CONTENTS IN BERIEF
 EBM’s History
 Vision
 Values
 Procurement Dept. Division
 Inventory purchases
 General Items
 Working Criteria of MM Commercials
 ISO 14000 (Environmental Management Systems)
 Solid Waste Management
 Application of Safety Stock
 Safety Stock Application in EBM (FGS)
 EBM’s Products
 EBM Revenue
 EBM Product Mix
 Market Share
 Pictorial Representation of the Supply Chain
 Production Functions
 Material Receiving
 Production Process
 Production Step 1: Mixing
 Production Step 2: Cutting
 Production Step 3: Baking
 Cooling (Buffer Zone)
 Production Step 4: Packaging
 Dispatch
 Export
 Procedure For Supply Chain
 Procedure for Evaluation of Supplier
 Procedure for Procurement of Raw/Packaging Material,
Technical and General Items
 General Procedure
 Raw Material Procurement Planning and Management
 Packing Material Procurement Planning and
Management
 General, Technical and IT Items Procurement
 Imported Items Procurement Planning and
Management
 Recommendations
EBM’S HISTORY
English Biscuit Manufacturers (Private) Limited was established as a
joint venture company in 1965 with the name of Peek Freans Pakistan
Limited. In 1966, the UK sponsor company was renamed Associated
Biscuits International Limited (ABIL), while the venture was renamed
English Biscuit Manufacturers (Private) Limited (EBM), which stands to
date.
EBM started manufacturing and marketing the world famous Peek
Freans range in 1967 in order to provide Pakistani consumers with
nutritious and hygienically packed biscuits of the highest quality.
True to its corporate claim, 'The Legend Leads', EBM has led the
biscuit industry in Pakistan for 39 years by playing a pioneering role in
providing innovative and high quality biscuits for every taste bud.
EBM’s trademark, Pied Piper, made its mark three and a half decades
ago, but continues to remain in the hearts, minds, and souls of the
people through the variety and excellent quality of biscuits
manufactured under its umbrella. EBM enjoys the distinction of being
the first food company in Pakistan to promote biscuits as 'food
between meals'.
EBM has been in the business of manufacturing and marketing
branded biscuits in Pakistan for 39 years. The brand name 'Peek
Freans' is a household name, and people trust and believe in the
quality of the products produced under this brand. EBM is also the first
biscuit company in Pakistan to have achieved ISO - 9001 Certification
in correspondence with its institutional slogan 'The Legend Leads'. The
achievement also endorses the company's firm commitment to high
standards of quality.
Under the brand range, Peek Freans, the company today carries the
largest variety of biscuit products including Marie, Gluco, Click,
Sooper, Smile, RIO Double Treat, Marvell, Party, Peanut Pik, Peanut
Pista, Lemon Sandwich and Chocolate Sandwich.
English Biscuit Manufacturers (Pvt) Ltd., or (EBM), is the country's
leading manufacturer of biscuits and cookies since 1967, with an
annual sales volume and production capacity of more than 65,000 tons
and a turnover of more than Rs. 7.0 billion. EBM is the only Company
in the industry to have achieved recognized international certifications
pertaining to quality control, environmental management system and
human resources management, including ISO 9001:2000, ISO
14001:2004, HACCP certifications and IIP (Investors in People)
Recognition. EBM is also the only food company to have been awarded
Environmental Excellence Award for four successive years 2004, 2005,
2006 & 2007.
As a socially conscious company, EBM consistently supports various
humanitarian causes in the areas of education, sports, healthcare and
help for the less privileged.
VISION
 To provide high quality value-added food to contemporary and
future generations
 To constantly endeavor for the acquisition of knowledge and
excellence in developing human skills, product innovations and
state-of-the-art technologies
 To be a good corporate citizen by giving back to the community
and improving the lives of the underprivileged
 To dispense equitably, fairly, and with compassion, the fruits of
success among our “partners in business”
 To become a partner with the Government in sharing the
responsibility of economic and social uplift and development of
Pakistan
VALUES
 We believe that no individual is bigger than the institution
 We believe in integrity, transparency and commitment as our
cultural ethos
 We continually adhere to the highest standards of hygiene and
ecology
 We believe in governance in human face
 We protect and promote the cause of the environment
 We emphasize on employee welfare
 We believe in leading and innovating in all aspects of business
PROCUREMENT DEPT. DIVISION
Inventory purchases
Raw material is purchased on the basis of forecast made by the
marketing department; raw material is purchased after the quotation
from supplier. Mainly flavors are outsourced from the best in class
vendors like IFF and Gevidaun; other raw materials include dry fruits,
eggs, sugar, flour, fat and butter.
Packaging material is sourced from the local market depending on the
nature of the finished products; it includes inner films, outer films and
master cartons.
Once the consignment of the supplier arises; it is recorded in the ERP
system through MNR (Material Receiving Note) and issued to
production through MCN (Material Consumption Note).
General Items
Items like stationary, computer accessories, engineering tools needed
in electrical, mechanical and civil worker is purchased. The category of
general items has been distributed to different official related to nature
of job. Demand note is prepared when there is a need of general item
in the ERP system (Inventory and Procurement Management)
EBM compliance with a paper less organization methodology and each
document is recorded in their module of Inventory and Procurement
management
Electrical appliances are purchased after negotiation by the suppliers;
every purchase has a purchase order prior to the purchase.
WORKING CRITERIA OF MM COMMERCIALS
Forecast (MKT)
Material Planning
Supplier Enquiry
QuotationMailing
Opening of LC
Purchase Order
Raw/Packaging received
QA sampling
RejectedAccepted
Stored through MNR Sent back to supplier
ISO 14000 (ENVIRONMENTAL MANAGEMENT
SYSTEMS)
Solid Waste Management
Since the introduction of ISO 14000 in 2005 EBM saves around 2
million annually. These standards deal with Solid Waste Management
and Water Treatment Plant. EBM requires around millions of cartons
for packaging purpose so corrugated cartons are sold to different
vendors once not in use, sacks of sugars and flours are also sold to
vendors once raw material has been used. Waste of biscuits on daily
bases is crushed and supplied as cattle feed.
APPLICATION OF SAFETY STOCK
Safety stock is now becoming a major issue for every process industry
globally, weather in the form of raw material or finished goods. It
depends how effective a supply chain is for an organization. When it
comes to raw material, inventory is build up when prices tend to go
high or there is a chance of uncertainties
Many process industries tat employ Mass Production tend to keep
safety stock in their warehouse and also their sole distributors. Levels
of inventory are maintained on for to six weeks.
Safety Stock Application in EBM (FGS)
Although EBM does employs safety stock methodology but due to lack
of space they are bound to do it. FGS store has a maximum capacity of
90000 master’s cartons but on average 15000 masters cartons are
dispatched on daily bases versus 15000 units of production. Also
transfer is taken from production on daily bases due to which there is
a bottle neck in dispatch of finished goods.
There should be an expansion in FGS so that volume of finished goods
can be increased.
EBM’S PRODUCTS
Marching ahead of the competition, Peek Freans biscuits are best
known for their excellent quality and taste. The Pied Piper symbol is
the most popular icon in the country, leading biscuit lovers to
experience one superb product after another.
Offering the largest variety in taste and textures, Peak Freans
produces thousands of tons of premium quality biscuits annually,
