5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 2 –
6.26.18
Whether you’re planning your first practice straight out of Associateship,
or launching your 10th in a growing group empire, building a dental office is
an extraordinary process - and at times both challenging and exacting.
This document outlines key steps & highlights project mile-
stones – and provides significant detail on Design Ergonomics’
development strategies and processes.
Your office will have an enormous impact on your future; it’s where you’ll
spend much of your time, determines your financial security, and allows you
to bring health and well-being to the community.
We are honored to be part of the creation process.
Please note that this document addresses issues specific to purchasing
a lot for Ground Up Construction or an Existing Building for develop-
ment. If you are considering leasing a space, please see “Dental Office
Design Process - Tenant Improvement”, also available on our website.
INTRODUCTION
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 3 –
6.26.18
OVERVIEW
Define Goals and Requirements
Gather Your Team
Rough Budgeting
Step ONE
EARLY PLANNING
Site Selection
Negotiations & Due Diligence
Preliminary Site Engineering
Step TWO
PROPERTY ACQUISITION
Conceptual
• Consultation
• Blocking Diagram & Operatory Planning
Refinement
• Preliminary Floor Plan
• Preliminary Exterior Design Concepts
• Equipment Determinations & Final Floor Plan
Interior Design
Step THREE
DESIGN
DEVELOPMENT
Construction Documents & Engineering
Bidding
Permitting
Step FOUR
DESIGN EXECUTION
Construction
Equipment Installation
Final Inspections & CO
Step FIVE
CONSTRUCTION
Every building project has unique elements; however, most follow the general flow as outlined below.
While this outline may appear simple at a glance, there are an enormous number of details to track and
many people involved. (Note that “Gather Your Team” is one of the first things you should consider!)
Design Ergonomics’ focus is Practice Development – locating the best possible site and designing the
most efficient, comfortable and attractive office possible. While these tasks fall mainly under the Location
and Design Steps (highlighted in red), we look forward to accompanying you on your entire journey.
Where possible, a “Time Frame” will be given for elements in each step. Please note that these ranges
are rough estimates only and may be subject to significant variation depending on your particular project.
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 4 –
6.26.18
• Financial Advisor (may be beneficial during rough budgeting phase)
• Banker/Lender
• Attorney
• Architectural & Interior Designers
• Clinical Specialist (equipment decisions impact design, budget and time-lines)
• Construction Team
	 - Architect
	 - Engineers (Civil, Mechanical, Electrical, Plumbing)
	 - Contractor
Building a new office is a Team Effort - though the members on the team, and how much input
each will have may vary considerably with each project. Key players include:
Depending on your project type, your Construction Team may be from one organization or several.
We have developed a large network of trusted referral partners across all the areas listed above.
Please don’t hesitate to ask if you would like advice or recommendations.
Define Goals and Requirements
Gather Your Team
PH A S E O N E • E A R LY PL A N N I N G
Time Frame: Varies
Time Frame: Varies (but could be several weeks)
• How many ops do I need at opening?
• How about 3 years from now? Or 10?
• How long am I going to work in this office?
	 - End-game retirement office?
	 - Lay ground work for later expansion?
	 - Plan on opening a second office later?
• What’s important to me?
	 - Location
	 - Start-up costs or long term value
	 - Efficiency & Productivity
	 - Ease of bringing in Associates
	 - Appearance
• What are my BIG PICTURE Goals?
- Personal Wealth, Charity, More Family Time?
- I just love Dentistry and want to do more of it!
This is “Big Picture” thinking. You need to ask yourself a lot of questions. Then think about the
answers – and ask them again. At this point, it’s easy to get lost in short term thinking and challenges,
but the decisions you make today will affect your career for years to come. So, think long term.
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 5 –
6.26.18
PH A S E O N E • E A R LY PL A N N I N G
As your vision of the future comes into focus, you need to develop a realistic picture of what it will
take to get there – and you need to start with a budget.
Developing a reasonable budget (one that you can expect to attain) can be somewhat convoluted,
and is impacted by a number of factors including:
This process often occurs as a cycle of propose, estimate, investigate, and refine – but it begins by
examining your Goals and Requirements.
A Financial Advisor and/or your Lender may be helpful in this process. Additionally, we have tools
that can help suggest very rough costs for a variety of project types. These address such issues as
operatory count, regional construction cost variation and level of finish treatment.
Balancing what you want now, what you want for the future, and what you can reasonably afford can
be a challenge. Fortunately, we’ve helped 1000’s of doctors through the process and one of Design
Ergonomics’ greatest strengths lies in our ability to design very cost effective offices suited to a wide
range of needs.
Rough Budgeting
• Your credit rating
• Your project type (Building Purchase, Ground Up Build)
• Complexity of design & level of finish treatments
• Your current production levels
• Ability to self-finance
• Practice history
• Practice ownership, and more...
FIRST FLOOR PLA
5338 SQ. FT.
334 SQ. FT. PER TX. R
PROJECT NUMBER: KEELAN -
DATE:
DRAWN BY:
CHECKED BY:
A 1.0
DR.
PAUL
KEELAN
BUTLER,
PA
198 Airport Rd
Fall River, MA 027
DN
9 Operatories?
16 Ops and phase equipment?
Area to Expand
Space to Lease Out
Development Potential
Time Frame: Varies
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 6 –
6.26.18
Site Selection
Finding the right location is absolutely critical to the success of your new
practice; to maximize your investment, it’s got to be perfect.
Obviously, enlisting the aid of a Realtor can help with this process. Howev-
er, in 20 years of designing exclusively for the dental field, we’ve analyzed
1000’s of construction sites and have developed a deep understanding of
what works. There are issues unique to the dental industry that even a com-
mercial real estate specialist may not be aware of.
We offer a range of service options to help you make an in-
formed decision on just the right spot to build the practice of
your dreams. All options utilize an algorithm we’ve developed
to analyze and quantify nearly a hundred variables, including:
If you’re having trouble finding an appropriate location –
or would like us to review and compare locations you have
found – please ask your Design Specialist for more informa-
tion.
Finally, you may want to determine feasibility of potential
sites. Many clients utilize our Blocking Diagram design ser-
vice to accomplish this. It is affordable, flexible and fast (see
Step Three, Design Development for details).
• Maximum exposure to your preferred demographic.
• Municipal or infrastructure hurdles that cause
delays and cost-overruns.
• Visibility, traffic and access factors that work for
you, not against you.
• Analysis of existing improvements (structures, etc.)
High Visibility
Exceptional Demographics
Strong Business Synergies
PHASE TWO • PROPERTY ACQUISITION
Time Frame: 4-12 weeks
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 7 –
6.26.18
Negotiations & Due Diligence
Preliminary Site Engineering & “As Builts”
You’ll want an attorney on your team at this point; it’s better to have one
familiar with you and your project now, than to wait until you really need one
because something unexpected has come up. He or she can provide critical
input at loan, purchase or contract review times throughout the process.
At negotiations you will determine your Due Diligence period. During this
time, you will have a Civil Engineer investigate the site to reveal any issues
that might cause it to be non-viable. Should such issues become apparent,
you may be able to pull out of the sale and still retain your escrow. Again,
consult your attorney.
Launching the Conceptual Design process during (or even before) the Due Diligence period may also
prove useful. Blocking Diagrams (see next section) can help determine the land or structure valuation.
Establishing the scale of practice that the property can support will give you a clearer sense of the
potential return on your investment – and hence, what the property is worth to you.
During the Due Diligence period, have a Civil Engineer prepare a
preliminary Site Engineering survey during the Due Diligence period.
This is a basic survey, and items covered will depend on the nature
of the particular site. Such items may include a preliminary site plan,
rough building location and allowable footprint, soil & environmental
testing, water remediation strategies etc. A much more comprehen-
sive study will be performed at a later date, which will be included
with the Construction Documentation.
As Builts - If you are purchasing an existing structure in which to
build your Office, you will need current drawings of the site. These
plans are known as “As Builts” and detail all the dimensional and
structural elements of a location as it currently exists. While we can
create a Conceptual schematic of how a space might be utilized
(see Blocking Diagram, page 9), the accuracy of such a drawing
depends heavily on what we have to work from. Outdated or in-
complete drawings may require changes or incur significant costs
when detailed design work begins.
Your Realtor can request As Builts from the seller. If they are not
available, you will need to make arrangements to have them created
before any reliable design work can be done on the space.
T:MontgomeryCMGM DwgSMILE MAKERS150040-DENTAL OFFICE+PLANSC5-GRADING.dwg
PHASE TWO • PROPERTY ACQUISITION
Time Frame: 1-2 weeks, but may vary
Time Frame: 2-4 weeks
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 8 –
6.26.18
Conceptual - Consultation
If you worked with us on Site Selection, then
we’ve developed a good relationship at this point.
Otherwise, we need to get to know more about
you; your goals, how you perform dentistry and your
project expectations. To start this process, you’ll be
asked to fill out our Dental Office Planner (“DOP”),
This is a fairly quick online form that will give us the
basic information we need to build an early profile
of your project. We will also schedule a Consult Call
with you.
Design is a visual medium. Whenever possible, we conduct Consultation and Plan
Reviews via Screen Share. We’ve found this to be the most effective method to relay our
design philosophies to our clients, while providing them the opportunity for immediate
feedback and commentary.
During the Design Consult Call, we’ll review your long term goals and desires, focusing on
the scope of your project. While operatory count, number of floors, basement amenities
and other architectural elements are critical to this discussion, they are not the only
elements under consideration. We’ll also investigate your preferred patient demographic,
staffing levels, and clinical systems (current and desired).
Operatory equipment has a significant impact on design and the practice development
process – including budgetary considerations. How rooms are utilized plays a role in
their size and arrangement; dedicated hygiene rooms, surgical suites, plumbed vs mobile
nitrous, hand-held X-rays and a number of other factors need to be taken into account to
create the most efficient and effective design for both patient and doctor. To this end, we
will also introduce you to one of our Clinical Specialists. This member of your team will
guide you on what equipment decisions need to be made and when.
PHASE THREE • DESIGN DEVELOPMENT
Time Frame: 1 week or faster
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 9 –
6.26.18
Conceptual - Blocking Diagram & Op Planning
Now the Design Process launches in earnest, and we begin with a conceptual Blocking Diagram.
A dental practice
is a system.
Before you define the walls, it’s crit-
ical to layout the flow of that sys-
tem – understanding the functional
demands of each space and how
they relate to one another. This
fast, flexible, and responsive design
approach will clarify your goals for
the future and solidify your vision of
the perfect practice.
Complex Issues Simplified
The Blocking Diagram is a preliminary space/plan concept used to outline the layout and flow of your
future practice. Using simplified square footage calculations and geometric space planning, we cre-
ate a schematic diagram representing one possible configuration of your space.
At this stage, we focus on maximizing the efficiency, capacity and comfort of your practice as a
whole. While the result looks simple, your Blocking Diagram represents 20 years of research maxi-
mizing dental office productivity and cost-effective design execution.
As schematics, these proposals are flexible and highly responsive to your input. This creates a de-
velopment and revision process that is faster and more effective than traditional floor planning tech-
niques – and at a much lower cost.
Iterations
Our standard Blocking Diagram service includes up to four design iterations. These may be used to
refine concepts within a single design theme, or to experiment with different approaches. They may
even be used to assess multiple spaces.
Each iteration will be presented via Screen Share. This allows us to show how design concepts may
look in the real world and to make minor changes for immediate approval based on your input.
Depending the on the number of iterations required, the Blocking Diagram phase of Design Develop-
ment can be done quite quickly – sometimes in just a few days. Once you are satisfied, the approved
design can move to the next step in Design Development: the Floor Plan.

FILENAME:
ISSUED:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
PJL
DJA







PROPOSED
DENTAL
OFFICE
FOR
LAKE
OCONEE
DENTISTRY
= DAYLIGHT
P = PLUMBING REQUIRED
= ACOUSTICS HIGH IMPORTANCE
PROPOSED BLOCKING DIAGRAM V2
SCALE = N.T.S
APPROX 4972 sq.ft.
331 sq.ft/Tx.Rm
THE 16 ELEMENTS OF AN IDEAL FLOOR PLAN
1.Clearly identifiable patient entrance.
2. Staff entrance screened from view. Prevents entry confusion.
3. Immediate visual and physical access to the front desk upon office entry.
4. Waiting room seating removed from primary circulation or traffic flow.
5. Patient bathroom visible to, but removed from, waiting room seating.
6. The major proportion of the open front desk does not face the waiting room seating.
7. Conference room accessible by the doctor without passing into the front desk space.
8. Conference room location minimally exposes patient to treatment room noises.
9. Treatment rooms isolated from the front desk.
10. Compact treatment area minimizing segregation of doctor and hygiene staff.
11. Doctor’s office within proximity of treatment rooms, to keep a pulse on clinical activities.
12. Space for mobilization of technology.
13. Sterilization, lab and re-supply areas in close physical proximity to treatment rooms.
14. Radiology areas do not block traffic flow when in use.
15. Staff lounge isolated from clinical and business zones.
16. Treatment room alignment does not channel noises from room to room.
= PRIVATE SPACES
= TREATMENTSPACES
= PUBLIC SPACES
QUIET
DOCTOR
TREATMENT
ROOM
“P”
(16’-0”X9’-0”)
QUIET
DOCTOR
TREATMENT
ROOM
“P”
(16’-0”X9’-0”)
QUIET
DOCTOR
TREATMENT
ROOM
“P”
(16’-0”X9’-0”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DENTAL
MECH
CLOSET
WAITING
ROOM
(16+ SEATS)
WAITING
ROOM
(11+ SEATS)
CAFE
AREA
(5+ SEATS)
CLOSET
PATIENT
RESTROOM
“P”
PATIENT
RESTROOM
“P”
STAFF
RESTROOM
“P”
SEDATION
RESTROOM
“P”
SEMI-PRIVATE
CHECKOUT
AREA
SEMI-PRIVATE
CHECKOUT
AREA
CONSULT
ROOM
CONSULT
ROOM
X-RAY &
IMAGING
ROOM
COMPUTER
STATION
STERILIZATION
RESUPPLY &
STORAGE
“P”
STAFF
LOUNGE
“P”
JANITOR
CLOSET
“P”
LAB &
MODEL
STORAGE
GREETING
AREA
(2 STATIONS)
LOGO
WALL
CHECKOUT
STATIONS
STAIRS UP
REFRESHMENTS
PLAY
AREA
MOBILE TECH
MOBILE TECH
PHASE THREE • DESIGN DEVELOPMENT
Time Frame: 1-2 weeks
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 10 –
6.26.18
Refinement - Preliminary Floor Plan
PHASE THREE • DESIGN DEVELOPMENT
Time Frame: 1-2 weeks
A Floor Plan is created by translating the conceptual elements that were
established during the Blocking Diagram process – patient flow, clinical sys-
tems, sterilization, inventory and storage – into a formal drawing.
As the basis from which all other documents are created, it must accurately
depict the specific details that allow the Blocking concepts to be realized.
Missteps and oversights at this stage can snowball into costly changes down
the road. Simply changing the location of a door, or the orientation of a room
– which are trivial matters to an Architect – can have dramatic and detrimen-
tal impact on traffic flow in a dental environment.
Most Architects don’t design exclusively for the dental
industry. We do. As the nation’s largest independent
dental office design firm, we’ve had the opportunity to
help develop 1000’s of practices, and have seen what
works – and what doesn’t. While our Blocking Dia-
grams establish the scheme for an incredibly effective
practice, they truly are conceptual frameworks only.
To avoid potential issues, we strongly recommend having our design team
take your approved Blocking Diagram to Floor Plan (initial, and then final).
We will ensure critical design elements are maintained, as well as provide
additional drawing details which accurately define Operatory, Sterilization,
Resupply and other clinical considerations unique to a dental practice.

