SlideShare une entreprise Scribd logo
1  sur  5
SHAIK MOHAMMAD KARIMULLA
Email: kareemshah.06@gmail.com
Mobile: +971 55 2596976 / +91 9885275048
Personal Details
PROFESSION : Senior Electrical Engineer
NATIONALITY : Indian
Date of Birth : 16-07-1985
Passport : H5168208
Skype ID : shaikmohammadkarimulla
Marital status : Married
LANGUAGES: English, Urdu, Hindi, Telugu and Arabic(Basic)
EDUCATION: B.E in Electrical Engineering in the year 2006,
Post-Graduation Diploma in Project Management 2012.
KEY EXPERIENCE:
 Complete Erection, installation, earthing, testing of Electrical equipment’s, panels, transformers and
implementing the Substations, Power plants & Traffic signals.
 Handel the projects, and supervising the team of technicians.
 Meeting with Consultants / clients for resolving site issues technically to reach the standards.
 Cable Laying, Jointing, termination and testing of HV/LV Power cables, control and power cables.
 Study and execution of project specification and BOQ of materials.
 Handling of Electrical & Civil Works from Initial stage to Final stage of the project.
 Analyzing the site and plan according to the material availability.
 Implementation of the Inspection/ Test plans and confirmation with the specification requirements.
 Operation and Maintenance of HV, MV, LV electrical equipments and utility systems (Authorized O&M
Engineer).
 Conduct all Routine tests for transformer as per Customer specifications
 Review of Submittals/Shop drawings and As-built drawings.
 Study and execution of project specification and checking/ approving bills.
 Maintain project correspondences/ documentations and produce for auditing as required.
 Coordinates with the inspection procedures along with (Abu Dhabi Distribution Company) ADDC Engineers.
 Prepare the documents for carrying out the approval of drawings and finally achieving the connection from
ADDC for the electrical systems.
PROFESSIONAL HISTORY
DEC 2014 – PRESENT ELECTRO MECHANICAL CO L.L.C (Agents for SIEMENS), ABU DHABI,U.A.E
SENIOR ELECTRICAL ENGINEER
NOV 2013 – NOV 2014 MEGHA ENGINEERING & INFRASTRUCTURE LTD, HYDERABAD, INDIA
SITE MANAGER
JAN 2011 – OCT 2013 PnU ENGINEERING PVT LTD, HYDERABAD, INDIA
SENIOR ELECTRICAL ENGINEER
AUG 2008 – DEC 2010 SRI RAYALASEEMA GREEN ENERGY LTD, ANDHRA PRADESH, INDIA
TESTING ENGINEER
JUN 2006 – JUL 2008 THULASI PROJECTS PVT LTD, HYDERABAD, INDIA
SITE ENGINEER-ELECTRICAL
DETAILED EXPERIENCE
DEC 2014 – PRESENT ELECTRO MECHANICAL CO L.L.C (Agents for SIEMENS), ABU DHABI,U.A.E
SENIOR ELECTRICAL ENGINEER
Projects: Infrastructure works at Saadiyat Island phase I&II, Al Raha Beach Development,Al DanaPhase II- Abu
Dhabi
Project Details:
Cultural District, Marina District, Al Raha & Al Dana- Infrastructure works - Intelligent Transportation Systems
(ITS), Distribution substations. Supply, Erection, installation, testing, commissioning & energization of Traffic
signals- C900V controller, change over, FEC, UPS system & CCTV cameras, distribution substations- (22/0.415KV)
complete with distribution transformers,22KV switchgears (9 panel arrangement), LV switchgears, telephone
outlets, auxiliary AC and DC power supplies, DMS interface, grounding, lighting, ventilation, 415volt, 8ways feeder
pillars, associated civil work and all required accessories, 22KV/415V cable laying including joints and termination.
Construction, testing and commissioning of traffic signals, distribution substations. Testing commissioning and
Plug in termination of 22KV cables to the primary substations. Fiber optic cable laying (FOC) connecting all
junctions and from primary substations to distribution 22KV substations, splicing and terminations to the FOTB.
Street lighting works – 10m, 14m and high mast light poles LED luminaries with dimmer controller technology.
Responsibilities:
 Study and execution of project specification and checking BOQ of material.
 Review of Submittals/Shop drawings according to the specifications/standards.
 Ensure the work is being performed at the most compliance to specification, international standards and time
schedule.
 Promote and ensure the use of safe work practices to provide a safe work environment to all personnel as
well as equipment’s.
 Prepare and communicate work progress reports.
 Providing the safety reports weekly
 Spot and immediately report any deviations to the engineering-specifications, inputs or targets, plan
corrective actions and realize them in co- operation with all the related staff.
 Inspect materials, work activities and witness testing and commissioning.
 Recognize and communicate scope and design changes promptly.
 Provide on-site technical assistance as needed.
 Coordinate work activities with other staff members, contractors and end users.
 Produce new and modified technical applications for the progress of work.
 Prepare snag list and ensure the snag clearance.
 Check and correct Bills of payment and Record drawings.
 Develop schematics, equipment layouts, procedures and schedules for the smooth handing over of project.
 Familiarize with the client’s expectations, scope, budget, and schedule for assigned tasks.
 Prepare the Documentations for carrying out Abu Dhabi Distribution Company (ADDC) Approval procedures.
 Co-ordinates with the Inspection Procedures along with Abu Dhabi Distribution Company (ADDC) Engineers.
NOV 2013 – NOV 2014 MEGHA ENGINEERING & INFRASTRUCTURE LTD, HYDERABAD, INDIA
SITE MANAGER
Project Details:
765/400/220 KV SS at WUPPTCL Project, Greater Noida- Substation Supply, Erection, Installation, Cabling,
Earthing, Testing & Commissioning of 220/400/765 KV SS with AIS Equipment’s like CT, CVT, LA, ISO, Shunt
reactors, Wave trappers & Transformers. Supervision and quality checking of all civil activities.
JAN 2011 – OCT 2013 PnU ENGINEERING PVT LTD, HYDERABAD, INDIA
SENIOR ELECTRICAL ENGINEER
Project Details:
220KV-15 Bay Switch Yard & 3X75MW Aluminum Refinery/Power plant at Anrak Aluminum Ltd – Supply,
Erection, Installation, Cabling, Testing & Commissioning of 220 KV SS 15 Bay with AIS Equipment’s like CT, CVT,
LA, ISO, Wave trappers & Transformers.
110kV SS Bay Extension at AERL 12X8.75 Gas Based Cyclic power Plant – Supply, Erection, Installation,
Cabling, and Testing & Commissioning of 110 KV SS with AIS Equipment’s like CT, CVT, LA and ISO.
132kV SS Bay Extension & 50MW Thermal Power Plant at Raasi Cements (ICL) - Supply, Erection, Installation,
Cabling, Testing & Commissioning of 132 KV SS Bay extension with AIS Equipment’s like CT, CVT, LA, ISO &
Transformer. 50 MW TPP HT Cable laying, Termination, Erection & Installation of Electrical Panels, HT Bus bars,
Bus Ducts and Transformers erection, Installation & Commissioning.
11/33kv ss at 128 MW Wind Energy at Fortune Five Hydel Projects, Bijapur – Supply, Erection, Installation,
caballing, Testing & Commissioning of 11/33 KV SS Equipment’s like Kiosk Panels equipped with CT, PT, Breaker
and C&R panel. LA, ISO and Transformers are out door.
Responsibilities:
 Major work is to manage the site comfortably by fulfilling the site requirements and reporting
customer for the daily work progress.
 Complete erection work in a 765/400/220/132/110/33KV Switch yard in Substation (Including Equipment
Erection and Installation, Earthling, Cable laying, panel, Transformer, Shunt Reactors erection, etc.)
 Main responsibility is to inspect the site for clearance and update our daily progress to the HO.
 Arranging manpower from Sub contractor for successful completion of AIS installation and testing of AIS
equipment’s like the Current Transformer SF-6 gas (Siemens), Control Panels (Siemens), Capacitor Voltage
