SlideShare une entreprise Scribd logo
1  sur  16
Upgrades and
Enhancement Packs Explained

SAP Live and Local Webcast Tour „08

3 April, 2008
Upgrade Roadmap
                                                     Upgrade Project                                         Upgrade Project
                                                         started                                               completed


                                Plan                                                  Build                                Run
                                                                                                                        Operations &
                Upgrade                  Upgrade                                                                          Continuous
                                                                            Upgrade Implementation
                Discovery               Evaluation                                                                       Improvement


          Define Business and              Define                                   Minimize costs
            IT requirements               strategy                           and risks of Upgrade Project




                                                           Upgrade Roadmap
                                                                                                                Production
                  Project                                                             Final Preparation
                                        Blueprint              Realization                                        Cutover &
                 Preparation                                                             for Cutover
                                                                                                                   Support

           Document current       Specify implementation                              Perform integration
                                                               Implement and                                Execute production
          solution and set-up       scope and solution                                 and system tests
                                                               adjust solution                              system Upgrade &
                project              adjustment needs                                  and plan cutover
                                                                                                                 Support




© SAP 2008 / Page 2
Upgrade Approaches
                                                             3
             Possible Upgrade Approaches                           Strategic Business Improvement
                                                                  Focus on functionality extension and
                                                                   improvement
                                                 3                Enablement of new and optimized business
                                                                   processes and scenarios based on new ERP
                                                                   core functionality

                                                             2 Functional Upgrade
     Value




                                         2
                                                                  New functionality to be implemented as part of
                                                                   the upgrade, modification clearing
                                                                  Focus on reduction of system complexity


                                   1                         1 Technical Upgrade
                 Starting Point                                   Focus on pure technology upgrade
                                                                  Retain functionality used
                                  Time
                                                                  Review Usage of custom developments
        Recommendations:
        •   Create and evaluate your own upgrade roadmap, considering the whole spectrum
        •   Define business justification first but start small with the technical upgrade only



© SAP 2008 / Page 3
Upgrade Info Center
                                                            Key documents:




                                                    • Value of Upgrade
                                                    • Functional Deltas in Detail
                                                    • SAP ERP Upgrade Aspects
                                                    • Upgrade Master Guides
                                                    • SAP Upgrade Offerings
                                                            Direct access to:




                                                    • SAP Upgrade Roadmap
                                                    • SAP Upgrade Services
                                                    • SAP ERP Solution
                                                      Browser
                                                    • Projects statistics
                                                      (Upgrade Experience DB)
                                                    • Product Availability Matrix
                      www.service.sap.com/upgrade




© SAP 2008 / Page 4
Upgrade Experience Database
                       R e a s o n s fo r U p g ra d e s b y S o u rc e R e le a s e                                                                                                                                                                                                       A p p ro a c h in U p g ra d e s b y S o u rc e R e le a s e
     S o u rc e                                                                                                                                                                                                                                                            S o u rc e
     R e le as e                                                                                                                                                                                                                                                           R e le as e
                                            M a in re as o n s fo r u p g rad es to S A P E C C 6 .0                                                                            Q u e s tio n a s k ed :                                                                                                                                                                                                                                         Q u e s tio n a s k ed :
                                                          S o u rc e re le a s e : S A P R /3 E n te rp ris e                                                                   “W ha t w a s th e m a in m otiv atio n fo r yo u r u pg ra d e p roje ct? ”                                                                                                                                                                                     “P lease specify the upgrade type of your upgrade project ”
                                                  Nee d o f ne w fu n c tio na lity                                                                                             (R e a so n s co u ld b e se le cte d from a d ro p -d o w n list a s w e ll a s
                                                  Tec h nic al r e qu ir em e nts *                                                                                             in d iv id u al re a so n s co u ld be m e ntio n e d (re a so n oth e rs))
                       En d o f ma in str e am / e xten d ed ma inte n an c e

                                             Le g ac y sy stem re p lac e me nt
                                                                                                                                                                                                                                                                                                                                A p p r o a c h in u p g r a d e p r o je c t
                                                L e ve r a ge late st te c h n olo g y
      S A P R /3                                                                                                                                                                 H o w to re ad th e c h a rts :                                                                                          S o u rce Re le a se : S A P R /3 En te rp rise                    T a rg e t re le a se : S A P EC C 6 .0                              H o w to re ad th e c h a rts :
     E n te rp ris e              Imp r ove u sa bility o f e xistin g so lutio n
                                                                                                                                                                                 T h e sh o w n re a so n ca te g o rie s co rre sp o n d to th e d ro p -do w n list in                                                                                                                                                                          T his diagram show s the approach in the upgrade projects
                                         In te gr a tio n of ind u str y so lu tio n s                                                                                           th e q u e stio n n aire .
                                         Re du c e to tal c ost of o wn e rsh ip                                                                                                 A s m o re tha n o n e re a so n co uld b e se le cte d p e r u pg ra de , th e
                                                                                                                                                                                                                                                                            S A P R /3      U p g ra d e w ith d e p lo y m e n t
                                                                                                                                                                                 d iffe re nt re a so n cate g o rie s m a y n ot a d d up to 1 0 0% . T he re su lts                                                                                                                     T e c h n ic a l U p g ra d e
                                                                               O the r s                                                                                                                                                                                   E n terp rise    o f n e w fu n c ito n a lity                           13%                     87%
                                                                                                                                                                                 fo r e a ch re a so n cate g o ry a re sta n d a rdize d to th e num be r of
                                                                                         0%             25%               50%               75%                100%              u p g ra d e s of th e g iv en sa m p le.                                                                                                                                                                                                                        C o n c lu s io n /fin d in g s :
                                                                                                                                       b a s e d o n 1 5 up g ra d e s            E xam p le: 5 0 % p e r re a so n = th e re a so n w a s se le cte d in ev e ry
                                                                                                                                                                                                                                                                                                                                                                                                                                                   M ost upgrade projects to S A P E C C 6.0 w ere perform ed
                                                                                                                                                                                 se co n d u p g ra d e d p roje ct.                                                                                                                                                                                      b as ed o n 15 u pg rad e s               using the upgrade approach “T echnical U pgrade.”