FILENAME:
ISSUED:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
PJL
DJA







PROPOSED
DENTAL
OFFICE
FOR
LAKE
OCONEE
DENTISTRY
= DAYLIGHT
P = PLUMBING REQUIRED
= ACOUSTICS HIGH IMPORTANCE
PROPOSED BLOCKING DIAGRAM V2
SCALE = N.T.S
APPROX 4972 sq.ft.
331 sq.ft/Tx.Rm
THE 16 ELEMENTS OF AN IDEAL FLOOR PLAN
1.Clearly identifiable patient entrance.
2. Staff entrance screened from view. Prevents entry confusion.
3. Immediate visual and physical access to the front desk upon office entry.
4. Waiting room seating removed from primary circulation or traffic flow.
5. Patient bathroom visible to, but removed from, waiting room seating.
6. The major proportion of the open front desk does not face the waiting room seating.
7. Conference room accessible by the doctor without passing into the front desk space.
8. Conference room location minimally exposes patient to treatment room noises.
9. Treatment rooms isolated from the front desk.
10. Compact treatment area minimizing segregation of doctor and hygiene staff.
11. Doctor’s office within proximity of treatment rooms, to keep a pulse on clinical activities.
12. Space for mobilization of technology.
13. Sterilization, lab and re-supply areas in close physical proximity to treatment rooms.
14. Radiology areas do not block traffic flow when in use.
15. Staff lounge isolated from clinical and business zones.
16. Treatment room alignment does not channel noises from room to room.
= PRIVATE SPACES
= TREATMENTSPACES
= PUBLIC SPACES
QUIET
DOCTOR
TREATMENT
ROOM
“P”
(16’-0”X9’-0”)
QUIET
DOCTOR
TREATMENT
ROOM
“P”
(16’-0”X9’-0”)
QUIET
DOCTOR
TREATMENT
ROOM
“P”
(16’-0”X9’-0”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DOCTOR
TREATMENT
ROOM
“P”
(11’-0”X8’-4”)
DENTAL
MECH
CLOSET
WAITING
ROOM
(16+ SEATS)
WAITING
ROOM
(11+ SEATS)
CAFE
AREA
(5+ SEATS)
CLOSET
PATIENT
RESTROOM
“P”
PATIENT
RESTROOM
“P”
STAFF
RESTROOM
“P”
SEDATION
RESTROOM
“P”
SEMI-PRIVATE
CHECKOUT
AREA
SEMI-PRIVATE
CHECKOUT
AREA
CONSULT
ROOM
CONSULT
ROOM
X-RAY &
IMAGING
ROOM
COMPUTER
STATION
STERILIZATION
RESUPPLY &
STORAGE
“P”
STAFF
LOUNGE
“P”
JANITOR
CLOSET
“P”
LAB &
MODEL
STORAGE
GREETING
AREA
(2 STATIONS)
LOGO
WALL
CHECKOUT
STATIONS
STAIRS UP
REFRESHMENTS
PLAY
AREA
MOBILE TECH
MOBILE TECH
Your Floor Plan is the
single most important
document in the Design
Development process
by virtue of the fact
that it is the reference
point for all subsequent
Construction
Documentation.
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 11 –
6.26.18
Refinement - Equipment & Final Floor Plan
Before Design Ergonomics or your Architect can produce a Final Floor plan, you must finalize many
decisions regarding equipment; certain structural, electrical and plumbing elements that need to be
delineated at this point depend on these decisions.
Where possible, Design Ergonomics
will provide drawing details that will
become part of the eventual plan
set (“Construction Drawings”) that
your Construction Partner will use
to build your office and install the
equipment that drives it. Typically,
these include one or more Operato-
ry designs as well as Sterilization.
Here again, we invite you to make use of our Clinical Specialists. No
matter what your equipment selections are, they will have valuable
insight on a broad range of topics - from HVAC to autoclaves.
From your Initial Floor Plan through Final, we will consult and review
with you, making changes as needed. Initial Floor Plan presentation
may take place via Screen Share. However, changes at this point tend
to be minor (though precise) and are often handled through email.
Once approved, we will create a document package for your Final
Floor Plan that includes:
TYP.
4'
-
2
1/16"
X-RAY UNIT: SINGLE STUD MOUNT
MODEL T.B.D. BY OWNER
SEE ELECTRICAL SHEETS FOR
FURTHER INFORMATION
L3
S1
D1
N16
N4
C3
C4
OPERATORY GENERAL
& PATIENT LIGHT
CENTER OF HEAD
CENTER
OF
HEAD
5' - 5"
4' - 0"
A5.6
3
2
A5.6
2' - 3 1/4"
5'
-
0"
7'
-
0"
7'
-
6"
INSTALL
STRAIGHT STOPS
ON ALL DOMESTIC
WATER LINES
FIN. FLOOR
1-1/2" SPARE CONDUIT
(TO TOE OF CHAIR J-BOX)
2' - 10 3/4"
2X6 BLOCKING
2X6 BLOCKING
2X6 BLOCKING
2X6 BLOCKING
2X4
NAILER
2X4
NAILER
10
1/4"
4
1/2"
DOORWAY HEADER
AS REQ'D
DOORWAY HEADER
AS REQ'D
DUPLEX OUTLET
DATA PORT
SPARE (OPEN) J-BOX
(FOR USB
CONNECTIONS)
1-1/2" CONDUIT FOR
USB CONNECTIONS
5'
-
3"
2'
-
4"
6'
-
0"
7'
-
0
5/8"
7'
-
6"
REF PLUMBING FOR
VACUUM, WATER, AND
AIR LINES REQUIRED
FIN. FLOOR
7'
-
0"
5'
-
6"
1'
-
2"
1' - 3"
1' - 3"
2' - 6"
6"
10"
1' - 7"
C3 CABINET BACK
C4 CABINET BACK
BACK CUTAWAY FOR
ELECTRICAL AND DATA
BY GC
DRYWALL
CUTAWAY AREA
BY GC
4"
1'
-
5
1/2"
2'
-
4"
5'
-
0"
7'
-
6"
6 1/2"
5 1/2"
2
1/4"
5
1/4"
8
1/4"
3"
SOLID WOOD
BLOCKING (REF.
DETAIL)
1/2" VACUUM
1/2" DENTAL WATER
1/2" COMPRESSED AIR
5/8" GYP. BOARD
2X FRAMING (TYP.)
REF PLUMBING FOR VACUUM,
WATER, AND AIR LINES REQUIRED
FINISHED FLOOR
C4
C3
D1
S1
C8
L3 2X6 WOOD BLOCKING
FOR FASTENING
CABINETRY (BY G.C.
TYP.) - SEE DETAIL 5/A3.0
SEE
REFLECTED
CEILING
PLAN
SEE
LIGHT
FIXTURE
MANUAL
2'
-
4"
4"
1'
-
5
1/2"
2'
-
8"
2'
-
6"
HUBBELL FLUSH MOUNT FLOOR BOX W/
POWER, & AUDIO, #HBLCF301 W/
HBLTCGNTSW COVER (BY G.C.)
SEE LIGHT FIXTURE MANUAL FOR BLOCKING INFORMATION
SEE LIGHT FIXTURE MANUAL FOR MOUNTING DETAILS
LAST
SAVED:
FILE
LOCATION:
8/24/2015
8:57:00
AM
C:UsersmichaelsidesDocumentsMontgomery
AL
-
Dental
Clinic_michaelsides.rvt
3/4" = 1'-0"
1
ENLARGEMENT OF DOCTOR
TREATMENT ROOM
3
3/4" = 1'-0"
4
C4/C3-9 - HEADWALL FRAMING - NO
NITROUS
3/4" = 1'-0"
5
C4/C3 - DRYWALL PREP
6
1 1/2" = 1'-0"
7
HEAD WALL DETAIL - WITH WATER LINE
3/4" = 1'-0"
2
DR. ROOM SECTION
DW
A5.1
6
5
A5.1
2
3
4
20' - 1"
6'
-
9
7/8"
3' - 0 5/8"
8' - 9 1/4"
13' - 11 1/4" 11' - 10 1/2"
15' - 10 3/4" 9' - 2 3/8" 8' - 11 3/4"
2'
-
8
1/8"
2'
-
7
1/4"
8'
-
6
3/4"
13' - 11 1/4"
4'
-
8
1/8"
STERILIZATION,
RESTOCK &
RESUPPLY
128
LAB & MODEL
STORAGE
131
1
A5.5
FIRST FLOO
0
DROP CEILIN
10' - 0
5'
-
2"
2'
-
10"
3' - 0" 3' - 0"
8'
-
0"
7' - 11 7/8"
PL1
PL4
AL 2000 PLUGMOLD
STRIP; 12" O.C.;
REF ELECTRICAL
ADJUSTABLE SHEL
PLASTIC LAMINATE
COLOR: TBD
(BY G.C.)
1' - 11 3/16"
2'
-
10"
5'
-
2"
3' - 0"
8'
-
0"
13' - 3 7/8"
SIN
PLA
CO
1' - 11 1/2"
FIRST FLOOR
0"
DROP CEILING
10' - 0"
8'
-
0"
5'
-
2"
2'
-
10"
2'
-
6"
HAFELE BRACKETS;
287.45.468 (BY MILLWORK)
PL4
ADJUSTABLE SHELVES
PLASTIC LAMINATE
COLOR: TBD (BY G.C.)
FIRST FLOOR
0"
DROP CEILING
10' - 0"
3'
-
6"
1'
-
8"
2'
-
10"
1' - 8"
1' - 8"
2' - 6"
2' - 6"
2' - 6"
2' - 6"
2' - 6"
2' - 6"
2' - 6"
2' - 6"
8'
-
0"
18' - 4 1/4"
2' - 6" 2' - 6"
1' - 6" 4' - 9 1/2"
1' - 6"
1' - 8"
5'
-
2"
2'
-
10"
1' - 3"
ERGONOMIC PRODUCTS PULL DOWN UNITS
(BY OWNER)
ERGONOMIC PRODUCTS PULL
DOWN UNITS
(BY OWNER)
AL 2000 PLUGMOLD
STRIP; 12" O.C.;
REF ELECTRICAL
HAFELE BRACKETS;
287.45.468
(BY MILLWORK)
TOEKICK; PLASTIC LAMINATE;
BY G.C.
PL1
PL4
FIRST FLOOR
0"
DROP CEILING
10' - 0"
2' - 6"
3' - 0" 1' - 6"
2' - 0"
2'
-
10"
1'
-
8"
3'
-
6"
8'
-
0"
3' - 0" 3' - 0" 3' - 0" 2' - 6" 2' - 6"
2' - 6" 2' - 6"
A5.1
8
A5.1
7
1' - 6"
1' - 6"
8' - 9 5/8" 15' - 6"
2' - 6 1/8"
4'
-
0"
4'
-
0"
3
A3
ERGONOMIC PRODUCTS PULL
DOWN UNITS
(BY OWNER)
AL 2000 PLUGMOLD
STRIP, 12" O.C.
REF ELECTRICAL
PL4
HAFELE BRACKETS;
287.45.468
(BY MILLWORK)
TOEKICK PLASTIC
LAMINATE;
BY G.C.
DISHWASHER
(BY OWNER)
RANGE HOOD
(BY G.C.)
AUTOCLAVES
(BY OWNER)
PANTRY-STYLE
CABINETS WITH
GLASS DOORS;
PL1
2' - 6"
2' - 6"
2' - 6"
1' - 3 5/8" PL1
A&M HARDWARE SHELF SUPPORT
BRACKETS SIZED AS NEEDED
ACCURIDE MODEL 301-2590/130lbs
FULL EXTENSION HEAVY DUTY
DRAWER SLIDE BY OTHERS
3/4" MARINE GRADE PLYWOOD
APPROVED FRO DAMP CONDITIONS
FINISHED FLOOR
FINISHED CEILING
2'
-
9
1/4"
2' - 0"
S T
6"
8"
GREENO MFG.:
# TCSCH-L
SHARPS HOLDER
6" DIA TRASH
CHUTE BY
CABINENT MAKER
PLASTIC WASTE
BIN (BY OWNER)
REV-A-SHELF (OR
EQUIVALENT) FULL
HEIGHT PULL OUT
WASTE BIN
LAST
SAVED:
FILE
LOCATION:
8/24/2015
8:56:51
AM
C:UsersmichaelsidesDocumentsMontgomery
AL
-
Dental
Clinic_michaelsides.rvt
1/2" = 1'-0"
1
ENLARGED STERILIZATION / RESTOCK &
RESUPPLY, AND LAB & MODEL STORAGE
1/2" = 1'-0"
2
LAB & MODEL STORAGE - A
1/2" = 1'-0"
3
LAB & MODEL STORAGE - B
1/2" = 1'-0"
4
LAB & MODEL STORAGE - C
1/2" = 1'-0"
5
RESUPPLY
1/2" = 1'-0"
6
STERILIZATION
3" = 1'-0"
7
SLIDING SHELF - DETAIL
1/2" = 1'-0"
8
PULL-OUT TRASH CABINET - SECTION
• First Floor Design Plan (sheet A1.0)
• First Floor Dimensioned Plan (sheet A1.1)
• Sterilization Elevation
• Equipment Detail Drawings (as available)
• CAD files of all drawings supplied
PHASE THREE • DESIGN DEVELOPMENT
Time Frame: 1-2 weeks
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 12 –
6.26.18
Interior Design
Interior Design (“ID”) is listed here at the end of the Design Development phase only because a
Final ID Package includes drawings that require an approved Floor Plan to create. That said, the ID
process, style, and level of finish need to be top-of-mind from the very beginning. Finish treatments
can have a significant impact on your overall costs, and these considerations need to be included (at
least in a general sense) when you’re developing an initial budget.
A critical point worth noting; ID – especially in a medical environment – is not for amateurs. Why?
Interior Design is as
much Science and
Business as it is an
Art Form.
There is a deep psychology specific to
creating a calming, reassuring flow in a
dental office – an environment that fills
many people with anxiety. Additionally,
building codes regarding medical facility
finishes can be stringent, and those out-
side the industry may not have access
to commercial grade materials required.
Finally, formal ID demands a significant
degree of professional drafting expertise
and requires a large investment in time.
The ID Process
Design Ergonomics offers multiple levels of Interior
Design, from a selection of pre-formatted options
to full custom package development. Regardless
of level, we start with a complimentary consultation
call. To prepare for this call, think about styles and
finishes that appeal to you. Find examples if pos-
sible; not just on the ID and Portfolio sections of
our site, but on Pinterest, in magazines and other
visual sources. Your ID specialist will guide you
through the process, but we value your ideas and
need your input to tailor a package that best suits
your goals, aesthetics and budget.
PHASE THREE • DESIGN DEVELOPMENT
Time Frame: Throughout (complete ID docs by Bid submission)
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 13 –
6.26.18
Interior Design con’t
Throughout Blocking and Floor Plan, we’ll work with you to develop an aesthetics and materials
package via email, screen shares and shipments of physical samples. The first deliverable in this pro-
cess will be a Design Board, which represents color schemes, materials and texture expressions to
be used throughout your practice for a cohesive and professional look.
With an approved Design Board, we can begin to gather all the
relevant material and finish information your Construction Part-
ner will require for a bid set and eventual execution.
During this process, we’ll also consult with you on a variety of
architectural issues related specifically to Interior Design. These
include the Reception Desk design, Door & Cabinet styles, Dec-
orative Lighting styles and more. The final package includes:
As with the Operatory and Sterilization details, these drawings and schedules will be folded into the
final Construction Documents prepared by your Architect. Your designer will also be available during
the construction phase to review materials with your Contractor or discuss changes that may arise.
ELEVATOR
A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0"
A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0" A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0" A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
13' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
1
A 6.3
TYP.
2
A 6.3
TYP.
A.F.F.
10' - 0"
2
A 6.3
TYP.
2
A 6.3
TYP.
A.F.F.
10' - 0"
A.F.F.
10' - 0"
2
A 6.3
TYP.
5
A 6.3
TYP.
5
A 6.3
TYP.
TYP.
TYP.
CHANDELIER -
SEE LIGHT FIXTURE SCHEDULE
FOR SPEC
TYP.
6
A 6.3
TYP.
3
A 6.3
TYP.
1
A 6.3
TYP.
TBL LIGHT SYSTEM - REF.
MANUAL (TYP. ALL
TREATMENT ROOMS)
TBL LIGHT SYSTEM - REF.
MANUAL (TYP. ALL
TREATMENT ROOMS)
8
A 6.3
TYP.
2'
-
6
3/8"
2'
-
0"
2'
-
0"
A.F.F.
10' - 0" A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
10' - 0"
A.F.F.
9' - 0"
A.F.F.
9' - 0"
A.F.F.
9' - 0"
A.F.F.
9' - 0"
A.F.F.
9' - 0"
A.F.F.
8' - 0"
A.F.F.
9' - 0"
A.F.F.
9' - 0"
A.F.F.
9' - 0"
1
A 6.3
TYP.
A.F.F.
8' - 0"
A.F.F.
8' - 0"
A.F.F.
9' - 0"
A.F.F.
9' - 0"
A.F.F.
8' - 0"
PENDANT
TROFFER 2X2 PARABOLIC
WALL SCONCE
TROFFER 2X4 PARABOLIC
6" RECESSED SPOT LIGHT
6" RECESSED CAN
RESTROOM VANITY
FLUORESCENT STRIP
A.F.F.
9' - 0"
A.F.F.
9' - 0"
PROVIDE
SURFACE-MOUNTED
LIGHTS BELOW STAIRS
Scale
Date
Drawn By
Checked By
Project Number
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
www.desergo.com
PO Box 3630
767 Main Road
Westport MA 02790
508 636 3600
