Summer Internship presentation
4/5/2015 – 13/6/2015
By : SHUBHAM RANA
12113104
Proposed Project
Lucknow Metro LKCC 01
Lucknow , Uttar Pradesh
Phase 1 Priority Corridor “Chaudhary Charan Singh
Airport to Charbagh Railway Station”
Total Stretch 8.5 Km
PROJECT DETAILS
 PROJECT - LUCKNOW METRO
 CLIENT -LUCKNOW METRO RAIL
CORPORATION
 CONSULTANT - SYSTRA MVA Consulting (I)
Pvt Ltd.
 CONTRACTOR–L&T CONSTRUCTION ,
HEAVY CIVIL INFRA IC
 TYPE OF CONTRACT – LUMPSUM
CONTRACT
 PROJECT COST - 4992 Crores
 CONSTRUCTION PERIOD = September
2014 – December 2016
 PROJECT COMPONENT–
Pre Cast Yard
U Girders
Beams
Piers
Pier Cap
Piles
Pile Cap
 PROJECT LOCATION –Near Domestic
Airport , Lucknow.
Salient Features
 Width of gauge : Standard (1435 mm)
 Axle Load: To be designed for 16T
 Max Acceleration: 1.0 m/s2 to 1.1 m/s2 ± 5%
 Max Deceleration: 1.1 m/s2 (Normal Brake)
>1.3m/s2 (Emergency Brake)
 Maximum Design Speed: 80 kmph
 Maximum Schedule Speed: 34 kmph
Why Metro ? Why is it needed ?
 It will provide speedy mass transport for the people
of Lucknow.
 Helps in reducing a traffic congestion on city roads.
 A better means of connectivity from Airport to
Railway Station for passengers travelling to and fro.
VARIOUS ASPECTS OF THE PROJECT
 ALLIGNMENT : Super elevation on curves is applied to counter the effect of
lateral force felt by passengers.
 CIRCULAR CURVES : The minimum length of the circular curves should not be
less than 25 m in order to accommodate full length of coach.
 VERTICAL CURVES : Vertical curves are to be provided when change in gradient
exceeds 0.4%
 TRACK : From considerations of maintainability, the complete track is proposed
to be joint-less and is made of LWR/CWR rails.
 RAIL SECTION : Keeping in view the proposed axle load , it is proposed to
adopt UIC-60 (60 kg. /m) rail section.
PRE – CAST YARD
 Pre Cast is Basically situated in the outskirts of City Region .
 This is a confined place where all the concrete Superstructure components for
this project are been casted here.
 Casting yard stores all the made units prior to erection in viaduct .
 It also contains a Fabrication and Scrap Yard Unit , Batching Plants , Storage of
Aggregate Fine and Coarse and Prestressing Units.
 Precast yard serves an economical and quality control way of constructing
components and hence beneficial in projects where mass production is done.
 Yard is spread in 27 acres.
 Place is suited so as to provide less hindrance to traffic movement while
transporting transit mixer and to avoid other nuisance to the public.
 Cement used to Mix Design is of OPC 43 grade.
 Before casting any Structure at Site mix design has to go through several
tests.
 7 days Compressive Strength of 6 concrete cube is determined . Strength
should come accordingly specified by the consultant , If not then the
whole structure is discarded .
 Slump test is also conducted at the spot so as to determine the workability
of Concrete .If it comes less ,then desired proportions of admixtures are
added (plasticizers/water reducer).
COMPONENTS FOR THE SUPERSTRUCTURE
1) U – GIRDER
 This is a specially designed U shaped Girder which basically provides a
track for the running of Metro Train .
 Design is maintained in a such a shape so as to provide an Aesthetic
attractiveness , Flexible shape to modify, A very Robust Cross Section.
 Twin U Girders are placed parallel to each other for the whole length of
Track , One for upgoing Train and other downgoing Train. Total of 478
U Girder are Required .
SPECIFICATION :
Length = 27000 mm Concrete Grade = M 55
Breadth = 5050 mm Concrete Quantity = 57m3
Height = 1870 mm Reinforcement = 10.076 MT
Dimension of Bars : 12 mm and 16 mm
Cleaning of Formworks
using Buffing Machine
Placing of Bars In Reinforcement Jigs
 Prestressing Strands are Introduced into
the U Girder from one end of the structure
to the other .
 Hoyer or Long Line Method is adopted , at
a time 6 U Girders are Prestressed
Simultaneously .
 For Prestressing work, low relaxation high
tensile steel strands conforming to
(IS:14268) 7 Ply Strands of 15.2 mm are
drawn through the Structure. Total Strands
72.
 Breaking Strength of each Strand 260.7 KN
conforming to IS :14268 - 1970.
 After Providing Cables , Prestressing
strands are fixed against the abutment at
one side and at the other side it is fixed
to the Prestressing Jacks.
 6 Prestressing Jacks , with each jacks
connected to 12 strands are stretched to
provide required Prestressing before the