                                            M a in re as o n s fo r u p g rad es to S A P E C C 6 .0                                                                                                                                                                                                                                                                                                                                               O n the other hand, the diagram s on the next page indicate
                                                                S o u rc e re le a s e : S A P R /3 4 .6 C                                                                                                                                                                                                                                                                                                                                          that the need for new functionality that is prov ided w ith S A P
                                                                                                                                                                                 C o n c lu s io n /fin d in g s : (to p thre e re a so n s)                                                                                    A p p r o a c h in u p g r a d e p r o je c t                                                                       E C C 6.0 is one of the m ain reasons to upgrade. T his is in
                                                  Nee d o f ne w fu n c tio na lity
                                                                                                                                                                                                                                                                                                           S o u rc e R e le a e s: S AP R /3 4.6 C                         T a rg e t re le a se : S A P EC C 6 .0
                                                                                                                                                                                  S A P R /3 E n te rp ris e : T h e “N e e d of n e w fu nctio n ality ” prov id e d                                                                                                                                                                              accordance w ith the experiences of other S A P U pgrade
                                                  Tec h nic al r e qu ir em e nts *
                                                                                                                                                                                   w ith S A P E C C 6 .0 is n am e d a s a re a so n fo r th e u p g ra de in                                                                                                                                                                                      projects and in agreem ent w ith S A P recom m endations. A
                       En d o f ma in str e am / e xten d ed ma inte n an c e                                                                                                      n e a rly ev e ry se co n d u p g ra d e p ro ject. “T e ch nical re q uire m e nts”                                                                                                                                                                             “T echnical U pgrade ” upgrade approach is the preferred
                                             Le g ac y sy stem re p lac e me nt                                                                                                    is th e m o st ofte n se le cte d re a so n . A n d “L ev e ra gin g th e la te st       S A P R /3                                                                                                                                                              project type in a first step (ex cept “low -hanging fruits”),
                                                                                                                                                                                                                                                                                             U p g ra d e w ith d e p lo y m e n t
                                                                                                                                                                                   te ch n olo g y ” w ith th e u pg ra d e is a n im p o rta n t re a so n in a b o u t      4.6C                                                                   3%                                     T e c h n ic a l U p g ra d e                           w herea s new functionality is deployed in a second step.
      S A P R /3                                L e ve r a ge late st te c h n olo g y                                                                                                                                                                                                       o f n e w fu n c tio n a lity                                                 97%
        4 .6 C                                                                                                                                                                     5 0 % of th e m e a su re d u pg ra d e s.
                                  Imp r ove u sa bility o f e xistin g so lutio n

                                         In te gr a tio n of ind u str y so lu tio n s                                                                                            S A P R /3 4.6 C : S im ila r to th e fin din g s in u p g ra de s w ith so u rce                                                                                                                                                                            A n n o ta tio n :
                                         Re du c e to tal c ost of o wn e rsh ip
                                                                                                                                                                                   re le a se S A P R /3 E n te rp rise , th e “N e e d of n e w fu nctio na lity ”                                                                                                                                                                             T echnical U pgrade: U pgrade of currently used S A P softw are
                                                                                                                                                                                                                                                                                                                                                                                                          b as ed o n 38 u pg rad e s
                                                                                                                                                                                   p rov id e d w ith S A P E C C 6 .0 is a re a so n in ev e ry se co n d                                                                                                                                                                                      w ithout applying new functionality during the upgrade project.
                                                                               O the r s
                                                                                                                                                                                   u p g ra d e p roje ct. “T e ch nical req u irem en ts ” is n am ed a s
                                                                                                                                                                                   im p o rtan t re a so n in 1 /3 of th e m e a su re d u p g ra d e p ro jects.                                                                                                                                                                               U pgrade w ith deploym ent of new functionality : U pgrade of
                                                                                         0%             25%               50%               75%                100%
                                                                                                                                       b a s e d o n 3 9 up g ra d e s
                                                                                                                                                                                   “E n d of m ain stre am /ex ten d e d m ainte n a n ce ” is th e m o st ofte n                                                                                                                                                                               currently used S A P softw are, w ith new functionality added during
                                                                                                                                                                                   se le cte d re a so n .                                                                                                                                                                                                                                      the upgrade project.
                       * A n n o ta tio n :
                         E x am ple s fo r te ch nica l re q uirem e nts: aim to hav e all S A P soft w a re

                                                  P ro je c t D u ra tio n in M o n th s b y S o u rc e R e le a s e
                         in u se o n th e sa m e re le a se lev el, te ch nica l infra stru ctu re , e tc.
                       S A P A G 2 0 0 7 , U p g ra d e E xp e rie n c e s in U p g ra d e P ro je c ts to S A P E C C 6 .0 / 1 4
                                                                                                                                                                                                                                                                                                                      B u s in e s s D o w n tim e * in H o u rs
                                                                                                                                                                                                                                                                                           S A P A G 2 0 0 7 , U p g ra d e E xp e rie n c e s in U p g ra d e P ro je c ts to S A P E C C 6 .0 / 1 3


