3. Mazadul Hasan sheshir
ID: 2010000400008
Wet Processing Technology
Southeast University
Department Of Textile Engineering
I/A 251,252 Tejgaon Dhaka -1213 Bangladesh
4.
Merchandising is the business art of matching
goods to the needs and preferences of customers
to ensure shelf off take.
How a product is presented, how much is
displayed, and in what form, size shape, colour,
etc. can determine the rate of speed at which a
product is bought.
In other words merchandising is the marketing
activity responsible for ensuring a product’s
“desirability”, both qualitatively and quantitatively.
This means that at the store end, your product has
to be perceived as “just right” by your market.
It is a whole lot of psyche satisfaction.
5. Merchandiser is a person who get converted
inspiration into design , use technology to
conceptualize and address the planning
,production, promotion and distribution
of products in the fashion industry to meet
the consumer needs and demands
7.
Good Command in English and adequate knowledge
of technical terms for accurate and efficient
communication.
Good knowledge of fiber, yarn, fabric, dyeing,
printing, finishing, dyes, color fastness, garments
production. Etc.
Clear conception of the usual potential quality
problems in the garments manufacturing.
Good knowledge of the usual raw material inspection
systems &garments inspection systems.
Knowledge of the quota system used in each of the
producing countries, duty rates, customers
regulations, shipping and banking documents etc.
8.
To collect buyers addresses.
To establish contact with the buyers sending formal
letters/profile.
Receiving buyer’s response and providing price
quotation along with making of sample as
counter/approval.
Receiving samples comments from the buyer.
To furnish the pro-forma invoice and sending the
buyer.
Taking necessary steps to develop lab-dips of the
materials (FAB & ACC)
Receiving the master L/C & verify clauses of the L/C
both in technical and commercial point of view.
9.
To confirm floor booking of the order with
factory.
To confirm transfer authentication of the L/C in
favor of fact.
Pushing the factory taking initial procurement to
open the back-to-back L/C by bank.
Searching reliable fabric and accessories sources
and finalize supplying of the required materials
relevant to the order.
To monitor the shipment of raw materials and
arrival in the factory.
To monitor of the supplying materials while
receiving factory.
To order the test cutting with quality.
10.
To check/inspect/advise for the bulk production.
To monitor production, quality and delivery.
To advise factory if buyer change any instruction
both in technical/commercial point of view to the
order.
Collecting order from the buyers.
Sending Samples to the buyer for approval.
Collecting accessories form different Suppliers.
Giving order to the specified garment factory.
Communicate with all the respective parties.
Coordinating the whole process at a regular
manner
11.
12. New Order:
Receive Product Package From buyer.
Discuss with planning & Production Officer
for space & ability to do the production.
Analyze Product package
List out type & fabric accessories
Do consumption of fabric & accessories
Do the Costing & quote price
Negotiate & confirm price
13. Confirmed Order
Prepare T & A calender
Prepare grantt chart
Recieveing color standard
Submission of lab dip, strike off, hand loom
Developemnet of printing & ambroidary
Booking of yarn, fabric & accessories
Recieving of Master L/C
Opening BB L/C
14. Running Order
Follow T& A calender
Follow grantt chart
Follow up fabric, dye lot, shade
Follow up knitting & dyeing
Follow up printing, ambroidary & washing
Arrange all samples
Arrange all lab test
Arrange all inspectiion
Ensure shipment of garments on time
15.
Oder Confirmation
Payment by L/C or other Terms
Costing & Sampling
Develop T & A Calender
Fabric & Accessories Booking
Open Back to Back L/C
P.O Order
Fabric and Trims in house
Inventory Report Making
Pre Production Meeting
16.
17.
18.
19.
Pattern Making for Bulk Production
Trial Cutting
Bulk Cutting, Numbering & Sortening
Bulk Sweing
Finishing
Final Inspection Booking
Inspection Certificate Released by Inspector
Delivery
Payment
20. Different Types of order:
FOB(free on board) Order
FOA(Free on Air) Order
C& F(Cost & Freight) Order
CIF(Cost Insurance & Freight) Order
CIFC(Cost Insurance & Freight & Commission)
Order
CMT(Cutting, Making & Trimming) Order
CM(Cost of Making)Order
Sub Contract Order
Exchange Order
CMC(Cutting, Making & Cartooning )Order
21.