Concreting is being done .
 After Prestressing , strands are anchored
at both ends to restrain the prestress.
Concreting
Curing is done for around 7 Days in
Formwork itself by using Gunny Bags, so as
to maintain required moisture throughout
the day. After 7 days it is being transported by using
cranes and stacked above another U Girder
And cured for another 7 days.
Final Step of giving finish and checking tyre pressure before
transporting it through Trailors.
2) Pier Cap
 The Upper or Bearing part of Bridge or Viaduct , Usually made of Concrete or
Hard Stone , which is designed to distribute concentrated loads evenly over
the area of the pier.
 No. Of Pier Caps Constructed for the project are around 230.
SPECIFICATIONS
 Length: 9200 mm
 Breadth : 2800 mm
 Height : 2000 mm
 Diameter of Bars : 16
and 25mm
 Concrete Grade : M 45
 Concrete Quantity: 27.3 m3
 Reinforcement: 3.491 MT
Pier Cap Installation
3) Beams
 A beam is a structural element that is capable of withstanding load
primarily by resisting bending.
 For the purpose of this project beams are made to be placed before placing
of slabs for Stations and also I Shaped Girder are casted, which are used in
some places instead of U Girder because of Uneven span and curvilinear
portion .
 Beams of different dimensions are casted depending upon the requirement
as per drawing. Length of single beam varies from 10 m to 16 m.
SPECIFICATIONS :
 Length : 10 m to 16 m
 Breadth : 1000mm
 Height : 1000mm
 Bar Dimensions : 32mm in longitudinal
and 25 mm in Transverse.
 Concrete Grade : M 40
 Concrete Quantity: 16 to 20 m3
 Reinforcement :2.5 to 3 MT
VIADUCT
GEOTECHNICAL INVESTIGATION
 Geotechnical investigations have been carried out along the
proposed alignments to determine the strata, depth of foundation and safe
bearing capacity of foundations required.
 Subsurface explorations were carried out, 30m bore holes were done at
every 500m at the proposed corridor .
 Water level was found at a varying depth of about 18 to 27 m that to only in
some boreholes only.
 The subsoil strata at proposed site is generally homogeneous and comprises
of :
Silty Sand /Sandy Silt of Low Plasticity and (Classification as per
Clayey Silt of Low Plasticity IS 1498-1970)
PILES
 A pile is a vertical structural
element of a deep foundation,
driven deep into the ground at
the building site.
 Cast in situ bored Pile are made
below the ground level to
support all the structures above
the ground .
SPECIFICATIONS :
 Length of Pile = 30m deep below
ground level
 Diameter Of Pile = 1200 mm
 Capacity of one Pile (Design
Load) =400 MT
 Ultimate Load =1000 MT
 Concrete Grade = M 40
 Clear Cover to Any Reinforcement
in Pile = 75 mm
 Quantity of Concrete in one Pile =
36 m3
Reinforcement :
Circular bars = Outer one 16 mm dia. and Spacer bar 25 mm dia.
Longitudinal Bar = 8 mm – 16 mm dia. Bars
Construction Methodology of Piles
PREBORING
 It is suggested that all utilities such as
(cables, pipelines ,gaslines ,
sewerlines) falling within excavation
area are diverted away in advance to
avoid damage to such utilities during
the excavation/ construction phase.
 Initial hard strata of the ground is cut
by a “Drilling Bucket” , which is a box
like structure attached to Rig
machine and has a sharp toothed like
structure below it .
 Then a temporary Mild Steel casing for about 4 to 6 m (approx) length
from the ground level will be driven to protect loose soil from falling
in the bore hole.
 Then a Polymer Powder is added to form a slurry which provides a
clear, solid-free, viscous borehole stabilizing fluid till the excavation is
done for the piles. Polymer Slurry has a pH of 11 to 12, Specific
Gravity of 1-1.04 and Viscosity 65 to 140.
 After drilling borehole, reinforcement cage (with sonic tubes of
50mm dia. and 2.9 mm thick attached to the inner rebar cage)is
lowered into it . While lowering the cage care has to be taken to
install it in gap of 10 m and fillet weld of 6mm is to be provided to
join upper end of previous cage with lower end of cage to be
lowered.
Sonic Tubes
 After cage lowering , Tremie Pipe
generally of diameter 200mm
and 2-3 m length are lowered
one by one and tied to each
other . The gap between the
bottom of the bore to the end of
tremie pipe will be min 300mm.
 Upper end of the tremie pipe is
connecter to funnel shaped
“Hopper” , to which concrete mix
is poured .
 As the Concreting Proceeds Concrete mix being denser replaces the Polymer slurry and
