SlideShare une entreprise Scribd logo
1  sur  7
R.P.SINGH
Contact: +91-9560664811,7023103346 011-22614190 E-Mail: rpsinghusa@rediffmail.com,rpsinghusa@gmail.com
Seeking challenging job assignments in Project, Operations & Maintenance with an
organisation of high repute
Preferred Location: Delhi & NCR / Anywhere in India
Professional Abridgement
 A competent professional with approx 23 years of experience in PROJECT, PLANT OPERATIONES
MAINTENANCE AND Safety Functions in Automobile & Allied industry.
 SUCESSFULY COMPLETED GREAN FIELD PROJECT LIKE H-ONE INDIA, VICTORA TOOLS, NMPL MAHINDRA
STAMPING.ASIA MOTOR WORKS & SKH SMC BINOLA &NMPL .
 Proficient in managing various process operations and control the operation as per the set standards and experience
of developing procedures for operational excellence to achieve organisational objectives.
 Adroit with TPM, Kaizen & ISO quality specifications.
 Deft in identifying scope for implementation & monitoring of technological changes to enhance productivity.
 Adept in executing cost saving techniques / measures and modifications to achieve substantial reduction in O&M
expenditures and work within the budget.
 Project-- budget planning & layout preparation.
 Plant and utility Equipment finalisation for techno commercial.
 Successfully erected and commissioned more than 150 mechanical and hydraulic normal speed and high
speed presses up to 2400 t Capacity. And complete lines also as blanking and transfer. WIDE
BLANKING ,MEDIUM BLANKING,SMALL BALANKING CTL & SLITTING LINE ROBOTIC WELD LINE OF46
ROBOT & B NORMAL WELD LINE
 Successfully erected and commissioned Paint shop including PTCED And top coat for Mahindra and
Mahindra tractor plant and paint shop supply by DURR India Bangalore.
 Successfully designing of electrification 33 kv substation transformer selection captive power generator
selection utility pipes lines propane storage HSD Storage tank water purification system (R.O.)plant ETP
STP Installation and commissioning with suppler and there maintenance and periodical lessoning with
lessoning dep’t
 Coordinate for civil activities, as planning execution, bill passing and meeting for various aspects.
 Experience in identify areas of obstruction / breakdowns and taking steps to rectify the equipment through application
of trouble shooting tools. In depth knowledge of hydraulic circuits used in presses & SPM.
 Skilled in the utility maintenance, paint shop, material handling equipments maintenance and maintenance of the
plant engineering equipments.
 Expertise in managing maintenance operations for reducing breakdown / downtime & enhancing operational
effectiveness of equipment.
 An enterprising leader with proven deftness in directing personnel towards accomplishment of a common goal.
 An effective communicator with excellent relationship management skills, problem solving & organisational abilities.
Core Competencies
PROJECT –
Project planning Budgeting tendering
Execution parts –interfacing with architect civil contractor
Coordinate with legal deptt. for lessoning activity
Equipment RFQ Negotiation ordering inspection delivery monitoring dispatch installation commissioning and Hand over to
production execution time QCD Monitoring.
Utility designing –Piping electrification &captive power plant
Operations & Maintenance
 Devising & implementing preventive & breakdown maintenance schedules for improving overall reliability and safety.
 Conducting failure investigation analysis to identify gaps & take corrective measures so as to reduce equipment
downtime & maximise plant up time availability MTTR & MTBF .
 Implementing rollout activities along with the maintenance schedules to increase uptime & reliability of the
equipments; monitoring and optimising processes, troubleshooting problems in coordination with other departments.
 Identifying areas of obstruction / defects and conducting service and repair to rectify the equipments through the
application of troubleshooting tools.
 Ensuring completion of all project activities within the time & cost parameters and effective resource utilisation to
maximise the output.
Plant Management
 Supervising activities involving working out various requirements & monitoring overall project operations for
ensuring timely completion.
 Coordinating projects for the set up standards with accountability for strategic utilisation & deployment of
available resources to achieve organisational objectives.
 Focussing on the cost reduction, time cycle reduction, improvement of the process variables and the
enhancement of process conditions.
 Direct and oversee plant operations and activities for production, quality, purchase, maintenance, HR etc.
 Coordinate plant activities through planning with departmental managers and supervisors to insure the total
manufacturing objectives are accomplished in a timely and cost effective manner.
 Ensures collaboration of engineering and other functional areas, establishing effective working relationships
with business partners.
 Implement cost effective systems of control over capital, operating expenditures, manpower, wages and
salaries.
 Manages capital asset maintenance.
 Establish and monitor overall plant performance for production, quality and industry standards.
 Optimizes utilization of labor overtime, freight, and repair expenses.
 Innovative process design and forward thinking planning, specifically on production lines
 Maintains existing plant facilities, production equipment, and systems and recommends replacement or
improvement when necessary.
 Develop yearly business plans and personal objectives that support the overall company goals.
 Complies with all training requirements to perform duties of the job.
 Leading and assisting in continuous improvement projects, including participation on cross functional teams.
 Conducting time studies and evaluating current states of existing processes and equipment.
 Identifying opportunities through root cause analysis to improve current processes, equipment, and generate
cost savings.
 Create proposals and execute solutions based on approved recommendations.
 Research, implement, and conduct ROIs on assigned capital budget projects.