© 2014 DESIGN ERGONOMICS INC. THESE DRAWINGS ARE THE PROPERTY OF DESIGN ERGONOMICS INC. AND MAY NOT BE SOLD, COPIED, OR USED IN ANYWAY WITHOUT OUR WRITTEN
PERMISSION
DO NOT SCALE
1/4" = 1'-0"
11/7/2017
11:11:01
AM
A 6.2
REFLECTED
CEILING PLANS
GP
JB
5/13/16
1/4" = 1'-0"
1
1ST FLOOR PLAN
1/4" = 1'-0"
2
2ND FLOOR PLAN
1/4" = 1'-0"
LIGHT LEGEND
1/4" = 1'-0"
3
BASEMENT PLAN
No. Description Date
P1
P2
P3
PAINT
PAINT
PAINT
SHERWIN WILLIAMS-DURATION HOME
MATTE
P4 PAINT
P5 PAINT
CANVAS TAN SW7531
REQUISITE GRAY SW7023
UPWARD SW6239
JUBILEE SW6248
ANTIQUE WHITE SW6119
PL1
CT1 CERAMIC FIELD TILE MANNINGTON SEASCAPE 12"X24"
DESCRIPTION
MATERIALS & FINISH LEGEND
MANUFACTURER
PC STYLE/COLOR NOTES
C1 CARPET TILE-LEVEL 1
BEACH HAUS 00173
PARISIAN PINE-AROW7860
FOUNDATION PAR203
PATCRAFT-INTRINSIC
VPT1
VINYL WOOD-LOOK VINYL
PLANK TILE
MANNINGTON-AMTICO 4.5"X36" PLANK
SV1 SHEET VINYL MANNINGTON
SS1
SS2
SOLID SURFACE
SOLID SURFACE
DUPONT ZODIAQ
DUPONT CORIAN
BOARDWALK OAK-7983
PLASTIC LAMINATE NEVAMAR
WINDRIFT
CLOUD WHITE
HAZELNUT
FLOW GRAY FT12491112X24
BLACK
BLACK
WINDRIFT
PL2
PL3
PLASTIC LAMINATE
PLASTIC LAMINATE
WILSONART
ASTRO STRANDZ-4940
ANTIQUE WHITE
B1 BASEBOARD-MILLWORK JOHNSONITE-RUBBER-OBLIQUE
B2 BASEBOARD-COVE JOHSONITE- 1/8" RUBBER COVE
B3 BASEBOARD-TILE COVE MANNINGTON-SEASCAPE 6"X24"
CT2 CERAMIC WALL TILE FLORIDA TILE-SOUL SERIES
SF1
SPECIALTY
FINISH
STACKED STONE
FAUX STONE SHEETS
STACKED STONE GRANDE 2'X4'
ACT1 SUSPENDED GRID
ACOUSTICAL TILE
ARMSTRONG 2'X2' OPTIMA 3250 WHITE
ACT2
SUSPENDED GRID
ACOUSTICAL TILE
ARMSTRONG 2'X2' ULTIMA 1912 WHITE
P6 PAINT SHERWIN WILLIAMS-DURATION HOME
SEMIGLOSS
PURE WHITE SW7005
WILSONART
PEPPERDUST-D327
BLACK
ST1 STAIR TREAD JOHNSONITE VINYL-ST-XXX-SQ
SHERWIN WILLIAMS-DURATION HOME
MATTE
SHERWIN WILLIAMS-DURATION HOME
MATTE
SHERWIN WILLIAMS-DURATION HOME
MATTE
SHERWIN WILLIAMS-DURATION HOME
MATTE
TO BE CONFIRMED ON SITE
TO BE CONFIRMED ON SITE
TO BE CONFIRMED ON SITE
TO BE CONFIRMED ON SITE
TO BE CONFIRMED ON SITE
POPLAR F121-16
SF2 WALL COVERING KOROSEAL
CONFIRMED 4-1-16
CONFIRMED 4-1-16
CONFIRMED 4-1-16
CONFIRMED 4-1-16
CONFIRMED 4-1-16
CONFIRMED 4-1-16
PARTITION LEGEND
DETAIL:
X
XX
SHEET
DETAIL
PLAN:
A6
12
NUMBER INDICATES STUD HEIGHT
NO NUMBER INDICATES STUD HEIGHT
TO BOTTOM OF FRAMING ABOVE
NUMBER INDICATES STUD SIZE AS
FOLLOWS:
REFERENCE SIDE
OPPOSITE SIDE
LETTER INDICATES PARTITION TYPE
4 - 2x4 NOMINAL WOOD STUD
6 - 2x6 NOMINAL WOOD STUD
NON RATED WALL
STRUCTURAL SHEAR WALL
1 HR FIRE RATED WALL
PARTITION TYPES
A
2X4" WOOD
STUDS @ 16" OC
5/8" GYPSUM
BOARD
C
B
5/8" GYPSUM
BOARD
2x4 WOOD STUDS
STAGGERED @ 16" OC
5/8" GYPSUM BOARD
2x4 WOOD STUDS @ 16" OC
5/8" GYPSUM BOARD
2x4 WOOD STUDS
STAGGERED @ 16" OC
REFERENCE SIDE OPPOSITE SIDE
E
2x6 WOOD STUDS
@ 16" OC
5/8" GYPSUM
BOARD
2x6 WOOD STUDS @ 16" OC
5/8" GYPSUM BOARD
3 1/2" OWENS
CORNING "QUIET
ZONE" FIBERGLASS
INSULATION
3 1/2" OWENS
CORNING "QUIET
ZONE" FIBERGLASS
INSULATION
3 1/2" OWENS
CORNING "QUIET
ZONE" FIBERGLASS
INSULATION
3 1/2" OWENS CORNING "QUIET
ZONE" FIBERGLASS INSULATION
0'
-
4
3/4"
0'
-
6
3/4"
0'
-
6
3/4"
3 1/2" OWENS CORNING "QUIET
ZONE" FIBERGLASS INSULATION
3 1/2" OWENS CORNING
"QUIET ZONE" FIBERGLASS
INSULATION
D
2x4 WOOD STUDS
@ 16" OC
5/8" GYPSUM BOARD
2x4 WOOD STUDS @ 16" OC
5/8" GYPSUM BOARD
0'
-
4
3/4"
FOR ALL PARTITION TYPES, FINISHES ARE TO EXTEND
A MINIMUM OF 4" ABOVE FINISHED CEILING AS
SCHEDULED. WHERE THERE IS NOT A SCHEDULE
CEILING, FINISHES TO CONTINUE TO BOTTOM OF DECK.
PROVIDE CONTINUOUS SEAL AT CONNECTION TO
BOTTOM OF DECK
2x6 WOOD STUDS @ 16" OC
5/8" GYPSUM BOARD
(TYPICAL)
5/8" GYPSUM
BOARD (TYPICAL)
2x6 WOOD
STUDS @ 16" OC
F
2x6 WOOD STUDS
@16" OC
5/8" GYPSUM BOARD
5/8" GYPSUM
BOARD
2x6 WOOD STUDS @ 16" OC
0'
-
7
3/8"
G
2x4 WOOD STUDS
@16" OC
5/8" TYPE "X" GYPSUM BOARD
5/8" TYPE "X"
GYPSUM BOARD
2x4 WOOD STUDS
@ 16" OC
0'
-
4
3/4"
H
2x6 WOOD STUDS
@ 16" OC
5/8" TYPE "X"
GYPSUM BOARD
2x6 WOOD STUDS @ 16" OC
5/8" TYPE "X" GYPSUM
BOARD
3 1/2" OWENS
CORNING "QUIET
ZONE" FIBERGLASS
INSULATION
3 1/2" OWENS CORNING "QUIET
ZONE" FIBERGLASS INSULATION
0'
-
6
3/4"
3 1/2" OWENS
CORNING "QUIET
ZONE" FIBERGLASS
INSULATION
OSB SHEATHING
REF STRUCTURAL
3 1/2" OWENS
CORNING "QUIET
ZONE" FIBERGLASS
INSULATION
OSB SHEATHING
REF STRUCTURAL
J
2x4 WOOD STUDS
@16" OC
5/8" TYPE "X" GYPSUM BOARD
5/8" TYPE "X"
GYPSUM BOARD
2x4 WOOD STUDS
@ 16" OC
0'
-
5
3/8"
OSB SHEATHING
REF
STRUCTURAL
OSB SHEATHING
REF
STRUCTURAL
K
2x4 WOOD STUDS
@16" OC
5/8" TYPE "X" GYPSUM BOARD
5/8" TYPE "X"
GYPSUM BOARD
2x4 WOOD STUDS
@ 16" OC
0'
-
5
3/8"
OSB SHEATHING
REF
STRUCTURAL
OSB SHEATHING
REF STRUCTURAL
3 1/2" OWENS CORNING "QUIET
ZONE" FIBERGLASS INSULATION
3 1/2" OWENS
CORNING "QUIET
ZONE"
FIBERGLASS
INSULATION
GENERAL CONTRACTOR TO VERIFY WALL
CONSTRUCTION FOR ANY REQUIRED
SHIELDING AT ROOMS CONTAINING
DENTAL IMAGING EQUIPMENT WITH
MANUFACTURER/SUPPLIER AND
ASSOCIATED REGULATIONS.
UL DESIGN NO. U305
0'
-
6
3/4"
L
2x4 WOOD STUDS
@ 16" OC
5/8" TYPE "X"
GYPSUM BOARD
2x4 WOOD STUDS @ 16" OC
5/8" TYPE "X" GYPSUM
BOARD
0'
-
8
7/8"
5/8" GYPSUM BOARD
5/8" GYPSUM BOARD
UL DESIGN NO. U305 AT RATED PARTION
REFERENCE SIDE OPPOSITE SIDE
M
2x6 WOOD STUDS
@16" OC
5/8" TYPE "X" GYPSUM BOARD
5/8" TYPE "X"
GYPSUM BOARD
2x6 WOOD STUDS @ 16" OC
0'
-
7
3/8"
OSB SHEATHING
REF
STRUCTURAL
OSB SHEATHING
REF
STRUCTURAL
N
2x6 WOOD STUDS
@16" OC
5/8" GYPSUM BOARD
5/8" GYPSUM
BOARD
2x6 WOOD STUDS @ 16" OC
0'
-
7
3/8"
OSB SHEATHING
REF
STRUCTURAL
OSB SHEATHING
REF STRUCTURAL
P
5/8" GYPSUM
BOARD
2x4 WOOD STUDS
STAGGERED @ 16" OC
5/8" GYPSUM BOARD
2x4 WOOD STUDS
STAGGERED @ 16" OC
3 1/2" OWENS
CORNING "QUIET
ZONE" FIBERGLASS
INSULATION
3 1/2" OWENS CORNING
"QUIET ZONE" FIBERGLASS
INSULATION
OSB SHEATHING
REF STRUCTURAL
0'
-
7
7/8"
OSB SHEATHING
REF
STRUCTURAL
ALL GYPSUM BOARD TO BE ORANGE PEEL
FINISH
1
Q
2x6 WOOD STUDS
@16" OC
5/8" GYPSUM BOARD
5/8" TYPE "X"
GYPSUM BOARD
2x6 WOOD STUDS @ 16" OC
0'
-
11
1/2"
OSB SHEATHING
REF
STRUCTURAL
OSB SHEATHING
REF
STRUCTURAL
UL DESIGN NO. U305 AT RATED PARTITION
UL DESIGN NO. U305 AT RATED PARTITION
2x4 WOOD STUDS @ 16" OC
5/8" GYPSUM
BOARD
2x4 WOOD STUDS
@16" OC
5/8" TYPE "X" GYPSUM BOARD
Scale
Date
Drawn By
Checked By
Project Number
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
www.desergo.com
PO Box 3630
767 Main Road
Westport MA 02790
508 636 3600
© 2014 DESIGN ERGONOMICS INC. THESE DRAWINGS ARE THE PROPERTY OF DESIGN ERGONOMICS INC. AND MAY NOT BE SOLD, COPIED, OR USED IN ANYWAY WITHOUT OUR WRITTEN
PERMISSION
DO NOT SCALE
As indicated
11/7/2017
11:11:01
AM
A 7.0
FINISH
SCHEDULE,
PARTITION TYPES
AND DETAILS
GP
JB
5/13/16
3/16" = 1'-0"
Materials & Finish Legend
PLAN
REFERENCE
ORIENTATION
ROOM FINISH SCHEDULE
RM # ROOM NAME
FLOOR WALL CEILING
NOTES
FINISH
A B C D
MAT P/C
HEIG
HT
BASE
WALL
MAT
WALL
FINISH P/C BASE
WALL
MAT
WALL
FINISH P/C
BAS
E
WALL
MAT
WALL
FINISH P/C BASE
WALL
MAT
WALL
FINISH P/C
001 EQUIPMENT, STORAGE, & UTILITY TBD SUSPD ACT ACT2 A.F.F.
002 ELEVATOR MECHANICALS TBD SUSPD ACT ACT2 A.F.F.
003 DENTAL MECH TBD SUSPD ACT ACT1 A.F.F.
004 STAIRWELL 'A' SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
100 VESTIBULE CT1 B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P SUSPD ACT ACT2 A.F.F.
101 WAITING ROOM C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
102 RECEPTION CT1,C1 B3,B1 GYP PAINT P B1 GYP PAINT SF1 B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
104 BUSINESS C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
105 EXIT CORRIDOR C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
106 SERVER CLOSET C1 N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P SUSPD ACT ACT2 A.F.F.
107 ON-DECK OFFICE #3 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
108 SPRINKLER ROOM TBD TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P GYP. P A.F.F.
109 STAIRWELL 'B' SV1;ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
110 SHIPPING & RECEIVING CLOSET SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
112 WAITING RESTROOM CT1 B1 GYP PAINT;TILE P;CT2 B1 GYP PAINT;TILE P;CT2 B1 GYP PAINT;TILE P;CT2 B1 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F.
113 TREATMENT ROOM #1 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
114 TREATMENT ROOM #2 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
115 TREATMENT ROOM #3 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
116 TREATMENT ROOM #4 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
117 TREATMENT ROOM #5 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
118 TREATMENT ROOM #6 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
119 TREATMENT ROOM #7 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
120 TREATMENT HALLWAY #1 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
121 QUIET WAITING AREA C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P GYP. P A.F.F.
122 STAIRWELL 'A' SV1;ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
123 TREATMENT HALLWAY #2 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
124 TREATMENT ROOM #9 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
125 TREATMENT ROOM #10 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
126 TREATMENT ROOM #11 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
127 TREATMENT ROOM #12 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
128 TREATMENT ROOM #13 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
129 TREATMENT ROOM #14 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
130 TREATMENT ROOM #15 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
131 TREATMENT ROOM #16 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
132 TREATMENT ROOM #17 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
133 TREATMENT ROOM #18 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
134 TREATMENT ROOM #19 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
135 QUIET TREATMENT ROOM #20 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
136 CONSULT ROOM #2 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP SF2 P SUSPD ACT ACT2 A.F.F.
137 PAN X-RAY C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
138 CONSULT ROOM #1 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP SF2 P SUSPD ACT ACT2 A.F.F.
139 CLIINICAL RESTROOM #2 CT1 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F.
140 STERILIZATION RESUPPLY &
STORAGE
SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
141 CROSSOVER HALLWAY C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
142 ON-DECK OFFICE #1 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
144 MED GAS C1 N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P SUSPD ACT ACT2 A.F.F.
145 BREAK ROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
146 MOBILE TECH C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P GYP. P A.F.F.
147 STAFF RESTROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
148 CLINICAL RESTROOM #1 CT1 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F.
149 LAB & MODEL STORAGE SV1 B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P SUSPD ACT ACT2 A.F.F.
150 MOBILE TECH C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P GYP. P A.F.F.
151 QUIET TREATMENT ROOM #8 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.
152 ON-DECK OFFICE #2 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
153 ELEVATOR TBD TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P TBD TBD A.F.F.
154 ELECTRICAL SV1 N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P TBD TBD A.F.F.
200 STAFF LOUNGE & CONFERENCE CI,SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
201 OFFICE C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
202 COMMAND CENTER C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
203 RESTROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
204 RESTROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT PP SUSPD ACT ACT2 A.F.F.
205 PRIVATE OFFICE C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
206 ATTIC EAST TBD N/A TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD A.F.F.
207 PRIVATE RESTROOM CT1 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F.
208 VESTIBULE C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
209 LOCKER ROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
210 STAIRWELL 'B' ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
211 ASSOCIATE'S OFFICE C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
212 ELEVATOR VESTIBULE C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.
213 MARKETING DIRECTOR C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
214 UTILITY CLOSET SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
215 ELEVATOR TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD A.F.F.
216 STAIRWELL 'A' ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.
1/4" = 1'-0"
1
PARTITION LEGEND (WOOD FRAMING)
1" = 1'-0"
2
PARTITION TYPES (WOOD FRAMING)
No. Description Date
1 Revision 1 Date 1
FINISHED FLOOR
3'
-
7"
2'
-
4
3/4"
1' - 0"
0' - 5 1/2"
3/4" VOID FREE PLYWOOD;
PL1
1' - 6"
PENCIL DRAWER ORGANIZER
ROCKLER #37399
DIM: 13"Wx18"Dx2"H
(OR EQUAL); BY MILLOWKR
