LUXproject Functionality Overview
                            R12.2

                                    Luxoft

                          23 December 2012
What exactly is LUXproject?
      LUXproject is a distributed web-based project management system created on the basis of
            specific commercial and non-commercial modules developed by third-party vendors and open-
            source communities (Atlassian JIRA/GreenHopper, Atlassian Confluence, Atlassian FishEye,
            Subversion/Perforce, Cruise Control, WebDav etc.) as well as Luxoft modules.


      The System provides users with a friendly, multi-purpose environment for implementing key
            project tasks and ensuring communications.


      The main LUXproject users are project executors as well as the Customer. LUXproject supports
            role access, i.e. each project team member depending on his/her project role has certain access
            permissions to the System functional.


      LUXproject management mechanisms as well as availability of project artifacts at any time and
            from any geographic location allow company management to arrange transparent project
            management and always have current and reliable information.


      Currently, LUXproject allows to choose one of several methodologies for software development
            and maintenance projects, deploy Service Desk.


January 9, 2013                                                                                               2
LUXproject is all you need for
          Release/Iteration/Milestone scope planning and management
          Task management
          Risk management
          Communication management
          Metric gathering and statistic analysis
          Requirement gathering and management
          Requirements classification
          Requirement status management
          Requirement test coverage management
          Change management
          Test specification creation and management
          Defect Management
          Continuous Integration
          Version and non-version storage of project artifacts
          Project knowledge base
          Global search
          Flexible project reporting
January 9, 2013                                                        3
Components and Architecture



                       Telecom           Energy   Technology


                  X      X           X                X
                  X              X   X     X          X
                  X                  X
                  X      X       X         X
                                 X   X
                  X      X       X   X     X          X
                  X      X           X     X          X
                  X              X                    X




January 9, 2013                                                4
Supported Platforms
      LUXproject supports 64bit operation systems, which ensures high performance and stability
      Linux Fedora core 12 i386 is recommended to be used for the LUXproject server deployment.
            The server can also be used under Windows, Solaris
      As there’s no thick client, LUXproject users can work with the System in any operation system

      Operation is guaranteed in browsers
       – Internet Explorer 8.x
       – FireFox 3.x

      The System works in browsers
       – Chrome
       – Safari




January 9, 2013                                                                                        5
Key Components of the Third Parties
           JIRA 5.1.4
           GreenHopper 6.0.6
           Confluence 4.2.x
           FishEye 2.2.х
           SVN 1.6.5
           Cruise Control 2.8.3
           Crucible 2.2.1




January 9, 2013                              6
Role Access
 Flexible security policies for
   accessing LUXproect                                              Project Manager
 Access to LUXproject for all            Customer
   project stakeholders, both the                                                      Analysts
   project team and the customer
   team
 Access to LUXproject from all
   geographic points where
   Internet is available




                           Support team
                                                                              Developers team




                                                     Testing team



                                                                                                  7
Project Template Concept1
       Project template predefines a set of role settings, access permissions, information objects
            (including their attributes and workflow models), functional system modules, screens, reports,
            version control system, document templates and portal structure in compliance with a certain
            development methodology and the Customer requirements.




January 9, 2013                                                                                              8
Project Template Concept2
     The advantages of a project template:


      Opportunity to choose a configured management environment with all required components
            by one mouse-click
      Best practices from previous projects involvement
      Capability of tailoring project templates in accordance with particular project needs
      Capability of saving tailored templates for future projects

     LUXproject includes several project templates:


      Project template for a traditional project which is based on RUP model with waterfall/iteration
            lifecycle (CMMI requirements support)
      Agile/SCRUM project template
      Support/Service Desk project template




January 9, 2013                                                                                          9
Benefits for Customer
      Capability of profound project team involvement to facilitate higher manageability needed to
            meet ever-changing priorities and business goals
      Real- time access to project data from any geographic location, if Internet is available
      Transparent lifecycle – from business requirements to system ones, from system requirements
            through tasks to source code, requirement links to test cases and defects
      Visual representation of the reported data: flexible and easy visualization of product builds,
            project team data, and reports
      Customization of project environment to meet the Customer requirements
      Heightened project security




January 9, 2013                                                                                         10
Program/PMO Report
      Representation of progress
            in terms of project
            milestones as well as
            releases
      Project statuses through
            color indication and % of
            completion
      Direct links to the key
            project milestones and
            releases
      Support of multi-release
            projects
      Export to Excel




January 9, 2013                         11
PMO/Program Dashboard for Agile Projects
      Representation of progress of
            LP-managed and manual Agile-
            projects:
            – Project progress through color
                  indication in terms of resolved
                  issues
            – Correlation of created issues to
                  resolved ones

             Direct links to home pages of
                  LP-managed projects and to
                  iteration data manual input
                  forms of manual projects
             Capability to view project
                  status charts showing the
                  dynamics of project
                  success parameters



January 9, 2013                                     12
Benefits for Project Manager
           Access to project data from any geographic location, if Internet is available
           Project data are represented in real-time mode
           Project activities planning and managing (via milestones/releases)
           Resource & Time Management: on-the-fly statistics for tracking the timeline of tasks in
            several projects simultaneously
           Ability to create tasks via email messages
           Risk management
           Release/build management
           Generate Roadmap, Release Notes
           Control Build status
           Ability to keep project mail within the System and make references to it
           Ability to archive completed projects and activate them back if needed
           Ability to customize a project to your needs and add new functions by yourself




January 9, 2013                                                                                       13
Unique Reports Creation
      LUXproject allows project members to
            create unique reports according to
            their needs


      When creating reports you can use
            requests with specific fields of the
            System entities, which greatly extends
            standard Jira functional




January 9, 2013                                      14
Milestone Management
      From the Milestones
            screen Project Manager
            can:
            – Control statuses of
                  project milestones
            – View tasks related to
                  milestones
            – Navigate to View Issue
                  Details screen of each
                  task included in a
                  milestone
            – Create new milestones
                  and link them to tasks
                  and other system
                  entities
      Project milestones and
            tasks can be
            synchronized with
            Microsoft Project




January 9, 2013                            15
Task Management
      Project planning and
            control: create tasks,
            assign them and
             IT value chain




            monitor their statuses
      Representation of
            different task statuses
            and tasks by status
            graphic statistics
      Monitoring task
            deadlines
      Auto-notification
            subsystem and events
            calendar




January 9, 2013                       16
Task Creation via Email
       Project Manager can create tasks
            in LUXproject by sending a task
            description email with project
            address specified in СС
            – The task will be assigned to the
                  email addressee automatically
            – The task name will be created on
                  the basis of the email subject
            – The task description will be created
                  on the basis of the email body
            – Email attachment will also be
                  included in the task in LUXproject
       Upon receipt of such email, the
            Assignee can log in LUXproject
            and start working with the task –
            change its status, comment on it,
            add artifacts as soon as they are
            created




January 9, 2013                                        17
MS Project Integration
       Bidirectional data exchange between MS Project and LUXproject (Jira) via plugin THE-Connector
             (plugin should be installed at the user’s working place)
             – Downloading planned tasks and milestones from MS Project to Jira
             – Importing tasks from Jira to MS Project
             – Synchronizing status and time information




January 9, 2013                                                                                         18
Workplan Plugin
      Capability to set work
            start date, utilization %
            of a user, and work
            estimate
      Capability to view the
            workload of:
            – a user
                                            IND



            – users within a certain
                                                US
                           UT GY




                  project
                                                   T
                             ION
                               O




                                                 RY
                       EV NOL




            – a specific JIRA group
                                                    E  VO
                         CH
                         OL




            – users of a specific
                                                         LU
                       TE




                  resource project in all
                                                         TIO




                  projects
                                                            N




             Capability toCOMPANY
                            plan
                  resources and EVOLUTION
                  activities for future




January 9, 2013                                                 19
Risk Management
       Log of risks for their
            estimation and
            description
       Automatic calculation
            of the next date of risk
            monitoring
       Different status tables
                                        IND



            (triggered, active risks,
                                            US
                        UT GY




            closed risks) and
                                               T
                          ION
                            O




                                             RY
                    EV NOL




            graphic statistics
                                                E  VO




            diagram.
                      CH
                      OL




                                                     LU
                    TE




       Links between risks and
                                                     TIO




            project artifacts
                                                        N




                              COMPANY
                             EVOLUTION




January 9, 2013                                             20
Project Events Report
       Report on the
            events registered
            in all System
            components
           Filter for:
            – Who?
            – When?
                                    IND


            – In which
                                        US


                  project?
                          UT GY




                                           T
                            ION
                              O




       Filter for project
                                         RY
                      EV NOL