Team Management
 Leading, mentoring & monitoring the performance of team members to ensure efficiency in process operations and
meeting of production targets.
 Creating and sustaining a dynamic environment that fosters development opportunities and motivates high
performance amongst team members.
 .
Previous Work Experience
TENURE ORGANISATION DESIGNATION
Sep-13 -till date H-ONE INDIA PVT LIMITED MANUFACTURING HEAD
SEPT -12 – JULY 13 VICTORA TOOL ENGINEERS LTD HEAD PROJECT & PLANT ENGINEG
DEC-09 –AUG-12 SKH METAL LIMITED SR MGR PROJECT MAINTENANCE
FEB-08 -NOV 09 ASIA MOTOR WORKS LTD DIV. MANAGER PLANT ENGINEERING
JUNE-06 -FEB-08 MAHINDRA STAMPINGS LIMITED HEAD PROJECT AND MAINTENANCE
JUNE-05 –MAY-06 NEEL METAL PRODUCT LIMITED MAINTENANCE HEAD
JULY-98-MAY-05 HONGO INDIA PVT. LIMITED COORDINATOR PR AND MAINT
AUG’93-JUN’98 JAI YUSHIN LIMITED ASSTT. ENGINEER
Machines Handled
 Press Shop
o Mechanical Presses up 2400 tone equipped with hydraulic clutch, dry clutches, moving bolster, and micro
inching -Make Isgec, Schuler, Aida, Komatshu clearing Vickers, Amteep, Narendra, Press Master, Impact
and JIER China Yangzhou Yangli.
o Hydraulic presses up to 2000 tone make HMT, Electropneumaic ISGEC.
o EOT 45 Tonne.
o Transfer lines and Blanking lines and High speed presses Up to 2400 T .
o Sheet cleaning die spotting m.c etc
o Plasma cutting .laser cutting press break etc
 Weld Shop
o Mig Welding Set, Spot Welding , Arc Welding , Seam Welding ,Projection Welding, Tig Welding Butt Welding
and Welding Robo.ABB FANUC AND Yashikawa motorman
 Machine Shop
o Lath, milling, drilling machines, radial drilling, surface grinding, belt grinder, broaching multi spindle
reaming, barrel vibrator, batch grinder and center less grinder.CNC Turning m/cs center less grinder vmc jig
bori vtl broaching EDM Wire cut etc
o Hydraulic SPM Hydro-Pneumatic SPM Pneumatic SPM, EOT Crane, Conveyors and Scrap Conveyor.
 Utility
o Air compressor up to 750 CFM , DG Set up to 1000 Kva, Cooling Tower 150 ton, OLTC type HT And
Transformer of 1650 Kva. HT servo Stavlizer. H.T. and L.T panels, 33kv substation R O, Chillier, Water
Softner, DM Water Plant, Boiler Rx4, Thermo Pack, Goods Lift, Pumps and Gas Bank.
 Paint shop
Paint shop equipped with P.T. CED And top coat robotics line DURR make
 Moulding Shop
Injection moulding, make- L & T , Asian Plast & Vendron up to 250 T . Compression moulding up to 2800 ton
Make victor, Electro pneumatic etc.
Training & Development
 Undergone basic training on:-
o Hydraulic System.
o Fire fighting.
o Training on Operation & Maintenance on----
o Robots, Press Machines, Spot Welding Machines etc. conducted by ABB, Aida Engineering and Hongo
Japan at Japan in 1998
Qualifications
B. Tech & Diploma (Govt. poly Moradabad)
.
Personal Vitae
Date of Birth : 20th
Jan 1973
Address : House No. 1059 2nd
Floor Block - A,G.D Colony Mayur Vihar phase -3 Delhi -110096
Current Location : Delhi
Current CTC : 23.4 lakh
Passport : Ready already visited japan china Taiwan
Permanents Address: Same As Above
Total Work Experience: 23 Years
Resume
Resume
Resume