                         S o u rc e                                                                                                                                                                                                                                                          S o u rc e
                         R e le as e                                                                                                                                                                                                                                                         R e le as e                                                                                                                                                             Q u e s tio n a s k ed :
                                                                                                                                                                                                   Q u e s tio n a s k ed :                                                                                                                                                                                                                                          “P lease specify how m any hours the solution w as unav ailable
                                                                                                                                                                                                   “P lease specify the duration of your upgrade project up to the                                                                                                                                                                                                   for your end users. E v en if your upgrade w as finished ov er the
                                                                                                                                                                                                   initial go -liv e (in m onths).”                                                                                                                                                                                                                                  w eekend, please specify how m any hours the solution w ould
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     hav e been unav ailable for end users in total. ”

                                                                                                                                                                                                                                                                                                                                                                                                                                                                     H o w to re ad th e c h a rts :
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     T o av oid distorting the results, 10% of the m easured num bers on
                                                                                              P ro ject d u ratio n in m o n th s                                                                                                                                                                                                                               B u sin ess d o w n tim e* in h o u rs                                                               the left hand side of the distribution and 10% of the m easured
                                                                                                                                                                                                    H o w to re ad th e c h a rts :
                                                                   S o u rce re leas e: S AP R /3 E n t erp rise                    T a rg e t relea se : S AP E C C 6 .0                                                                                                                                                             S o u rce re leas e: S AP R /3 E n t erp rise                     T a rg e t relea se : S AP E C C 6 .0                        num bers on the right hand side of the distribution are cut off.
                                                                                                                                                                                                    T o av oid distorting the results, 10% of the m easured num bers
                                                                                                                                                                                                                                                                                                                                     Up g rad e str ate g y = d o w n tim e m in im iz ed , w /o U n ic o d e co n ve rsio n                                          P er sam p le, 80% o f th e co llected d ata is rep resen ted b y
                                                                                      M e d ia n : 4 ,0
                                                                                                                                                                                                    on the left hand side of the distribution and 10% of the
                                                                                                                                                                                                                                                                                                                                                    M e d ia n : 3 4 ,0                                                                                              th e in d icated ran g e.
                                                                                                                                                                                                    m easured num bers on the right hand side of the distribution
                         S A P R /3                                                                                                                                                                                                                                                          S A P R /3
                                                                                                                                                                                                    w ere cut off.                                                                                                                                                                                                                                                   M edian = in a giv en sam ple, 50% of all m easured num bers are
                        E n terp rise                               M in : 1 ,9                                           M a x : 6 ,6                                                                                                                                                      E n terp rise
                                                                                                                                                                                                     P er sam p le, 80% o f th e co llected d ata is rep resen ted b y                                                                  M in : 2 0 ,0                                       M a x : 6 5 ,0                                                          less or equal to the m edian, and 50% of all m easured num bers
                                                                                                                                                                                                    th e in d icated ran g e.                                                                                                                                                                                                                                        are greater or equal to the m edian. In sym m etric distributions, the
                                                   0           1           2           3          4           5           6           7          8             9         10       11       12                                                                                                                           0                      20                     40                     60                    80                   100                 120      m edian is located in the m iddle of the distribution .
                                                                                                                   M o n th s                                                                       M edian = In a giv en sam ple, 50% of all m easured num bers                                                                                                                      H o u rs
                                                                                                                                                                   b ase d o n 1 5 up g rad e s                                                                                                                                                                                                                                    b as e d o n 1 1 up g rad e s
                                                                                                                                                                                                    are less than or equal to the m edian, and 50% of all m easured                                                                                                                                                                                                  O nly upgrades that follow ed the “D ow ntim e m inim ized “ upgrade
                                                                                                                                                                                                    num bers are greater than or equal to the m edian. In sym m etric                                                                                                                                                                                                strategy w ere taken into account. N o U nicode conv ersion w as
                                                                                                                                                                                                    distributions, the m edian is located in the m iddle of the                                                                                                                                                                                                      perform ed.
                                                                                                                                                                                                    distribution.
                                                                                              P ro ject d u ratio n in m o n th s
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     C o n c lu s io n /fin d in g s :
                                                                                                                                                                                                                                                                                                                                                                B u sin ess d o w n tim e* in h o u rs
                                                                   S o u rc e relea se : S AP R /3 4.6C                             T arg et re leas e: S AP E C C 6.0                                                                                                                                                               S o u rc e relea se : S AP R /3 4.6C                               T arg et re leas e: S AP E C C 6.0                           T he business dow ntim e w as < = 48 hours (2 days)
                                                                                                                                                                                                    C o n c lu s io n /fin d in g s :
                                                                                                                                                                                                                                                                                                                                     U p g rad e s tra te g y = d o w n tim e m in im iz ed , w /o U n ico d e co n ve rsio n                                         S A P R /3 E n terp rise: for 64% of all m easured upgrade projects
                                                                                                 M e d ia n : 5 ,0
                          S A P R /3                                                                                                                                                                 S A P R /3 E n terp rise, S A P R /3 4.6C : U pgrades w ith source                                                                                           M e d ia n : 4 8 ,0                                                                                                            (for 82% < = 60 hours)
                                                                                                                                                                                                      releases S A P R /3 E nterprise and S A P R /3 4.6C show                                S A P R /3
                            4.6C
                                                                                                                                                                                                                                                                                                4.6C                                                                                                                                                                  S A P R /3 4.6C :           for 61% of all m easured upgrade projects
                                                                                  M in : 3 ,0                             M a x : 6 ,6                                                                sim ilar results w ith a trend to slightly shorter project                                                                                       M in : 3 1 ,2                                             M a x : 8 4 ,0
                                                                                                                                                                                                      durations for upgrade projects w ith source release S A P R /3                                                                                                                                                                                                                              (for 74% < = 60 hours)
                                                   0           1           2           3          4           5        6              7          8             9         10       11        12        E nterprise. B ut m ore statistics are needed to prov e this                                                      0                      20                     40                     60                    80                   100                 120
                                                                                                                    M o n th s                                     b ase d o n 3 9 up g rad e s       trend.                                                                                                                                                                          H o u rs                                     b as e d o n 2 3 up g rad e s
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   * A n n o ta tio n :
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     B usiness dow ntim e = total tim e (planned and unplanned) that
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     the system /solution is not av ailable for end users. T his include s
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     the technical dow ntim e p lu s the tim e necessary for the data
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     backup, final tests, etc., before the productiv e
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     env ironm ent is released for end users.