Transformer (CGL), Capacitor Voltage Transformer (SIEMENS), Wave or Line trap (Areva), Capacitor Voltage
Transformer (Areva), Circuit Breaker SF-6 gas (SIEMENS), Isolators and alignments (SIEMENS), Terminal clamps
and connectors as per erection key drawings.
 Reviewing the site drawings, before starting a job any modification of erection that discussed with design
engineer/project manager and ensuring corrective action to sub-contractor.
 Stringing insulator for twin moose ACSR conductor and quad moose ACSR conductor as per drawings.
 Single suspension insulators for twin moose ACSR conductor and quad moose ACSR conductor as per
drawings.
 Installation of the Auxiliary Earth mat and Main mat Throughout Substation and Arranging the Earthling for
the all Equipment as Per Design.
 Installation of the Lightning Protection and Earth pit for the Substation as per Design.
 Coordinating the all power and Control Cable Laying work for the all Equipment as per scheme requires.
 Assisting to testing and pre-commissioning activities of various systems in conjunction with customer.
 To determine and estimate the needs of additional resources.
 To prepare measurement sheet for conductor and aluminum pipe.
 Prepare BOM for handover the spares as per technical specification.
 Preparing of Cables Schedule as per schematics.
 Preparing BOQ for the earth rod, GI & MS earth flat etc.,
 Handling of Civil & Electrical Works from Initial stage to Final stage at all Sub Stations
 Analyzing the site and plan according to the material availability.
 Erection of Cable Trench, Tray Erection, Cable Laying, Installing joint kits & Termination.
 Transformer erection, testing and commissioning.
AUG 2008 – DEC 2010 SRI RAYALASEEMA GREEN ENERGY LTD, ANDHRA PRADESH, INDIA
TESTING ENGINEER
Project Details:
 Transformer Divison-Worked as Testing Engineer from August-2008 to Dec-2010.
 Having 3 years rich experience in transformer testing
 Done the testing of the transformers as per IS 2026 – 1997
 Conduct all Routine tests for transformer as per Customer specifications
 Tested All Ratings of Distribution Transformers & Power Transformers
 Handling all type of test Equipment
 Prepare Final Inspection Plan according to delivery schedule
 Inspecting All transformers before offering for Final Inspection
 Attended Joint inspection of the Departmental & Third Party at factory
 Preparing Joint Inspection Reports & Calculation Sheets
 Maintain Calibration Records for test equipment & precious instruments
JUN 2006 – JUL 2008 THULASI PROJECTS PVT LTD, HYDERABAD, INDIA
SITE ENGINEER-ELECTRICAL
Project Details: Corporation Worked as Site Engineer In charge of High Voltage Distribution System (HVDS) at
Rajampet Division-II of Kadapa Dist., from june-2006 to july-2008 and acquired Knowledge in execution of the
works in connection with conversion of LT Network into HT and erection of 3phase 16/25 KVA Distribution
Transformers for individual Agricultural Services in Southern Power Distribution Limited
OUTSTANDING ACHIEVEMENTS
 CERTIFICATION: Development of PLC Application programme through SCADA.
(ECIL-Electronics Corporation of India Ltd)
Description- This application programme includes motion control of motors etc., SCADA technology results in
time-saving and efficient performance. Today PLC’s deliver a wide range of complex networking. PLC’s used
to monitor and control a plant or a process distributed over a large geographic area such as power
distribution network.
 Holding UAE Driving License.
COMPUTER PROFICIENCY
 Packages: MS Office, Auto-CAD.
 Operating systems: MS DOS, MS WINDOWS, WINDOWS VISTA & 7.
 System trouble shooting, Software/ Hardware Installations & Networking.
DECLARATION
I hereby declare that above stated information is true and correct with best of my knowledge and belief.
Date: Yours Truly,
Place: (Shaik Mohammad Karimulla)