employing the most innovative ideas, state-of-the-art technology and
sophisticated Food Safety Systems.
Plain Sweet Biscuits
Gluco
Marie
Sooper
Whole Wheat Slice
Nuts
Peanut Pik
Peanut Pista
Cream Biscuits
Choco Vanilla Sandwich
Chocolate Sandwich
Lemon Sandwich
Rio Double Treat Chocolate/Vanilla
Rio Double Treat Strawberry/Vanilla
Rio Vanilla
Crackers
Butter Puff
Marvell
Saltish
EBM’S REVENUE
0
50000
100000
150000
200000
250000
300000
350000
03-04 Y 04-05 Y 05-06 Y 06-07 Y
inBillion
Net Sales
EBM’S PRODUCT MIX
Rio Variant
Party
Butter Puff
Gluco
Peanut Pik
Munna
Marvel
Other
Sooper
MARKET SHARE
55%
20%
16%
9%
EBM
Kolson
LU Continental
Bisconni
PICTORIAL REPRESENTATION OF THE SCM
Receiving
Raw
Material
RM Unload in
Quarantining Area
QA
Inspection
Rejected
by QA
QA
Inspection
RMS Store
Flour/Sugar GrindingCold Room 1 Nuts Cleaning/Grinding
Mixing Storage Area
Mixing Process
Hopper
Cutting
Weighing Area
Master Cartons Filling
Baking
Packing
QA Packing / Coding
QA Inspection
Transfer and Storage in FGS
Distributors
Retail Shop
Customer
PRODUCTION FUNCTIONS
MATERIAL RECEIVING
 Supply Chain contact approved suppliers and purchase raw
material from them.
 Supplies come through trucks. In case of some materials,
material is not off-loaded without testing.
 Sampling and testing is carried out by QA personnel. Composite
sample is collected to get good results.
 After approval, incoming material is stored in raw material store
and packaging material store, whereas sensitive items such as
butter, color, flavors are stored in cold rooms.
 In rest of the cases, Quality assurance performs testing after
material is stored in relevant stores and then accepts/rejects the
material.
PRODUCTION PROCESS
 Information for daily production plan is supplied by marketing
and sales department on the basis of customer demand. Keeping
in view these factors, production plan is made.
PRODUCTION STEP 1: MIXING
 There are six different mixing areas.
 For a specific product, ingredients are weighed (according to
pre-defined recipe) in weighing area.
 Mixing is carried out in either vertical or horizontal mixer,
depending upon the nature of the product.
PRODUCTION STEP 2: CUTTING
 After mixing, dough is transferred from hopper to cutting line.
 There are total 6 lines, which are reserved for different products.
 Dough passes through the conveyer belt and is shaped according
to product.
PRODUCTION STEP 3: BAKING
 Unbaked biscuits enter the oven, conveyer belt is constantly
moving at a slow pace.
 Different types of heating devices are present in oven which
provides different temperature.
 Approximately 6 minutes are passed in oven during which
different temperatures treatment are given to biscuits starting
form lower to higher temperature.
 Conveyer belt then moves to Buffer Zone.
COOLING (BUFFER ZONE)
 After high temperature treatment baked, biscuits are not very
stable and texture is not fully developed, that’s why they are
passed through Buffer Zone for cooling.
 It is merely an area consisting of relatively low temperature.
Conveyer belt containing biscuits passes through this area to
cool down the biscuits.
PRODUCTION STEP 4: PACKAGING
 After cooling, workers pick the biscuits for conveyer belt and
place them in different gauges set according to Ticky Pack (TP),
Snack Pack (SP), Half Roll (HR) or Family Pack (FP).
 Biscuits are automatically packed in final packaging material
(inner sealing) incase of TP, SN, HR, and then are finally packed
in master cartons.
 FP is packed in 3 different packaging material; inner sealing,
outer sealing and then finally master carton.
 Master cartons are sealed and are transferred to finished goods
store.
DISPATCH
 Products are stored in finished goods store according to date are
dispatched on FIFO (First in First Out) basis.
 QA performs final checking of finished products, after which
product is dispatched through trucks to different distributors.
 Distributors further distribute the product to retailers.
EXPORT
 Peak Freans products are also exported to different countries of
the world including USA, UK, and Canada etc.
 Export order is raised from sales and marketing department.
 Export order contains the name, type, quantity, packing
specifications of the product.
 Supply chain and production is enquired whether they can
produce the required amount of product in limited time.
 After their approval, product is manufactured according to
specifications defined in export order.
 Product is packed in containers which are shipped to the
destination.
 After custom’s clearance, containers are delivered to address
mentioned on the export order.
PROCEDURE FOR SUPPLY CHAIN
Procedure for Evaluation of Supplier
 Supplier is evaluated on the basis of range of products and
services he provides.
 The supplier is required to furnish details of his quality system.
 Supplier performance is evaluated be Supply Chain Dept.
 Supplier’s end survey is to be conducted upon requirement. If
the system/ supplies are not flowing properly then it needs to be
addressed through site survey.
 Based on the information gathered supplier is approved /
rejected.
Procedure for Procurement of Raw/Packaging Material, Technical and
General Items
General Procedure
 Procurement of Materials is done on the basis of Annual Sales
Budget
 Raw & Packaging Materials are purchased from Approved
Suppliers only.
 Approved Standard Specifications of all materials are given to
suppliers
 Negotiation of prices of various materials depends on quantity
purchased in a certain period. Rates of various materials vary at
different interval. For locally purchased items, normally one
month credit period is allowed except for few items which
payment is made on delivery. In case of Engineering / IT /
General Items, the payments terms are negotiated on case to
case basis.
Raw Material Procurement Planning and Management
 Requirement is computed on the basis of Weekly Production
Schedule
 Purchase Order is issued to Local Suppliers with all terms and
conditions and specifications / credit record
 After Receipt of Material QA department collects the samples of
receipt material and verifies them
 If the material is rejected by QA, the rejected materials are
returned to the supplier
 Bills are received at MM Department from the suppliers and sent
to Finance Department
Packing Material Procurement Planning and Management
 Monthly Requirement is generated on the basis of
Comprehensive Report on periodic basis
 Purchase Order is issued to Local Suppliers with all terms and
conditions and specifications / credit record.
 After Receipt of Material QA department collects the samples of
receipt material and verifies them
 If the material is rejected by QA, the rejected materials are
returned to the supplier
 Bills are received at MM Department from the suppliers and sent
to Finance Department
General, Technical and IT Items Procurement
 Demand Note is received for purchase of General / Technical / IT
equipments.
 Required materials are arranged from on spot market buying
 Purchase Order is issued
 Material is received by concerned Stores
 Bills are received at MM Department from the suppliers and sent
to Finance Department
Imported Items Procurement Planning and Management
 Requirement for Imported Raw Material is generated on period
basis
 A letter is sent to supplier or their Agent in Pakistan and Price /
Rate is negotiated
 Application is sent for L/C to the bank
 Copy of L/C is sent to Supplier through courier / fax.
 Negotiable documents are received from our bank
 Clearing Agent arranges for clearance of consignment and
delivery at EBM
 Bill of Clearing Agent is sent to HOD for approval.
RECOMMENDATIONS
 Raw Material should be stored according to FIFO which avoids
bottle neck in dispensing the raw material
 Raw Material should be kept at 20 feet away from main
entrance, because once the gate opens there are chances of
pesticides entering the store.
 EBM should deploy self distribution in spite of hiring on
contractual bases, this will leave a positive perception on the
consumers mind once they see transport vehicle of the company.