                                            E




            events:
                                               VO
                        CH
                        OL




            – Project item
                                                 LU
                      TE




                                                 TIO




                  updates (tasks,
                  risks,
                                                    N




                  requirements,
                  defects etc.) COMPANY
            –     File updates EVOLUTION
            –     Page updates
            – Builds



January 9, 2013                                         21
Benefits for Analyst
           Centralized requirements repository
           Easy to use tool to manage requirements - assign, review, approve, control the requirements online
           Ability to notify all project teams about changes in requirements
           Requirements traceability: from business requirements to functional requirements, from
            requirements through tasks to source code and defects
                                   IND


      Ability to review requirements
                                       US
                       UT GY




                                          T



      Graphic representation of requirements statistics
                         ION
                           O




                                        RY
                   EV NOL




                                           E  VO
                     CH
                     OL




                                                LU
                   TE




                                                TIO
                                                   N




                            COMPANY
                           EVOLUTION




January 9, 2013                                                                                              22
Requirements Management1
       Requirements gathering and
            management: their creation,
            assignment, control
       Requirements grouping by
            statuses and graphic
            representation of status statistics
       Requirements Traceability
                                     IND
                                         US



       Automatic tracking of changes
                        UT GY




                                            T
                          ION
                            O




                                          RY



            in linked requirements
                    EV NOL




                                             E  VO
                      CH
                      OL




                                                  LU
                    TE




                                                  TIO
                                                     N




                             COMPANY
                            EVOLUTION




January 9, 2013                                          23
Requirements Management2
      Requirements list can
            be displayed as a tree
            structure
      Requirement
            description can be
            represented as a wiki-
            page
                                     IND



      Requirements and
                                         US
                        UT GY




            change requests can
                                            T
                          ION
                            O




                                          RY
                    EV NOL




            be created and
                                             E  VO




            managed via Jira
                      CH
                      OL




                                                  LU
                    TE




            +WIKI or Jira + SVN
                                                  TIO
                                                     N




                            COMPANY
                           EVOLUTION




January 9, 2013                                          24
Requirements Traceability –
       Matrix
      Ability to link
            requirements to other
            dependent artifacts of
            this as well as a related
            project
           Visualization of
            dependencies and their
            types
                                  IND



           Links Coverage Matrix
                                      US
                       UT GY




            allows to visualize
                                         T
                         ION
                           O




                                       RY
                   EV NOL




            requirements coverage
                                          E  VO




            by other artifacts such as
                     CH
                     OL




                                               LU
                   TE




            test cases
                                               TIO




           Identification of
                                                  N




            suspected dependencies
            to define which COMPANY
                             EVOLUTION
            requirements need to be
            reviewed and confirmed
            to relevant
           Color indication of
            dependency types

January 9, 2013                                       25
Benefits for Developers
           It’s obvious which tasks are to be performed and when it should be done
           All documents and requirements needed to perform a task are linked to the assigned task
           Extended functional for release/build management
           Build management in Cruise Control right from LUXproject interface
           Build reports in real-time mode
                                    IND



           Ability to work with version control repository without installing a specific client
                                        US
                        UT GY




                                           T
                          ION
                            O




     
                                         RY



            Ability to link source code with tasks and defects from Jira
                    EV NOL




                                            E  VO




     
                      CH




            Ability to share experience or find the needed answer in the project knowledge base
                      OL




                                                 LU
                    TE




                                                 TIO
                                                    N




                             COMPANY
                            EVOLUTION




January 9, 2013                                                                                       26
Release Management
      Creation of release and
            build entities, linking
            project activities to
            them
      Support of hierarchic
            structure of releases
            and builds
                                      IND



      Attributes of important
                                          US
                        UT GY




                                             T



            life cycle dates of
                          ION
                            O




                                           RY
                    EV NOL




            releases and builds
                                              E  VO
                      CH
                      OL




      Control of release and
                                                   LU
                    TE




                                                   TIO




            build implementation
                                                      N




                             COMPANY
                            EVOLUTION




January 9, 2013                                           27
Build Management
      Setting up Continuous
            Integration parameters
            (Continuous integration
            - Cruise Control)
      Build status online
      Results of automatic
            unit tests
                                 IND



      Errors/Warnings
                                     US
                        UT GY




                                        T
                          ION
                            O




                                      RY



      Ability to download
                    EV NOL




                                         E




            delivery package
                                            VO
                      CH
                      OL




                                              LU




      Build/Release notes
                    TE




                                              TIO
                                                 N




                           COMPANY
                          EVOLUTION




January 9, 2013                                      28
Source Code Management
       Web-access to the
            project version control
            repository via FishEye
       Flexible filter settings
       Changelog (including a
            mechanism for
            comparing differences)
                                      IND



       Diagram of code size
                                          US
                        UT GY




                                             T
                          ION
                            O




            variation
                                           RY
                    EV NOL




                                              E




       Content Search by
                                                 VO
                      CH
                      OL




                                                   LU




            directories, commit
                    TE




                                                   TIO




            comments, files, file
                                                      N




            names
                             COMPANY
                            EVOLUTION




January 9, 2013                                           29
Code Review
       Capability to arrange
            code review:
            – create review card
            – select source code
                  files for review
            – define review
                  participants and due
                                         IND


                  dates
                                             US
                           UT GY




       Ability to add
                                                T
                             ION
                               O




                                              RY
                       EV NOL




            comments to source
                                                 E  VO




            code lines, reviewed
                         CH
                         OL




                                                      LU
                       TE




            file, review in general
                                                      TIO




       Track reviews status
                                                         N




            and statistics
                                 COMPANY
       Reviews SearchEVOLUTION




January 9, 2013                                              30
Benefits for Test Team
      Test Assignment creation:
      − Assigning test cases that need to be performed
      − Assigning defects for validation
      Testing reports
      Ability to:
                                        IND



      −           create a wiki-page with test plan description and link it to test cases
                                            US
                            UT GY




                                               T




      −
                              ION
                                O




                                             RY



                  access requirements quickly
                        EV NOL




                                                E  VO




      −
                          CH




                  access the centralized document storage and version control repository
                          OL




                                                     LU
                        TE




      −
                                                     TIO




                  view the current build status
                                                        N




      −           access defect statistics
                                  COMPANY
                  Ability to link defects to other project entities
                                 EVOLUTION
                  Ability to control requirements coverage by test cases




January 9, 2013                                                                             31
Test Management
      Test cases creation
      Control of test assignments
            implementation
      Linking defects to
            requirements, tasks, and test
            cases
      Test cases results report
                                   IND
                                       US
                        UT GY




      Statistics reports on testing
                                          T
                          ION
                            O




                                        RY
                    EV NOL




                                           E  VO
                      CH
                      OL




                                                LU
                    TE




                                                TIO
                                                   N




                            COMPANY
                           EVOLUTION




January 9, 2013                                        32
Test Manager Workplace
      Ability to analyze and
            predict release quality
      Information on testing
            progress, test case
            creation, defect statistics is
            available to Test Manager
            in a convenient form
                                      IND



      More than 20 metric
                                          US
                        UT GY




            reports on testing
                                             T
                          ION
                            O




                                           RY
                    EV NOL




      Ability to export reports to
                                              E  VO
                      CH
                      OL




            Excel, PDF, charts to
                                                   LU
                    TE




            graphics format
                                                   TIO
                                                      N




                              COMPANY
                             EVOLUTION




January 9, 2013                                           33
Test Manager Workplace
       Sample Test Reports




                              IND
                                  US
                      UT GY




                                     T
                        ION
                          O




                                   RY
                  EV NOL




                                      E  VO
                    CH
                    OL




                                           LU
                  TE




                                           TIO
                                              N




                         COMPANY
                        EVOLUTION




January 9, 2013                                   34
Test Manager Workplace
       Sample Test Assignment Reports




                              IND
                                  US
                      UT GY




                                     T
                        ION
                          O




                                   RY
                  EV NOL




                                      E  VO
                    CH
                    OL




                                           LU
                  TE




                                           TIO
                                              N




                         COMPANY
                        EVOLUTION




January 9, 2013                                   35
Communication Management
      Project news line
      Project correspondence
            storage

                                  IND
                                      US
                          UT GY




                                         T
                            ION
                              O




                                       RY
                      EV NOL




                                          E  VO
                        CH
                        OL




                                               LU
                      TE




                                               TIO
                                                  N




                             COMPANY
                            EVOLUTION




January 9, 2013                                       36
Files Sharing
       Non-version File Storage
      Possibility to share files within project team:
            – upload files
            – view files
            – manage files and folders
                                   IND
                                       US
                        UT GY




