover Bldg. 2 (06/30/2008) 2009 Turnover Bldg. 3 (5/31/2009) Construction of Bldg. 4 Pre-selling of Bldg. 4 Construction of Bldg. 3 Turnover Bldg. 4 (12/30/2009) Turnover Bldg. 1 (12/31/2008) Construction of Bldg. 1
  • 52. Development Timetable 2009 2008 2007 Construction of Bldgs. 1, 2, 3 & 4 Turnover Bldgs. 1, 2, 3 & 4 Turnover Bldg. 5 (04/30/2010) 2010 Construction of Bldg. 5 Turnover Bldg. 8 (11/30/2010 ) Turnover Bldg. 6 (8/31/2011 )
  • 53. Price Range Parking Slots : P400,000.00 Laundry Cages: P125,000.00 UNIT PRICES* *Building 5 - as of March 05, 2008
  • 54. Payment Terms CASH TERM * RF for Europe Sales – P25,000.00 for all unit types *
  • 55. DEFERRED CASH – 20/80 Payment Terms
  • 58. Sample Computation Deferred Cash – Building 5