Contenu connexe

Tendances (20)

Resume
ResumeResume
Resume
 
Maverick consulting
Maverick consulting Maverick consulting
Maverick consulting
 
resume new
resume newresume new
resume new
 
HEMANT Resume 2015
HEMANT Resume 2015HEMANT Resume 2015
HEMANT Resume 2015
 
pradeep~Rsume (1)
pradeep~Rsume (1)pradeep~Rsume (1)
pradeep~Rsume (1)
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
 
Ashish Resume.doc
Ashish Resume.docAshish Resume.doc
Ashish Resume.doc
 
Quality resume
Quality resumeQuality resume
Quality resume
 
Resume
ResumeResume
Resume
 
Pankaj K. Jha_ Senior Project_Engg__Resume-
Pankaj K. Jha_ Senior Project_Engg__Resume-Pankaj K. Jha_ Senior Project_Engg__Resume-
Pankaj K. Jha_ Senior Project_Engg__Resume-
 
Resume MG
Resume MGResume MG
Resume MG
 
Krishnan Resume
Krishnan ResumeKrishnan Resume
Krishnan Resume
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
Resume
ResumeResume
Resume
 
Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 
JOSSY JACOB CV
JOSSY JACOB CVJOSSY JACOB CV
JOSSY JACOB CV
 
MSSRESUME 02-12-2016
MSSRESUME 02-12-2016 MSSRESUME 02-12-2016
MSSRESUME 02-12-2016
 
SahilResume
SahilResumeSahilResume
SahilResume
 
Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015
 

En vedette

StrategicStatementEmployabilityfinal
StrategicStatementEmployabilityfinalStrategicStatementEmployabilityfinal
StrategicStatementEmployabilityfinal
Hamish Walker
 

En vedette (10)

24 ur neenakosti
24 ur neenakosti24 ur neenakosti
24 ur neenakosti
 
Prot. 045 17 pl autoriza o pe instituir bônus pela apreensão de armas de f...
Prot. 045 17   pl autoriza o pe instituir bônus  pela apreensão de armas de f...Prot. 045 17   pl autoriza o pe instituir bônus  pela apreensão de armas de f...
Prot. 045 17 pl autoriza o pe instituir bônus pela apreensão de armas de f...
 
StrategicStatementEmployabilityfinal
StrategicStatementEmployabilityfinalStrategicStatementEmployabilityfinal
StrategicStatementEmployabilityfinal
 
3.2 calculo de rantabilidad
3.2 calculo de rantabilidad3.2 calculo de rantabilidad
3.2 calculo de rantabilidad
 
Pl 1525 15 pl cria a semana educativa de concientização para a prática de s...
Pl 1525 15   pl cria a semana educativa de concientização para a prática de s...Pl 1525 15   pl cria a semana educativa de concientização para a prática de s...
Pl 1525 15 pl cria a semana educativa de concientização para a prática de s...
 