Contenu connexe

Tendances

Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)sajid akram
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume Arun Das
 
MEP engineer CV
MEP engineer CV MEP engineer CV
MEP engineer CV Khalid Wdn
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineernomanqudrat
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineerIram shahzad khan
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015Prem Kumar
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)Mohd ismail
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINHossam Fattah
 

Tendances (19)

Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
Electrical Engineer C.V
Electrical Engineer C.VElectrical Engineer C.V
Electrical Engineer C.V
 
MEP engineer CV
MEP engineer CV MEP engineer CV
MEP engineer CV
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 

En vedette

ELECTRÓNICA+RADIO+TV. Tomo III: DETECTORES. OSCILADORES. AMPLIFICADORES. Lecc...
ELECTRÓNICA+RADIO+TV. Tomo III: DETECTORES. OSCILADORES. AMPLIFICADORES. Lecc...ELECTRÓNICA+RADIO+TV. Tomo III: DETECTORES. OSCILADORES. AMPLIFICADORES. Lecc...
ELECTRÓNICA+RADIO+TV. Tomo III: DETECTORES. OSCILADORES. AMPLIFICADORES. Lecc...Gabriel Araceli
 
Projectionofplane
ProjectionofplaneProjectionofplane
Projectionofplanekartik1432
 
Open Science, Why not?
Open Science, Why not?Open Science, Why not?
Open Science, Why not?Nancy Pontika
 
ELECTRÓNICA+RADIO+TV. Tomo V: SUPERHETERODINO DE A.M. Apéndice
ELECTRÓNICA+RADIO+TV. Tomo V: SUPERHETERODINO DE A.M. ApéndiceELECTRÓNICA+RADIO+TV. Tomo V: SUPERHETERODINO DE A.M. Apéndice
ELECTRÓNICA+RADIO+TV. Tomo V: SUPERHETERODINO DE A.M. ApéndiceGabriel Araceli
 

En vedette (8)

Sistema de archivos
Sistema de archivosSistema de archivos
Sistema de archivos
 
ELECTRÓNICA+RADIO+TV. Tomo III: DETECTORES. OSCILADORES. AMPLIFICADORES. Lecc...
ELECTRÓNICA+RADIO+TV. Tomo III: DETECTORES. OSCILADORES. AMPLIFICADORES. Lecc...ELECTRÓNICA+RADIO+TV. Tomo III: DETECTORES. OSCILADORES. AMPLIFICADORES. Lecc...
ELECTRÓNICA+RADIO+TV. Tomo III: DETECTORES. OSCILADORES. AMPLIFICADORES. Lecc...
 
SEVEN-PÉRGAMO
SEVEN-PÉRGAMOSEVEN-PÉRGAMO
SEVEN-PÉRGAMO
 
Projectionofplane
ProjectionofplaneProjectionofplane
Projectionofplane
 
Rpm bio2
Rpm bio2Rpm bio2
Rpm bio2
 
INDOPRIMA PROFILE
INDOPRIMA PROFILEINDOPRIMA PROFILE
INDOPRIMA PROFILE
 
Open Science, Why not?
Open Science, Why not?Open Science, Why not?
Open Science, Why not?
 
ELECTRÓNICA+RADIO+TV. Tomo V: SUPERHETERODINO DE A.M. Apéndice
ELECTRÓNICA+RADIO+TV. Tomo V: SUPERHETERODINO DE A.M. ApéndiceELECTRÓNICA+RADIO+TV. Tomo V: SUPERHETERODINO DE A.M. Apéndice
ELECTRÓNICA+RADIO+TV. Tomo V: SUPERHETERODINO DE A.M. Apéndice
 

Similaire à Kareem cv updated

Similaire à Kareem cv updated (20)

Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
 
CV_Krishnanand
CV_KrishnanandCV_Krishnanand
CV_Krishnanand
 
Maninder Kajal CV
Maninder Kajal CVManinder Kajal CV
Maninder Kajal CV
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
cv umar
cv umarcv umar
cv umar
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 

Dernier

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 

Dernier (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 

Kareem cv updated

  • 1. SHAIK MOHAMMAD KARIMULLA Email: kareemshah.06@gmail.com Mobile: +971 55 2596976 / +91 9885275048 Personal Details PROFESSION : Senior Electrical Engineer NATIONALITY : Indian Date of Birth : 16-07-1985 Passport : H5168208 Skype ID : shaikmohammadkarimulla Marital status : Married LANGUAGES: English, Urdu, Hindi, Telugu and Arabic(Basic) EDUCATION: B.E in Electrical Engineering in the year 2006, Post-Graduation Diploma in Project Management 2012. KEY EXPERIENCE:  Complete Erection, installation, earthing, testing of Electrical equipment’s, panels, transformers and implementing the Substations, Power plants & Traffic signals.  Handel the projects, and supervising the team of technicians.  Meeting with Consultants / clients for resolving site issues technically to reach the standards.  Cable Laying, Jointing, termination and testing of HV/LV Power cables, control and power cables.  Study and execution of project specification and BOQ of materials.  Handling of Electrical & Civil Works from Initial stage to Final stage of the project.  Analyzing the site and plan according to the material availability.  Implementation of the Inspection/ Test plans and confirmation with the specification requirements.  Operation and Maintenance of HV, MV, LV electrical equipments and utility systems (Authorized O&M Engineer).  Conduct all Routine tests for transformer as per Customer specifications  Review of Submittals/Shop drawings and As-built drawings.  Study and execution of project specification and checking/ approving bills.  Maintain project correspondences/ documentations and produce for auditing as required.  Coordinates with the inspection procedures along with (Abu Dhabi Distribution Company) ADDC Engineers.  Prepare the documents for carrying out the approval of drawings and finally achieving the connection from ADDC for the electrical systems.
  • 2. PROFESSIONAL HISTORY DEC 2014 – PRESENT ELECTRO MECHANICAL CO L.L.C (Agents for SIEMENS), ABU DHABI,U.A.E SENIOR ELECTRICAL ENGINEER NOV 2013 – NOV 2014 MEGHA ENGINEERING & INFRASTRUCTURE LTD, HYDERABAD, INDIA SITE MANAGER JAN 2011 – OCT 2013 PnU ENGINEERING PVT LTD, HYDERABAD, INDIA SENIOR ELECTRICAL ENGINEER AUG 2008 – DEC 2010 SRI RAYALASEEMA GREEN ENERGY LTD, ANDHRA PRADESH, INDIA TESTING ENGINEER JUN 2006 – JUL 2008 THULASI PROJECTS PVT LTD, HYDERABAD, INDIA SITE ENGINEER-ELECTRICAL DETAILED EXPERIENCE DEC 2014 – PRESENT ELECTRO MECHANICAL CO L.L.C (Agents for SIEMENS), ABU DHABI,U.A.E SENIOR ELECTRICAL ENGINEER Projects: Infrastructure works at Saadiyat Island phase I&II, Al Raha Beach Development,Al DanaPhase II- Abu Dhabi Project Details: Cultural District, Marina District, Al Raha & Al Dana- Infrastructure works - Intelligent Transportation Systems (ITS), Distribution substations. Supply, Erection, installation, testing, commissioning & energization of Traffic signals- C900V controller, change over, FEC, UPS system & CCTV cameras, distribution substations- (22/0.415KV) complete with distribution transformers,22KV switchgears (9 panel arrangement), LV switchgears, telephone outlets, auxiliary AC and DC power supplies, DMS interface, grounding, lighting, ventilation, 415volt, 8ways feeder pillars, associated civil work and all required accessories, 22KV/415V cable laying including joints and termination. Construction, testing and commissioning of traffic signals, distribution substations. Testing commissioning and Plug in termination of 22KV cables to the primary substations. Fiber optic cable laying (FOC) connecting all junctions and from primary substations to distribution 22KV substations, splicing and terminations to the FOTB. Street lighting works – 10m, 14m and high mast light poles LED luminaries with dimmer controller technology. Responsibilities:  Study and execution of project specification and checking BOQ of material.  Review of Submittals/Shop drawings according to the specifications/standards.  Ensure the work is being performed at the most compliance to specification, international standards and time schedule.