                                          T
                          ION
                            O




                                         RY
                    EV NOL




                                            E VO
                      CH
                      OL




                                                LU
                    TE




                                                TIO
                                                   N




                            COMPANY
                           EVOLUTION




January 9, 2013                                          37
Time Tracking
      Time spent on each
            project activity
      Different time tracking
            reports
                                     IND
                                         US
                          UT GY




                                            T
                            ION
                              O




                                          RY
                      EV NOL




                                             E  VO
                        CH
                        OL




                                                  LU
                      TE




                                                  TIO
                                                     N




                                COMPANY
                               EVOLUTION




January 9, 2013                                          38
Time Tracking
       SLA Support Report
      Capability to view the
            work time the issues
            spend in each of their
            statuses within the
            specified period
      Capability to see
            bottlenecks in the
                                      IND


            lifecycle of issues and
                                          US
                        UT GY




            stick to the SLA terms
                                             T
                          ION
                            O




                                           RY
                    EV NOL




                                              E  VO
                      CH
                      OL




                                                   LU
                    TE




                                                   TIO
                                                      N




                             COMPANY
                            EVOLUTION




January 9, 2013                                           39
Business Processes Visualization
       Ability to run an eye over a
            process workflow
           Visualization of workflow
            transitions of a certain issue
           Visualization of the latest
            changes history
                                    IND
                                        US
                        UT GY




                                           T
                          ION
                            O




                                         RY
                    EV NOL




                                            E  VO
                      CH
                      OL




                                                 LU
                    TE




                                                 TIO
                                                    N




                             COMPANY
                            EVOLUTION




January 9, 2013                                         40
Global Search
      Search through all
            components and
            modules of system
      Filter for detailed
            search by date, user,
            project etc.
                                    IND
                                        US
                        UT GY




                                           T
                          ION
                            O




                                         RY
                    EV NOL




                                            E  VO
                      CH
                      OL




                                                 LU
                    TE




                                                 TIO
                                                    N




                            COMPANY
                           EVOLUTION




January 9, 2013                                         41
System Administration Console
       Manage project
            roles and team
            members
       Manage security
       Manage
            attributes, etc.
       Manage
                                     IND



            components
                                         US
                        UT GY




                                            T
                          ION




            (SVN, Cruise
                            O




                                          RY
                    EV NOL




            Control, etc.)
                                             E  VO
                      CH
                      OL




       Project
                                                  LU
                    TE




                                                  TIO




            configuration
                                                     N




            export
                                COMPANY
                               EVOLUTION




January 9, 2013                                          42
Localization Capabilities
      Bilingual menu system
            – Русский
            – English
      Availability of English
            and Russian project
            templates
      Ability to select GUI
                                     IND
                                         US


            language for each user
                       UT GY




                                            T
                         ION
                           O




                                          RY



      User and Administrator
                   EV NOL




                                             E




            documentation in
                                                VO
                     CH
                     OL




                                                  LU




            Russian and English
                   TE




                                                  TIO
                                                     N




                           COMPANY
                          EVOLUTION




January 9, 2013                                          43
Agile Project Template
      Task management
            – Product backlog
            – Iteration backlog
            – Personal backlog
      Release and build
            management
                                  IND


      Defect management;
                                      US
                        UT GY




      Communication
                                         T
                          ION
                            O




                                       RY
                    EV NOL




            management (Scrum
                                          E  VO




            and retrospective
                      CH
                      OL




                                               LU
                    TE




            meetings);
                                               TIO




      Configuration
                                                  N




            management
                             COMPANY
           Project Status Charts
                            EVOLUTION




January 9, 2013                                       44
Agile Project Template
       Additional tools - GreenHopper
      GreenHopper is a
            plugin for Jira that
            allows to manage
            Agile projects
            – Backlog management
            – Sprint and release
                  planning
                                        IND



            – Whiteboard
                                            US
                           UT GY




                  metaphora
                                               T
                             ION
                               O




                                             RY
                       EV NOL




            – Easy work with cards
                                                E  VO




                  of Jira entities
                         CH
                         OL




                                                     LU
                       TE




            – Editing entities within
                                                     TIO




                  their cards as well as
                                                        N




                  editing entities in bulk
                                  COMPANY
                                 EVOLUTION




January 9, 2013                                             45
Agile Project Template
       GreenHopper Task Board
      Task Board displays tasks
            according to their statuses
            in a convenient form:
            – Cards
            – List
            – Minimized cards, as a full
                  list of tasks
                                     IND



            – Color indication
                                         US
                           UT GY




                                            T



            – Flexible filters
                             ION
                               O




                                           RY
                       EV NOL




                                              E




      It is possible to combine
                                                VO
                         CH
                         OL




            saved filters with custom
                                                  LU
                       TE




                                                  TIO




            criteria to display only the
                                                     N




            needed issues
      It is possible to drag-and-
                         COMPANY
                           EVOLUTION
            drop cards from column to
            column in order to change
            task status
      Kanban Support


January 9, 2013                                          46
Agile Project Template
       GreenHopper Burndown chart
      Burndown chart shows
            current dynamics of tasks
            implementation and
            allows to predict the time
            when activities will be
            finished
                                   IND
                                       US
                       UT GY




                                          T
                         ION
                           O




                                         RY
                   EV NOL




                                            E VO
                     CH
                     OL




                                                LU
                   TE




                                                TIO
                                                   N




                            COMPANY
                           EVOLUTION




January 9, 2013                                        47
Agile Project Template
       GreenHopper Cumulative Flow chart
      Cumulative Flow chart
            allows to track
            cumulative change of
            work in progress by
            statuses and can be
            useful for identifying
            bottlenecks.
                                     IND
                                         US
                       UT GY




                                            T
                         ION
                           O




                                          RY
                   EV NOL




                                             E  VO
                     CH
                     OL




                                                  LU
                   TE




                                                  TIO
                                                     N




                            COMPANY
                           EVOLUTION




January 9, 2013                                          48
Project Knowledge Base
           News
           Tag cloud
           Quick Search
           Ability to import Word
            documents to wiki-pages
       Voting ability (with capability
                                       IND


            to view the voters list, their
                                           US
                          UT GY




            votes being anonymous )
                                              T
                            ION
                              O




                                            RY
                      EV NOL




                                               E  VO
                        CH
                        OL




       Useful capabilities
                                                    LU
                      TE




                                                    TIO




            – Confluence-SharePoint search
                                                       N




                  is a great example of
                  LUXproject integration with
                                 COMPANY
                  other knowledge management
                  systems       EVOLUTION

            – Confluence Watch list helps
                  Confluence administrators
                  manage a list of watchers on
                  any wiki-page of the
                  knowledge base

January 9, 2013                                            49
Project Knowledge Base
       Labels Groups Plugin
      Possibility to organize
            labels into groups
      Capability to use the
            predefined list of labels
            groups (page passport) to
            quickly label your WIKI
            content
                                   IND



      Capability to use page
                                       US
                       UT GY




            passport to search Wiki
                                          T
                         ION
                           O




                                        RY
                   EV NOL




            pages by labels
                                           E  VO
                     CH
                     OL




      Capability to search Wiki
                                                LU
                   TE




            pages by attachments
                                                TIO
                                                   N




                            COMPANY
                           EVOLUTION




January 9, 2013                                        50
Project Knowledge Base
       Labels Groups Plugin. Navigation Macros
      Possibility to predefine search by particular label AND label group



                               IND
                                   US
                      UT GY




                                      T
                        ION
                          O




                                    RY
                  EV NOL




                                       E  VO
                    CH
                    OL




                                            LU
                  TE




                                            TIO
                                               N




                         COMPANY
                        EVOLUTION


   Possibility to use navigation table to quickly search by predefined label AND label group




January 9, 2013                                                                                51
Help Desk Project Template
      Requests creation
      Log of request statuses
      Graphic representation of
            request resolution statistics
      Report on efforts spent on
            requests implementation
                                    IND


      Knowledge base for each
                                        US
                          UT GY




            project
                                           T
                            ION
                              O




                                           RY
                      EV NOL




      Ability to link requests to
                                              EVO




            activities of other projects
                        CH
                        OL




                                                 LU
                      TE




                                                  TIO
                                                     N




                             COMPANY
                            EVOLUTION




January 9, 2013                                          52
Benefits Summary
      Atlassian components used in LUXproject enjoy world-wide recognition due to diverse
            functional, supportability, scalability and reliability at a relatively modest price per user
      The LUXproject platform integrates all components into one environment, which increases
            capabilities of the components, and provides missing functions:
            – Common interface and single sign on to all System components
            – Flexible security policies customized for each project member
            – Additional functional for risk management, test management, release management, requirements
                                         IND


                  management
                                             US
                           UT GY




