3. CONTENTS
SCOPE
SPECIFICATIONS
STRUCTURAL DESIGN
BILL OF MATERIAL
OPERATING SEQUENCE
TECHNICAL DRAWINGS
DIMENSIONAL VIEW
ISOMETRIC VIEW
4. SCOPE
This manual covers operating instruction for O.K. Marking Machine
of outer Door Mirror As per HSCI Div.
SPECIFICATIONS
This machine will check mirror motor wiring connection by making
the following
SEQUENCE TEST: DOWN
UP
LEFT
RIGHT
The machine will take a decision on OK/NG depending upon the
sequence of mirror plate movement. The OK sequence is shown
above.
After OK mirror testing, machine will put a punch mark on mirror
coupler assy.
13. 25 DMQC_CYL_CXSM_MOUNTING_L_2CV 150X23X20 MS/EN31 2
26 DMQC_LEVELING_ROD_HOLDER_2CV 40X56X23 MS/EN31 2
27 DMQC_ROD_LEVELING_2CV Ø8X145
EN31/HRC-
45 4
28 DMQC_JIG_SPACER_2CV 50X150X250 AL. 2
29 DMQC_S.MOTOR_SPACER_2CV 40X40X30 AL. 1
30 DMQC_LINER_TRANS_MOUNTING_2CV 70X50X30 NYLON 1
31 DMQC_LINER_RAIL_SMALL_MOUNTING_2CV 90X70X15 EN-31 1
32 DMQC_LINER_RAIL_SMALL_M_ROUND_2CV Ø50X40 AL. 1
33 COUPLER CLAMP 150X18X25 MS 4
34
O K PUNCHING CYLINDER MOUNTING
PLATE 60X25X10 MS 2
35 O K PUNCHING CYLINDER SPACER PLATE 25X25X12 MS 2
36 O K PUNCHING CYLINDER BASE PLATE 60X12X150 MS 2
37 COUPLER SUPPORT 25X25X12 ACCRALIC 2
14. OPERATING SEQUENCE
MIRROR SETTING PROCEDURE:
OPERATING SEQUENCE:
STEP 1: PUT ON MAIN SWITCH
STEP 2: SELECT AUTO MODE & CHOSE MIRROR TYPE (LEFT / RIGHT)
STEP 3: SET DOOR MIRROR ON FIXTURE
15. STEP 4: INSERT MIRROR SWITCH INTO COUPLER (UH / LK)
STEP 5: PRESS START SWITCH.
STEP 6: MAIN CYL. GO DOWN & ALIGNING CYL. MAKE MIRROR PLATE TO
ALIGN.
STEP 7: NOW MOVEMENT PINS MAKE THE REQUIRED SEQUENCE TEST.
16. STEP 4: INSERT MIRROR SWITCH INTO COUPLER (UH / LK)
STEP 5: PRESS START SWITCH.
STEP 6: MAIN CYL. GO DOWN & ALIGNING CYL. MAKE
MIRROR PLATE TO ALIGN.
STEP 7: NOW MOVEMENT PINS MAKE THE REQUIRED
SEQUENCE TEST.