20716
2071620716
20716
 
Christmas111
Christmas111Christmas111
Christmas111
 
Asking and answering about posession
Asking and answering about posessionAsking and answering about posession
Asking and answering about posession
 
Rencontres de l'officine 2017 - Créer son site marchand : 10 règles essentielles
Rencontres de l'officine 2017 - Créer son site marchand : 10 règles essentiellesRencontres de l'officine 2017 - Créer son site marchand : 10 règles essentielles
Rencontres de l'officine 2017 - Créer son site marchand : 10 règles essentielles
 
Kular, Jaideep - Tutorial 7
Kular, Jaideep - Tutorial 7Kular, Jaideep - Tutorial 7
Kular, Jaideep - Tutorial 7
 

Similaire à Resume

resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015
sanjay mahapadi
 
Motiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
Motiur Rahman_Mechanical_Prjct_Engg_resume,_ResumeMotiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
Motiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
rehman1991
 
B.MANOHARAN - HEC -SAKTHI 2015
B.MANOHARAN  - HEC -SAKTHI 2015B.MANOHARAN  - HEC -SAKTHI 2015
B.MANOHARAN - HEC -SAKTHI 2015
MANOHARAN B
 
B.MANOHARAN - HEC -SAKTHI 2015
B.MANOHARAN  - HEC -SAKTHI 2015B.MANOHARAN  - HEC -SAKTHI 2015
B.MANOHARAN - HEC -SAKTHI 2015
MANOHARAN B
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
Al Obaidi Abdullah
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
Vittal B
 

Similaire à Resume (20)

resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
Mayank Mathur- New
Mayank Mathur- NewMayank Mathur- New
Mayank Mathur- New
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
Resume
ResumeResume
Resume
 
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
 
Cover letter
Cover letterCover letter
Cover letter
 
Motiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
Motiur Rahman_Mechanical_Prjct_Engg_resume,_ResumeMotiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
Motiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
shanmuganathan-Chennai
shanmuganathan-Chennaishanmuganathan-Chennai
shanmuganathan-Chennai
 
Brajesh Resume
Brajesh ResumeBrajesh Resume
Brajesh Resume
 
Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
 
B.MANOHARAN - HEC -SAKTHI 2015
B.MANOHARAN  - HEC -SAKTHI 2015B.MANOHARAN  - HEC -SAKTHI 2015
B.MANOHARAN - HEC -SAKTHI 2015
 
B.MANOHARAN - HEC -SAKTHI 2015
B.MANOHARAN  - HEC -SAKTHI 2015B.MANOHARAN  - HEC -SAKTHI 2015
B.MANOHARAN - HEC -SAKTHI 2015
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
anil
anilanil
anil
 
MS Suresh -Jun-16
MS Suresh -Jun-16MS Suresh -Jun-16
MS Suresh -Jun-16
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
 