            –
                                                T



                  Extended capabilities for reports creation as well as ready-made reports
                             ION
                               O




                                                RY
                       EV NOL




            –     Quick search of the needed information in all System components
                                                   EVO
                         CH
                         OL




            –     Localization capabilities
                                                      LU
                       TE




                                                       TIO




            –     Ability to group projects into programs and monitor their statuses
                                                          N




            –     High level of data security
      Unique project templates developed on the basis of the best Luxoft practices and
                       COMPANY
            methodologiesEVOLUTION
           Extended capabilities of System customization in compliance with unique Customer
            processes
           Continuous System development and ability to add specific functions upon request
           Diverse functional at a modest price

January 9, 2013                                                                                              53
LUXproject Implementation Models
       LUXproject basic implementation is recommended when:
        The Customer wants to use the best practices and processes of the Luxoft company and chooses
              one or several standard project templates:
              – Standard
              – Agile
              – HelpDesk
                                     IND
                                         US
                         UT GY




        The Customer does not have similar systems that must be integrated and/or a system to migrate
                                            T
                           ION
                             O




                                          RY
                     EV NOL




              data from.
                                             E  VO
                       CH
                       OL




                                                  LU
                     TE




                                                  TIO




       LUXproject enhanced implementation with future System customization in compliance
                                                     N




         with Customer’s specifics and/or data migration:
                      COMPANY
        The Customer considers his software development process to be mature and/or unique and
                            EVOLUTION
              wants the existing template to be customized or a new project template to be developed.
        The Customer has a different tracking system (for example, JIRA, ClearQuest, Bugzilla) and wants
              to save the historical data.



January 9, 2013                                                                                             54
Server Requirements for LUXproject
       Installation
           System requirements (up to 100 users)
            –     CPU 1 x Dual Core XEON from 2.33GHz (server edition with х64 support)
            –     RAM 4 GB FBD 667MHz Memory
            –     ROM 100GB, SAS/SCSI, 15.000/10.000 rpm Hard Drive (2 in RAID1)
            –     RAID Controller (RAID 1)
            –     NIC 1x Gb NIC
            –     Drive 8X DVD Drive
           System requirements (up to 500 users)
                                             IND



            –     CPU 1 x Quad Core XEON from 2.33GHz (server edition with х64 support)
                                                 US
                           UT GY




                                                    T



            –
                             ION
                               O




                  RAM 8 GB FBD 667MHz Memory
                                                  RY
                       EV NOL




            –
                                                     E



                  ROM 160GB, SAS/SCSI, 15.000/10.000 rpm Hard Drive (2 in RAID1)
                                                        VO
                         CH
                         OL




            –     RAID Controller (RAID 1)
                                                          LU
                       TE




                                                          TIO




            –     NIC 1x Gb NIC
                                                             N




            –     Drive 8X DVD Drive
           Operation system requirements
                                  COMPANY
            – Linux Fedora core 15 64bit
                             EVOLUTION
            – CentOS
           Data base requirements
            – MySQL 5
           Current configuration of the LUXproject production server in Luxoft
            – CPU 4x Phenom™ II 955, Memory 8GB, 2x200Gb HDD Raid1

January 9, 2013                                                                           55
Thanks !




                                                      Contacts:
                              IND
                                  US
                      UT GY




                                                  LUXproject@luxoft.com
                                     T
                        ION
                          O




                                   RY
                  EV NOL




                                      E  VO
                    CH
                    OL




                                           LU
                  TE




                                           TIO
                                              N




                         COMPANY
                        EVOLUTION




January 9, 2013                                                           56

Contenu connexe

Tendances

Design Resource Center Proposal
Design Resource Center  ProposalDesign Resource Center  Proposal
Design Resource Center ProposalJohn Vaughan
 
The real time publisher subscriber inter-process communication model for dist...
The real time publisher subscriber inter-process communication model for dist...The real time publisher subscriber inter-process communication model for dist...
The real time publisher subscriber inter-process communication model for dist...yancha1973
 
Sa 008 architecture_views
Sa 008 architecture_viewsSa 008 architecture_views
Sa 008 architecture_viewsFrank Gielen
 
Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...IBM Rational software
 
Kavaskar_LatestResume
Kavaskar_LatestResumeKavaskar_LatestResume
Kavaskar_LatestResumeKavaskar Kava
 
Software architecture patterns
Software architecture patternsSoftware architecture patterns
Software architecture patternsRiccardo Cardin
 
Aspect Oriented Software Development
Aspect Oriented Software DevelopmentAspect Oriented Software Development
Aspect Oriented Software DevelopmentJignesh Patel
 
Configurability for Cloud-Native Applications: Observability and Control
Configurability for Cloud-Native Applications: Observability and ControlConfigurability for Cloud-Native Applications: Observability and Control
Configurability for Cloud-Native Applications: Observability and ControlCognizant
 
[2015/2016] Modern development paradigms
[2015/2016] Modern development paradigms[2015/2016] Modern development paradigms
[2015/2016] Modern development paradigmsIvano Malavolta
 
Unit iv -Documenting and Implementation of Software Architecture
Unit iv -Documenting and Implementation of Software ArchitectureUnit iv -Documenting and Implementation of Software Architecture
Unit iv -Documenting and Implementation of Software ArchitectureDhivyaa C.R
 
Codendi Datasheet
Codendi DatasheetCodendi Datasheet
Codendi DatasheetCodendi
 
SE2018_Lec-22_-Continuous-Integration-Tools
SE2018_Lec-22_-Continuous-Integration-ToolsSE2018_Lec-22_-Continuous-Integration-Tools
SE2018_Lec-22_-Continuous-Integration-ToolsAmr E. Mohamed
 
A summary of software architecture guide
A summary of software architecture guideA summary of software architecture guide
A summary of software architecture guideTriet Ho
 
Software Engineering unit 3
Software Engineering unit 3Software Engineering unit 3
Software Engineering unit 3Abhimanyu Mishra
 
Define and Manage Requirements with IBM Rational Requirements Composer
Define and Manage Requirements with IBM Rational Requirements ComposerDefine and Manage Requirements with IBM Rational Requirements Composer
Define and Manage Requirements with IBM Rational Requirements ComposerAlan Kan
 
System Architect and Rhapsody
System Architect and RhapsodySystem Architect and Rhapsody
System Architect and RhapsodyMartin Owen
 

Tendances (20)

Design Resource Center Proposal
Design Resource Center  ProposalDesign Resource Center  Proposal
Design Resource Center Proposal
 
The real time publisher subscriber inter-process communication model for dist...
The real time publisher subscriber inter-process communication model for dist...The real time publisher subscriber inter-process communication model for dist...
The real time publisher subscriber inter-process communication model for dist...
 
Sa 008 architecture_views
Sa 008 architecture_viewsSa 008 architecture_views
Sa 008 architecture_views
 
Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...
 
Kavaskar_LatestResume
Kavaskar_LatestResumeKavaskar_LatestResume
Kavaskar_LatestResume
 
Software architecture patterns
Software architecture patternsSoftware architecture patterns
Software architecture patterns
 
Aspect Oriented Software Development
Aspect Oriented Software DevelopmentAspect Oriented Software Development
Aspect Oriented Software Development
 
Configurability for Cloud-Native Applications: Observability and Control
Configurability for Cloud-Native Applications: Observability and ControlConfigurability for Cloud-Native Applications: Observability and Control
Configurability for Cloud-Native Applications: Observability and Control
 
[2015/2016] Modern development paradigms
[2015/2016] Modern development paradigms[2015/2016] Modern development paradigms
[2015/2016] Modern development paradigms
 
Unit iv -Documenting and Implementation of Software Architecture
Unit iv -Documenting and Implementation of Software ArchitectureUnit iv -Documenting and Implementation of Software Architecture
Unit iv -Documenting and Implementation of Software Architecture
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Codendi Datasheet
Codendi DatasheetCodendi Datasheet
Codendi Datasheet
 
SE2018_Lec-22_-Continuous-Integration-Tools
SE2018_Lec-22_-Continuous-Integration-ToolsSE2018_Lec-22_-Continuous-Integration-Tools
SE2018_Lec-22_-Continuous-Integration-Tools
 