                                                  S A P A G 2 0 0 7 , U p g ra d e E xp e rie n c e s in U p g ra d e P ro je c ts to S A P E C C 6 .0 / 1 7                                                                                                                                                          S A P A G 2 0 0 7 , U p g ra d e E xp e rie n c e s in U p g ra d e P ro je c ts to S A P E C C 6 .0 / 1 8




© SAP 2008 / Page 5
Upgrade Roadmap - Guide




© SAP 2008 / Page 6
Discover: The Solution Browser

  Activities

     Discover new capabilities
      across different releases and
      enhancement packages

     Filter new capabilities
      according to a dedicated
      source and target release

  Benefits

     Get to know all the delta
      functionality R/3 – ERP releases
      and new Enhancement
      Packages (EhP)

     Fast identification of
      capabilities

                                           Assess the value of upgrading by
                                               comparing functionality
                                         enhancements between your existing
                                           solution and your desired target
                                                       releases

© SAP 2008 / Page 7
Enhancement Packages

                      SAP ERP Release Strategy

                            2006          2008             2010     2012+


                                            Enhancement Packages

                                                  SAP ERP 6.0


                                                 SAP NetWeaver


         What Are Enhancement Packages?
                 Optionally installed and activated software innovations for SAP ERP 6.0
                 Software innovations include; UI simplifications, functional
                  enhancements, industry specific capabilities and enterprise services
                 Cumulative in nature; current enhancement packages contain all contents
                  of earlier packages
                 Enhancement packages are not support packages

© SAP 2008 / Page 8
Enhancement Packages

Optional
                      Enhancement Packages



                           Enterprise Services




                                     Switch Framework
                      New/Improved Functionality



                         Support Packages



                            Legal/Tax Changes,
   Man-                        Corrections
  datory



© SAP 2008 / Page 9
Discover the Concept
  Basic Materials for Getting Started

                                        SAP Enhancement Package
                                          Strategy for SAP ERP




                                                   Lifecycle of SAP
 What IT professionals must know                Enhancement Packages
about SAP Enhancement Packages




                                              SAP Enhancement Packages –
                                                   Technology Facts
 SAP Enhancement Packages -
  Frequently Asked Questions

© SAP 2008 / Page 10
Enhancement Packages - Doco




                       http:/service.sap.com/erp-ehp
© SAP 2008 / Page 11
Typical Look of an ‘At-A-Glance’ Presentation
  Example

       Generic Innovations (1-slider)             Innovations Industry Sector 1 (1-slider)




       Innovations Industry Sector 2 (1-slider)   Enterprise Service Bundles (1-slider)




© SAP 2008 / Page 12
SAP Service Marketplace

               SAP ERP
              Homepage: http://service.sap.com/erp
              Development News: http://service.sap.com/developmentnews
              Release Notes: http://service.sap.com/releasenotes
              Release Strategy: http://service.sap.com/releasestrategy
              Maintenance Strategy: http://service.sap.com/maintenance
              Enhancement Packages: http://service.sap.com/erp-ehp
              Upgrade info centre: http://service.sap.com/upgrade


           SAP Netweaver:
              Homepage: http://service.sap.com/netweaver
              Netweaver Administrator: http://service.sap.com/nwa
              System Landscape Directory: http://service.sap.com/sld
              Software Lifecycle Manager: http://service.sap.com/slm


© SAP 2008 / Page 13
Questions?




© SAP 2008 / Page 14
Our offer to you




  If you haven‟t done one – Get One!



  Free Quick Upgrade Analysis



  Book in before 30th April to secure
  your Analysis



                       peter.dee@sap.com



© SAP 2008 / Page 15
Thank you




© SAP 2008 / Page 16

Contenu connexe

Tendances

How to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindseyHow to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindsey
IBM
 
6 rpt oracle_plugin-anitha_krishnamurthy
6 rpt oracle_plugin-anitha_krishnamurthy6 rpt oracle_plugin-anitha_krishnamurthy
6 rpt oracle_plugin-anitha_krishnamurthy
IBM
 
Rational
RationalRational
Rational
IBM
 
3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal
IBM
 
5 rqm gdd-sharmila-ramesh
5 rqm gdd-sharmila-ramesh5 rqm gdd-sharmila-ramesh
5 rqm gdd-sharmila-ramesh
IBM
 
Jet aviation
Jet aviationJet aviation
Jet aviation
vvenunit
 
EM overview- - Hayden lindsey
EM overview- - Hayden lindseyEM overview- - Hayden lindsey
EM overview- - Hayden lindsey
Roopa Nadkarni
 
1 rdm keynote-robin_bater
1 rdm keynote-robin_bater1 rdm keynote-robin_bater
1 rdm keynote-robin_bater
IBM
 
Overcoming contradictions mike-o_rourke
Overcoming contradictions mike-o_rourkeOvercoming contradictions mike-o_rourke
Overcoming contradictions mike-o_rourke
IBM
 