Contenu connexe

Tendances

Ebm internship report
Ebm internship reportEbm internship report
Ebm internship reportHamid Hussain
 
EBM Supply Chain Management
EBM Supply Chain ManagementEBM Supply Chain Management
EBM Supply Chain ManagementSyed Arsalan
 
Continental biscuits limited(cbl) pakistan
Continental biscuits limited(cbl) pakistanContinental biscuits limited(cbl) pakistan
Continental biscuits limited(cbl) pakistanMuhammad Qureshi
 
Peek freans 1
Peek freans 1Peek freans 1
Peek freans 1Mian Umar
 
Karim . . . Continental Biscuits Marketing Presentation
Karim . . . Continental Biscuits   Marketing PresentationKarim . . . Continental Biscuits   Marketing Presentation
Karim . . . Continental Biscuits Marketing PresentationKarim Virani
 
English Biscuit Manufacturers SCM ASSIGNMENT EBM
English Biscuit Manufacturers SCM ASSIGNMENT EBMEnglish Biscuit Manufacturers SCM ASSIGNMENT EBM
English Biscuit Manufacturers SCM ASSIGNMENT EBMFurqan Aslam
 
Principle of marketing presentation by khurram wasim khan mba -1- hu
Principle of marketing presentation by khurram wasim khan   mba -1- huPrinciple of marketing presentation by khurram wasim khan   mba -1- hu
Principle of marketing presentation by khurram wasim khan mba -1- hukhurram wasim khan
 
English Biscuit Manufacturers Pvt. Ltd (CSR )
English Biscuit Manufacturers Pvt. Ltd  (CSR )English Biscuit Manufacturers Pvt. Ltd  (CSR )
English Biscuit Manufacturers Pvt. Ltd (CSR )Atif Salam
 