KAPIL GANGWAL
KAPIL GANGWALKAPIL GANGWAL
KAPIL GANGWAL
 
A summary of software architecture guide
A summary of software architecture guideA summary of software architecture guide
A summary of software architecture guide
 
Sdlc
SdlcSdlc
Sdlc
 
Raghavendra Prasad Reddy_resume
Raghavendra Prasad Reddy_resumeRaghavendra Prasad Reddy_resume
Raghavendra Prasad Reddy_resume
 
Software Engineering unit 3
Software Engineering unit 3Software Engineering unit 3
Software Engineering unit 3
 
Define and Manage Requirements with IBM Rational Requirements Composer
Define and Manage Requirements with IBM Rational Requirements ComposerDefine and Manage Requirements with IBM Rational Requirements Composer
Define and Manage Requirements with IBM Rational Requirements Composer
 
System Architect and Rhapsody
System Architect and RhapsodySystem Architect and Rhapsody
System Architect and Rhapsody
 

En vedette

Learn About the Top Oracle E-Business Suite Security Vulnerabilities
Learn About the Top Oracle E-Business Suite Security VulnerabilitiesLearn About the Top Oracle E-Business Suite Security Vulnerabilities
Learn About the Top Oracle E-Business Suite Security VulnerabilitiesOAUGNJ
 
Using ACFS as a Storage for EBS
Using ACFS as a Storage for EBSUsing ACFS as a Storage for EBS
Using ACFS as a Storage for EBSAndrejs Karpovs
 
Upgrading to Oracle Hyperion Enterprise Performance Management 11.1.2.3 and B...
Upgrading to Oracle Hyperion Enterprise Performance Management 11.1.2.3 and B...Upgrading to Oracle Hyperion Enterprise Performance Management 11.1.2.3 and B...
Upgrading to Oracle Hyperion Enterprise Performance Management 11.1.2.3 and B...OAUGNJ
 
Oracle cloud storage and file system
Oracle cloud storage and file systemOracle cloud storage and file system
Oracle cloud storage and file systemAndrejs Karpovs
 
Optimizing E-Business Suite Storage Using Oracle Advanced Compression
Optimizing E-Business Suite Storage Using Oracle Advanced CompressionOptimizing E-Business Suite Storage Using Oracle Advanced Compression
Optimizing E-Business Suite Storage Using Oracle Advanced CompressionAndrejs Karpovs
 
Reducing Your E-Business Suite Storage Footprint Using Oracle Advanced Compre...
Reducing Your E-Business Suite Storage Footprint Using Oracle Advanced Compre...Reducing Your E-Business Suite Storage Footprint Using Oracle Advanced Compre...
Reducing Your E-Business Suite Storage Footprint Using Oracle Advanced Compre...Andrejs Karpovs
 
Staged Patching Approach in Oracle E-Business Suite
Staged Patching Approach in Oracle E-Business SuiteStaged Patching Approach in Oracle E-Business Suite
Staged Patching Approach in Oracle E-Business Suitevasuballa
 
Esouag r12 presentation
Esouag r12 presentationEsouag r12 presentation
Esouag r12 presentationBerry Clemens
 
Simplified user experience_design_patterns_for_the_oracle_applications_cloud_...
Simplified user experience_design_patterns_for_the_oracle_applications_cloud_...Simplified user experience_design_patterns_for_the_oracle_applications_cloud_...
Simplified user experience_design_patterns_for_the_oracle_applications_cloud_...Berry Clemens
 
Autoconfig r12
Autoconfig r12Autoconfig r12
Autoconfig r12techDBA
 
Infrastructure as a Service - ready for Mission Critical ERP ?
Infrastructure as a Service - ready for Mission Critical ERP ?Infrastructure as a Service - ready for Mission Critical ERP ?
Infrastructure as a Service - ready for Mission Critical ERP ?Ravi Madabhushanam
 
OEM12c - Application Management Suite
OEM12c - Application Management SuiteOEM12c - Application Management Suite
OEM12c - Application Management SuiteRavi Madabhushanam
 
EBS 12.1 and 12.2 strategy-roadmap-given
EBS 12.1 and 12.2 strategy-roadmap-givenEBS 12.1 and 12.2 strategy-roadmap-given
EBS 12.1 and 12.2 strategy-roadmap-givenBerry Clemens
 
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPTCOLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPTPreet Kamal Singh
 
Zero Downtime for Oracle E-Business Suite on Oracle Exalogic
Zero Downtime for Oracle E-Business Suite on Oracle ExalogicZero Downtime for Oracle E-Business Suite on Oracle Exalogic
Zero Downtime for Oracle E-Business Suite on Oracle ExalogicPaulo Fagundes
 
Application Continuity
Application ContinuityApplication Continuity
Application ContinuitySean Braymen
 
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]vasuballa
 
Oracle exalytics deployment for high availability
Oracle exalytics deployment for high availabilityOracle exalytics deployment for high availability
Oracle exalytics deployment for high availabilityPaulo Fagundes
 
What’s New in Oracle E-Business Suite R12.2 for Database Administrators?
What’s New in Oracle E-Business Suite R12.2 for Database Administrators?What’s New in Oracle E-Business Suite R12.2 for Database Administrators?
What’s New in Oracle E-Business Suite R12.2 for Database Administrators?vasuballa
 

En vedette (20)

Learn About the Top Oracle E-Business Suite Security Vulnerabilities
Learn About the Top Oracle E-Business Suite Security VulnerabilitiesLearn About the Top Oracle E-Business Suite Security Vulnerabilities
Learn About the Top Oracle E-Business Suite Security Vulnerabilities
 
R12 upgrade webinar
R12 upgrade webinarR12 upgrade webinar
R12 upgrade webinar
 
Using ACFS as a Storage for EBS
Using ACFS as a Storage for EBSUsing ACFS as a Storage for EBS
Using ACFS as a Storage for EBS
 
Upgrading to Oracle Hyperion Enterprise Performance Management 11.1.2.3 and B...
Upgrading to Oracle Hyperion Enterprise Performance Management 11.1.2.3 and B...Upgrading to Oracle Hyperion Enterprise Performance Management 11.1.2.3 and B...
Upgrading to Oracle Hyperion Enterprise Performance Management 11.1.2.3 and B...
 
Oracle cloud storage and file system
Oracle cloud storage and file systemOracle cloud storage and file system
Oracle cloud storage and file system
 
Optimizing E-Business Suite Storage Using Oracle Advanced Compression
Optimizing E-Business Suite Storage Using Oracle Advanced CompressionOptimizing E-Business Suite Storage Using Oracle Advanced Compression
Optimizing E-Business Suite Storage Using Oracle Advanced Compression
 
Reducing Your E-Business Suite Storage Footprint Using Oracle Advanced Compre...
Reducing Your E-Business Suite Storage Footprint Using Oracle Advanced Compre...Reducing Your E-Business Suite Storage Footprint Using Oracle Advanced Compre...
Reducing Your E-Business Suite Storage Footprint Using Oracle Advanced Compre...
 
Staged Patching Approach in Oracle E-Business Suite
Staged Patching Approach in Oracle E-Business SuiteStaged Patching Approach in Oracle E-Business Suite
Staged Patching Approach in Oracle E-Business Suite
 
Esouag r12 presentation
Esouag r12 presentationEsouag r12 presentation
Esouag r12 presentation
 
Simplified user experience_design_patterns_for_the_oracle_applications_cloud_...
Simplified user experience_design_patterns_for_the_oracle_applications_cloud_...Simplified user experience_design_patterns_for_the_oracle_applications_cloud_...
Simplified user experience_design_patterns_for_the_oracle_applications_cloud_...
 
Autoconfig r12
Autoconfig r12Autoconfig r12
Autoconfig r12
 
Infrastructure as a Service - ready for Mission Critical ERP ?
Infrastructure as a Service - ready for Mission Critical ERP ?Infrastructure as a Service - ready for Mission Critical ERP ?
Infrastructure as a Service - ready for Mission Critical ERP ?
 