(2) LAYERS 3/4" VOID FREE PLYWOOD;
PL1
3/4" VOID FREE PLYWOOD;
PL1
CUT OUT FOR WIRE MANGEMENT
TRANSACTION SURFACE:
SS1
ALIGN
DETAIL
SEE
RCP
FOR
FRAMING TO EXTEND TO
UNDERSIDE OF SUPPORTS
SEE RCP FOR DETAIL
FINISHED CEILING
2x BLOCKING
(AS REQ'D)
FRONT FACE;
PL1
2x6 STUDS @ 16" O.C
(CUT AS SHOWN)
1/2" PLYWOOD
TOE KICK LAMINATE
3/4" PLYWOOD
WIRED W/ OUTLETS FOR AC
POWER, PHONE, COMPUTER
2x3 BOTTOM PLATE
COMPUTER MONITOR (BY OWNER)
RECESS MONITORS
PENDANT LIGHT - SEE
LIGHTING SCHEDULE
CHECK-OUT
STAFF
103
RECEPTION
102
3
A 3.0
A 5.0
4
A 5.0 3
A 5.0
8
7' - 10 3/4"
9' - 10 3/8"
7' - 10 3/4"
37.87°
12' - 2 5/8"
9'
-
5
3/4"
14' - 1 5/8"
24'
-
3
3/8"
5'
-
9
1/2"
0'
-
2
7/8"
5'
-
0"
0'
-
2
7/8"
5'
-
0"
0'
-
2
7/8"
7'
-
2"
A 5.0
5
A 5.0
6
SF1
SS1
4" TOEKICK
3'
-
7"
2'
-
6"
5'
-
11"
3'
-
6"
2X2 ACT SYSTEM IN RECEPTION
& WAITING AREA
13'
-
0"
9'
-
6"
0'
-
4"
P1
7' - 0 7/8" 5' - 0" 5' - 0" 5' - 9 1/2"
3' - 7 3/8" 3' - 5 1/2" 0' - 2 7/8" 0' - 2 7/8"
0' - 2 7/8"
PL1
SS1
4" TOEKICK
PL2
PL1
SS1
3'
-
7"
2'
-
6"
5'
-
6"
PENDANT LIGHTS
ADA COMPLIANT
CHECKOUT
SF1
1' - 5 1/2" 3' - 0"
SS1
PL1
GLASS FRONT
BEVERAGE FRIDGE
(BY OWNER)
3'
-
6"
FURR DOWN
WITH RECESSED
LIGHTS; TBC
6'
-
8"
2'
-
10"
6" SS TRASH CHUTE
IN COUNTER;
PULL-OUT TRASH BELOW
50" VIEWABLE
TV;BY OWNER;
CONFIRM MOUNTING
HEIGT IN FIELD
PL1
SS1
PL2
UNDER-COUNTER
PENCIL DRAWERS;
(BY MILLWORK)
2'
-
6"
3'
-
7"
5'
-
11"
0'
-
6"
3
A 3.0
2'
-
6"
3'
-
7"
5' - 10 1/8" 5' - 0 5/8" 5' - 0 5/8"
3' - 6 1/4" 3' - 7 3/8"
5' - 7 5/8" 1' - 6"
1' - 6" 3' - 6 5/8"
1' - 6" 4' - 4 1/8" 1' - 6" 3' - 6 5/8"
5'
-
6"
3'
-
6"
1'
-
0"
7' - 1 5/8"
PL1
SS1
PL2
PL1
UNDER-COUNTER
PENCIL DRAWERS;
(BY MILLWORK)
Scale
Date
Drawn By
Checked By
Project Number
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
Consultant
Address
Address
Address
Phone
www.desergo.com
PO Box 3630
767 Main Road
Westport MA 02790
508 636 3600
© 2014 DESIGN ERGONOMICS INC. THESE DRAWINGS ARE THE PROPERTY OF DESIGN ERGONOMICS INC. AND MAY NOT BE SOLD, COPIED, OR USED IN ANYWAY WITHOUT OUR WRITTEN
PERMISSION
DO NOT SCALE
As indicated
11/7/2017
11:10:49
AM
A 5.0
ENLARGED
RECEPTION/
CHECKOUT PLAN
AND DETAILS
PJL
DK
5/13/16
3/4" = 1'-0"
1
RECEPTION DESK - SECTION
(PENDANT)
1/2" = 1'-0"
2
ENLARGED RECEPTION, BUSINESS, &
CHECK-OUT
1/2" = 1'-0"
4
RECEPTION
1/2" = 1'-0"
3
CHECKOUT
1/2" = 1'-0"
8
REFRESHMENTS
1/2" = 1'-0"
5
RECEPTION - STAFF SIDE
1/2" = 1'-0"
6
CHECKOUT - STAFF SIDE
No. Description Date
• Interior Elevation Drawings
• Material & Finish Schedules
- Walls & Baseboards
- Mill Work
- Floor Coverings
- Ceiling
• Door Schedule
• Lighting Plan
PHASE THREE • DESIGN DEVELOPMENT
Exterior Design
Our design specialty lies in interiors – establishing
unmatched clinical efficiencies & creating an excep-
tional patient experience, with the most cost-effective
use of space in the industry.
While your Exterior Design will be dictated in part by
the floor plans we may produce, your Architect will
handle the details of design development. We will,
however, work with them to ensure a cohesive exe-
cution of your overall vision.
Time Frame: 1-2 Weeks
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 14 –
6.26.18
PHASE FOUR • DESIGN EXECUTION
Construction Documents
At this point, the vision of your future practice is clear – but you can’t put up a
building on vision alone. The documents created up to now have been schematics
– accurate, but limited to layout. To move forward to the bidding & permitting pro-
cesses and eventually to construction, you need a very comprehensive set of plans,
referred to as “Construction Documents”.
Generating Construction Documents is a time consuming process. Be prepared
for this phase to take up to 12 weeks. These documents are developed by your
Architect in conjunction with a variety of engineers, including Mechanical/Plumbing,
Electrical and Structural engineers.
As with your initial Floor Plan, the Construction Documents follow a development
process from initial to final. Your architect will co-ordinate communications, and you
will be asked to review and approve each step, as follows.
	 Progress Set (preliminary engineering schematics)
	 Bid Set (used for Construction Estimates)
	 MEP Final Approval (Finalized Construction Documents - “Permit Set”)
Bidding
Depending on your Contractor candidates, construction estimates may be
based on Architectural drawings at varying levels of completion. Known as a “Bid
Set”, you will provide this package to your chosen candidates (typically 3 or 4 com-
panies).
When you have selected a Contractor, they will handle the next step, Permitting.
Permitting
The time frame to obtain Permits can vary widely – from as little as a few
weeks, to 4 or 5 months. Minor design or engineering changes may require
re-submittal (in whole or in part). However, the most common source of delay is
the current work-load at your municipal building department.
We suggest you and/or your Contractor speak to the local agencies early in the
process. Try to get a feel for how quickly they can move you through this step,
as it can significantly impact your overall project time-line.
Time Frame: 8-12 weeks
Time Frame: 3-4 weeks
Time Frame: As little as 2 weeks, but may take several months
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 15 –
6.26.18
PHASE FIVE • CONSTRUCTION
Construction
Equipment Installation
Final Inspection & CO
We’re committed to the success of
your project, from start to finish.
When you enter the Construction phase,
we’ll continue communicating with both
you and your Contractor. We are happy
to review progress photos, and in some
cases, will make site visits if issues arise
for which we can help advise or provide
solutions.
Equipment installation – who does it, and
what will it cost – will vary by item type and
supplier. Your Contractor will generally handle
non-clinical cabinetry, general lighting etc. This
should have been clearly delineated in the bid-
ding process.
The installation of Clinical Equipment – Chairs,
X-ray, Delivery, Compressor, Vacuum and more
– is commonly done by the suppliers, and prices
will vary significantly. Here again, your Clinical
Specialist can provide valuable guidance.
During this period, you will also be setting up ad-
ministrative elements; clerical, computers, phone
systems etc.
Everything is in place, but you need your local building authority to sign off on a
wide range of items, including structural, mechanical, plumbing, electrical – even
your clinical systems (lighting, motorized patient chairs). Your Contractor and Archi-
tect should be on hand during the inspection to provide necessary information.
When the inspection is complete, you’ll receive a Certificate of Occupancy (“CO”).
Congratulations! You can now open for business...but have you considered how?
Page 4
6
Time Frame: 6 months ±3 months (weather & other variables dependent)
Time Frame: 2-4 weeks
Time Frame: 2-4 weeks (post Install)
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 16 –
6.26.18
A Few Suggestions to Consider Before Your
GRAND OPENING...
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 17 –
6.26.18
Leave Adequate Time to
Set Up Your Systems.
Try a Soft Opening with Friends and Family.
Want to Optimize? Get Help.
Your new office is beautiful, but it’s a blank slate.
It won’t become a highly-efficient power-house of
productivity until all the systems are up and running.
And running together.
It’s a new space, and it will take some time to pre-
pare and settle in to a rhythm. Sterilization, phone
systems, software, imaging...all the interdependent
activities you’ve come to take for granted are going
to be new to both you and your staff.
Before the balloons, confetti, press releases and ribbon-cutting – see some
live patients! This will give you an opportunity to work the last of the equipment
and system bugs out in a much more low-key fashion. Many of our clients run
several days to a week or more seeing only friends and family.
Performing a Soft Opening can help ease tensions in what is often an anxious
time. This will also give you an opportunity to finalize any last-minute painting
touch ups, art-work or furnishing acquisitions as well.
After opening thousands of offices, we realized that the Effi-
ciency and Productivity guidance we give during design could
be magnified tremendously with some hands-on instruction.
To that end, we now offer Clinical Systems Training Programs.
These programs can help practices during any stage of
growth, but they provide truly remarkable results when applied
to start ups.
Our certified Trainers will help
establish Inventory, Steriliza-
tion & Resupply systems now
that will propel your practice
to unparalleled heights in the
years to come.
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 18 –
6.26.18
Thank You,again for the trust you’ve placed in Design Ergonomics.
Our goal is
your complete
satisfaction.
We realize an overview document such as this
won’t answer every question you have now, or
that will come up during the design process.
Please don’t hesitate to call or email us if you
need clarification on topics covered here.
We’re part of your Team. If we don’t have the
answers you’re looking for, we will work with
you to find them.
We look forward to helping you turn the Practice of Your Dreams into a Reality.
5 Step Playbook to Building the Practice of Your Dreams
© 2018 Design Ergonomics, Fall River MA
– 19 –
6.26.18
GLOSSARY
•	 As Builts - CAD drawings showing complete internal and external dimensions of an existing building (new
or previously built), including walls, load-bearing structures, stairs, doors, windows and utilities.
•	 Authority Having Jurisdiction (“AHJ”) - the governing body regulating construction and development of
commercial enterprises in a specified region.
•	 CAD - “Computer Assisted Design,” an electronic file created by Architects, Designers and Draftsmen.
•	 Construction Documentation - The complete, formal set of plans required by the AHJ to construct an
office, including but not limited to; floor-plans, interior and exterior elevations, ID elevations and materials
schedules, mechanical/electrical/plumbing/structural plans, and site plans.
•	 Due Diligence - A period of time included in the P&S used by the purchaser to determine that the proper-
ty is suited to their goals and that all elements of the sale as represented by the seller are true and accu-
rate.
•	 Elevation - A architectural drawing showing the face of something (as opposed to a view from above).
This may be a building exterior, or interior elements such as cabinetry, reception desks etc.
•	 Engineering Disciplines (as they relate to a Construction project)
Civil, relating to environmental/exterior elements including landscaping, building and parking location
and availability, utilities, water remediation, offsets, site entries/exits, and site planning approval.
Mechanical/Plumbing, covers HVAC and all fluid flow systems. As a subset, Plumbing Engineers
address water service connection to municipal infrastructure (feed and sewage) and develop all piping
schematics including feed lines, venting, drainage and waste. In the dental industry, this also covers
compressors, vacuum and plumbed nitrous.
Electrical, addressing electrical loads, service, wiring schematics and electrical code compliance.
•	 Escrow - an amount of money or other documents kept in the custody of a third party, transfered only
when a specified condition has been fulfilled (eg a Due Diligence period). Depending on the terms of the
P&S, this is essentially a deposit which may be refundable during the Due Diligence period.
•	 HVAC - “Heating, Ventilation and Air Conditioning”
•	 Letter of Intent (“LOI”) - An informal agreement including an offer for purchase at an expressed amount.
The LOI is the beginning of the Negotiation process and several rounds of offers and counter-offers may
be required before both parties accept and sign the LOI.
•	 Purchase and Sale Agreement (“P&S”) - The agreed upon conditions relating to the transfer of a prop-
erty from seller to buyer. This is typically drafted after the LOI has been accepted by both parties and
includes relevant conditions such as the length and terms of the Due Diligence period and Escrow.
•	 Screen Share - An interactive method of presenting drawings and other material in which your computer
monitor is set to mirror what your designer is presenting remotely.
•	 Site Engineering Survey - A comprehensive study of a lot including plat map generation/confirmation,
topography, soil analysis, availability of utilities, parking concerns, abutment issues, water remediation and
other environmental issues that may impact a lot’s suitability for development.
•	 Value Engineering (“VE”) - Determining the need – and evaluating the suitability – of alternative finish ma-
terials. This may occur in the field during construction and will require the input of your Interior Designer.