Tendances (18)

How to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindseyHow to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindsey
 
6 rpt oracle_plugin-anitha_krishnamurthy
6 rpt oracle_plugin-anitha_krishnamurthy6 rpt oracle_plugin-anitha_krishnamurthy
6 rpt oracle_plugin-anitha_krishnamurthy
 
Rational
RationalRational
Rational
 
3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal3 hang on_a_minute-ankur_goyal
3 hang on_a_minute-ankur_goyal
 
5 rqm gdd-sharmila-ramesh
5 rqm gdd-sharmila-ramesh5 rqm gdd-sharmila-ramesh
5 rqm gdd-sharmila-ramesh
 
MCIF- Per Kroll
MCIF-  Per KrollMCIF-  Per Kroll
MCIF- Per Kroll
 
Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)
 
Jet aviation
Jet aviationJet aviation
Jet aviation
 
EM overview- - Hayden lindsey
EM overview- - Hayden lindseyEM overview- - Hayden lindsey
EM overview- - Hayden lindsey
 
Oracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers shareOracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers share
 
RTCi Demo Scenario
RTCi Demo ScenarioRTCi Demo Scenario
RTCi Demo Scenario
 
Automating user provisioning with SAP NW BPM
Automating user provisioning with SAP NW BPMAutomating user provisioning with SAP NW BPM
Automating user provisioning with SAP NW BPM
 
1 rdm keynote-robin_bater
1 rdm keynote-robin_bater1 rdm keynote-robin_bater
1 rdm keynote-robin_bater
 
Overcoming contradictions mike-o_rourke
Overcoming contradictions mike-o_rourkeOvercoming contradictions mike-o_rourke
Overcoming contradictions mike-o_rourke
 
ERP Logic Upgrade Brochure
ERP Logic Upgrade BrochureERP Logic Upgrade Brochure
ERP Logic Upgrade Brochure
 
Become A Best Run Inecom Client - Remote Services Platform
Become A Best Run Inecom Client - Remote Services PlatformBecome A Best Run Inecom Client - Remote Services Platform
Become A Best Run Inecom Client - Remote Services Platform
 
Aggregating application, service, and portfolio demand using HP Project and P...
Aggregating application, service, and portfolio demand using HP Project and P...Aggregating application, service, and portfolio demand using HP Project and P...
Aggregating application, service, and portfolio demand using HP Project and P...
 
Technological Breakthroughs in 2011 and Beyond
Technological Breakthroughs in 2011 and BeyondTechnological Breakthroughs in 2011 and Beyond
Technological Breakthroughs in 2011 and Beyond
 

En vedette (6)

Co teaching
Co teachingCo teaching
Co teaching
 
German Rocket Program
German Rocket ProgramGerman Rocket Program
German Rocket Program
 
Dance Thing
Dance ThingDance Thing
Dance Thing
 
CSUSM Co-Teaching in Clinical Practice
CSUSM Co-Teaching in Clinical PracticeCSUSM Co-Teaching in Clinical Practice
CSUSM Co-Teaching in Clinical Practice
 
Cruise missile technology.ppt
Cruise missile technology.pptCruise missile technology.ppt
Cruise missile technology.ppt
 
Cruise missile technology By shailesh shukla ppt
Cruise missile technology By shailesh shukla pptCruise missile technology By shailesh shukla ppt
Cruise missile technology By shailesh shukla ppt
 

Similaire à Upgrades and enhancement_packs_explained_mar_2008

Sap upgrade
Sap upgradeSap upgrade
Sap upgrade
Ram K
 
Bridging the gap between pre-production testing and production monitoring
Bridging the gap between pre-production testing and production monitoringBridging the gap between pre-production testing and production monitoring
Bridging the gap between pre-production testing and production monitoring
fsyed
 
How To Make It Real - Hayden Lindsey
How To Make It Real - Hayden LindseyHow To Make It Real - Hayden Lindsey
How To Make It Real - Hayden Lindsey
Roopa Nadkarni
 
How to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindseyHow to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindsey
IBM
 
Run sap methodology how to implement end to-end solution operations
Run sap methodology  how to implement end to-end solution operations  Run sap methodology  how to implement end to-end solution operations
Run sap methodology how to implement end to-end solution operations
ricardopabloasensio
 
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
Arvind Rajan
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
Alithya
 

Similaire à Upgrades and enhancement_packs_explained_mar_2008 (20)

Sap upgrade
Sap upgradeSap upgrade
Sap upgrade
 
Agile at AT&T
Agile at AT&TAgile at AT&T
Agile at AT&T
 
Case study - Information Technology Consulting
Case study - Information Technology ConsultingCase study - Information Technology Consulting
Case study - Information Technology Consulting
 
Bridging the gap between pre-production testing and production monitoring
Bridging the gap between pre-production testing and production monitoringBridging the gap between pre-production testing and production monitoring
Bridging the gap between pre-production testing and production monitoring
 
How To Make It Real - Hayden Lindsey
How To Make It Real - Hayden LindseyHow To Make It Real - Hayden Lindsey
How To Make It Real - Hayden Lindsey
 
How to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindseyHow to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindsey
 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentation
 
Ds Erp Practice Overview 0403081
Ds Erp Practice Overview 0403081Ds Erp Practice Overview 0403081
Ds Erp Practice Overview 0403081
 
Run sap methodology how to implement end to-end solution operations
Run sap methodology  how to implement end to-end solution operations  Run sap methodology  how to implement end to-end solution operations
Run sap methodology how to implement end to-end solution operations
 
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie ThomasIBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
 