OEM12c - Application Management Suite
OEM12c - Application Management SuiteOEM12c - Application Management Suite
OEM12c - Application Management Suite
 
EBS 12.1 and 12.2 strategy-roadmap-given
EBS 12.1 and 12.2 strategy-roadmap-givenEBS 12.1 and 12.2 strategy-roadmap-given
EBS 12.1 and 12.2 strategy-roadmap-given
 
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPTCOLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
 
Zero Downtime for Oracle E-Business Suite on Oracle Exalogic
Zero Downtime for Oracle E-Business Suite on Oracle ExalogicZero Downtime for Oracle E-Business Suite on Oracle Exalogic
Zero Downtime for Oracle E-Business Suite on Oracle Exalogic
 
Application Continuity
Application ContinuityApplication Continuity
Application Continuity
 
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]
OOW16 - Planning Your Upgrade to Oracle E-Business Suite 12.2 [CON1423]
 
Oracle exalytics deployment for high availability
Oracle exalytics deployment for high availabilityOracle exalytics deployment for high availability
Oracle exalytics deployment for high availability
 
What’s New in Oracle E-Business Suite R12.2 for Database Administrators?
What’s New in Oracle E-Business Suite R12.2 for Database Administrators?What’s New in Oracle E-Business Suite R12.2 for Database Administrators?
What’s New in Oracle E-Business Suite R12.2 for Database Administrators?
 

Similaire à LUXproject Functionality Overview R12.2

Bikram kishor rout
Bikram kishor routBikram kishor rout
Bikram kishor routBikram Rout
 
Bikram kishor rout
Bikram kishor routBikram kishor rout
Bikram kishor routBikram Rout
 
open project tool.ppt
open project tool.pptopen project tool.ppt
open project tool.pptNgu Khine
 
SathishKumar Natarajan
SathishKumar NatarajanSathishKumar Natarajan
SathishKumar NatarajanSathish Kumar
 
Spira plan overview presentation
Spira plan overview presentationSpira plan overview presentation
Spira plan overview presentationTrabalistra Bagaz
 
Vidya_Shankar-Res-Consize
Vidya_Shankar-Res-ConsizeVidya_Shankar-Res-Consize
Vidya_Shankar-Res-ConsizeShankar S
 
IT 8003 Cloud ComputingFor this activi.docx
IT 8003 Cloud ComputingFor this activi.docxIT 8003 Cloud ComputingFor this activi.docx
IT 8003 Cloud ComputingFor this activi.docxvrickens
 
Mobile Responsive Social Corporate Intranet Portal Application
Mobile Responsive Social Corporate Intranet Portal ApplicationMobile Responsive Social Corporate Intranet Portal Application
Mobile Responsive Social Corporate Intranet Portal ApplicationMike Taylor
 
Sr_MicroStrategy_Consultant
Sr_MicroStrategy_ConsultantSr_MicroStrategy_Consultant
Sr_MicroStrategy_ConsultantMohammed Kaleem
 
Leveraging Analytics for DevOps
Leveraging Analytics for DevOpsLeveraging Analytics for DevOps
Leveraging Analytics for DevOpsMichael Floyd
 

Similaire à LUXproject Functionality Overview R12.2 (20)

Modern application development with heroku
Modern application development with herokuModern application development with heroku
Modern application development with heroku
 
Manigandan_narasimhan_resume
Manigandan_narasimhan_resumeManigandan_narasimhan_resume
Manigandan_narasimhan_resume
 
Tommaso campanella
Tommaso campanellaTommaso campanella
Tommaso campanella
 
Bikram kishor rout
Bikram kishor routBikram kishor rout
Bikram kishor rout
 
Bikram kishor rout
Bikram kishor routBikram kishor rout
Bikram kishor rout
 
Full Stack Development
Full Stack DevelopmentFull Stack Development
Full Stack Development
 
open project tool.ppt
open project tool.pptopen project tool.ppt
open project tool.ppt
 
Ernest Morariu
Ernest MorariuErnest Morariu
Ernest Morariu
 
SathishKumar Natarajan
SathishKumar NatarajanSathishKumar Natarajan
SathishKumar Natarajan
 
Spira plan overview presentation
Spira plan overview presentationSpira plan overview presentation
Spira plan overview presentation
 
Vidya_Shankar-Res-Consize
Vidya_Shankar-Res-ConsizeVidya_Shankar-Res-Consize
Vidya_Shankar-Res-Consize
 
Dhiraj_Kalra
Dhiraj_KalraDhiraj_Kalra
Dhiraj_Kalra
 
Neeraj_Virmani_Resume
Neeraj_Virmani_ResumeNeeraj_Virmani_Resume
Neeraj_Virmani_Resume
 
Report
ReportReport
Report
 
IT 8003 Cloud ComputingFor this activi.docx
IT 8003 Cloud ComputingFor this activi.docxIT 8003 Cloud ComputingFor this activi.docx
IT 8003 Cloud ComputingFor this activi.docx
 
Mobile Responsive Social Corporate Intranet Portal Application
Mobile Responsive Social Corporate Intranet Portal ApplicationMobile Responsive Social Corporate Intranet Portal Application
Mobile Responsive Social Corporate Intranet Portal Application
 
CV -UmerAslam
CV -UmerAslamCV -UmerAslam
CV -UmerAslam
 
Sr_MicroStrategy_Consultant
Sr_MicroStrategy_ConsultantSr_MicroStrategy_Consultant
Sr_MicroStrategy_Consultant
 
sonal
sonalsonal
sonal
 
Leveraging Analytics for DevOps
Leveraging Analytics for DevOpsLeveraging Analytics for DevOps
Leveraging Analytics for DevOps
 

Dernier

Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...pujan9679
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 

Dernier (20)

Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 

LUXproject Functionality Overview R12.2

  • 1. LUXproject Functionality Overview R12.2 Luxoft 23 December 2012
  • 2. What exactly is LUXproject?  LUXproject is a distributed web-based project management system created on the basis of specific commercial and non-commercial modules developed by third-party vendors and open- source communities (Atlassian JIRA/GreenHopper, Atlassian Confluence, Atlassian FishEye, Subversion/Perforce, Cruise Control, WebDav etc.) as well as Luxoft modules.  The System provides users with a friendly, multi-purpose environment for implementing key project tasks and ensuring communications.  The main LUXproject users are project executors as well as the Customer. LUXproject supports role access, i.e. each project team member depending on his/her project role has certain access permissions to the System functional.  LUXproject management mechanisms as well as availability of project artifacts at any time and from any geographic location allow company management to arrange transparent project management and always have current and reliable information.  Currently, LUXproject allows to choose one of several methodologies for software development and maintenance projects, deploy Service Desk. January 9, 2013 2
  • 3. LUXproject is all you need for  Release/Iteration/Milestone scope planning and management  Task management  Risk management  Communication management  Metric gathering and statistic analysis  Requirement gathering and management  Requirements classification  Requirement status management  Requirement test coverage management  Change management  Test specification creation and management  Defect Management  Continuous Integration  Version and non-version storage of project artifacts  Project knowledge base  Global search  Flexible project reporting January 9, 2013 3
  • 4. Components and Architecture Telecom Energy Technology X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X January 9, 2013 4
  • 5. Supported Platforms  LUXproject supports 64bit operation systems, which ensures high performance and stability  Linux Fedora core 12 i386 is recommended to be used for the LUXproject server deployment. The server can also be used under Windows, Solaris  As there’s no thick client, LUXproject users can work with the System in any operation system  Operation is guaranteed in browsers – Internet Explorer 8.x – FireFox 3.x  The System works in browsers – Chrome – Safari January 9, 2013 5
  • 6. Key Components of the Third Parties  JIRA 5.1.4  GreenHopper 6.0.6  Confluence 4.2.x  FishEye 2.2.х  SVN 1.6.5  Cruise Control 2.8.3  Crucible 2.2.1 January 9, 2013 6
  • 7. Role Access  Flexible security policies for accessing LUXproect Project Manager  Access to LUXproject for all Customer project stakeholders, both the Analysts project team and the customer team  Access to LUXproject from all geographic points where Internet is available Support team Developers team Testing team 7
  • 8. Project Template Concept1  Project template predefines a set of role settings, access permissions, information objects (including their attributes and workflow models), functional system modules, screens, reports, version control system, document templates and portal structure in compliance with a certain development methodology and the Customer requirements. January 9, 2013 8
  • 9. Project Template Concept2 The advantages of a project template:  Opportunity to choose a configured management environment with all required components by one mouse-click  Best practices from previous projects involvement  Capability of tailoring project templates in accordance with particular project needs  Capability of saving tailored templates for future projects LUXproject includes several project templates:  Project template for a traditional project which is based on RUP model with waterfall/iteration lifecycle (CMMI requirements support)  Agile/SCRUM project template  Support/Service Desk project template January 9, 2013 9
  • 10. Benefits for Customer  Capability of profound project team involvement to facilitate higher manageability needed to meet ever-changing priorities and business goals  Real- time access to project data from any geographic location, if Internet is available  Transparent lifecycle – from business requirements to system ones, from system requirements through tasks to source code, requirement links to test cases and defects  Visual representation of the reported data: flexible and easy visualization of product builds, project team data, and reports  Customization of project environment to meet the Customer requirements  Heightened project security January 9, 2013 10
  • 11. Program/PMO Report  Representation of progress in terms of project milestones as well as releases  Project statuses through color indication and % of completion  Direct links to the key project milestones and releases  Support of multi-release projects  Export to Excel January 9, 2013 11
  • 12. PMO/Program Dashboard for Agile Projects  Representation of progress of LP-managed and manual Agile- projects: – Project progress through color indication in terms of resolved issues – Correlation of created issues to resolved ones  Direct links to home pages of LP-managed projects and to iteration data manual input forms of manual projects  Capability to view project status charts showing the dynamics of project success parameters January 9, 2013 12
  • 13. Benefits for Project Manager  Access to project data from any geographic location, if Internet is available  Project data are represented in real-time mode  Project activities planning and managing (via milestones/releases)  Resource & Time Management: on-the-fly statistics for tracking the timeline of tasks in several projects simultaneously  Ability to create tasks via email messages  Risk management  Release/build management  Generate Roadmap, Release Notes  Control Build status  Ability to keep project mail within the System and make references to it  Ability to archive completed projects and activate them back if needed  Ability to customize a project to your needs and add new functions by yourself January 9, 2013 13
  • 14. Unique Reports Creation  LUXproject allows project members to create unique reports according to their needs  When creating reports you can use requests with specific fields of the System entities, which greatly extends standard Jira functional January 9, 2013 14
  • 15. Milestone Management  From the Milestones screen Project Manager can: – Control statuses of project milestones – View tasks related to milestones – Navigate to View Issue Details screen of each task included in a milestone – Create new milestones and link them to tasks and other system entities  Project milestones and tasks can be synchronized with Microsoft Project January 9, 2013 15
  • 16. Task Management  Project planning and control: create tasks, assign them and IT value chain monitor their statuses  Representation of different task statuses and tasks by status graphic statistics  Monitoring task deadlines  Auto-notification subsystem and events calendar January 9, 2013 16
  • 17. Task Creation via Email  Project Manager can create tasks in LUXproject by sending a task description email with project address specified in СС – The task will be assigned to the email addressee automatically – The task name will be created on the basis of the email subject – The task description will be created on the basis of the email body – Email attachment will also be included in the task in LUXproject  Upon receipt of such email, the Assignee can log in LUXproject and start working with the task – change its status, comment on it, add artifacts as soon as they are created January 9, 2013 17
  • 18. MS Project Integration  Bidirectional data exchange between MS Project and LUXproject (Jira) via plugin THE-Connector (plugin should be installed at the user’s working place) – Downloading planned tasks and milestones from MS Project to Jira – Importing tasks from Jira to MS Project – Synchronizing status and time information January 9, 2013 18
  • 19. Workplan Plugin  Capability to set work start date, utilization % of a user, and work estimate  Capability to view the workload of: – a user IND – users within a certain US UT GY project T ION O RY EV NOL – a specific JIRA group E VO CH OL – users of a specific LU TE resource project in all TIO projects N  Capability toCOMPANY plan resources and EVOLUTION activities for future January 9, 2013 19
  • 20. Risk Management  Log of risks for their estimation and description  Automatic calculation of the next date of risk monitoring  Different status tables IND (triggered, active risks, US UT GY closed risks) and T ION O RY EV NOL graphic statistics E VO diagram. CH OL LU TE  Links between risks and TIO project artifacts N COMPANY EVOLUTION January 9, 2013 20
  • 21. Project Events Report  Report on the events registered in all System components  Filter for: – Who? – When? IND – In which US project? UT GY T ION O  Filter for project RY EV NOL E events: VO CH OL – Project item LU TE TIO updates (tasks, risks, N requirements, defects etc.) COMPANY – File updates EVOLUTION – Page updates – Builds January 9, 2013 21
  • 22. Benefits for Analyst  Centralized requirements repository  Easy to use tool to manage requirements - assign, review, approve, control the requirements online  Ability to notify all project teams about changes in requirements  Requirements traceability: from business requirements to functional requirements, from requirements through tasks to source code and defects IND  Ability to review requirements US UT GY T  Graphic representation of requirements statistics ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 22
  • 23. Requirements Management1  Requirements gathering and management: their creation, assignment, control  Requirements grouping by statuses and graphic representation of status statistics  Requirements Traceability IND US  Automatic tracking of changes UT GY T ION O RY in linked requirements EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 23
  • 24. Requirements Management2  Requirements list can be displayed as a tree structure  Requirement description can be represented as a wiki- page IND  Requirements and US UT GY change requests can T ION O RY EV NOL be created and E VO managed via Jira CH OL LU TE +WIKI or Jira + SVN TIO N COMPANY EVOLUTION January 9, 2013 24
  • 25. Requirements Traceability – Matrix  Ability to link requirements to other dependent artifacts of this as well as a related project  Visualization of dependencies and their types IND  Links Coverage Matrix US UT GY allows to visualize T ION O RY EV NOL requirements coverage E VO by other artifacts such as CH OL LU TE test cases TIO  Identification of N suspected dependencies to define which COMPANY EVOLUTION requirements need to be reviewed and confirmed to relevant  Color indication of dependency types January 9, 2013 25
  • 26. Benefits for Developers  It’s obvious which tasks are to be performed and when it should be done  All documents and requirements needed to perform a task are linked to the assigned task  Extended functional for release/build management  Build management in Cruise Control right from LUXproject interface  Build reports in real-time mode IND  Ability to work with version control repository without installing a specific client US UT GY T ION O  RY Ability to link source code with tasks and defects from Jira EV NOL E VO  CH Ability to share experience or find the needed answer in the project knowledge base OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 26
  • 27. Release Management  Creation of release and build entities, linking project activities to them  Support of hierarchic structure of releases and builds IND  Attributes of important US UT GY T life cycle dates of ION O RY EV NOL releases and builds E VO CH OL  Control of release and LU TE TIO build implementation N COMPANY EVOLUTION January 9, 2013 27
  • 28. Build Management  Setting up Continuous Integration parameters (Continuous integration - Cruise Control)  Build status online  Results of automatic unit tests IND  Errors/Warnings US UT GY T ION O RY  Ability to download EV NOL E delivery package VO CH OL LU  Build/Release notes TE TIO N COMPANY EVOLUTION January 9, 2013 28
  • 29. Source Code Management  Web-access to the project version control repository via FishEye  Flexible filter settings  Changelog (including a mechanism for comparing differences) IND  Diagram of code size US UT GY T ION O variation RY EV NOL E  Content Search by VO CH OL LU directories, commit TE TIO comments, files, file N names COMPANY EVOLUTION January 9, 2013 29
  • 30. Code Review  Capability to arrange code review: – create review card – select source code files for review – define review participants and due IND dates US UT GY  Ability to add T ION O RY EV NOL comments to source E VO code lines, reviewed CH OL LU TE file, review in general TIO  Track reviews status N and statistics COMPANY  Reviews SearchEVOLUTION January 9, 2013 30
  • 31. Benefits for Test Team  Test Assignment creation: − Assigning test cases that need to be performed − Assigning defects for validation  Testing reports  Ability to: IND − create a wiki-page with test plan description and link it to test cases US UT GY T − ION O RY access requirements quickly EV NOL E VO − CH access the centralized document storage and version control repository OL LU TE − TIO view the current build status N − access defect statistics COMPANY  Ability to link defects to other project entities EVOLUTION  Ability to control requirements coverage by test cases January 9, 2013 31
  • 32. Test Management  Test cases creation  Control of test assignments implementation  Linking defects to requirements, tasks, and test cases  Test cases results report IND US UT GY  Statistics reports on testing T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 32
  • 33. Test Manager Workplace  Ability to analyze and predict release quality  Information on testing progress, test case creation, defect statistics is available to Test Manager in a convenient form IND  More than 20 metric US UT GY reports on testing T ION O RY EV NOL  Ability to export reports to E VO CH OL Excel, PDF, charts to LU TE graphics format TIO N COMPANY EVOLUTION January 9, 2013 33
  • 34. Test Manager Workplace Sample Test Reports IND US UT GY T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 34
  • 35. Test Manager Workplace Sample Test Assignment Reports IND US UT GY T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 35
  • 36. Communication Management  Project news line  Project correspondence storage IND US UT GY T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 36
  • 37. Files Sharing Non-version File Storage  Possibility to share files within project team: – upload files – view files – manage files and folders IND US UT GY T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 37
  • 38. Time Tracking  Time spent on each project activity  Different time tracking reports IND US UT GY T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 38
  • 39. Time Tracking SLA Support Report  Capability to view the work time the issues spend in each of their statuses within the specified period  Capability to see bottlenecks in the IND lifecycle of issues and US UT GY stick to the SLA terms T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 39
  • 40. Business Processes Visualization  Ability to run an eye over a process workflow  Visualization of workflow transitions of a certain issue  Visualization of the latest changes history IND US UT GY T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 40
  • 41. Global Search  Search through all components and modules of system  Filter for detailed search by date, user, project etc. IND US UT GY T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 41
  • 42. System Administration Console  Manage project roles and team members  Manage security  Manage attributes, etc.  Manage IND components US UT GY T ION (SVN, Cruise O RY EV NOL Control, etc.) E VO CH OL  Project LU TE TIO configuration N export COMPANY EVOLUTION January 9, 2013 42
  • 43. Localization Capabilities  Bilingual menu system – Русский – English  Availability of English and Russian project templates  Ability to select GUI IND US language for each user UT GY T ION O RY  User and Administrator EV NOL E documentation in VO CH OL LU Russian and English TE TIO N COMPANY EVOLUTION January 9, 2013 43
  • 44. Agile Project Template  Task management – Product backlog – Iteration backlog – Personal backlog  Release and build management IND  Defect management; US UT GY  Communication T ION O RY EV NOL management (Scrum E VO and retrospective CH OL LU TE meetings); TIO  Configuration N management COMPANY  Project Status Charts EVOLUTION January 9, 2013 44
  • 45. Agile Project Template Additional tools - GreenHopper  GreenHopper is a plugin for Jira that allows to manage Agile projects – Backlog management – Sprint and release planning IND – Whiteboard US UT GY metaphora T ION O RY EV NOL – Easy work with cards E VO of Jira entities CH OL LU TE – Editing entities within TIO their cards as well as N editing entities in bulk COMPANY EVOLUTION January 9, 2013 45
  • 46. Agile Project Template GreenHopper Task Board  Task Board displays tasks according to their statuses in a convenient form: – Cards – List – Minimized cards, as a full list of tasks IND – Color indication US UT GY T – Flexible filters ION O RY EV NOL E  It is possible to combine VO CH OL saved filters with custom LU TE TIO criteria to display only the N needed issues  It is possible to drag-and- COMPANY EVOLUTION drop cards from column to column in order to change task status  Kanban Support January 9, 2013 46
  • 47. Agile Project Template GreenHopper Burndown chart  Burndown chart shows current dynamics of tasks implementation and allows to predict the time when activities will be finished IND US UT GY T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 47
  • 48. Agile Project Template GreenHopper Cumulative Flow chart  Cumulative Flow chart allows to track cumulative change of work in progress by statuses and can be useful for identifying bottlenecks. IND US UT GY T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 48
  • 49. Project Knowledge Base  News  Tag cloud  Quick Search  Ability to import Word documents to wiki-pages  Voting ability (with capability IND to view the voters list, their US UT GY votes being anonymous ) T ION O RY EV NOL E VO CH OL  Useful capabilities LU TE TIO – Confluence-SharePoint search N is a great example of LUXproject integration with COMPANY other knowledge management systems EVOLUTION – Confluence Watch list helps Confluence administrators manage a list of watchers on any wiki-page of the knowledge base January 9, 2013 49
  • 50. Project Knowledge Base Labels Groups Plugin  Possibility to organize labels into groups  Capability to use the predefined list of labels groups (page passport) to quickly label your WIKI content IND  Capability to use page US UT GY passport to search Wiki T ION O RY EV NOL pages by labels E VO CH OL  Capability to search Wiki LU TE pages by attachments TIO N COMPANY EVOLUTION January 9, 2013 50
  • 51. Project Knowledge Base Labels Groups Plugin. Navigation Macros  Possibility to predefine search by particular label AND label group IND US UT GY T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION Possibility to use navigation table to quickly search by predefined label AND label group January 9, 2013 51
  • 52. Help Desk Project Template  Requests creation  Log of request statuses  Graphic representation of request resolution statistics  Report on efforts spent on requests implementation IND  Knowledge base for each US UT GY project T ION O RY EV NOL  Ability to link requests to EVO activities of other projects CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 52
  • 53. Benefits Summary  Atlassian components used in LUXproject enjoy world-wide recognition due to diverse functional, supportability, scalability and reliability at a relatively modest price per user  The LUXproject platform integrates all components into one environment, which increases capabilities of the components, and provides missing functions: – Common interface and single sign on to all System components – Flexible security policies customized for each project member – Additional functional for risk management, test management, release management, requirements IND management US UT GY – T Extended capabilities for reports creation as well as ready-made reports ION O RY EV NOL – Quick search of the needed information in all System components EVO CH OL – Localization capabilities LU TE TIO – Ability to group projects into programs and monitor their statuses N – High level of data security  Unique project templates developed on the basis of the best Luxoft practices and COMPANY methodologiesEVOLUTION  Extended capabilities of System customization in compliance with unique Customer processes  Continuous System development and ability to add specific functions upon request  Diverse functional at a modest price January 9, 2013 53
  • 54. LUXproject Implementation Models LUXproject basic implementation is recommended when:  The Customer wants to use the best practices and processes of the Luxoft company and chooses one or several standard project templates: – Standard – Agile – HelpDesk IND US UT GY  The Customer does not have similar systems that must be integrated and/or a system to migrate T ION O RY EV NOL data from. E VO CH OL LU TE TIO LUXproject enhanced implementation with future System customization in compliance N with Customer’s specifics and/or data migration: COMPANY  The Customer considers his software development process to be mature and/or unique and EVOLUTION wants the existing template to be customized or a new project template to be developed.  The Customer has a different tracking system (for example, JIRA, ClearQuest, Bugzilla) and wants to save the historical data. January 9, 2013 54
  • 55. Server Requirements for LUXproject Installation  System requirements (up to 100 users) – CPU 1 x Dual Core XEON from 2.33GHz (server edition with х64 support) – RAM 4 GB FBD 667MHz Memory – ROM 100GB, SAS/SCSI, 15.000/10.000 rpm Hard Drive (2 in RAID1) – RAID Controller (RAID 1) – NIC 1x Gb NIC – Drive 8X DVD Drive  System requirements (up to 500 users) IND – CPU 1 x Quad Core XEON from 2.33GHz (server edition with х64 support) US UT GY T – ION O RAM 8 GB FBD 667MHz Memory RY EV NOL – E ROM 160GB, SAS/SCSI, 15.000/10.000 rpm Hard Drive (2 in RAID1) VO CH OL – RAID Controller (RAID 1) LU TE TIO – NIC 1x Gb NIC N – Drive 8X DVD Drive  Operation system requirements COMPANY – Linux Fedora core 15 64bit EVOLUTION – CentOS  Data base requirements – MySQL 5  Current configuration of the LUXproject production server in Luxoft – CPU 4x Phenom™ II 955, Memory 8GB, 2x200Gb HDD Raid1 January 9, 2013 55
  • 56. Thanks ! Contacts: IND US UT GY LUXproject@luxoft.com T ION O RY EV NOL E VO CH OL LU TE TIO N COMPANY EVOLUTION January 9, 2013 56