Report of English Biscuits Manufacturing Peek Freans
Report of English Biscuits Manufacturing Peek FreansReport of English Biscuits Manufacturing Peek Freans
Report of English Biscuits Manufacturing Peek FreansMuhammad Ahmed
 
STP & MARKETING MIX OF PEANUT PIK BISCUITS
STP & MARKETING MIX OF PEANUT PIK BISCUITSSTP & MARKETING MIX OF PEANUT PIK BISCUITS
STP & MARKETING MIX OF PEANUT PIK BISCUITSIrfan Tanwari
 
National foods ltd.
National foods ltd.National foods ltd.
National foods ltd.Zain Shah
 
K&N's Marketing Plan - Institute of Administrative Sciences, Punjab U, Lahore
K&N's Marketing Plan - Institute of Administrative Sciences, Punjab U, LahoreK&N's Marketing Plan - Institute of Administrative Sciences, Punjab U, Lahore
K&N's Marketing Plan - Institute of Administrative Sciences, Punjab U, LahoreAli Imran Zubairi
 
Ringo Biscuit - New Marketing Plan For a Failed Product - Peek Freans
Ringo Biscuit - New Marketing Plan For a Failed Product - Peek FreansRingo Biscuit - New Marketing Plan For a Failed Product - Peek Freans
Ringo Biscuit - New Marketing Plan For a Failed Product - Peek FreansFaHaD .H. NooR
 
National foods
National foodsNational foods
National foodsmimranch
 
Candyland (ismail industry)
Candyland (ismail industry)Candyland (ismail industry)
Candyland (ismail industry)IIUI
 
National foods
National foodsNational foods
National foodsUsman Aziz
 

Tendances (20)

Ebm internship report
Ebm internship reportEbm internship report
Ebm internship report
 
EBM Supply Chain Management
EBM Supply Chain ManagementEBM Supply Chain Management
EBM Supply Chain Management
 
Continental biscuits limited(cbl) pakistan
Continental biscuits limited(cbl) pakistanContinental biscuits limited(cbl) pakistan
Continental biscuits limited(cbl) pakistan
 
Peek freans 1
Peek freans 1Peek freans 1
Peek freans 1
 
Karim . . . Continental Biscuits Marketing Presentation
Karim . . . Continental Biscuits   Marketing PresentationKarim . . . Continental Biscuits   Marketing Presentation
Karim . . . Continental Biscuits Marketing Presentation
 
English Biscuit Manufacturers SCM ASSIGNMENT EBM
English Biscuit Manufacturers SCM ASSIGNMENT EBMEnglish Biscuit Manufacturers SCM ASSIGNMENT EBM
English Biscuit Manufacturers SCM ASSIGNMENT EBM
 
Principle of marketing presentation by khurram wasim khan mba -1- hu
Principle of marketing presentation by khurram wasim khan   mba -1- huPrinciple of marketing presentation by khurram wasim khan   mba -1- hu
Principle of marketing presentation by khurram wasim khan mba -1- hu
 
English Biscuit Manufacturers Pvt. Ltd (CSR )
English Biscuit Manufacturers Pvt. Ltd  (CSR )English Biscuit Manufacturers Pvt. Ltd  (CSR )
English Biscuit Manufacturers Pvt. Ltd (CSR )
 
Report of English Biscuits Manufacturing Peek Freans
Report of English Biscuits Manufacturing Peek FreansReport of English Biscuits Manufacturing Peek Freans
Report of English Biscuits Manufacturing Peek Freans
 
STP & MARKETING MIX OF PEANUT PIK BISCUITS
STP & MARKETING MIX OF PEANUT PIK BISCUITSSTP & MARKETING MIX OF PEANUT PIK BISCUITS
STP & MARKETING MIX OF PEANUT PIK BISCUITS
 
Cbl (scom)
Cbl (scom)Cbl (scom)
Cbl (scom)
 
National foods ltd.
National foods ltd.National foods ltd.
National foods ltd.
 
K&N's Marketing Plan - Institute of Administrative Sciences, Punjab U, Lahore
K&N's Marketing Plan - Institute of Administrative Sciences, Punjab U, LahoreK&N's Marketing Plan - Institute of Administrative Sciences, Punjab U, Lahore
K&N's Marketing Plan - Institute of Administrative Sciences, Punjab U, Lahore
 
Ringo Biscuit - New Marketing Plan For a Failed Product - Peek Freans
Ringo Biscuit - New Marketing Plan For a Failed Product - Peek FreansRingo Biscuit - New Marketing Plan For a Failed Product - Peek Freans
Ringo Biscuit - New Marketing Plan For a Failed Product - Peek Freans
 
Mkt
MktMkt
Mkt
 
National foods
National foodsNational foods
National foods
 
Candyland (ismail industry)
Candyland (ismail industry)Candyland (ismail industry)
Candyland (ismail industry)
 
National foods
National foodsNational foods
National foods
 
National foods
National foodsNational foods
National foods
 
Candyland
CandylandCandyland
Candyland
 

Similaire à Peak freens

Report on mother dairy
Report on mother dairyReport on mother dairy
Report on mother dairyANSHU SINGH
 
Parle G, operations management by Manpreet singh digital
Parle G, operations management by Manpreet singh digitalParle G, operations management by Manpreet singh digital
Parle G, operations management by Manpreet singh digitalManpreet Singh Chhabra
 
Contemporary- Indian dairy industry
Contemporary- Indian dairy industryContemporary- Indian dairy industry
Contemporary- Indian dairy industryastha inani
 