slurry comes out of the borehole and is diverted away from the hole.
 A very high Slump Concrete 150 – 200 mm is needed for piling ,regular compaction to be
provided by Hydraulic Drilling Machine so as to ensure proper lowering of concrete .
 After Few days of setting sonic tubes are filled with water and then in one tube ultrasonic
wave emitter probe and in other receiver probes are inserted, knowing the distance
between the two tubes , Relative energy, waveform and differential time are recorded and
mapped. This is called “Cross Hole Sonic Logging”.
 This gives qualitative idea of the structural soundness of the concrete throughout the pile
and hence structural integrity of pile can be verified by this method.
PILE CAP
 A pile cap is a thick concrete mat that rests on concrete or timber
piles that have been driven into soft or unstable ground to provide
a suitable stable foundation.
 It usually forms part of the foundation of a piers and above
superstructure and support base for heavy equipment.
 Pile cap is constructed over Piles after they acquire the desired
strength , Pile cut off level extends to about 75 mm in the Pile Cap
as per the drawing of the site.
SPECIFICATIONS :
 Generally for 4 Piles Dimension of Pile Cap is 5300mm x 5300 mm
For 6 piles 5300 x 8900 mm
For 8 piles 5300 x 12500 mm
 Height of Pile Cap 1800 mm
 Clear cover to Reinforcement 75 mm
 Concrete Grade : M 40
Pile Cap Concrete Volume : pile cap with 4 piles 50.5 m3.
For pile cap with 6 piles 85 m3 and so on.
Reinforcement :
 Top Reinforcement : 16 mm dia. bars on both axis
 Bottom Reinforcement : 32 & 25 mm dia. bars.
 Stirrups : 12 mm Dia.
• ,
 Pile Cap Cut off level should be at least 500mm below ground level .
 After Concreting and few days of curing , Over Pile cap a layer of PCC
(Plain Cement Concrete) of 75 mm height is laid , having Compressive
Strength of M 15. PCC provides even surface for Pier formation.
 After 7 days of continuous curing Pier construction activities are
started.
PIER
 A pier is a raised structure typically supported by well-spaced piles or
pillars.
 Pier casted at the viaduct starts from the 0.5 m below the ground level.
 Piers are made of varying height giving a slope of about 0.3 for
effective flow of Rainwater . Height varies as per the drawing.
 Through the piers a 15cm diameter drainage pipe HDPE is inserted to
reach to the ground.
SPECIFICATIONS :
 Diameter = 1700 mm
 Height = 12 m average
 Concrete Grade for Pier = M 45 to M 60
as per drawing .
 Clear Cover = 50 mm
Reinforcement :
 Outer Circular Bar 16 mm dia.
 Spacer Bar = 32 mm
 Longitudinal Bar = 20 mm - 32 mm depending upon drawings.
 Starter Bar should start from atleast 300 mm from edge of pier.
CRASH BARRIER
 To prevent Pier from wear and Tear due to Crashing of vehicles, a
protective Concrete Structure is made around Pier to a height of about
1.5 m from ground level.
 It works as a shock absorber and protect pier from Road Accidents.
 It has a dimension of 2200 mm diameter.
 Concrete Grade = M 30
 Clear Cover = 40mm
 Gap between the Pier and Crash Barrier boundary is around 250 mm.
BATCHING PLANT
 It is a machine that combines various ingredients to form concrete.
Some of these inputs include sand, water, aggregate (rocks, gravel,
etc.), fly ash, potash, and cement.
 At this site there were 2 Batching Plants.
 CP 30 = which generates 30m3 of concrete in 1hour.
 CP 60 = which generates 60m3 of concrete in 1 hour.
TRANSIT MIXER
 Special concrete transport trucks (in–transit mixers) are made to transport and
mix concrete up to the construction site.
 One Transit Mixer has the capacity of loading 6m3 of Concrete at a time to the
site.
 The concrete mixing transport truck maintains the material's liquid state
through agitation, or turning of the drum, until delivery.
BOOM PLACER
A concrete pump is a machine used for transferring liquid concrete by pumping.
It is known as a trailer-mounted boom concrete pump because it uses a remote
controlled articulating robotic arm (called a boom) to place concrete accurate.
GANTRY
 Gantry cranes are a type of crane built atop a gantry, which is a structure used
to straddle an object or workspace.
 These Gantry cranes run over the rail track which are laid in the precast yard.
 At the project location they were 4 in Nos. with 3 having capacity of 100 MT
for lifting (U-Girders, Pier Cap , Beam , I-Girder), while 1 is of 25 MT for ( Steel
Yard).
Thank You