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
 
Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Net@Work Client Presentation with Security
Net@Work Client Presentation with Security
 
Modernize your-java ee-app-server-infrastructure
Modernize your-java ee-app-server-infrastructureModernize your-java ee-app-server-infrastructure
Modernize your-java ee-app-server-infrastructure
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
Uneecops Company Profile
Uneecops Company ProfileUneecops Company Profile
Uneecops Company Profile
 
Gebbs Technology Services
Gebbs Technology ServicesGebbs Technology Services
Gebbs Technology Services
 
Avea Release Management IBM Innovate 2012
Avea Release Management IBM Innovate 2012Avea Release Management IBM Innovate 2012
Avea Release Management IBM Innovate 2012
 
Erp Implementation Methodology Wkshp 2.0 120611
Erp Implementation Methodology Wkshp 2.0 120611Erp Implementation Methodology Wkshp 2.0 120611
Erp Implementation Methodology Wkshp 2.0 120611
 
Ams Webinar 25 March 2010 Jf Final[1]
Ams Webinar 25 March 2010 Jf Final[1]Ams Webinar 25 March 2010 Jf Final[1]
Ams Webinar 25 March 2010 Jf Final[1]
 
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
 

Upgrades and enhancement_packs_explained_mar_2008

  • 1. Upgrades and Enhancement Packs Explained SAP Live and Local Webcast Tour „08 3 April, 2008
  • 2. Upgrade Roadmap Upgrade Project Upgrade Project started completed Plan Build Run Operations & Upgrade Upgrade Continuous Upgrade Implementation Discovery Evaluation Improvement Define Business and Define Minimize costs IT requirements strategy and risks of Upgrade Project Upgrade Roadmap Production Project Final Preparation Blueprint Realization Cutover & Preparation for Cutover Support Document current Specify implementation Perform integration Implement and Execute production solution and set-up scope and solution and system tests adjust solution system Upgrade & project adjustment needs and plan cutover Support © SAP 2008 / Page 2
  • 3. Upgrade Approaches 3 Possible Upgrade Approaches Strategic Business Improvement  Focus on functionality extension and improvement 3  Enablement of new and optimized business processes and scenarios based on new ERP core functionality 2 Functional Upgrade Value 2  New functionality to be implemented as part of the upgrade, modification clearing  Focus on reduction of system complexity 1 1 Technical Upgrade Starting Point  Focus on pure technology upgrade  Retain functionality used Time  Review Usage of custom developments Recommendations: • Create and evaluate your own upgrade roadmap, considering the whole spectrum • Define business justification first but start small with the technical upgrade only © SAP 2008 / Page 3
  • 4. Upgrade Info Center Key documents: • Value of Upgrade • Functional Deltas in Detail • SAP ERP Upgrade Aspects • Upgrade Master Guides • SAP Upgrade Offerings Direct access to: • SAP Upgrade Roadmap • SAP Upgrade Services • SAP ERP Solution Browser • Projects statistics (Upgrade Experience DB) • Product Availability Matrix www.service.sap.com/upgrade © SAP 2008 / Page 4
  • 5. Upgrade Experience Database R e a s o n s fo r U p g ra d e s b y S o u rc e R e le a s e A p p ro a c h in U p g ra d e s b y S o u rc e R e le a s e S o u rc e S o u rc e R e le as e R e le as e M a in re as o n s fo r u p g rad es to S A P E C C 6 .0 Q u e s tio n a s k ed : Q u e s tio n a s k ed : S o u rc e re le a s e : S A P R /3 E n te rp ris e “W ha t w a s th e m a in m otiv atio n fo r yo u r u pg ra d e p roje ct? ” “P lease specify the upgrade type of your upgrade project ” Nee d o f ne w fu n c tio na lity (R e a so n s co u ld b e se le cte d from a d ro p -d o w n list a s w e ll a s Tec h nic al r e qu ir em e nts * in d iv id u al re a so n s co u ld be m e ntio n e d (re a so n oth e rs)) En d o f ma in str e am / e xten d ed ma inte n an c e Le g ac y sy stem re p lac e me nt A p p r o a c h in u p g r a d e p r o je c t L e ve r a ge late st te c h n olo g y S A P R /3 H o w to re ad th e c h a rts : S o u rce Re le a se : S A P R /3 En te rp rise T a rg e t re le a se : S A P EC C 6 .0 H o w to re ad th e c h a rts : E n te rp ris e Imp r ove u sa bility o f e xistin g so lutio n T h e sh o w n re a so n ca te g o rie s co rre sp o n d to th e d ro p -do w n list in T his diagram show s the approach in the upgrade projects In te gr a tio n of ind u str y so lu tio n s th e q u e stio n n aire . Re du c e to tal c ost of o wn e rsh ip A s m o re tha n o n e re a so n co uld b e se le cte d p e r u pg ra de , th e S A P R /3 U p g ra d e w ith d e p lo y m e n t d iffe re nt re a so n cate g o rie s m a y n ot a d d up to 1 0 0% . T he re su lts T e c h n ic a l U p g ra d e O the r s E n terp rise o f n e w fu n c ito n a lity 13% 87% fo r e a ch re a so n cate g o ry a re sta n d a rdize d to th e num be r of 0% 25% 50% 75% 100% u p g ra d e s of th e g iv en sa m p le. C o n c lu s io n /fin d in g s : b a s e d o n 1 5 up g ra d e s  E xam p le: 5 0 % p e r re a so n = th e re