  • 3.  Promote and ensure the use of safe work practices to provide a safe work environment to all personnel as well as equipment’s.  Prepare and communicate work progress reports.  Providing the safety reports weekly  Spot and immediately report any deviations to the engineering-specifications, inputs or targets, plan corrective actions and realize them in co- operation with all the related staff.  Inspect materials, work activities and witness testing and commissioning.  Recognize and communicate scope and design changes promptly.  Provide on-site technical assistance as needed.  Coordinate work activities with other staff members, contractors and end users.  Produce new and modified technical applications for the progress of work.  Prepare snag list and ensure the snag clearance.  Check and correct Bills of payment and Record drawings.  Develop schematics, equipment layouts, procedures and schedules for the smooth handing over of project.  Familiarize with the client’s expectations, scope, budget, and schedule for assigned tasks.  Prepare the Documentations for carrying out Abu Dhabi Distribution Company (ADDC) Approval procedures.  Co-ordinates with the Inspection Procedures along with Abu Dhabi Distribution Company (ADDC) Engineers. NOV 2013 – NOV 2014 MEGHA ENGINEERING & INFRASTRUCTURE LTD, HYDERABAD, INDIA SITE MANAGER Project Details: 765/400/220 KV SS at WUPPTCL Project, Greater Noida- Substation Supply, Erection, Installation, Cabling, Earthing, Testing & Commissioning of 220/400/765 KV SS with AIS Equipment’s like CT, CVT, LA, ISO, Shunt reactors, Wave trappers & Transformers. Supervision and quality checking of all civil activities. JAN 2011 – OCT 2013 PnU ENGINEERING PVT LTD, HYDERABAD, INDIA SENIOR ELECTRICAL ENGINEER Project Details: 220KV-15 Bay Switch Yard & 3X75MW Aluminum Refinery/Power plant at Anrak Aluminum Ltd – Supply, Erection, Installation, Cabling, Testing & Commissioning of 220 KV SS 15 Bay with AIS Equipment’s like CT, CVT, LA, ISO, Wave trappers & Transformers. 110kV SS Bay Extension at AERL 12X8.75 Gas Based Cyclic power Plant – Supply, Erection, Installation, Cabling, and Testing & Commissioning of 110 KV SS with AIS Equipment’s like CT, CVT, LA and ISO. 132kV SS Bay Extension & 50MW Thermal Power Plant at Raasi Cements (ICL) - Supply, Erection, Installation, Cabling, Testing & Commissioning of 132 KV SS Bay extension with AIS Equipment’s like CT, CVT, LA, ISO & Transformer. 50 MW TPP HT Cable laying, Termination, Erection & Installation of Electrical Panels, HT Bus bars, Bus Ducts and Transformers erection, Installation & Commissioning.
  • 4. 11/33kv ss at 128 MW Wind Energy at Fortune Five Hydel Projects, Bijapur – Supply, Erection, Installation, caballing, Testing & Commissioning of 11/33 KV SS Equipment’s like Kiosk Panels equipped with CT, PT, Breaker and C&R panel. LA, ISO and Transformers are out door. Responsibilities:  Major work is to manage the site comfortably by fulfilling the site requirements and reporting customer for the daily work progress.  Complete erection work in a 765/400/220/132/110/33KV Switch yard in Substation (Including Equipment Erection and Installation, Earthling, Cable laying, panel, Transformer, Shunt Reactors erection, etc.)  Main responsibility is to inspect the site for clearance and update our daily progress to the HO.  