Contenu connexe

Tendances

Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine Roshan Sharma
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCAl Hakam Khan
 
Training report - RCC Bridge
Training report - RCC BridgeTraining report - RCC Bridge
Training report - RCC BridgePRASUNMANI
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway TrackArbaz Kazi
 
Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Chandan Singh
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)Sukhdarshan Singh
 
Ppt bridges & types
Ppt bridges & typesPpt bridges & types
Ppt bridges & typespratik vanam
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhiRajesh Prasad
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Rail and Road Over Rail Bridge
Rail and Road Over Rail BridgeRail and Road Over Rail Bridge
Rail and Road Over Rail BridgeKorutla Harish
 
DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONMd Shadab
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO Akanksha Priya
 
Study of Bridge Bearings
Study of Bridge BearingsStudy of Bridge Bearings
Study of Bridge BearingsAyushHajare
 

Tendances (20)

Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
 
Training report ON BRIDGE
Training report ON BRIDGETraining report ON BRIDGE
Training report ON BRIDGE
 
Metro Work
Metro WorkMetro Work
Metro Work
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 
Training report - RCC Bridge
Training report - RCC BridgeTraining report - RCC Bridge
Training report - RCC Bridge
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway Track
 
Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Ppt bridges & types
Ppt bridges & typesPpt bridges & types
Ppt bridges & types
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
PQC concrete road
PQC concrete roadPQC concrete road
PQC concrete road
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Spine and wing method for box girders
Spine and wing method for box girdersSpine and wing method for box girders
Spine and wing method for box girders
 
Rail and Road Over Rail Bridge
Rail and Road Over Rail BridgeRail and Road Over Rail Bridge
Rail and Road Over Rail Bridge
 
DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTION
 
Signature bridge ppt2
Signature bridge ppt2Signature bridge ppt2
Signature bridge ppt2
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
 
Box culverts
Box culvertsBox culverts
Box culverts
 
Study of Bridge Bearings
Study of Bridge BearingsStudy of Bridge Bearings
Study of Bridge Bearings
 

En vedette

Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship PresentationKishore Kumar
 
Summer internship in Jaypee Group
Summer internship in Jaypee GroupSummer internship in Jaypee Group
Summer internship in Jaypee GroupAbhimanyu Saraswat
 
Electromagnetic brake solenoid coil 2014
Electromagnetic brake  solenoid coil 2014Electromagnetic brake  solenoid coil 2014
Electromagnetic brake solenoid coil 2014chockalingam athilingam
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report Aditya Pratap Singh
 
Lmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationLmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationPrakhar Tri
 
larsen & turbo_finance analysis
larsen & turbo_finance analysislarsen & turbo_finance analysis
larsen & turbo_finance analysisMayuri vadher
 
40256100 presentation-larsen-toubro
40256100 presentation-larsen-toubro40256100 presentation-larsen-toubro
40256100 presentation-larsen-toubroRajesh Dey
 