Notes de l'éditeur

  1. 9.01.13
  2. 9.01.13
  3. 9.01.13
  4. 9.01.13
  5. 9.01.13
  6. 9.01.13
  7. 9.01.13
  8. 9.01.13
  9. 9.01.13
  10. 9.01.13
  11. 9.01.13
  12. 9.01.13
  13. 9.01.13
  14. 9.01.13
  15. 9.01.13
  16. 9.01.13
  17. 9.01.13
  18. 9.01.13
  19. 9.01.13
  20. 9.01.13
  21. 9.01.13
  22. 9.01.13
  23. 9.01.13
  24. 9.01.13
  25. 9.01.13
  26. 9.01.13
  27. 9.01.13
  28. 9.01.13
  29. 9.01.13
  30. 9.01.13
  31. 9.01.13
  32. 9.01.13
  33. 9.01.13
  34. 9.01.13
  35. 9.01.13
  36. 9.01.13
  37. 9.01.13
  38. 9.01.13
  39. 9.01.13
  40. 9.01.13
  41. 9.01.13
  42. 9.01.13
  43. 9.01.13
  44. 9.01.13
  45. 9.01.13
  46. 9.01.13
  47. 9.01.13
  48. 9.01.13
  49. 9.01.13
  50. 9.01.13
  51. 9.01.13
  52. 9.01.13
  53. 9.01.13
  54. 9.01.13
  55. 9.01.13