a so n w a s se le cte d in ev e ry  M ost upgrade projects to S A P E C C 6.0 w ere perform ed se co n d u p g ra d e d p roje ct. b as ed o n 15 u pg rad e s using the upgrade approach “T echnical U pgrade.” M a in re as o n s fo r u p g rad es to S A P E C C 6 .0  O n the other hand, the diagram s on the next page indicate S o u rc e re le a s e : S A P R /3 4 .6 C that the need for new functionality that is prov ided w ith S A P C o n c lu s io n /fin d in g s : (to p thre e re a so n s) A p p r o a c h in u p g r a d e p r o je c t E C C 6.0 is one of the m ain reasons to upgrade. T his is in Nee d o f ne w fu n c tio na lity S o u rc e R e le a e s: S AP R /3 4.6 C T a rg e t re le a se : S A P EC C 6 .0  S A P R /3 E n te rp ris e : T h e “N e e d of n e w fu nctio n ality ” prov id e d accordance w ith the experiences of other S A P U pgrade Tec h nic al r e qu ir em e nts * w ith S A P E C C 6 .0 is n am e d a s a re a so n fo r th e u p g ra de in projects and in agreem ent w ith S A P recom m endations. A En d o f ma in str e am / e xten d ed ma inte n an c e n e a rly ev e ry se co n d u p g ra d e p ro ject. “T e ch nical re q uire m e nts” “T echnical U pgrade ” upgrade approach is the preferred Le g ac y sy stem re p lac e me nt is th e m o st ofte n se le cte d re a so n . A n d “L ev e ra gin g th e la te st S A P R /3 project type in a first step (ex cept “low -hanging fruits”), U p g ra d e w ith d e p lo y m e n t te ch n olo g y ” w ith th e u pg ra d e is a n im p o rta n t re a so n in a b o u t 4.6C 3% T e c h n ic a l U p g ra d e w herea s new functionality is deployed in a second step. S A P R /3 L e ve r a ge late st te c h n olo g y o f n e w fu n c tio n a lity 97% 4 .6 C 5 0 % of th e m e a su re d u pg ra d e s. Imp r ove u sa bility o f e xistin g so lutio n In te gr a tio n of ind u str y so lu tio n s  S A P R /3 4.6 C : S im ila r to th e fin din g s in u p g ra de s w ith so u rce A n n o ta tio n : Re du c e to tal c ost of o wn e rsh ip re le a se S A P R /3 E n te rp rise , th e “N e e d of n e w fu nctio na lity ” T echnical U pgrade: U pgrade of currently used S A P softw are b as ed o n 38 u pg rad e s p rov id e d w ith S A P E C C 6 .0 is a re a so n in ev e ry se co n d w ithout applying new functionality during the upgrade project. O the r s u p g ra d e p roje ct. “T e ch nical req u irem en ts ” is n am ed a s im p o rtan t re a so n in 1 /3 of th e m e a su re d u p g ra d e p ro jects. U pgrade w ith deploym ent of new functionality : U pgrade of 0% 25% 50% 75% 100% b a s e d o n 3 9 up g ra d e s “E n d of m ain stre am /ex ten d e d m ainte n a n ce ” is th e m o st ofte n currently used S A P softw are, w ith new functionality added during se le cte d re a so n . the upgrade project. * A n n o ta tio n : E x am ple s fo r te ch nica l re q uirem e nts: aim to hav e all S A P soft w a re P ro je c t D u ra tio n in M o n th s b y S o u rc e R e le a s e in u se o n th e sa m e re le a se lev el, te ch nica l infra stru ctu re , e tc. S A P A G 2 0 0 7 , U p g ra d e E xp e rie n c e s in U p g ra d e P ro je c ts to S A P E C C 6 .0 / 1 4 B u s in e s s D o w n tim e * in H o u rs S A P A G 2 0 0 7 , U p g ra d e E xp e rie n c e s in U p g ra d e P ro je c ts to S A P E C C 6 .0 / 1 3 S o u rc e S o u rc e R e le as e R e le as e Q u e s tio n a s k ed : Q u e s tio n a s k ed : “P lease specify how m any hours the solution w as unav ailable “P lease specify the duration of your upgrade project up to the for your end users. E v en if your upgrade w as finished ov er the initial go -liv e (in m onths).” w eekend, please specify how m any hours the solution w ould hav e been unav ailable for end users in total. ” H o w to re ad th e c h a rts : T o av oid distorting the results, 10% of the m easured num bers on P ro ject d u ratio n in m o n th s B u sin ess d o w n tim e* in h o u rs the left hand side of the distribution and 10% of the m easured H o w to re ad th e c h a rts : S o u rce re leas e: S AP R /3 E n t erp rise T a rg e t relea se : S AP E C C 6 .0 S o u rce re leas e: S AP R /3 E n t erp rise T a rg e t relea se : S AP E C C 6 .0 num bers on the right hand side of the distribution are cut off. T o av oid distorting the results, 10% of the m easured num bers Up g rad e str ate g y = d o w n tim e m in im iz ed , w /o U n ic o d e co n ve rsio n  P er sam p le, 80% o f th e co llected d ata is rep resen ted b y M e d ia n : 4 ,0 on the left hand side of the distribution and 10% of the M e d ia n : 3 4 ,0 th e in d icated ran g e. m easured num bers on the right hand side of the distribution S A P R /3 S A P R /3 w ere cut off. M edian = in a giv en sam ple, 50% of all m easured num bers are E n terp rise M in : 1 ,9 M a x : 6 ,6 E n terp rise  P er sam p le, 80% o f th e co llected d ata is rep resen ted b y M in : 2 0 ,0 M a x : 6 5 ,0 less or equal to the m edian, and 50% of all m easured num bers th e in d icated ran g e. are greater or equal to the m edian. In sym m etric distributions, the 0 1 2 3 4 5 6 7 8 9 10 11 