Larsen and toubro
Larsen and toubroLarsen and toubro
Larsen and toubroankit3991
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 
Larsen toubro
Larsen toubroLarsen toubro
Larsen toubroDeepak25
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in indiaSourav Paul
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Alok Mishra
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSHAILESH SHUKLA
 

En vedette (18)

Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
 
Summer internship in Jaypee Group
Summer internship in Jaypee GroupSummer internship in Jaypee Group
Summer internship in Jaypee Group
 
kishore kumar CV
kishore kumar CVkishore kumar CV
kishore kumar CV
 
Electromagnetic brake solenoid coil 2014
Electromagnetic brake  solenoid coil 2014Electromagnetic brake  solenoid coil 2014
Electromagnetic brake solenoid coil 2014
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report
 
Lmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationLmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporation
 
larsen & turbo_finance analysis
larsen & turbo_finance analysislarsen & turbo_finance analysis
larsen & turbo_finance analysis
 
Larsen & toubro_pres
Larsen & toubro_presLarsen & toubro_pres
Larsen & toubro_pres
 
40256100 presentation-larsen-toubro
40256100 presentation-larsen-toubro40256100 presentation-larsen-toubro
40256100 presentation-larsen-toubro
 
Larsen and toubro
Larsen and toubroLarsen and toubro
Larsen and toubro
 
Larsen and toubro
Larsen and toubroLarsen and toubro
Larsen and toubro
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
Larsen toubro
Larsen toubroLarsen toubro
Larsen toubro
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
 

Similaire à Summer internship presentation on Lucknow Metro project

signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentationPravin Gaurav
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
lmrc presentation
lmrc presentationlmrc presentation
lmrc presentationATUL SHUKLA
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONatchitect and design
 
Prestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptxPrestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptxRajeshKumar25548
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea linkKAVYA H
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMIshant Gautam.
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGJAPJEETSINGH13
 
Summer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamSummer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamRaju kumar Gautam
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Self Compacting Concrete
Self Compacting ConcreteSelf Compacting Concrete
Self Compacting ConcreteAhsan Rabbani
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 

Similaire à Summer internship presentation on Lucknow Metro project (20)

training report LMRC
training report LMRCtraining report LMRC
training report LMRC
 
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
lmrc presentation
lmrc presentationlmrc presentation
lmrc presentation
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
Prestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptxPrestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptx
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
ppt on training civil report on shuttering
ppt on training civil report on shutteringppt on training civil report on shuttering
ppt on training civil report on shuttering
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERING
 
Summer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamSummer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman Nigam
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
Metroppt
MetropptMetroppt
Metroppt
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Self Compacting Concrete
Self Compacting ConcreteSelf Compacting Concrete
Self Compacting Concrete
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Field work
Field workField work
Field work
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
 
Intership in DMRC
Intership in DMRCIntership in DMRC
Intership in DMRC
 

Dernier

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Dernier (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Summer internship presentation on Lucknow Metro project