Production function on parle comany
Production function on parle comanyProduction function on parle comany
Production function on parle comanyDave Sonavvane
 
Marekting presentation farm house
Marekting presentation farm houseMarekting presentation farm house
Marekting presentation farm houseFahad Haroon
 
Britannia ppt in Operations
Britannia ppt in OperationsBritannia ppt in Operations
Britannia ppt in OperationsSneha Nair
 
anmol biscuits pvt limited
anmol biscuits pvt limitedanmol biscuits pvt limited
anmol biscuits pvt limitedPranabMishra10
 
Book on bakery products (4th revised edition)
Book on bakery products (4th revised edition)  Book on bakery products (4th revised edition)
Book on bakery products (4th revised edition) Ajjay Kumar Gupta
 
Mother dairy- A report
Mother dairy- A reportMother dairy- A report
Mother dairy- A reportGurpreet Singh
 
Super crisp relaunching
Super crisp relaunchingSuper crisp relaunching
Super crisp relaunchingtariqmehsud
 
sushant file.docx
sushant file.docxsushant file.docx
sushant file.docxSagar Patil
 
operation research of Igloo Bd
operation research of Igloo Bdoperation research of Igloo Bd
operation research of Igloo BdMd. Yeasin Arafat
 
Enhancement of developed food products from CVRC open pollinated (OPV) white ...
Enhancement of developed food products from CVRC open pollinated (OPV) white ...Enhancement of developed food products from CVRC open pollinated (OPV) white ...
Enhancement of developed food products from CVRC open pollinated (OPV) white ...Bureau of Agricultural Research
 
Study of macroeconomic variables on dairy products
Study of macroeconomic variables on dairy productsStudy of macroeconomic variables on dairy products
Study of macroeconomic variables on dairy productsRachna Gupta
 
Young's food Brand Management
Young's food Brand Management Young's food Brand Management
Young's food Brand Management Muhammad Zakaria
 

Similaire à Peak freens (20)

Report on mother dairy
Report on mother dairyReport on mother dairy
Report on mother dairy
 
Parle operation
Parle  operationParle  operation
Parle operation
 
Parle G, operations management by Manpreet singh digital
Parle G, operations management by Manpreet singh digitalParle G, operations management by Manpreet singh digital
Parle G, operations management by Manpreet singh digital
 
Contemporary- Indian dairy industry
Contemporary- Indian dairy industryContemporary- Indian dairy industry
Contemporary- Indian dairy industry
 
Production function on parle comany
Production function on parle comanyProduction function on parle comany
Production function on parle comany
 
Marekting presentation farm house
Marekting presentation farm houseMarekting presentation farm house
Marekting presentation farm house
 
Britannia ppt in Operations
Britannia ppt in OperationsBritannia ppt in Operations
Britannia ppt in Operations
 
anmol biscuits pvt limited
anmol biscuits pvt limitedanmol biscuits pvt limited
anmol biscuits pvt limited
 
Book on bakery products (4th revised edition)
Book on bakery products (4th revised edition)  Book on bakery products (4th revised edition)
Book on bakery products (4th revised edition)
 
Mother dairy- A report
Mother dairy- A reportMother dairy- A report
Mother dairy- A report
 
Itc
ItcItc
Itc
 
Super crisp relaunching
Super crisp relaunchingSuper crisp relaunching
Super crisp relaunching
 
sushant file.docx
sushant file.docxsushant file.docx
sushant file.docx
 
operation research of Igloo Bd
operation research of Igloo Bdoperation research of Igloo Bd
operation research of Igloo Bd
 
PMG Newsletter (Volume 03. Issue 04).pdf
PMG Newsletter (Volume 03. Issue 04).pdfPMG Newsletter (Volume 03. Issue 04).pdf
PMG Newsletter (Volume 03. Issue 04).pdf
 
Enhancement of developed food products from CVRC open pollinated (OPV) white ...
Enhancement of developed food products from CVRC open pollinated (OPV) white ...Enhancement of developed food products from CVRC open pollinated (OPV) white ...
Enhancement of developed food products from CVRC open pollinated (OPV) white ...
 
Study of macroeconomic variables on dairy products
Study of macroeconomic variables on dairy productsStudy of macroeconomic variables on dairy products
Study of macroeconomic variables on dairy products
 
Ensuring Food Safety and Brand Protection
Ensuring Food Safety and Brand ProtectionEnsuring Food Safety and Brand Protection
Ensuring Food Safety and Brand Protection
 
Brand Mangement
Brand MangementBrand Mangement
Brand Mangement
 
Young's food Brand Management
Young's food Brand Management Young's food Brand Management
Young's food Brand Management
 

Plus de Hamid Hussain

TEAMWORKTable of contents
TEAMWORKTable of contentsTEAMWORKTable of contents
TEAMWORKTable of contentsHamid Hussain
 
My wrr TEAMWORK project report
My wrr TEAMWORK project reportMy wrr TEAMWORK project report
My wrr TEAMWORK project reportHamid Hussain
 
TEAMWORK Letter of transmittal
TEAMWORK Letter of transmittalTEAMWORK Letter of transmittal
TEAMWORK Letter of transmittalHamid Hussain
 
TEAMWORK Aknowledgment
TEAMWORK AknowledgmentTEAMWORK Aknowledgment
TEAMWORK AknowledgmentHamid Hussain
 
TEAMWORKReferences and bibliography
TEAMWORKReferences and bibliographyTEAMWORKReferences and bibliography
TEAMWORKReferences and bibliographyHamid Hussain
 