Resume

  • 1. R.P.SINGH Contact: +91-9560664811,7023103346 011-22614190 E-Mail: rpsinghusa@rediffmail.com,rpsinghusa@gmail.com Seeking challenging job assignments in Project, Operations & Maintenance with an organisation of high repute Preferred Location: Delhi & NCR / Anywhere in India Professional Abridgement  A competent professional with approx 23 years of experience in PROJECT, PLANT OPERATIONES MAINTENANCE AND Safety Functions in Automobile & Allied industry.  SUCESSFULY COMPLETED GREAN FIELD PROJECT LIKE H-ONE INDIA, VICTORA TOOLS, NMPL MAHINDRA STAMPING.ASIA MOTOR WORKS & SKH SMC BINOLA &NMPL .  Proficient in managing various process operations and control the operation as per the set standards and experience of developing procedures for operational excellence to achieve organisational objectives.  Adroit with TPM, Kaizen & ISO quality specifications.  Deft in identifying scope for implementation & monitoring of technological changes to enhance productivity.  Adept in executing cost saving techniques / measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget.  Project-- budget planning & layout preparation.  Plant and utility Equipment finalisation for techno commercial.  Successfully erected and commissioned more than 150 mechanical and hydraulic normal speed and high speed presses up to 2400 t Capacity. And complete lines also as blanking and transfer. WIDE BLANKING ,MEDIUM BLANKING,SMALL BALANKING CTL & SLITTING LINE ROBOTIC WELD LINE OF46 ROBOT & B NORMAL WELD LINE  Successfully erected and commissioned Paint shop including PTCED And top coat for Mahindra and Mahindra tractor plant and paint shop supply by DURR India Bangalore.  Successfully designing of electrification 33 kv substation transformer selection captive power generator selection utility pipes lines propane storage HSD Storage tank water purification system (R.O.)plant ETP STP Installation and commissioning with suppler and there maintenance and periodical lessoning with lessoning dep’t  Coordinate for civil activities, as planning execution, bill passing and meeting for various aspects.  Experience in identify areas of obstruction / breakdowns and taking steps to rectify the equipment through application of trouble shooting tools. In depth knowledge of hydraulic circuits used in presses & SPM.  Skilled in the utility maintenance, paint shop, material handling equipments maintenance and maintenance of the plant engineering equipments.  Expertise in managing maintenance operations for reducing breakdown / downtime & enhancing operational effectiveness of equipment.  An enterprising leader with proven deftness in directing personnel towards accomplishment of a common goal.  An effective communicator with excellent relationship management skills, problem solving & organisational abilities. Core Competencies PROJECT – Project planning Budgeting tendering Execution parts –interfacing with architect civil contractor Coordinate with legal deptt. for lessoning activity Equipment RFQ Negotiation ordering inspection delivery monitoring dispatch installation commissioning and Hand over to production execution time QCD Monitoring. Utility designing –Piping electrification &captive power plant Operations & Maintenance  Devising & implementing preventive & breakdown maintenance schedules for improving overall reliability and safety.  Conducting failure investigation analysis to identify gaps & take corrective measures so as to reduce equipment downtime & maximise plant up time availability MTTR & MTBF .
  • 2.  Implementing rollout activities along with the maintenance schedules to increase uptime & reliability of the equipments; monitoring and optimising processes, troubleshooting problems in coordination with other departments.  Identifying areas of obstruction / defects and conducting service and repair to rectify the equipments through the application of troubleshooting tools.  Ensuring completion of all project activities within the time & cost parameters and effective resource utilisation to maximise the output. Plant Management  Supervising activities involving working out various requirements & monitoring overall project operations for ensuring timely completion.  Coordinating projects for the set up standards with accountability for strategic utilisation & deployment of available resources to achieve organisational objectives.  Focussing on the cost reduction, time cycle reduction, improvement of the process variables and the enhancement of process conditions.  