  • 1. Summer Internship presentation 4/5/2015 – 13/6/2015 By : SHUBHAM RANA 12113104
  • 2. Proposed Project Lucknow Metro LKCC 01 Lucknow , Uttar Pradesh Phase 1 Priority Corridor “Chaudhary Charan Singh Airport to Charbagh Railway Station” Total Stretch 8.5 Km
  • 3.
  • 4. PROJECT DETAILS  PROJECT - LUCKNOW METRO  CLIENT -LUCKNOW METRO RAIL CORPORATION  CONSULTANT - SYSTRA MVA Consulting (I) Pvt Ltd.  CONTRACTOR–L&T CONSTRUCTION , HEAVY CIVIL INFRA IC  TYPE OF CONTRACT – LUMPSUM CONTRACT  PROJECT COST - 4992 Crores  CONSTRUCTION PERIOD = September 2014 – December 2016  PROJECT COMPONENT– Pre Cast Yard U Girders Beams Piers Pier Cap Piles Pile Cap  PROJECT LOCATION –Near Domestic Airport , Lucknow.
  • 5.
  • 6. Salient Features  Width of gauge : Standard (1435 mm)  Axle Load: To be designed for 16T  Max Acceleration: 1.0 m/s2 to 1.1 m/s2 ± 5%  Max Deceleration: 1.1 m/s2 (Normal Brake) >1.3m/s2 (Emergency Brake)  Maximum Design Speed: 80 kmph  Maximum Schedule Speed: 34 kmph
  • 7. Why Metro ? Why is it needed ?  It will provide speedy mass transport for the people of Lucknow.  Helps in reducing a traffic congestion on city roads.  A better means of connectivity from Airport to Railway Station for passengers travelling to and fro.
  • 8. VARIOUS ASPECTS OF THE PROJECT  ALLIGNMENT : Super elevation on curves is applied to counter the effect of lateral force felt by passengers.  CIRCULAR CURVES : The minimum length of the circular curves should not be less than 25 m in order to accommodate full length of coach.  VERTICAL CURVES : Vertical curves are to be provided when change in gradient exceeds 0.4%  TRACK : From considerations of maintainability, the complete track is proposed to be joint-less and is made of LWR/CWR rails.  RAIL SECTION : Keeping in view the proposed axle load , it is proposed to adopt UIC-60 (60 kg. /m) rail section.
  • 10.  Pre Cast is Basically situated in the outskirts of City Region .  This is a confined place where all the concrete Superstructure components for this project are been casted here.  Casting yard stores all the made units prior to erection in viaduct .  It also contains a Fabrication and Scrap Yard Unit , Batching Plants , Storage of Aggregate Fine and Coarse and Prestressing Units.  Precast yard serves an economical and quality control way of constructing components and hence beneficial in projects where mass production is done.  Yard is spread in 27 acres.  Place is suited so as to provide less hindrance to traffic movement while transporting transit mixer and to avoid other nuisance to the public.
  • 11.
  • 12.  Cement used to Mix Design is of OPC 43 grade.  Before casting any Structure at Site mix design has to go through several tests.  7 days Compressive Strength of 6 concrete cube is determined . Strength should come accordingly specified by the consultant , If not then the whole structure is discarded .  Slump test is also conducted at the spot so as to determine the workability of Concrete .If it comes less ,then desired proportions of admixtures are added (plasticizers/water reducer).
  • 13. COMPONENTS FOR THE SUPERSTRUCTURE 1) U – GIRDER
  • 14.  This is a specially designed U shaped Girder which basically provides a track for the running of Metro Train .  Design is maintained in a such a shape so as to provide an Aesthetic attractiveness , Flexible shape to modify, A very Robust Cross Section.  Twin U Girders are placed parallel to each other for the whole length of Track , One for upgoing Train and other downgoing Train. Total of 478 U Girder are Required .
  • 15. SPECIFICATION : Length = 27000 mm Concrete Grade = M 55 Breadth = 5050 mm Concrete Quantity = 57m3 Height = 1870 mm Reinforcement = 10.076 MT Dimension of Bars : 12 mm and 16 mm
  • 16. Cleaning of Formworks using Buffing Machine Placing of Bars In Reinforcement Jigs
  • 17.
  • 18.  Prestressing Strands are Introduced into the U Girder from one end of the structure to the other .  Hoyer or Long Line Method is adopted , at a time 6 U Girders are Prestressed Simultaneously .  For Prestressing work, low relaxation high tensile steel strands conforming to (IS:14268) 7 Ply Strands of 15.2 mm are drawn through the Structure. Total Strands 72.  Breaking Strength of each Strand 260.7 KN conforming to IS :14268 - 1970.
  • 19.  After Providing Cables , Prestressing strands are fixed against the abutment at one side and at the other side it is fixed to the Prestressing Jacks.  6 Prestressing Jacks , with each jacks connected to 12 strands are stretched to provide required Prestressing before the Concreting is being done .  After Prestressing , strands are anchored at both ends to restrain the prestress.