12 0 20 40 60 80 100 120 m edian is located in the m iddle of the distribution . M o n th s M edian = In a giv en sam ple, 50% of all m easured num bers H o u rs b ase d o n 1 5 up g rad e s b as e d o n 1 1 up g rad e s are less than or equal to the m edian, and 50% of all m easured O nly upgrades that follow ed the “D ow ntim e m inim ized “ upgrade num bers are greater than or equal to the m edian. In sym m etric strategy w ere taken into account. N o U nicode conv ersion w as distributions, the m edian is located in the m iddle of the perform ed. distribution. P ro ject d u ratio n in m o n th s C o n c lu s io n /fin d in g s : B u sin ess d o w n tim e* in h o u rs S o u rc e relea se : S AP R /3 4.6C T arg et re leas e: S AP E C C 6.0 S o u rc e relea se : S AP R /3 4.6C T arg et re leas e: S AP E C C 6.0 T he business dow ntim e w as < = 48 hours (2 days) C o n c lu s io n /fin d in g s : U p g rad e s tra te g y = d o w n tim e m in im iz ed , w /o U n ico d e co n ve rsio n  S A P R /3 E n terp rise: for 64% of all m easured upgrade projects M e d ia n : 5 ,0 S A P R /3  S A P R /3 E n terp rise, S A P R /3 4.6C : U pgrades w ith source M e d ia n : 4 8 ,0 (for 82% < = 60 hours) releases S A P R /3 E nterprise and S A P R /3 4.6C show S A P R /3 4.6C 4.6C  S A P R /3 4.6C : for 61% of all m easured upgrade projects M in : 3 ,0 M a x : 6 ,6 sim ilar results w ith a trend to slightly shorter project M in : 3 1 ,2 M a x : 8 4 ,0 durations for upgrade projects w ith source release S A P R /3 (for 74% < = 60 hours) 0 1 2 3 4 5 6 7 8 9 10 11 12 E nterprise. B ut m ore statistics are needed to prov e this 0 20 40 60 80 100 120 M o n th s b ase d o n 3 9 up g rad e s trend. H o u rs b as e d o n 2 3 up g rad e s * A n n o ta tio n : B usiness dow ntim e = total tim e (planned and unplanned) that the system /solution is not av ailable for end users. T his include s the technical dow ntim e p lu s the tim e necessary for the data backup, final tests, etc., before the productiv e env ironm ent is released for end users. S A P A G 2 0 0 7 , U p g ra d e E xp e rie n c e s in U p g ra d e P ro je c ts to S A P E C C 6 .0 / 1 7 S A P A G 2 0 0 7 , U p g ra d e E xp e rie n c e s in U p g ra d e P ro je c ts to S A P E C C 6 .0 / 1 8 © SAP 2008 / Page 5
  • 6. Upgrade Roadmap - Guide © SAP 2008 / Page 6
  • 7. Discover: The Solution Browser Activities  Discover new capabilities across different releases and enhancement packages  Filter new capabilities according to a dedicated source and target release Benefits  Get to know all the delta functionality R/3 – ERP releases and new Enhancement Packages (EhP)  Fast identification of capabilities Assess the value of upgrading by comparing functionality enhancements between your existing solution and your desired target releases © SAP 2008 / Page 7
  • 8. Enhancement Packages SAP ERP Release Strategy 2006 2008 2010 2012+ Enhancement Packages SAP ERP 6.0 SAP NetWeaver What Are Enhancement Packages?  Optionally installed and activated software innovations for SAP ERP 6.0  Software innovations include; UI simplifications, functional enhancements, industry specific capabilities and enterprise services  Cumulative in nature; current enhancement packages contain all contents of earlier packages  Enhancement packages are not support packages © SAP 2008 / Page 8
  • 9. Enhancement Packages Optional Enhancement Packages Enterprise Services Switch Framework New/Improved Functionality Support Packages Legal/Tax Changes, Man- Corrections datory © SAP 2008 / Page 9
  • 10. Discover the Concept Basic Materials for Getting Started SAP Enhancement Package Strategy for SAP ERP Lifecycle of SAP What IT professionals must know Enhancement Packages about SAP Enhancement Packages SAP Enhancement Packages – Technology Facts SAP Enhancement Packages - Frequently Asked Questions © SAP 2008 / Page 10
  • 11. Enhancement Packages - Doco http:/service.sap.com/erp-ehp © SAP 2008 / Page 11
  • 12. Typical Look of an ‘At-A-Glance’ Presentation Example Generic Innovations (1-slider) Innovations Industry Sector 1 (1-slider) Innovations Industry Sector 2 (1-slider) Enterprise Service Bundles (1-slider) © SAP 2008 / Page 12
  • 13. SAP Service Marketplace SAP ERP  Homepage: http://service.sap.com/erp  Development News: http://service.sap.com/developmentnews  Release Notes: http://service.sap.com/releasenotes  Release Strategy: http://service.sap.com/releasestrategy  Maintenance Strategy: http://service.sap.com/maintenance  Enhancement Packages: http://service.sap.com/erp-ehp  Upgrade info centre: http://service.sap.com/upgrade SAP Netweaver:  Homepage: http://service.sap.com/netweaver  Netweaver Administrator: http://service.sap.com/nwa  System Landscape Directory: http://service.sap.com/sld  Software Lifecycle Manager: http://service.sap.com/slm © SAP 2008 / Page 13
  • 15. Our offer to you If you haven‟t done one – Get One! Free Quick Upgrade Analysis Book in before 30th April to secure your Analysis peter.dee@sap.com © SAP 2008 / Page 15
  • 16. Thank you © SAP 2008 / Page 16