Product and brand managment
Product and brand managmentProduct and brand managment
Product and brand managmentHamid Hussain
 
Presentation background2
Presentation background2Presentation background2
Presentation background2Hamid Hussain
 
Presentation background1
Presentation background1Presentation background1
Presentation background1Hamid Hussain
 
Presentation background
Presentation backgroundPresentation background
Presentation backgroundHamid Hussain
 

Plus de Hamid Hussain (20)

MY WRR Teamwork PPT
MY WRR Teamwork PPTMY WRR Teamwork PPT
MY WRR Teamwork PPT
 
TEAMWORKTable of contents
TEAMWORKTable of contentsTEAMWORKTable of contents
TEAMWORKTable of contents
 
My wrr TEAMWORK project report
My wrr TEAMWORK project reportMy wrr TEAMWORK project report
My wrr TEAMWORK project report
 
TEAMWORK Letter of transmittal
TEAMWORK Letter of transmittalTEAMWORK Letter of transmittal
TEAMWORK Letter of transmittal
 
TEAMWORK Aknowledgment
TEAMWORK AknowledgmentTEAMWORK Aknowledgment
TEAMWORK Aknowledgment
 
TEAMWORK Title
TEAMWORK TitleTEAMWORK Title
TEAMWORK Title
 
TEAMWORKReferences and bibliography
TEAMWORKReferences and bibliographyTEAMWORKReferences and bibliography
TEAMWORKReferences and bibliography
 
Product and brand managment
Product and brand managmentProduct and brand managment
Product and brand managment
 
Processes and flows
Processes and flowsProcesses and flows
Processes and flows
 
Processes and flows
Processes and flowsProcesses and flows
Processes and flows
 
Presentation background2
Presentation background2Presentation background2
Presentation background2
 
Presentation background1
Presentation background1Presentation background1
Presentation background1
 
Presentation background
Presentation backgroundPresentation background
Presentation background
 
Presentation1
Presentation1Presentation1
Presentation1
 
Nestle resentation1
Nestle resentation1Nestle resentation1
Nestle resentation1
 
Nestle Presentation
Nestle PresentationNestle Presentation
Nestle Presentation
 
Nature animated
Nature animatedNature animated
Nature animated
 
My flash
My flashMy flash
My flash
 
Meddona
MeddonaMeddona
Meddona
 
Marketing plan
Marketing planMarketing plan
Marketing plan
 

Dernier

Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876dlhescort
 

Dernier (20)

Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 

Peak freens

  • 3. CONTENTS IN BERIEF  EBM’s History  Vision  Values  Procurement Dept. Division  Inventory purchases  General Items  Working Criteria of MM Commercials  ISO 14000 (Environmental Management Systems)  Solid Waste Management  Application of Safety Stock  Safety Stock Application in EBM (FGS)  EBM’s Products  EBM Revenue  EBM Product Mix  Market Share  Pictorial Representation of the Supply Chain  Production Functions  Material Receiving  Production Process  Production Step 1: Mixing  Production Step 2: Cutting  Production Step 3: Baking  Cooling (Buffer Zone)  Production Step 4: Packaging  Dispatch  Export  Procedure For Supply Chain  Procedure for Evaluation of Supplier
  • 4.  Procedure for Procurement of Raw/Packaging Material, Technical and General Items  General Procedure  Raw Material Procurement Planning and Management  Packing Material Procurement Planning and Management  General, Technical and IT Items Procurement  Imported Items Procurement Planning and Management  Recommendations
  • 5. EBM’S HISTORY English Biscuit Manufacturers (Private) Limited was established as a joint venture company in 1965 with the name of Peek Freans Pakistan Limited. In 1966, the UK sponsor company was renamed Associated Biscuits International Limited (ABIL), while the venture was renamed English Biscuit Manufacturers (Private) Limited (EBM), which stands to date. EBM started manufacturing and marketing the world famous Peek Freans range in 1967 in order to provide Pakistani consumers with nutritious and hygienically packed biscuits of the highest quality. True to its corporate claim, 'The Legend Leads', EBM has led the biscuit industry in Pakistan for 39 years by playing a pioneering role in providing innovative and high quality biscuits for every taste bud. EBM’s trademark, Pied Piper, made its mark three and a half decades ago, but continues to remain in the hearts, minds, and souls of the people through the variety and excellent quality of biscuits manufactured under its umbrella. EBM enjoys the distinction of being the first food company in Pakistan to promote biscuits as 'food between meals'. EBM has been in the business of manufacturing and marketing branded biscuits in Pakistan for 39 years. The brand name 'Peek Freans' is a household name, and people trust and believe in the quality of the products produced under this brand. EBM is also the first biscuit company in Pakistan to have achieved ISO - 9001 Certification in correspondence with its institutional slogan 'The Legend Leads'. The achievement also endorses the company's firm commitment to high standards of quality. Under the brand range, Peek Freans, the company today carries the largest variety of biscuit products including Marie, Gluco, Click, Sooper, Smile, RIO Double Treat, Marvell, Party, Peanut Pik, Peanut Pista, Lemon Sandwich and Chocolate Sandwich. English Biscuit Manufacturers (Pvt) Ltd., or (EBM), is the country's leading manufacturer of biscuits and cookies since 1967, with an annual sales volume and production capacity of more than 65,000 tons and a turnover of more than Rs. 7.0 billion. EBM is the only Company in the industry to have achieved recognized international certifications pertaining to quality control, environmental management system and
  • 6. human resources management, including ISO 9001:2000, ISO 14001:2004, HACCP certifications and IIP (Investors in People) Recognition. EBM is also the only food company to have been awarded Environmental Excellence Award for four successive years 2004, 2005, 2006 & 2007. As a socially conscious company, EBM consistently supports various humanitarian causes in the areas of education, sports, healthcare and help for the less privileged. VISION  To provide high quality value-added food to contemporary and future generations  To constantly endeavor for the acquisition of knowledge and excellence in developing human skills, product innovations and state-of-the-art technologies  To be a good corporate citizen by giving back to the community and improving the lives of the underprivileged  To dispense equitably, fairly, and with compassion, the fruits of success among our “partners in business”  To become a partner with the Government in sharing the responsibility of economic and social uplift and development of Pakistan VALUES  We believe that no individual is bigger than the institution  We believe in integrity, transparency and commitment as our cultural ethos  We continually adhere to the highest standards of hygiene and ecology  We believe in governance in human face  We protect and promote the cause of the environment  We emphasize on employee welfare  We believe in leading and innovating in all aspects of business PROCUREMENT DEPT. DIVISION
  • 7. Inventory purchases Raw material is purchased on the basis of forecast made by the marketing department; raw material is purchased after the quotation from supplier. Mainly flavors are outsourced from the best in class vendors like IFF and Gevidaun; other raw materials include dry fruits, eggs, sugar, flour, fat and butter. Packaging material is sourced from the local market depending on the nature of the finished products; it includes inner films, outer films and master cartons. Once the consignment of the supplier arises; it is recorded in the ERP system through MNR (Material Receiving Note) and issued to production through MCN (Material Consumption Note). General Items Items like stationary, computer accessories, engineering tools needed in electrical, mechanical and civil worker is purchased. The category of general items has been distributed to different official related to nature of job. Demand note is prepared when there is a need of general item in the ERP system (Inventory and Procurement Management)
  • 8. EBM compliance with a paper less organization methodology and each document is recorded in their module of Inventory and Procurement management Electrical appliances are purchased after negotiation by the suppliers; every purchase has a purchase order prior to the purchase. WORKING CRITERIA OF MM COMMERCIALS Forecast (MKT) Material Planning Supplier Enquiry QuotationMailing Opening of LC Purchase Order Raw/Packaging received QA sampling RejectedAccepted Stored through MNR Sent back to supplier
  • 9. ISO 14000 (ENVIRONMENTAL MANAGEMENT SYSTEMS) Solid Waste Management Since the introduction of ISO 14000 in 2005 EBM saves around 2 million annually. These standards deal with Solid Waste Management and Water Treatment Plant. EBM requires around millions of cartons for packaging purpose so corrugated cartons are sold to different vendors once not in use, sacks of sugars and flours are also sold to vendors once raw material has been used. Waste of biscuits on daily bases is crushed and supplied as cattle feed. APPLICATION OF SAFETY STOCK Safety stock is now becoming a major issue for every process industry globally, weather in the form of raw material or finished goods. It depends how effective a supply chain is for an organization. When it comes to raw material, inventory is build up when prices tend to go high or there is a chance of uncertainties Many process industries tat employ Mass Production tend to keep safety stock in their warehouse and also their sole distributors. Levels of inventory are maintained on for to six weeks. Safety Stock Application in EBM (FGS) Although EBM does employs safety stock methodology but due to lack of space they are bound to do it. FGS store has a maximum capacity of 90000 master’s cartons but on average 15000 masters cartons are dispatched on daily bases versus 15000 units of production. Also transfer is taken from production on daily bases due to which there is a bottle neck in dispatch of finished goods. There should be an expansion in FGS so that volume of finished goods can be increased. EBM’S PRODUCTS Marching ahead of the competition, Peek Freans biscuits are best known for their excellent quality and taste. The Pied Piper symbol is the most popular icon in the country, leading biscuit lovers to experience one superb product after another.