Arranging manpower from Sub contractor for successful completion of AIS installation and testing of AIS equipment’s like the Current Transformer SF-6 gas (Siemens), Control Panels (Siemens), Capacitor Voltage Transformer (CGL), Capacitor Voltage Transformer (SIEMENS), Wave or Line trap (Areva), Capacitor Voltage Transformer (Areva), Circuit Breaker SF-6 gas (SIEMENS), Isolators and alignments (SIEMENS), Terminal clamps and connectors as per erection key drawings.  Reviewing the site drawings, before starting a job any modification of erection that discussed with design engineer/project manager and ensuring corrective action to sub-contractor.  Stringing insulator for twin moose ACSR conductor and quad moose ACSR conductor as per drawings.  Single suspension insulators for twin moose ACSR conductor and quad moose ACSR conductor as per drawings.  Installation of the Auxiliary Earth mat and Main mat Throughout Substation and Arranging the Earthling for the all Equipment as Per Design.  Installation of the Lightning Protection and Earth pit for the Substation as per Design.  Coordinating the all power and Control Cable Laying work for the all Equipment as per scheme requires.  Assisting to testing and pre-commissioning activities of various systems in conjunction with customer.  To determine and estimate the needs of additional resources.  To prepare measurement sheet for conductor and aluminum pipe.  Prepare BOM for handover the spares as per technical specification.  Preparing of Cables Schedule as per schematics.  Preparing BOQ for the earth rod, GI & MS earth flat etc.,  Handling of Civil & Electrical Works from Initial stage to Final stage at all Sub Stations  Analyzing the site and plan according to the material availability.  Erection of Cable Trench, Tray Erection, Cable Laying, Installing joint kits & Termination.  Transformer erection, testing and commissioning. AUG 2008 – DEC 2010 SRI RAYALASEEMA GREEN ENERGY LTD, ANDHRA PRADESH, INDIA TESTING ENGINEER Project Details:  Transformer Divison-Worked as Testing Engineer from August-2008 to Dec-2010.  Having 3 years rich experience in transformer testing  Done the testing of the transformers as per IS 2026 – 1997  Conduct all Routine tests for transformer as per Customer specifications  Tested All Ratings of Distribution Transformers & Power Transformers
  • 5.  Handling all type of test Equipment  Prepare Final Inspection Plan according to delivery schedule  Inspecting All transformers before offering for Final Inspection  Attended Joint inspection of the Departmental & Third Party at factory  Preparing Joint Inspection Reports & Calculation Sheets  Maintain Calibration Records for test equipment & precious instruments JUN 2006 – JUL 2008 THULASI PROJECTS PVT LTD, HYDERABAD, INDIA SITE ENGINEER-ELECTRICAL Project Details: Corporation Worked as Site Engineer In charge of High Voltage Distribution System (HVDS) at Rajampet Division-II of Kadapa Dist., from june-2006 to july-2008 and acquired Knowledge in execution of the works in connection with conversion of LT Network into HT and erection of 3phase 16/25 KVA Distribution Transformers for individual Agricultural Services in Southern Power Distribution Limited OUTSTANDING ACHIEVEMENTS  CERTIFICATION: Development of PLC Application programme through SCADA. (ECIL-Electronics Corporation of India Ltd) Description- This application programme includes motion control of motors etc., SCADA technology results in time-saving and efficient performance. Today PLC’s deliver a wide range of complex networking. PLC’s used to monitor and control a plant or a process distributed over a large geographic area such as power distribution network.  Holding UAE Driving License. COMPUTER PROFICIENCY  Packages: MS Office, Auto-CAD.  Operating systems: MS DOS, MS WINDOWS, WINDOWS VISTA & 7.  System trouble shooting, Software/ Hardware Installations & Networking. DECLARATION I hereby declare that above stated information is true and correct with best of my knowledge and belief. Date: Yours Truly, Place: (Shaik Mohammad Karimulla)