Contenu connexe

Tendances

IT Demand and Delivery Management
IT Demand and Delivery ManagementIT Demand and Delivery Management
IT Demand and Delivery ManagementDavid Messineo
 
Feasibility Study Lesson- Technical Plan
Feasibility Study Lesson- Technical PlanFeasibility Study Lesson- Technical Plan
Feasibility Study Lesson- Technical PlanHoly Angel University
 
S&OP Overview - Implementation Approach - Biel- 01-18-12
S&OP Overview - Implementation Approach - Biel- 01-18-12S&OP Overview - Implementation Approach - Biel- 01-18-12
S&OP Overview - Implementation Approach - Biel- 01-18-12Jim Biel
 
Executive Engagement and S&OP
Executive Engagement and S&OPExecutive Engagement and S&OP
Executive Engagement and S&OPPatrick Bower
 
IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...
IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...
IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...Quantitative Software Management, Inc.
 
Stanton_Pat_Resume
Stanton_Pat_ResumeStanton_Pat_Resume
Stanton_Pat_ResumePat Stanton
 
S&OP Leadership Exchange: Tailoring S&OP to Fit your Business
S&OP Leadership Exchange: Tailoring S&OP to Fit your BusinessS&OP Leadership Exchange: Tailoring S&OP to Fit your Business
S&OP Leadership Exchange: Tailoring S&OP to Fit your BusinessPlan4Demand
 
Best Practices in Software Vendor Selection
Best Practices in Software Vendor SelectionBest Practices in Software Vendor Selection
Best Practices in Software Vendor SelectionAdvantiv Solutions, LLC
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringNeelkamal Sharma
 
PRESENTATION ON S&OP KUNZITE SUPPLY CHAIN
PRESENTATION ON S&OP KUNZITE SUPPLY CHAINPRESENTATION ON S&OP KUNZITE SUPPLY CHAIN
PRESENTATION ON S&OP KUNZITE SUPPLY CHAINHpm India
 
Executive S&OP
Executive S&OPExecutive S&OP
Executive S&OPSteelwedge
 
Krzysztof pulkiewicz kpi
Krzysztof pulkiewicz kpiKrzysztof pulkiewicz kpi
Krzysztof pulkiewicz kpibanqUP
 
Business Process Improvement
Business Process ImprovementBusiness Process Improvement
Business Process ImprovementAnand Subramaniam
 

Tendances (18)

Close Loop MRP
Close Loop MRPClose Loop MRP
Close Loop MRP
 
IT Demand and Delivery Management
IT Demand and Delivery ManagementIT Demand and Delivery Management
IT Demand and Delivery Management
 
Feasibility Study Lesson- Technical Plan
Feasibility Study Lesson- Technical PlanFeasibility Study Lesson- Technical Plan
Feasibility Study Lesson- Technical Plan
 
S&OP Overview - Implementation Approach - Biel- 01-18-12
S&OP Overview - Implementation Approach - Biel- 01-18-12S&OP Overview - Implementation Approach - Biel- 01-18-12
S&OP Overview - Implementation Approach - Biel- 01-18-12
 
Executive Engagement and S&OP
Executive Engagement and S&OPExecutive Engagement and S&OP
Executive Engagement and S&OP
 
Change Management Checklist
Change Management ChecklistChange Management Checklist
Change Management Checklist
 
IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...
IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...
IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...
 
Stanton_Pat_Resume
Stanton_Pat_ResumeStanton_Pat_Resume
Stanton_Pat_Resume
 
S&OP Leadership Exchange: Tailoring S&OP to Fit your Business
S&OP Leadership Exchange: Tailoring S&OP to Fit your BusinessS&OP Leadership Exchange: Tailoring S&OP to Fit your Business
S&OP Leadership Exchange: Tailoring S&OP to Fit your Business
 
Best Practices in Software Vendor Selection
Best Practices in Software Vendor SelectionBest Practices in Software Vendor Selection
Best Practices in Software Vendor Selection
 
Guide to demand planning
Guide to demand planningGuide to demand planning
Guide to demand planning
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
PRESENTATION ON S&OP KUNZITE SUPPLY CHAIN
PRESENTATION ON S&OP KUNZITE SUPPLY CHAINPRESENTATION ON S&OP KUNZITE SUPPLY CHAIN
PRESENTATION ON S&OP KUNZITE SUPPLY CHAIN
 
Executive S&OP
Executive S&OPExecutive S&OP
Executive S&OP
 
Krzysztof pulkiewicz kpi
Krzysztof pulkiewicz kpiKrzysztof pulkiewicz kpi
Krzysztof pulkiewicz kpi
 
Business Process Improvement
Business Process ImprovementBusiness Process Improvement
Business Process Improvement
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
Sapna Resume
Sapna ResumeSapna Resume
Sapna Resume
 

Similaire à Build the Dental Practice of Your Dreams in 5 Steps

about start up for you 12
about start up for you 12about start up for you 12
about start up for you 12aliaalistartup
 
Project management best practices
Project management best practicesProject management best practices
Project management best practicesJackson Chan
 
Gestión de Proyectos y mejores practicas
Gestión de Proyectos y mejores practicas Gestión de Proyectos y mejores practicas
Gestión de Proyectos y mejores practicas ✔Alejandro J. Román
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
Outsourcing for Profit - A book outlining best practices in offshore outsourcing
Outsourcing for Profit - A book outlining best practices in offshore outsourcingOutsourcing for Profit - A book outlining best practices in offshore outsourcing
Outsourcing for Profit - A book outlining best practices in offshore outsourcingIndus Net Technologies Private Limited
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleKate Pynn
 
Operator engaged construction enigi - by avanulo
Operator engaged construction   enigi - by avanuloOperator engaged construction   enigi - by avanulo
Operator engaged construction enigi - by avanuloDave Cahill
 
Beyond Budget and Scope: Managing Client Expectations and Delivering Value
Beyond Budget and Scope: Managing Client Expectations and Delivering ValueBeyond Budget and Scope: Managing Client Expectations and Delivering Value
Beyond Budget and Scope: Managing Client Expectations and Delivering ValueVanessa Turke
 
LoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development ProcessLoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development ProcessJoseph Horwedel
 
Business Process Mapping for Salesforce Admins
Business Process Mapping for Salesforce AdminsBusiness Process Mapping for Salesforce Admins
Business Process Mapping for Salesforce AdminsSalesforce Admins
 
Auto-enrolment checklist
Auto-enrolment checklistAuto-enrolment checklist
Auto-enrolment checklistDavid Roderick
 
Identifying a project in trouble and re-planning
Identifying a project in trouble and re-planningIdentifying a project in trouble and re-planning
Identifying a project in trouble and re-planningmfarbstein
 
How to Break Down your Projects into Milestones and Tasks
How to Break Down your Projects into Milestones and TasksHow to Break Down your Projects into Milestones and Tasks
How to Break Down your Projects into Milestones and TasksOrangescrum
 
Using process thinking to define project scope: how to start in the right place
Using process thinking to define project scope: how to start in the right placeUsing process thinking to define project scope: how to start in the right place
Using process thinking to define project scope: how to start in the right placeSamuel Chin, PMP, CSM
 
Business plan template
Business plan templateBusiness plan template
Business plan templateInsightory
 
Shorten Your Development Time with an Extensible Design for Apex
Shorten Your Development Time with an Extensible Design for ApexShorten Your Development Time with an Extensible Design for Apex
Shorten Your Development Time with an Extensible Design for ApexSalesforce Developers
 

Similaire à Build the Dental Practice of Your Dreams in 5 Steps (20)

about start up for you 12
about start up for you 12about start up for you 12
about start up for you 12
 
Your Next Move
Your Next MoveYour Next Move
Your Next Move
 
Project management best practices
Project management best practicesProject management best practices
Project management best practices
 
Gestión de Proyectos y mejores practicas
Gestión de Proyectos y mejores practicas Gestión de Proyectos y mejores practicas
Gestión de Proyectos y mejores practicas
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Outsourcing for Profit - A book outlining best practices in offshore outsourcing
Outsourcing for Profit - A book outlining best practices in offshore outsourcingOutsourcing for Profit - A book outlining best practices in offshore outsourcing
Outsourcing for Profit - A book outlining best practices in offshore outsourcing
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
Operator engaged construction enigi - by avanulo
Operator engaged construction   enigi - by avanuloOperator engaged construction   enigi - by avanulo
Operator engaged construction enigi - by avanulo
 
Beyond Budget and Scope: Managing Client Expectations and Delivering Value
Beyond Budget and Scope: Managing Client Expectations and Delivering ValueBeyond Budget and Scope: Managing Client Expectations and Delivering Value
Beyond Budget and Scope: Managing Client Expectations and Delivering Value
 
LoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development ProcessLoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development Process
 
Dit yvol2iss36
Dit yvol2iss36Dit yvol2iss36
Dit yvol2iss36
 
Business Process Mapping for Salesforce Admins
Business Process Mapping for Salesforce AdminsBusiness Process Mapping for Salesforce Admins
Business Process Mapping for Salesforce Admins
 
Cost estimation
Cost estimationCost estimation
Cost estimation
 
Auto-enrolment checklist
Auto-enrolment checklistAuto-enrolment checklist
Auto-enrolment checklist
 
Identifying a project in trouble and re-planning
Identifying a project in trouble and re-planningIdentifying a project in trouble and re-planning
Identifying a project in trouble and re-planning
 
How to Break Down your Projects into Milestones and Tasks
How to Break Down your Projects into Milestones and TasksHow to Break Down your Projects into Milestones and Tasks
How to Break Down your Projects into Milestones and Tasks
 
Using process thinking to define project scope: how to start in the right place
Using process thinking to define project scope: how to start in the right placeUsing process thinking to define project scope: how to start in the right place
Using process thinking to define project scope: how to start in the right place
 
Business plan template
Business plan templateBusiness plan template
Business plan template
 
Shorten Your Development Time with an Extensible Design for Apex
Shorten Your Development Time with an Extensible Design for ApexShorten Your Development Time with an Extensible Design for Apex
Shorten Your Development Time with an Extensible Design for Apex
 
Business cases, the project fundamentals
Business cases, the project fundamentalsBusiness cases, the project fundamentals
Business cases, the project fundamentals
 

Dernier

CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵anilsa9823
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...nagunakhan
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...Pooja Nehwal
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...Suhani Kapoor
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxTusharBahuguna2
 

Dernier (20)

CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 

Build the Dental Practice of Your Dreams in 5 Steps

  • 1. w w w . d e s e r g o . c o m of your 5 STEP to Building the Practice PLAYBOOK Dreams
  • 2. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 2 – 6.26.18 Whether you’re planning your first practice straight out of Associateship, or launching your 10th in a growing group empire, building a dental office is an extraordinary process - and at times both challenging and exacting. This document outlines key steps & highlights project mile- stones – and provides significant detail on Design Ergonomics’ development strategies and processes. Your office will have an enormous impact on your future; it’s where you’ll spend much of your time, determines your financial security, and allows you to bring health and well-being to the community. We are honored to be part of the creation process. Please note that this document addresses issues specific to purchasing a lot for Ground Up Construction or an Existing Building for develop- ment. If you are considering leasing a space, please see “Dental Office Design Process - Tenant Improvement”, also available on our website. INTRODUCTION
  • 3. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 3 – 6.26.18 OVERVIEW Define Goals and Requirements Gather Your Team Rough Budgeting Step ONE EARLY PLANNING Site Selection Negotiations & Due Diligence Preliminary Site Engineering Step TWO PROPERTY ACQUISITION Conceptual • Consultation • Blocking Diagram & Operatory Planning Refinement • Preliminary Floor Plan • Preliminary Exterior Design Concepts • Equipment Determinations & Final Floor Plan Interior Design Step THREE DESIGN DEVELOPMENT Construction Documents & Engineering Bidding Permitting Step FOUR DESIGN EXECUTION Construction Equipment Installation Final Inspections & CO Step FIVE CONSTRUCTION Every building project has unique elements; however, most follow the general flow as outlined below. While this outline may appear simple at a glance, there are an enormous number of details to track and many people involved. (Note that “Gather Your Team” is one of the first things you should consider!) Design Ergonomics’ focus is Practice Development – locating the best possible site and designing the most efficient, comfortable and attractive office possible. While these tasks fall mainly under the Location and Design Steps (highlighted in red), we look forward to accompanying you on your entire journey. Where possible, a “Time Frame” will be given for elements in each step. Please note that these ranges are rough estimates only and may be subject to significant variation depending on your particular project.
  • 4. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 4 – 6.26.18 • Financial Advisor (may be beneficial during rough budgeting phase) • Banker/Lender • Attorney • Architectural & Interior Designers • Clinical Specialist (equipment decisions impact design, budget and time-lines) • Construction Team - Architect - Engineers (Civil, Mechanical, Electrical, Plumbing) - Contractor Building a new office is a Team Effort - though the members on the team, and how much input each will have may vary considerably with each project. Key players include: Depending on your project type, your Construction Team may be from one organization or several. We have developed a large network of trusted referral partners across all the areas listed above. Please don’t hesitate to ask if you would like advice or recommendations. Define Goals and Requirements Gather Your Team PH A S E O N E • E A R LY PL A N N I N G Time Frame: Varies Time Frame: Varies (but could be several weeks) • How many ops do I need at opening? • How about 3 years from now? Or 10? • How long am I going to work in this office? - End-game retirement office? - Lay ground work for later expansion? - Plan on opening a second office later? • What’s important to me? - Location - Start-up costs or long term value - Efficiency & Productivity - Ease of bringing in Associates - Appearance • What are my BIG PICTURE Goals? - Personal Wealth, Charity, More Family Time? - I just love Dentistry and want to do more of it! This is “Big Picture” thinking. You need to ask yourself a lot of questions. Then think about the answers – and ask them again. At this point, it’s easy to get lost in short term thinking and challenges, but the decisions you make today will affect your career for years to come. So, think long term.
  • 5. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 5 – 6.26.18 PH A S E O N E • E A R LY PL A N N I N G As your vision of the future comes into focus, you need to develop a realistic picture of what it will take to get there – and you need to start with a budget. Developing a reasonable budget (one that you can expect to attain) can be somewhat convoluted, and is impacted by a number of factors including: This process often occurs as a cycle of propose, estimate, investigate, and refine – but it begins by examining your Goals and Requirements. A Financial Advisor and/or your Lender may be helpful in this process. Additionally, we have tools that can help suggest very rough costs for a variety of project types. These address such issues as operatory count, regional construction cost variation and level of finish treatment. Balancing what you want now, what you want for the future, and what you can reasonably afford can be a challenge. Fortunately, we’ve helped 1000’s of doctors through the process and one of Design Ergonomics’ greatest strengths lies in our ability to design very cost effective offices suited to a wide range of needs. Rough Budgeting • Your credit rating • Your project type (Building Purchase, Ground Up Build) • Complexity of design & level of finish treatments • Your current production levels • Ability to self-finance • Practice history • Practice ownership, and more... FIRST FLOOR PLA 5338 SQ. FT. 334 SQ. FT. PER TX. R PROJECT NUMBER: KEELAN - DATE: DRAWN BY: CHECKED BY: A 1.0 DR. PAUL KEELAN BUTLER, PA 198 Airport Rd Fall River, MA 027 DN 9 Operatories? 16 Ops and phase equipment? Area to Expand Space to Lease Out Development Potential Time Frame: Varies
  • 6. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 6 – 6.26.18 Site Selection Finding the right location is absolutely critical to the success of your new practice; to maximize your investment, it’s got to be perfect. Obviously, enlisting the aid of a Realtor can help with this process. Howev- er, in 20 years of designing exclusively for the dental field, we’ve analyzed 1000’s of construction sites and have developed a deep understanding of what works. There are issues unique to the dental industry that even a com- mercial real estate specialist may not be aware of. We offer a range of service options to help you make an in- formed decision on just the right spot to build the practice of your dreams. All options utilize an algorithm we’ve developed to analyze and quantify nearly a hundred variables, including: If you’re having trouble finding an appropriate location – or would like us to review and compare locations you have found – please ask your Design Specialist for more informa- tion. Finally, you may want to determine feasibility of potential sites. Many clients utilize our Blocking Diagram design ser- vice to accomplish this. It is affordable, flexible and fast (see Step Three, Design Development for details). • Maximum exposure to your preferred demographic. • Municipal or infrastructure hurdles that cause delays and cost-overruns. • Visibility, traffic and access factors that work for you, not against you. • Analysis of existing improvements (structures, etc.) High Visibility Exceptional Demographics Strong Business Synergies PHASE TWO • PROPERTY ACQUISITION Time Frame: 4-12 weeks
  • 7. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 7 – 6.26.18 Negotiations & Due Diligence Preliminary Site Engineering & “As Builts” You’ll want an attorney on your team at this point; it’s better to have one familiar with you and your project now, than to wait until you really need one because something unexpected has come up. He or she can provide critical input at loan, purchase or contract review times throughout the process. At negotiations you will determine your Due Diligence period. During this time, you will have a Civil Engineer investigate the site to reveal any issues that might cause it to be non-viable. Should such issues become apparent, you may be able to pull out of the sale and still retain your escrow. Again, consult your attorney. Launching the Conceptual Design process during (or even before) the Due Diligence period may also prove useful. Blocking Diagrams (see next section) can help determine the land or structure valuation. Establishing the scale of practice that the property can support will give you a clearer sense of the potential return on your investment – and hence, what the property is worth to you. During the Due Diligence period, have a Civil Engineer prepare a preliminary Site Engineering survey during the Due Diligence period. This is a basic survey, and items covered will depend on the nature of the particular site. Such items may include a preliminary site plan, rough building location and allowable footprint, soil & environmental testing, water remediation strategies etc. A much more comprehen- sive study will be performed at a later date, which will be included with the Construction Documentation. As Builts - If you are purchasing an existing structure in which to build your Office, you will need current drawings of the site. These plans are known as “As Builts” and detail all the dimensional and structural elements of a location as it currently exists. While we can create a Conceptual schematic of how a space might be utilized (see Blocking Diagram, page 9), the accuracy of such a drawing depends heavily on what we have to work from. Outdated or in- complete drawings may require changes or incur significant costs when detailed design work begins. Your Realtor can request As Builts from the seller. If they are not available, you will need to make arrangements to have them created before any reliable design work can be done on the space. T:MontgomeryCMGM DwgSMILE MAKERS150040-DENTAL OFFICE+PLANSC5-GRADING.dwg PHASE TWO • PROPERTY ACQUISITION Time Frame: 1-2 weeks, but may vary Time Frame: 2-4 weeks
  • 8. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 8 – 6.26.18 Conceptual - Consultation If you worked with us on Site Selection, then we’ve developed a good relationship at this point. Otherwise, we need to get to know more about you; your goals, how you perform dentistry and your project expectations. To start this process, you’ll be asked to fill out our Dental Office Planner (“DOP”), This is a fairly quick online form that will give us the basic information we need to build an early profile of your project. We will also schedule a Consult Call with you. Design is a visual medium. Whenever possible, we conduct Consultation and Plan Reviews via Screen Share. We’ve found this to be the most effective method to relay our design philosophies to our clients, while providing them the opportunity for immediate feedback and commentary. During the Design Consult Call, we’ll review your long term goals and desires, focusing on the scope of your project. While operatory count, number of floors, basement amenities and other architectural elements are critical to this discussion, they are not the only elements under consideration. We’ll also investigate your preferred patient demographic, staffing levels, and clinical systems (current and desired). Operatory equipment has a significant impact on design and the practice development process – including budgetary considerations. How rooms are utilized plays a role in their size and arrangement; dedicated hygiene rooms, surgical suites, plumbed vs mobile nitrous, hand-held X-rays and a number of other factors need to be taken into account to create the most efficient and effective design for both patient and doctor. To this end, we will also introduce you to one of our Clinical Specialists. This member of your team will guide you on what equipment decisions need to be made and when. PHASE THREE • DESIGN DEVELOPMENT Time Frame: 1 week or faster
  • 9. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 9 – 6.26.18 Conceptual - Blocking Diagram & Op Planning Now the Design Process launches in earnest, and we begin with a conceptual Blocking Diagram. A dental practice is a system. Before you define the walls, it’s crit- ical to layout the flow of that sys- tem – understanding the functional demands of each space and how they relate to one another. This fast, flexible, and responsive design approach will clarify your goals for the future and solidify your vision of the perfect practice. Complex Issues Simplified The Blocking Diagram is a preliminary space/plan concept used to outline the layout and flow of your future practice. Using simplified square footage calculations and geometric space planning, we cre- ate a schematic diagram representing one possible configuration of your space. At this stage, we focus on maximizing the efficiency, capacity and comfort of your practice as a whole. While the result looks simple, your Blocking Diagram represents 20 years of research maxi- mizing dental office productivity and cost-effective design execution. As schematics, these proposals are flexible and highly responsive to your input. This creates a de- velopment and revision process that is faster and more effective than traditional floor planning tech- niques – and at a much lower cost. Iterations Our standard Blocking Diagram service includes up to four design iterations. These may be used to refine concepts within a single design theme, or to experiment with different approaches. They may even be used to assess multiple spaces. Each iteration will be presented via Screen Share. This allows us to show how design concepts may look in the real world and to make minor changes for immediate approval based on your input. Depending the on the number of iterations required, the Blocking Diagram phase of Design Develop- ment can be done quite quickly – sometimes in just a few days. Once you are satisfied, the approved design can move to the next step in Design Development: the Floor Plan.  FILENAME: ISSUED: DRAWN BY: CHECKED BY: PROJECT NUMBER: PJL DJA        PROPOSED DENTAL OFFICE FOR LAKE OCONEE DENTISTRY = DAYLIGHT P = PLUMBING REQUIRED = ACOUSTICS HIGH IMPORTANCE PROPOSED BLOCKING DIAGRAM V2 SCALE = N.T.S APPROX 4972 sq.ft. 331 sq.ft/Tx.Rm THE 16 ELEMENTS OF AN IDEAL FLOOR PLAN 1.Clearly identifiable patient entrance. 2. Staff entrance screened from view. Prevents entry confusion. 3. Immediate visual and physical access to the front desk upon office entry. 4. Waiting room seating removed from primary circulation or traffic flow. 5. Patient bathroom visible to, but removed from, waiting room seating. 6. The major proportion of the open front desk does not face the waiting room seating. 7. Conference room accessible by the doctor without passing into the front desk space. 8. Conference room location minimally exposes patient to treatment room noises. 9. Treatment rooms isolated from the front desk. 10. Compact treatment area minimizing segregation of doctor and hygiene staff. 11. Doctor’s office within proximity of treatment rooms, to keep a pulse on clinical activities. 12. Space for mobilization of technology. 13. Sterilization, lab and re-supply areas in close physical proximity to treatment rooms. 14. Radiology areas do not block traffic flow when in use. 15. Staff lounge isolated from clinical and business zones. 16. Treatment room alignment does not channel noises from room to room. = PRIVATE SPACES = TREATMENTSPACES = PUBLIC SPACES QUIET DOCTOR TREATMENT ROOM “P” (16’-0”X9’-0”) QUIET DOCTOR TREATMENT ROOM “P” (16’-0”X9’-0”) QUIET DOCTOR TREATMENT ROOM “P” (16’-0”X9’-0”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DENTAL MECH CLOSET WAITING ROOM (16+ SEATS) WAITING ROOM (11+ SEATS) CAFE AREA (5+ SEATS) CLOSET PATIENT RESTROOM “P” PATIENT RESTROOM “P” STAFF RESTROOM “P” SEDATION RESTROOM “P” SEMI-PRIVATE CHECKOUT AREA SEMI-PRIVATE CHECKOUT AREA CONSULT ROOM CONSULT ROOM X-RAY & IMAGING ROOM COMPUTER STATION STERILIZATION RESUPPLY & STORAGE “P” STAFF LOUNGE “P” JANITOR CLOSET “P” LAB & MODEL STORAGE GREETING AREA (2 STATIONS) LOGO WALL CHECKOUT STATIONS STAIRS UP REFRESHMENTS PLAY AREA MOBILE TECH MOBILE TECH PHASE THREE • DESIGN DEVELOPMENT Time Frame: 1-2 weeks