  • 10. Offering the largest variety in taste and textures, Peak Freans produces thousands of tons of premium quality biscuits annually, employing the most innovative ideas, state-of-the-art technology and sophisticated Food Safety Systems. Plain Sweet Biscuits Gluco Marie Sooper Whole Wheat Slice Nuts Peanut Pik Peanut Pista Cream Biscuits Choco Vanilla Sandwich Chocolate Sandwich Lemon Sandwich Rio Double Treat Chocolate/Vanilla Rio Double Treat Strawberry/Vanilla Rio Vanilla Crackers Butter Puff Marvell Saltish
  • 11. EBM’S REVENUE 0 50000 100000 150000 200000 250000 300000 350000 03-04 Y 04-05 Y 05-06 Y 06-07 Y inBillion Net Sales EBM’S PRODUCT MIX Rio Variant Party Butter Puff Gluco Peanut Pik Munna Marvel Other Sooper
  • 13. PICTORIAL REPRESENTATION OF THE SCM Receiving Raw Material RM Unload in Quarantining Area QA Inspection Rejected by QA QA Inspection RMS Store Flour/Sugar GrindingCold Room 1 Nuts Cleaning/Grinding Mixing Storage Area Mixing Process Hopper Cutting Weighing Area Master Cartons Filling Baking Packing QA Packing / Coding QA Inspection Transfer and Storage in FGS Distributors Retail Shop Customer
  • 14. PRODUCTION FUNCTIONS MATERIAL RECEIVING  Supply Chain contact approved suppliers and purchase raw material from them.  Supplies come through trucks. In case of some materials, material is not off-loaded without testing.  Sampling and testing is carried out by QA personnel. Composite sample is collected to get good results.  After approval, incoming material is stored in raw material store and packaging material store, whereas sensitive items such as butter, color, flavors are stored in cold rooms.  In rest of the cases, Quality assurance performs testing after material is stored in relevant stores and then accepts/rejects the material. PRODUCTION PROCESS  Information for daily production plan is supplied by marketing and sales department on the basis of customer demand. Keeping in view these factors, production plan is made. PRODUCTION STEP 1: MIXING  There are six different mixing areas.  For a specific product, ingredients are weighed (according to pre-defined recipe) in weighing area.  Mixing is carried out in either vertical or horizontal mixer, depending upon the nature of the product. PRODUCTION STEP 2: CUTTING  After mixing, dough is transferred from hopper to cutting line.  There are total 6 lines, which are reserved for different products.  Dough passes through the conveyer belt and is shaped according to product.
  • 15. PRODUCTION STEP 3: BAKING  Unbaked biscuits enter the oven, conveyer belt is constantly moving at a slow pace.  Different types of heating devices are present in oven which provides different temperature.  Approximately 6 minutes are passed in oven during which different temperatures treatment are given to biscuits starting form lower to higher temperature.  Conveyer belt then moves to Buffer Zone. COOLING (BUFFER ZONE)  After high temperature treatment baked, biscuits are not very stable and texture is not fully developed, that’s why they are passed through Buffer Zone for cooling.  It is merely an area consisting of relatively low temperature. Conveyer belt containing biscuits passes through this area to cool down the biscuits. PRODUCTION STEP 4: PACKAGING  After cooling, workers pick the biscuits for conveyer belt and place them in different gauges set according to Ticky Pack (TP), Snack Pack (SP), Half Roll (HR) or Family Pack (FP).  Biscuits are automatically packed in final packaging material (inner sealing) incase of TP, SN, HR, and then are finally packed in master cartons.  FP is packed in 3 different packaging material; inner sealing, outer sealing and then finally master carton.  Master cartons are sealed and are transferred to finished goods store. DISPATCH  Products are stored in finished goods store according to date are dispatched on FIFO (First in First Out) basis.  QA performs final checking of finished products, after which product is dispatched through trucks to different distributors.  Distributors further distribute the product to retailers.
  • 16. EXPORT  Peak Freans products are also exported to different countries of the world including USA, UK, and Canada etc.  Export order is raised from sales and marketing department.  Export order contains the name, type, quantity, packing specifications of the product.  Supply chain and production is enquired whether they can produce the required amount of product in limited time.  After their approval, product is manufactured according to specifications defined in export order.  Product is packed in containers which are shipped to the destination.  After custom’s clearance, containers are delivered to address mentioned on the export order. PROCEDURE FOR SUPPLY CHAIN Procedure for Evaluation of Supplier  Supplier is evaluated on the basis of range of products and services he provides.  The supplier is required to furnish details of his quality system.  Supplier performance is evaluated be Supply Chain Dept.  Supplier’s end survey is to be conducted upon requirement. If the system/ supplies are not flowing properly then it needs to be addressed through site survey.  Based on the information gathered supplier is approved / rejected. Procedure for Procurement of Raw/Packaging Material, Technical and General Items General Procedure  Procurement of Materials is done on the basis of Annual Sales Budget  Raw & Packaging Materials are purchased from Approved Suppliers only.  Approved Standard Specifications of all materials are given to suppliers
  • 17.  Negotiation of prices of various materials depends on quantity purchased in a certain period. Rates of various materials vary at different interval. For locally purchased items, normally one month credit period is allowed except for few items which payment is made on delivery. In case of Engineering / IT / General Items, the payments terms are negotiated on case to case basis. Raw Material Procurement Planning and Management  Requirement is computed on the basis of Weekly Production Schedule  Purchase Order is issued to Local Suppliers with all terms and conditions and specifications / credit record  After Receipt of Material QA department collects the samples of receipt material and verifies them  If the material is rejected by QA, the rejected materials are returned to the supplier  Bills are received at MM Department from the suppliers and sent to Finance Department Packing Material Procurement Planning and Management  Monthly Requirement is generated on the basis of Comprehensive Report on periodic basis  Purchase Order is issued to Local Suppliers with all terms and conditions and specifications / credit record.  After Receipt of Material QA department collects the samples of receipt material and verifies them  If the material is rejected by QA, the rejected materials are returned to the supplier  Bills are received at MM Department from the suppliers and sent to Finance Department General, Technical and IT Items Procurement  Demand Note is received for purchase of General / Technical / IT equipments.  Required materials are arranged from on spot market buying  Purchase Order is issued  Material is received by concerned Stores  Bills are received at MM Department from the suppliers and sent to Finance Department
  • 18. Imported Items Procurement Planning and Management  Requirement for Imported Raw Material is generated on period basis  A letter is sent to supplier or their Agent in Pakistan and Price / Rate is negotiated  Application is sent for L/C to the bank  Copy of L/C is sent to Supplier through courier / fax.  Negotiable documents are received from our bank  Clearing Agent arranges for clearance of consignment and delivery at EBM  Bill of Clearing Agent is sent to HOD for approval. RECOMMENDATIONS  Raw Material should be stored according to FIFO which avoids bottle neck in dispensing the raw material  Raw Material should be kept at 20 feet away from main entrance, because once the gate opens there are chances of pesticides entering the store.  EBM should deploy self distribution in spite of hiring on contractual bases, this will leave a positive perception on the consumers mind once they see transport vehicle of the company.