  • 21. Curing is done for around 7 Days in Formwork itself by using Gunny Bags, so as to maintain required moisture throughout the day. After 7 days it is being transported by using cranes and stacked above another U Girder And cured for another 7 days.
  • 22. Final Step of giving finish and checking tyre pressure before transporting it through Trailors.
  • 23. 2) Pier Cap  The Upper or Bearing part of Bridge or Viaduct , Usually made of Concrete or Hard Stone , which is designed to distribute concentrated loads evenly over the area of the pier.  No. Of Pier Caps Constructed for the project are around 230.
  • 24.
  • 25. SPECIFICATIONS  Length: 9200 mm  Breadth : 2800 mm  Height : 2000 mm  Diameter of Bars : 16 and 25mm  Concrete Grade : M 45  Concrete Quantity: 27.3 m3  Reinforcement: 3.491 MT
  • 26.
  • 27.
  • 29. 3) Beams  A beam is a structural element that is capable of withstanding load primarily by resisting bending.  For the purpose of this project beams are made to be placed before placing of slabs for Stations and also I Shaped Girder are casted, which are used in some places instead of U Girder because of Uneven span and curvilinear portion .  Beams of different dimensions are casted depending upon the requirement as per drawing. Length of single beam varies from 10 m to 16 m.
  • 30.
  • 31. SPECIFICATIONS :  Length : 10 m to 16 m  Breadth : 1000mm  Height : 1000mm  Bar Dimensions : 32mm in longitudinal and 25 mm in Transverse.  Concrete Grade : M 40  Concrete Quantity: 16 to 20 m3  Reinforcement :2.5 to 3 MT
  • 32.
  • 33.
  • 34.
  • 35.
  • 37. GEOTECHNICAL INVESTIGATION  Geotechnical investigations have been carried out along the proposed alignments to determine the strata, depth of foundation and safe bearing capacity of foundations required.  Subsurface explorations were carried out, 30m bore holes were done at every 500m at the proposed corridor .  Water level was found at a varying depth of about 18 to 27 m that to only in some boreholes only.  The subsoil strata at proposed site is generally homogeneous and comprises of : Silty Sand /Sandy Silt of Low Plasticity and (Classification as per Clayey Silt of Low Plasticity IS 1498-1970)
  • 38. PILES  A pile is a vertical structural element of a deep foundation, driven deep into the ground at the building site.  Cast in situ bored Pile are made below the ground level to support all the structures above the ground .
  • 39. SPECIFICATIONS :  Length of Pile = 30m deep below ground level  Diameter Of Pile = 1200 mm  Capacity of one Pile (Design Load) =400 MT  Ultimate Load =1000 MT  Concrete Grade = M 40  Clear Cover to Any Reinforcement in Pile = 75 mm  Quantity of Concrete in one Pile = 36 m3 Reinforcement : Circular bars = Outer one 16 mm dia. and Spacer bar 25 mm dia. Longitudinal Bar = 8 mm – 16 mm dia. Bars
  • 40. Construction Methodology of Piles PREBORING  It is suggested that all utilities such as (cables, pipelines ,gaslines , sewerlines) falling within excavation area are diverted away in advance to avoid damage to such utilities during the excavation/ construction phase.  Initial hard strata of the ground is cut by a “Drilling Bucket” , which is a box like structure attached to Rig machine and has a sharp toothed like structure below it .
  • 41.  Then a temporary Mild Steel casing for about 4 to 6 m (approx) length from the ground level will be driven to protect loose soil from falling in the bore hole.  Then a Polymer Powder is added to form a slurry which provides a clear, solid-free, viscous borehole stabilizing fluid till the excavation is done for the piles. Polymer Slurry has a pH of 11 to 12, Specific Gravity of 1-1.04 and Viscosity 65 to 140.  After drilling borehole, reinforcement cage (with sonic tubes of 50mm dia. and 2.9 mm thick attached to the inner rebar cage)is lowered into it . While lowering the cage care has to be taken to install it in gap of 10 m and fillet weld of 6mm is to be provided to join upper end of previous cage with lower end of cage to be lowered.
  • 43.  After cage lowering , Tremie Pipe generally of diameter 200mm and 2-3 m length are lowered one by one and tied to each other . The gap between the bottom of the bore to the end of tremie pipe will be min 300mm.  Upper end of the tremie pipe is connecter to funnel shaped “Hopper” , to which concrete mix is poured .
  • 44.