Direct and oversee plant operations and activities for production, quality, purchase, maintenance, HR etc.  Coordinate plant activities through planning with departmental managers and supervisors to insure the total manufacturing objectives are accomplished in a timely and cost effective manner.  Ensures collaboration of engineering and other functional areas, establishing effective working relationships with business partners.  Implement cost effective systems of control over capital, operating expenditures, manpower, wages and salaries.  Manages capital asset maintenance.  Establish and monitor overall plant performance for production, quality and industry standards.  Optimizes utilization of labor overtime, freight, and repair expenses.  Innovative process design and forward thinking planning, specifically on production lines  Maintains existing plant facilities, production equipment, and systems and recommends replacement or improvement when necessary.  Develop yearly business plans and personal objectives that support the overall company goals.  Complies with all training requirements to perform duties of the job.  Leading and assisting in continuous improvement projects, including participation on cross functional teams.  Conducting time studies and evaluating current states of existing processes and equipment.  Identifying opportunities through root cause analysis to improve current processes, equipment, and generate cost savings.  Create proposals and execute solutions based on approved recommendations.  Research, implement, and conduct ROIs on assigned capital budget projects.  Team Management  Leading, mentoring & monitoring the performance of team members to ensure efficiency in process operations and meeting of production targets.  Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members.  . Previous Work Experience TENURE ORGANISATION DESIGNATION Sep-13 -till date H-ONE INDIA PVT LIMITED MANUFACTURING HEAD SEPT -12 – JULY 13 VICTORA TOOL ENGINEERS LTD HEAD PROJECT & PLANT ENGINEG DEC-09 –AUG-12 SKH METAL LIMITED SR MGR PROJECT MAINTENANCE FEB-08 -NOV 09 ASIA MOTOR WORKS LTD DIV. MANAGER PLANT ENGINEERING JUNE-06 -FEB-08 MAHINDRA STAMPINGS LIMITED HEAD PROJECT AND MAINTENANCE JUNE-05 –MAY-06 NEEL METAL PRODUCT LIMITED MAINTENANCE HEAD JULY-98-MAY-05 HONGO INDIA PVT. LIMITED COORDINATOR PR AND MAINT AUG’93-JUN’98 JAI YUSHIN LIMITED ASSTT. ENGINEER
  • 3. Machines Handled  Press Shop o Mechanical Presses up 2400 tone equipped with hydraulic clutch, dry clutches, moving bolster, and micro inching -Make Isgec, Schuler, Aida, Komatshu clearing Vickers, Amteep, Narendra, Press Master, Impact and JIER China Yangzhou Yangli. o Hydraulic presses up to 2000 tone make HMT, Electropneumaic ISGEC. o EOT 45 Tonne. o Transfer lines and Blanking lines and High speed presses Up to 2400 T . o Sheet cleaning die spotting m.c etc o Plasma cutting .laser cutting press break etc  Weld Shop o Mig Welding Set, Spot Welding , Arc Welding , Seam Welding ,Projection Welding, Tig Welding Butt Welding and Welding Robo.ABB FANUC AND Yashikawa motorman  Machine Shop o Lath, milling, drilling machines, radial drilling, surface grinding, belt grinder, broaching multi spindle reaming, barrel vibrator, batch grinder and center less grinder.CNC Turning m/cs center less grinder vmc jig bori vtl broaching EDM Wire cut etc o Hydraulic SPM Hydro-Pneumatic SPM Pneumatic SPM, EOT Crane, Conveyors and Scrap Conveyor.  Utility o Air compressor up to 750 CFM , DG Set up to 1000 Kva, Cooling Tower 150 ton, OLTC type HT And Transformer of 1650 Kva. HT servo Stavlizer. H.T. and L.T panels, 33kv substation R O, Chillier, Water Softner, DM Water Plant, Boiler Rx4, Thermo Pack, Goods Lift, Pumps and Gas Bank.  Paint shop Paint shop equipped with P.T. CED And top coat robotics line DURR make  Moulding Shop Injection moulding, make- L & T , Asian Plast & Vendron up to 250 T . Compression moulding up to 2800 ton Make victor, Electro pneumatic etc. Training & Development  Undergone basic training on:- o Hydraulic System. o Fire fighting. o Training on Operation & Maintenance on---- o Robots, Press Machines, Spot Welding Machines etc. conducted by ABB, Aida Engineering and Hongo Japan at Japan in 1998 Qualifications
  • 4. B. Tech & Diploma (Govt. poly Moradabad) . Personal Vitae Date of Birth : 20th Jan 1973 Address : House No. 1059 2nd Floor Block - A,G.D Colony Mayur Vihar phase -3 Delhi -110096 Current Location : Delhi Current CTC : 23.4 lakh Passport : Ready already visited japan china Taiwan Permanents Address: Same As Above Total Work Experience: 23 Years