  • 10. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 10 – 6.26.18 Refinement - Preliminary Floor Plan PHASE THREE • DESIGN DEVELOPMENT Time Frame: 1-2 weeks A Floor Plan is created by translating the conceptual elements that were established during the Blocking Diagram process – patient flow, clinical sys- tems, sterilization, inventory and storage – into a formal drawing. As the basis from which all other documents are created, it must accurately depict the specific details that allow the Blocking concepts to be realized. Missteps and oversights at this stage can snowball into costly changes down the road. Simply changing the location of a door, or the orientation of a room – which are trivial matters to an Architect – can have dramatic and detrimen- tal impact on traffic flow in a dental environment. Most Architects don’t design exclusively for the dental industry. We do. As the nation’s largest independent dental office design firm, we’ve had the opportunity to help develop 1000’s of practices, and have seen what works – and what doesn’t. While our Blocking Dia- grams establish the scheme for an incredibly effective practice, they truly are conceptual frameworks only. To avoid potential issues, we strongly recommend having our design team take your approved Blocking Diagram to Floor Plan (initial, and then final). We will ensure critical design elements are maintained, as well as provide additional drawing details which accurately define Operatory, Sterilization, Resupply and other clinical considerations unique to a dental practice.  FILENAME: ISSUED: DRAWN BY: CHECKED BY: PROJECT NUMBER: PJL DJA        PROPOSED DENTAL OFFICE FOR LAKE OCONEE DENTISTRY = DAYLIGHT P = PLUMBING REQUIRED = ACOUSTICS HIGH IMPORTANCE PROPOSED BLOCKING DIAGRAM V2 SCALE = N.T.S APPROX 4972 sq.ft. 331 sq.ft/Tx.Rm THE 16 ELEMENTS OF AN IDEAL FLOOR PLAN 1.Clearly identifiable patient entrance. 2. Staff entrance screened from view. Prevents entry confusion. 3. Immediate visual and physical access to the front desk upon office entry. 4. Waiting room seating removed from primary circulation or traffic flow. 5. Patient bathroom visible to, but removed from, waiting room seating. 6. The major proportion of the open front desk does not face the waiting room seating. 7. Conference room accessible by the doctor without passing into the front desk space. 8. Conference room location minimally exposes patient to treatment room noises. 9. Treatment rooms isolated from the front desk. 10. Compact treatment area minimizing segregation of doctor and hygiene staff. 11. Doctor’s office within proximity of treatment rooms, to keep a pulse on clinical activities. 12. Space for mobilization of technology. 13. Sterilization, lab and re-supply areas in close physical proximity to treatment rooms. 14. Radiology areas do not block traffic flow when in use. 15. Staff lounge isolated from clinical and business zones. 16. Treatment room alignment does not channel noises from room to room. = PRIVATE SPACES = TREATMENTSPACES = PUBLIC SPACES QUIET DOCTOR TREATMENT ROOM “P” (16’-0”X9’-0”) QUIET DOCTOR TREATMENT ROOM “P” (16’-0”X9’-0”) QUIET DOCTOR TREATMENT ROOM “P” (16’-0”X9’-0”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DOCTOR TREATMENT ROOM “P” (11’-0”X8’-4”) DENTAL MECH CLOSET WAITING ROOM (16+ SEATS) WAITING ROOM (11+ SEATS) CAFE AREA (5+ SEATS) CLOSET PATIENT RESTROOM “P” PATIENT RESTROOM “P” STAFF RESTROOM “P” SEDATION RESTROOM “P” SEMI-PRIVATE CHECKOUT AREA SEMI-PRIVATE CHECKOUT AREA CONSULT ROOM CONSULT ROOM X-RAY & IMAGING ROOM COMPUTER STATION STERILIZATION RESUPPLY & STORAGE “P” STAFF LOUNGE “P” JANITOR CLOSET “P” LAB & MODEL STORAGE GREETING AREA (2 STATIONS) LOGO WALL CHECKOUT STATIONS STAIRS UP REFRESHMENTS PLAY AREA MOBILE TECH MOBILE TECH Your Floor Plan is the single most important document in the Design Development process by virtue of the fact that it is the reference point for all subsequent Construction Documentation.
  • 11. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 11 – 6.26.18 Refinement - Equipment & Final Floor Plan Before Design Ergonomics or your Architect can produce a Final Floor plan, you must finalize many decisions regarding equipment; certain structural, electrical and plumbing elements that need to be delineated at this point depend on these decisions. Where possible, Design Ergonomics will provide drawing details that will become part of the eventual plan set (“Construction Drawings”) that your Construction Partner will use to build your office and install the equipment that drives it. Typically, these include one or more Operato- ry designs as well as Sterilization. Here again, we invite you to make use of our Clinical Specialists. No matter what your equipment selections are, they will have valuable insight on a broad range of topics - from HVAC to autoclaves. From your Initial Floor Plan through Final, we will consult and review with you, making changes as needed. Initial Floor Plan presentation may take place via Screen Share. However, changes at this point tend to be minor (though precise) and are often handled through email. Once approved, we will create a document package for your Final Floor Plan that includes: TYP. 4' - 2 1/16" X-RAY UNIT: SINGLE STUD MOUNT MODEL T.B.D. BY OWNER SEE ELECTRICAL SHEETS FOR FURTHER INFORMATION L3 S1 D1 N16 N4 C3 C4 OPERATORY GENERAL & PATIENT LIGHT CENTER OF HEAD CENTER OF HEAD 5' - 5" 4' - 0" A5.6 3 2 A5.6 2' - 3 1/4" 5' - 0" 7' - 0" 7' - 6" INSTALL STRAIGHT STOPS ON ALL DOMESTIC WATER LINES FIN. FLOOR 1-1/2" SPARE CONDUIT (TO TOE OF CHAIR J-BOX) 2' - 10 3/4" 2X6 BLOCKING 2X6 BLOCKING 2X6 BLOCKING 2X6 BLOCKING 2X4 NAILER 2X4 NAILER 10 1/4" 4 1/2" DOORWAY HEADER AS REQ'D DOORWAY HEADER AS REQ'D DUPLEX OUTLET DATA PORT SPARE (OPEN) J-BOX (FOR USB CONNECTIONS) 1-1/2" CONDUIT FOR USB CONNECTIONS 5' - 3" 2' - 4" 6' - 0" 7' - 0 5/8" 7' - 6" REF PLUMBING FOR VACUUM, WATER, AND AIR LINES REQUIRED FIN. FLOOR 7' - 0" 5' - 6" 1' - 2" 1' - 3" 1' - 3" 2' - 6" 6" 10" 1' - 7" C3 CABINET BACK C4 CABINET BACK BACK CUTAWAY FOR ELECTRICAL AND DATA BY GC DRYWALL CUTAWAY AREA BY GC 4" 1' - 5 1/2" 2' - 4" 5' - 0" 7' - 6" 6 1/2" 5 1/2" 2 1/4" 5 1/4" 8 1/4" 3" SOLID WOOD BLOCKING (REF. DETAIL) 1/2" VACUUM 1/2" DENTAL WATER 1/2" COMPRESSED AIR 5/8" GYP. BOARD 2X FRAMING (TYP.) REF PLUMBING FOR VACUUM, WATER, AND AIR LINES REQUIRED FINISHED FLOOR C4 C3 D1 S1 C8 L3 2X6 WOOD BLOCKING FOR FASTENING CABINETRY (BY G.C. TYP.) - SEE DETAIL 5/A3.0 SEE REFLECTED CEILING PLAN SEE LIGHT FIXTURE MANUAL 2' - 4" 4" 1' - 5 1/2" 2' - 8" 2' - 6" HUBBELL FLUSH MOUNT FLOOR BOX W/ POWER, & AUDIO, #HBLCF301 W/ HBLTCGNTSW COVER (BY G.C.) SEE LIGHT FIXTURE MANUAL FOR BLOCKING INFORMATION SEE LIGHT FIXTURE MANUAL FOR MOUNTING DETAILS LAST SAVED: FILE LOCATION: 8/24/2015 8:57:00 AM C:UsersmichaelsidesDocumentsMontgomery AL - Dental Clinic_michaelsides.rvt 3/4" = 1'-0" 1 ENLARGEMENT OF DOCTOR TREATMENT ROOM 3 3/4" = 1'-0" 4 C4/C3-9 - HEADWALL FRAMING - NO NITROUS 3/4" = 1'-0" 5 C4/C3 - DRYWALL PREP 6 1 1/2" = 1'-0" 7 HEAD WALL DETAIL - WITH WATER LINE 3/4" = 1'-0" 2 DR. ROOM SECTION DW A5.1 6 5 A5.1 2 3 4 20' - 1" 6' - 9 7/8" 3' - 0 5/8" 8' - 9 1/4" 13' - 11 1/4" 11' - 10 1/2" 15' - 10 3/4" 9' - 2 3/8" 8' - 11 3/4" 2' - 8 1/8" 2' - 7 1/4" 8' - 6 3/4" 13' - 11 1/4" 4' - 8 1/8" STERILIZATION, RESTOCK & RESUPPLY 128 LAB & MODEL STORAGE 131 1 A5.5 FIRST FLOO 0 DROP CEILIN 10' - 0 5' - 2" 2' - 10" 3' - 0" 3' - 0" 8' - 0" 7' - 11 7/8" PL1 PL4 AL 2000 PLUGMOLD STRIP; 12" O.C.; REF ELECTRICAL ADJUSTABLE SHEL PLASTIC LAMINATE COLOR: TBD (BY G.C.) 1' - 11 3/16" 2' - 10" 5' - 2" 3' - 0" 8' - 0" 13' - 3 7/8" SIN PLA CO 1' - 11 1/2" FIRST FLOOR 0" DROP CEILING 10' - 0" 8' - 0" 5' - 2" 2' - 10" 2' - 6" HAFELE BRACKETS; 287.45.468 (BY MILLWORK) PL4 ADJUSTABLE SHELVES PLASTIC LAMINATE COLOR: TBD (BY G.C.) FIRST FLOOR 0" DROP CEILING 10' - 0" 3' - 6" 1' - 8" 2' - 10" 1' - 8" 1' - 8" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 8' - 0" 18' - 4 1/4" 2' - 6" 2' - 6" 1' - 6" 4' - 9 1/2" 1' - 6" 1' - 8" 5' - 2" 2' - 10" 1' - 3" ERGONOMIC PRODUCTS PULL DOWN UNITS (BY OWNER) ERGONOMIC PRODUCTS PULL DOWN UNITS (BY OWNER) AL 2000 PLUGMOLD STRIP; 12" O.C.; REF ELECTRICAL HAFELE BRACKETS; 287.45.468 (BY MILLWORK) TOEKICK; PLASTIC LAMINATE; BY G.C. PL1 PL4 FIRST FLOOR 0" DROP CEILING 10' - 0" 2' - 6" 3' - 0" 1' - 6" 2' - 0" 2' - 10" 1' - 8" 3' - 6" 8' - 0" 3' - 0" 3' - 0" 3' - 0" 2' - 6" 2' - 6" 2' - 6" 2' - 6" A5.1 8 A5.1 7 1' - 6" 1' - 6" 8' - 9 5/8" 15' - 6" 2' - 6 1/8" 4' - 0" 4' - 0" 3 A3 ERGONOMIC PRODUCTS PULL DOWN UNITS (BY OWNER) AL 2000 PLUGMOLD STRIP, 12" O.C. REF ELECTRICAL PL4 HAFELE BRACKETS; 287.45.468 (BY MILLWORK) TOEKICK PLASTIC LAMINATE; BY G.C. DISHWASHER (BY OWNER) RANGE HOOD (BY G.C.) AUTOCLAVES (BY OWNER) PANTRY-STYLE CABINETS WITH GLASS DOORS; PL1 2' - 6" 2' - 6" 2' - 6" 1' - 3 5/8" PL1 A&M HARDWARE SHELF SUPPORT BRACKETS SIZED AS NEEDED ACCURIDE MODEL 301-2590/130lbs FULL EXTENSION HEAVY DUTY DRAWER SLIDE BY OTHERS 3/4" MARINE GRADE PLYWOOD APPROVED FRO DAMP CONDITIONS FINISHED FLOOR FINISHED CEILING 2' - 9 1/4" 2' - 0" S T 6" 8" GREENO MFG.: # TCSCH-L SHARPS HOLDER 6" DIA TRASH CHUTE BY CABINENT MAKER PLASTIC WASTE BIN (BY OWNER) REV-A-SHELF (OR EQUIVALENT) FULL HEIGHT PULL OUT WASTE BIN LAST SAVED: FILE LOCATION: 8/24/2015 8:56:51 AM C:UsersmichaelsidesDocumentsMontgomery AL - Dental Clinic_michaelsides.rvt 1/2" = 1'-0" 1 ENLARGED STERILIZATION / RESTOCK & RESUPPLY, AND LAB & MODEL STORAGE 1/2" = 1'-0" 2 LAB & MODEL STORAGE - A 1/2" = 1'-0" 3 LAB & MODEL STORAGE - B 1/2" = 1'-0" 4 LAB & MODEL STORAGE - C 1/2" = 1'-0" 5 RESUPPLY 1/2" = 1'-0" 6 STERILIZATION 3" = 1'-0" 7 SLIDING SHELF - DETAIL 1/2" = 1'-0" 8 PULL-OUT TRASH CABINET - SECTION • First Floor Design Plan (sheet A1.0) • First Floor Dimensioned Plan (sheet A1.1) • Sterilization Elevation • Equipment Detail Drawings (as available) • CAD files of all drawings supplied PHASE THREE • DESIGN DEVELOPMENT Time Frame: 1-2 weeks
  • 12. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 12 – 6.26.18 Interior Design Interior Design (“ID”) is listed here at the end of the Design Development phase only because a Final ID Package includes drawings that require an approved Floor Plan to create. That said, the ID process, style, and level of finish need to be top-of-mind from the very beginning. Finish treatments can have a significant impact on your overall costs, and these considerations need to be included (at least in a general sense) when you’re developing an initial budget. A critical point worth noting; ID – especially in a medical environment – is not for amateurs. Why? Interior Design is as much Science and Business as it is an Art Form. There is a deep psychology specific to creating a calming, reassuring flow in a dental office – an environment that fills many people with anxiety. Additionally, building codes regarding medical facility finishes can be stringent, and those out- side the industry may not have access to commercial grade materials required. Finally, formal ID demands a significant degree of professional drafting expertise and requires a large investment in time. The ID Process Design Ergonomics offers multiple levels of Interior Design, from a selection of pre-formatted options to full custom package development. Regardless of level, we start with a complimentary consultation call. To prepare for this call, think about styles and finishes that appeal to you. Find examples if pos- sible; not just on the ID and Portfolio sections of our site, but on Pinterest, in magazines and other visual sources. Your ID specialist will guide you through the process, but we value your ideas and need your input to tailor a package that best suits your goals, aesthetics and budget. PHASE THREE • DESIGN DEVELOPMENT Time Frame: Throughout (complete ID docs by Bid submission)