  • 45.  As the Concreting Proceeds Concrete mix being denser replaces the Polymer slurry and slurry comes out of the borehole and is diverted away from the hole.  A very high Slump Concrete 150 – 200 mm is needed for piling ,regular compaction to be provided by Hydraulic Drilling Machine so as to ensure proper lowering of concrete .  After Few days of setting sonic tubes are filled with water and then in one tube ultrasonic wave emitter probe and in other receiver probes are inserted, knowing the distance between the two tubes , Relative energy, waveform and differential time are recorded and mapped. This is called “Cross Hole Sonic Logging”.  This gives qualitative idea of the structural soundness of the concrete throughout the pile and hence structural integrity of pile can be verified by this method.
  • 46. PILE CAP  A pile cap is a thick concrete mat that rests on concrete or timber piles that have been driven into soft or unstable ground to provide a suitable stable foundation.  It usually forms part of the foundation of a piers and above superstructure and support base for heavy equipment.  Pile cap is constructed over Piles after they acquire the desired strength , Pile cut off level extends to about 75 mm in the Pile Cap as per the drawing of the site.
  • 47. SPECIFICATIONS :  Generally for 4 Piles Dimension of Pile Cap is 5300mm x 5300 mm For 6 piles 5300 x 8900 mm For 8 piles 5300 x 12500 mm  Height of Pile Cap 1800 mm  Clear cover to Reinforcement 75 mm  Concrete Grade : M 40 Pile Cap Concrete Volume : pile cap with 4 piles 50.5 m3. For pile cap with 6 piles 85 m3 and so on. Reinforcement :  Top Reinforcement : 16 mm dia. bars on both axis  Bottom Reinforcement : 32 & 25 mm dia. bars.  Stirrups : 12 mm Dia.
  • 48.
  • 49. • ,
  • 50.  Pile Cap Cut off level should be at least 500mm below ground level .  After Concreting and few days of curing , Over Pile cap a layer of PCC (Plain Cement Concrete) of 75 mm height is laid , having Compressive Strength of M 15. PCC provides even surface for Pier formation.  After 7 days of continuous curing Pier construction activities are started.
  • 51. PIER  A pier is a raised structure typically supported by well-spaced piles or pillars.  Pier casted at the viaduct starts from the 0.5 m below the ground level.  Piers are made of varying height giving a slope of about 0.3 for effective flow of Rainwater . Height varies as per the drawing.  Through the piers a 15cm diameter drainage pipe HDPE is inserted to reach to the ground.
  • 52.
  • 53. SPECIFICATIONS :  Diameter = 1700 mm  Height = 12 m average  Concrete Grade for Pier = M 45 to M 60 as per drawing .  Clear Cover = 50 mm Reinforcement :  Outer Circular Bar 16 mm dia.  Spacer Bar = 32 mm  Longitudinal Bar = 20 mm - 32 mm depending upon drawings.  Starter Bar should start from atleast 300 mm from edge of pier.
  • 54.
  • 55.
  • 56. CRASH BARRIER  To prevent Pier from wear and Tear due to Crashing of vehicles, a protective Concrete Structure is made around Pier to a height of about 1.5 m from ground level.  It works as a shock absorber and protect pier from Road Accidents.  It has a dimension of 2200 mm diameter.  Concrete Grade = M 30  Clear Cover = 40mm  Gap between the Pier and Crash Barrier boundary is around 250 mm.
  • 57.
  • 58. BATCHING PLANT  It is a machine that combines various ingredients to form concrete. Some of these inputs include sand, water, aggregate (rocks, gravel, etc.), fly ash, potash, and cement.  At this site there were 2 Batching Plants.  CP 30 = which generates 30m3 of concrete in 1hour.  CP 60 = which generates 60m3 of concrete in 1 hour.
  • 59.
  • 60. TRANSIT MIXER  Special concrete transport trucks (in–transit mixers) are made to transport and mix concrete up to the construction site.  One Transit Mixer has the capacity of loading 6m3 of Concrete at a time to the site.  The concrete mixing transport truck maintains the material's liquid state through agitation, or turning of the drum, until delivery.
  • 61.
  • 62. BOOM PLACER A concrete pump is a machine used for transferring liquid concrete by pumping. It is known as a trailer-mounted boom concrete pump because it uses a remote controlled articulating robotic arm (called a boom) to place concrete accurate.
  • 63.
  • 64. GANTRY  Gantry cranes are a type of crane built atop a gantry, which is a structure used to straddle an object or workspace.  These Gantry cranes run over the rail track which are laid in the precast yard.  At the project location they were 4 in Nos. with 3 having capacity of 100 MT for lifting (U-Girders, Pier Cap , Beam , I-Girder), while 1 is of 25 MT for ( Steel Yard).