22. A normal Tech-pack will consist of the following:
8. Embroidery Details and artwork details if any
9. Print details and artworks (if any)
10. Label details
11. label placements
12. Wash detail
13. Special treatment details
14. Testing Details (as per the their testing forms)
15. Measurement chart with all sizes (graded spec)
16. Details Instructions:
17. Packing Details:
23. Here Body Length should be Body length from high shoulder point and leg
height
Length= Body Length+Sleeve Length+Leg
Height+Allowance+shrinkage+folding area
= 45cm+35.5cm+13cm+4cm+4cm
=98.5cm
Width=0.5chest+seam aloowance+shrinkage allowance
=(28+4+4)cm
=36cm
We know,
[Length×Width×(GSM/10000)×24]/1000+10%
=[98.5cm×36cm×(200/10000)×24]/1000+10%
=[3546×0.02×24]/1000+10%
=[1702.08/1000]+10%
=1.70+10%
=1.87kg/dz
24. For Hood
Here hoody has two layers, one layer is fleece
fabric and another layer is single jersey which is
220 GSM
For fleece:
[Length×Width×(GSM/10000)×12]/1000+5%wes
tage
=[15cm×19cm×12×200]/10000000+5%
=0.068+5%
=0.075 kg/dz
27. Yarn Dyed
Cost
$4.95/kg
Knitting Cost
$2.00 /kg
Total Cost
Fabric Cost
Cost of accessories
$6.95/kg
($6.95×2.078)+$1.24+$0.2
05 = $15.88/dz
$3.00/dz
Cost of printing
$2.50/dz
Cost of washing
$1.50/dz
Value addition
$3.50/dz
Commercial cost
$0.85/dz
Cost of Making
$6/dz
Others
Total
$0.30/dz
$33.53/dz or $2.79/pcs
If it is between buying house and factory the
buying commission usually considered 5% of
Total cost
This is $1.67/dz.
29. Shade wise dyeing charge without Enzyme &
Silicon (Cotton & Lycra)
Sl.
Shade
Shade %
Tube
Finish
Open
Finish
Open with
Heat set
1.
White
00.00
$0.49
$0.83
$0.97
2.
Light
0.001 1.49%
$0.90
$1.25
$1.53
3.
Medium
1.50 -2.49%
$1.04
$1.39
$1.67
4.
Dark
2.50 -3.99%
$1.18
$1.60
$1.74
5.
Extra Dark
Above 4%
$1.39
$1.81
$1.94
6.
R/Black
$1.67
$1.94
$2.01
7.
Royal
$1.67
$1.94
$2.08
30. Price for additional process.
Sl.
1
2
3
4
5
6
7
8
9
10
Process
Enzyme Wash
Silicon
Silicon Softener
Normal Brush
Peach Finish/Carbon Brush Only
Only Heat set
Normal Wash (Tube finish)
Y/D Fabric Wash (Open)
Y/D Lycra Fabric wash (Heat set & Open finish)
Stentering
Price
$0.14
$0.07
$0.11
$0.14
$0.35
$0.31
$0.49
$0.56
$0.90
$0.21
31. Time and Action calendar is a schedule is all
kind of works of running production. It helps
the merchandiser to do the work organized
way. It also gives a at glance view of overall
process. Sometimes it can be essential
elements to recover the initial process loss
and process control.
32. After receive order confirmation from buyer we
chase buyer to provide us PO sheet (purchase
order) which includes color & size wise break
down of the total quantity. Then we will go for
knit fabrics booking. Yarn is the first element of
knit fabric. So to make fabric we have to book
suitable yarn from home or abroad. To import
yarn from abroad it need approx 44/45 days and
to buyer yarn from Bangladesh it need approx
20/30 days. After receive yarn we go for fabrics
knitting and then coloring of the fabrics. After
dyed fabrics are ready to make garments
33. Various kinds of trims are used in Basic TShirt. To buy or make booking for trim firstly
we have to know from buyer what kind of
trims they required for other product After
collecting trimming information from buyer
we have to develop the same and need to get
approval. Then we will book trim from
respective trim manufacturing house. It is
very important to buy all the necessary trims
before start garments production
34. The Persons who conduct with Final Inspection
Buyer’s QC (Liaisons Office or foreign office)
Buyer
Trader’s QC
Self Inspection (Factory QC)
Any third party Inspection (QC team)
There are two types Two types of inspection
Inline Inspection: It is held by buyer’s QC or
representative.
Online inspection: It is held by factory’s QC
35. After receive a purchase order from buyer
merchandiser have to sit with production planner
to make a production plan. Production plan
contain below things:
Planned date to start knitting to make the
required fabrics.
Planned date to start dyeing to color the fabrics.
Planned date to start cutting fabrics.4)Planned
date to start sewing the required garments.
Planned date to start packing the required
garments.
Planned date to hand over finished goods to
buyer nominated sea or air forward
36.
Knowing the customers’ needs.
Designing to meet them
Faultless construction- manufacture.
Certified performance and safety.
Clear instruction manuals.
Suitable packing.
Prompt delivery.
Feed back of field experience
37. We have learned about Merchandising
practically by doing this project. For being a
good merchandiser this project will help us.
From this project we have learned about a
project presentation, writing sequence, team
work .This will enrich our analytical ability. All
this will be very helpful for our knowledge;
will increase our experience, skill and above
all our future industrial job and life.