19. •
Conventional
Conformal cooling
cooling layout
layout
Moulding area Moulding area
• Conventional cycle time: 27.2 s
• CCC cycle time: 17.9 s
• Reducing cycle time: 34%
• Profit as the 1° year: 8600 € (100.000 units /year)
• Reducing thickness
• Better ejection and quality part
20. •
• (cycle time, less material, less rejects)
• (Uniformity of T° and pressure – Reducing Max T°
and pressure)
• (Reducing time, rejects, material volume)
• (Hot spots management, Mould T°
uniformity, reducing rejects)
•
30. Race Car Upright Race Car Gearbox Casing
Material: Ti6Al4V
Size: 280 x 180 x 120 mm Material: Ti6Al4V
Weight: 2,7 kg Weight: 2,5 kg
Build time: 28 hours Build time: 48 hours