  • 13. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 13 – 6.26.18 Interior Design con’t Throughout Blocking and Floor Plan, we’ll work with you to develop an aesthetics and materials package via email, screen shares and shipments of physical samples. The first deliverable in this pro- cess will be a Design Board, which represents color schemes, materials and texture expressions to be used throughout your practice for a cohesive and professional look. With an approved Design Board, we can begin to gather all the relevant material and finish information your Construction Part- ner will require for a bid set and eventual execution. During this process, we’ll also consult with you on a variety of architectural issues related specifically to Interior Design. These include the Reception Desk design, Door & Cabinet styles, Dec- orative Lighting styles and more. The final package includes: As with the Operatory and Sterilization details, these drawings and schedules will be folded into the final Construction Documents prepared by your Architect. Your designer will also be available during the construction phase to review materials with your Contractor or discuss changes that may arise. ELEVATOR A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 13' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" 1 A 6.3 TYP. 2 A 6.3 TYP. A.F.F. 10' - 0" 2 A 6.3 TYP. 2 A 6.3 TYP. A.F.F. 10' - 0" A.F.F. 10' - 0" 2 A 6.3 TYP. 5 A 6.3 TYP. 5 A 6.3 TYP. TYP. TYP. CHANDELIER - SEE LIGHT FIXTURE SCHEDULE FOR SPEC TYP. 6 A 6.3 TYP. 3 A 6.3 TYP. 1 A 6.3 TYP. TBL LIGHT SYSTEM - REF. MANUAL (TYP. ALL TREATMENT ROOMS) TBL LIGHT SYSTEM - REF. MANUAL (TYP. ALL TREATMENT ROOMS) 8 A 6.3 TYP. 2' - 6 3/8" 2' - 0" 2' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 10' - 0" A.F.F. 9' - 0" A.F.F. 9' - 0" A.F.F. 9' - 0" A.F.F. 9' - 0" A.F.F. 9' - 0" A.F.F. 8' - 0" A.F.F. 9' - 0" A.F.F. 9' - 0" A.F.F. 9' - 0" 1 A 6.3 TYP. A.F.F. 8' - 0" A.F.F. 8' - 0" A.F.F. 9' - 0" A.F.F. 9' - 0" A.F.F. 8' - 0" PENDANT TROFFER 2X2 PARABOLIC WALL SCONCE TROFFER 2X4 PARABOLIC 6" RECESSED SPOT LIGHT 6" RECESSED CAN RESTROOM VANITY FLUORESCENT STRIP A.F.F. 9' - 0" A.F.F. 9' - 0" PROVIDE SURFACE-MOUNTED LIGHTS BELOW STAIRS Scale Date Drawn By Checked By Project Number Consultant Address Address Address Phone Consultant Address Address Address Phone Consultant Address Address Address Phone Consultant Address Address Address Phone Consultant Address Address Address Phone www.desergo.com PO Box 3630 767 Main Road Westport MA 02790 508 636 3600 © 2014 DESIGN ERGONOMICS INC. THESE DRAWINGS ARE THE PROPERTY OF DESIGN ERGONOMICS INC. AND MAY NOT BE SOLD, COPIED, OR USED IN ANYWAY WITHOUT OUR WRITTEN PERMISSION DO NOT SCALE 1/4" = 1'-0" 11/7/2017 11:11:01 AM A 6.2 REFLECTED CEILING PLANS GP JB 5/13/16 1/4" = 1'-0" 1 1ST FLOOR PLAN 1/4" = 1'-0" 2 2ND FLOOR PLAN 1/4" = 1'-0" LIGHT LEGEND 1/4" = 1'-0" 3 BASEMENT PLAN No. Description Date P1 P2 P3 PAINT PAINT PAINT SHERWIN WILLIAMS-DURATION HOME MATTE P4 PAINT P5 PAINT CANVAS TAN SW7531 REQUISITE GRAY SW7023 UPWARD SW6239 JUBILEE SW6248 ANTIQUE WHITE SW6119 PL1 CT1 CERAMIC FIELD TILE MANNINGTON SEASCAPE 12"X24" DESCRIPTION MATERIALS & FINISH LEGEND MANUFACTURER PC STYLE/COLOR NOTES C1 CARPET TILE-LEVEL 1 BEACH HAUS 00173 PARISIAN PINE-AROW7860 FOUNDATION PAR203 PATCRAFT-INTRINSIC VPT1 VINYL WOOD-LOOK VINYL PLANK TILE MANNINGTON-AMTICO 4.5"X36" PLANK SV1 SHEET VINYL MANNINGTON SS1 SS2 SOLID SURFACE SOLID SURFACE DUPONT ZODIAQ DUPONT CORIAN BOARDWALK OAK-7983 PLASTIC LAMINATE NEVAMAR WINDRIFT CLOUD WHITE HAZELNUT FLOW GRAY FT12491112X24 BLACK BLACK WINDRIFT PL2 PL3 PLASTIC LAMINATE PLASTIC LAMINATE WILSONART ASTRO STRANDZ-4940 ANTIQUE WHITE B1 BASEBOARD-MILLWORK JOHNSONITE-RUBBER-OBLIQUE B2 BASEBOARD-COVE JOHSONITE- 1/8" RUBBER COVE B3 BASEBOARD-TILE COVE MANNINGTON-SEASCAPE 6"X24" CT2 CERAMIC WALL TILE FLORIDA TILE-SOUL SERIES SF1 SPECIALTY FINISH STACKED STONE FAUX STONE SHEETS STACKED STONE GRANDE 2'X4' ACT1 SUSPENDED GRID ACOUSTICAL TILE ARMSTRONG 2'X2' OPTIMA 3250 WHITE ACT2 SUSPENDED GRID ACOUSTICAL TILE ARMSTRONG 2'X2' ULTIMA 1912 WHITE P6 PAINT SHERWIN WILLIAMS-DURATION HOME SEMIGLOSS PURE WHITE SW7005 WILSONART PEPPERDUST-D327 BLACK ST1 STAIR TREAD JOHNSONITE VINYL-ST-XXX-SQ SHERWIN WILLIAMS-DURATION HOME MATTE SHERWIN WILLIAMS-DURATION HOME MATTE SHERWIN WILLIAMS-DURATION HOME MATTE SHERWIN WILLIAMS-DURATION HOME MATTE TO BE CONFIRMED ON SITE TO BE CONFIRMED ON SITE TO BE CONFIRMED ON SITE TO BE CONFIRMED ON SITE TO BE CONFIRMED ON SITE POPLAR F121-16 SF2 WALL COVERING KOROSEAL CONFIRMED 4-1-16 CONFIRMED 4-1-16 CONFIRMED 4-1-16 CONFIRMED 4-1-16 CONFIRMED 4-1-16 CONFIRMED 4-1-16 PARTITION LEGEND DETAIL: X XX SHEET DETAIL PLAN: A6 12 NUMBER INDICATES STUD HEIGHT NO NUMBER INDICATES STUD HEIGHT TO BOTTOM OF FRAMING ABOVE NUMBER INDICATES STUD SIZE AS FOLLOWS: REFERENCE SIDE OPPOSITE SIDE LETTER INDICATES PARTITION TYPE 4 - 2x4 NOMINAL WOOD STUD 6 - 2x6 NOMINAL WOOD STUD NON RATED WALL STRUCTURAL SHEAR WALL 1 HR FIRE RATED WALL PARTITION TYPES A 2X4" WOOD STUDS @ 16" OC 5/8" GYPSUM BOARD C B 5/8" GYPSUM BOARD 2x4 WOOD STUDS STAGGERED @ 16" OC 5/8" GYPSUM BOARD 2x4 WOOD STUDS @ 16" OC 5/8" GYPSUM BOARD 2x4 WOOD STUDS STAGGERED @ 16" OC REFERENCE SIDE OPPOSITE SIDE E 2x6 WOOD STUDS @ 16" OC 5/8" GYPSUM BOARD 2x6 WOOD STUDS @ 16" OC 5/8" GYPSUM BOARD 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION 0' - 4 3/4" 0' - 6 3/4" 0' - 6 3/4" 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION D 2x4 WOOD STUDS @ 16" OC 5/8" GYPSUM BOARD 2x4 WOOD STUDS @ 16" OC 5/8" GYPSUM BOARD 0' - 4 3/4" FOR ALL PARTITION TYPES, FINISHES ARE TO EXTEND A MINIMUM OF 4" ABOVE FINISHED CEILING AS SCHEDULED. WHERE THERE IS NOT A SCHEDULE CEILING, FINISHES TO CONTINUE TO BOTTOM OF DECK. PROVIDE CONTINUOUS SEAL AT CONNECTION TO BOTTOM OF DECK 2x6 WOOD STUDS @ 16" OC 5/8" GYPSUM BOARD (TYPICAL) 5/8" GYPSUM BOARD (TYPICAL) 2x6 WOOD STUDS @ 16" OC F 2x6 WOOD STUDS @16" OC 5/8" GYPSUM BOARD 5/8" GYPSUM BOARD 2x6 WOOD STUDS @ 16" OC 0' - 7 3/8" G 2x4 WOOD STUDS @16" OC 5/8" TYPE "X" GYPSUM BOARD 5/8" TYPE "X" GYPSUM BOARD 2x4 WOOD STUDS @ 16" OC 0' - 4 3/4" H 2x6 WOOD STUDS @ 16" OC 5/8" TYPE "X" GYPSUM BOARD 2x6 WOOD STUDS @ 16" OC 5/8" TYPE "X" GYPSUM BOARD 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION 0' - 6 3/4" 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION OSB SHEATHING REF STRUCTURAL 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION OSB SHEATHING REF STRUCTURAL J 2x4 WOOD STUDS @16" OC 5/8" TYPE "X" GYPSUM BOARD 5/8" TYPE "X" GYPSUM BOARD 2x4 WOOD STUDS @ 16" OC 0' - 5 3/8" OSB SHEATHING REF STRUCTURAL OSB SHEATHING REF STRUCTURAL K 2x4 WOOD STUDS @16" OC 5/8" TYPE "X" GYPSUM BOARD 5/8" TYPE "X" GYPSUM BOARD 2x4 WOOD STUDS @ 16" OC 0' - 5 3/8" OSB SHEATHING REF STRUCTURAL OSB SHEATHING REF STRUCTURAL 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION GENERAL CONTRACTOR TO VERIFY WALL CONSTRUCTION FOR ANY REQUIRED SHIELDING AT ROOMS CONTAINING DENTAL IMAGING EQUIPMENT WITH MANUFACTURER/SUPPLIER AND ASSOCIATED REGULATIONS. UL DESIGN NO. U305 0' - 6 3/4" L 2x4 WOOD STUDS @ 16" OC 5/8" TYPE "X" GYPSUM BOARD 2x4 WOOD STUDS @ 16" OC 5/8" TYPE "X" GYPSUM BOARD 0' - 8 7/8" 5/8" GYPSUM BOARD 5/8" GYPSUM BOARD UL DESIGN NO. U305 AT RATED PARTION REFERENCE SIDE OPPOSITE SIDE M 2x6 WOOD STUDS @16" OC 5/8" TYPE "X" GYPSUM BOARD 5/8" TYPE "X" GYPSUM BOARD 2x6 WOOD STUDS @ 16" OC 0' - 7 3/8" OSB SHEATHING REF STRUCTURAL OSB SHEATHING REF STRUCTURAL N 2x6 WOOD STUDS @16" OC 5/8" GYPSUM BOARD 5/8" GYPSUM BOARD 2x6 WOOD STUDS @ 16" OC 0' - 7 3/8" OSB SHEATHING REF STRUCTURAL OSB SHEATHING REF STRUCTURAL P 5/8" GYPSUM BOARD 2x4 WOOD STUDS STAGGERED @ 16" OC 5/8" GYPSUM BOARD 2x4 WOOD STUDS STAGGERED @ 16" OC 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION 3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION OSB SHEATHING REF STRUCTURAL 0' - 7 7/8" OSB SHEATHING REF STRUCTURAL ALL GYPSUM BOARD TO BE ORANGE PEEL FINISH 1 Q 2x6 WOOD STUDS @16" OC 5/8" GYPSUM BOARD 5/8" TYPE "X" GYPSUM BOARD 2x6 WOOD STUDS @ 16" OC 0' - 11 1/2" OSB SHEATHING REF STRUCTURAL OSB SHEATHING REF STRUCTURAL UL DESIGN NO. U305 AT RATED PARTITION UL DESIGN NO. U305 AT RATED PARTITION 2x4 WOOD STUDS @ 16" OC 5/8" GYPSUM BOARD 2x4 WOOD STUDS @16" OC 5/8" TYPE "X" GYPSUM BOARD Scale Date Drawn By Checked By Project Number Consultant Address Address Address Phone Consultant Address Address Address Phone Consultant Address Address Address Phone Consultant Address Address Address Phone Consultant Address Address Address Phone www.desergo.com PO Box 3630 767 Main Road Westport MA 02790 508 636 3600 © 2014 DESIGN ERGONOMICS INC. THESE DRAWINGS ARE THE PROPERTY OF DESIGN ERGONOMICS INC. AND MAY NOT BE SOLD, COPIED, OR USED IN ANYWAY WITHOUT OUR WRITTEN PERMISSION DO NOT SCALE As indicated 11/7/2017 11:11:01 AM A 7.0 FINISH SCHEDULE, PARTITION TYPES AND DETAILS GP JB 5/13/16 3/16" = 1'-0" Materials & Finish Legend PLAN REFERENCE ORIENTATION ROOM FINISH SCHEDULE RM # ROOM NAME FLOOR WALL CEILING NOTES FINISH A B C D MAT P/C HEIG HT BASE WALL MAT WALL FINISH P/C BASE WALL MAT WALL FINISH P/C BAS E WALL MAT WALL FINISH P/C BASE WALL MAT WALL FINISH P/C 001 EQUIPMENT, STORAGE, & UTILITY TBD SUSPD ACT ACT2 A.F.F. 002 ELEVATOR MECHANICALS TBD SUSPD ACT ACT2 A.F.F. 003 DENTAL MECH TBD SUSPD ACT ACT1 A.F.F. 004 STAIRWELL 'A' SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 100 VESTIBULE CT1 B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P SUSPD ACT ACT2 A.F.F. 101 WAITING ROOM C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 102 RECEPTION CT1,C1 B3,B1 GYP PAINT P B1 GYP PAINT SF1 B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 104 BUSINESS C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 105 EXIT CORRIDOR C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 106 SERVER CLOSET C1 N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P SUSPD ACT ACT2 A.F.F. 107 ON-DECK OFFICE #3 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 108 SPRINKLER ROOM TBD TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P GYP. P A.F.F. 109 STAIRWELL 'B' SV1;ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 110 SHIPPING & RECEIVING CLOSET SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 112 WAITING RESTROOM CT1 B1 GYP PAINT;TILE P;CT2 B1 GYP PAINT;TILE P;CT2 B1 GYP PAINT;TILE P;CT2 B1 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F. 113 TREATMENT ROOM #1 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 114 TREATMENT ROOM #2 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 115 TREATMENT ROOM #3 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 116 TREATMENT ROOM #4 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 117 TREATMENT ROOM #5 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 118 TREATMENT ROOM #6 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 119 TREATMENT ROOM #7 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 120 TREATMENT HALLWAY #1 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 121 QUIET WAITING AREA C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P GYP. P A.F.F. 122 STAIRWELL 'A' SV1;ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 123 TREATMENT HALLWAY #2 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 124 TREATMENT ROOM #9 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 125 TREATMENT ROOM #10 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 126 TREATMENT ROOM #11 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 127 TREATMENT ROOM #12 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 128 TREATMENT ROOM #13 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 129 TREATMENT ROOM #14 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 130 TREATMENT ROOM #15 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 131 TREATMENT ROOM #16 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 132 TREATMENT ROOM #17 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 133 TREATMENT ROOM #18 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 134 TREATMENT ROOM #19 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 135 QUIET TREATMENT ROOM #20 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 136 CONSULT ROOM #2 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP SF2 P SUSPD ACT ACT2 A.F.F. 137 PAN X-RAY C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 138 CONSULT ROOM #1 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP SF2 P SUSPD ACT ACT2 A.F.F. 139 CLIINICAL RESTROOM #2 CT1 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F. 140 STERILIZATION RESUPPLY & STORAGE SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 141 CROSSOVER HALLWAY C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 142 ON-DECK OFFICE #1 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 144 MED GAS C1 N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P SUSPD ACT ACT2 A.F.F. 145 BREAK ROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 146 MOBILE TECH C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P GYP. P A.F.F. 147 STAFF RESTROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 148 CLINICAL RESTROOM #1 CT1 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F. 149 LAB & MODEL STORAGE SV1 B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P SUSPD ACT ACT2 A.F.F. 150 MOBILE TECH C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P GYP. P A.F.F. 151 QUIET TREATMENT ROOM #8 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F. 152 ON-DECK OFFICE #2 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 153 ELEVATOR TBD TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P TBD TBD A.F.F. 154 ELECTRICAL SV1 N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P TBD TBD A.F.F. 200 STAFF LOUNGE & CONFERENCE CI,SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 201 OFFICE C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 202 COMMAND CENTER C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 203 RESTROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 204 RESTROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT PP SUSPD ACT ACT2 A.F.F. 205 PRIVATE OFFICE C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 206 ATTIC EAST TBD N/A TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD A.F.F. 207 PRIVATE RESTROOM CT1 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F. 208 VESTIBULE C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 209 LOCKER ROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 210 STAIRWELL 'B' ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 211 ASSOCIATE'S OFFICE C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 212 ELEVATOR VESTIBULE C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F. 213 MARKETING DIRECTOR C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 214 UTILITY CLOSET SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 215 ELEVATOR TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD A.F.F. 216 STAIRWELL 'A' ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F. 1/4" = 1'-0" 1 PARTITION LEGEND (WOOD FRAMING) 1" = 1'-0" 2 PARTITION TYPES (WOOD FRAMING) No. Description Date 1 Revision 1 Date 1 FINISHED FLOOR 3' - 7" 2' - 4 3/4" 1' - 0" 0' - 5 1/2" 3/4" VOID FREE PLYWOOD; PL1 1' - 6" PENCIL DRAWER ORGANIZER ROCKLER #37399 DIM: 13"Wx18"Dx2"H (OR EQUAL); BY MILLOWKR (2) LAYERS 3/4" VOID FREE PLYWOOD; PL1 3/4" VOID FREE PLYWOOD; PL1 CUT OUT FOR WIRE MANGEMENT TRANSACTION SURFACE: SS1 ALIGN DETAIL SEE RCP FOR FRAMING TO EXTEND TO UNDERSIDE OF SUPPORTS SEE RCP FOR DETAIL FINISHED CEILING 2x BLOCKING (AS REQ'D) FRONT FACE; PL1 2x6 STUDS @ 16" O.C (CUT AS SHOWN) 1/2" PLYWOOD TOE KICK LAMINATE 3/4" PLYWOOD WIRED W/ OUTLETS FOR AC POWER, PHONE, COMPUTER 2x3 BOTTOM PLATE COMPUTER MONITOR (BY OWNER) RECESS MONITORS PENDANT LIGHT - SEE LIGHTING SCHEDULE CHECK-OUT STAFF 103 RECEPTION 102 3 A 3.0 A 5.0 4 A 5.0 3 A 5.0 8 7' - 10 3/4" 9' - 10 3/8" 7' - 10 3/4" 37.87° 12' - 2 5/8" 9' - 5 3/4" 14' - 1 5/8" 24' - 3 3/8" 5' - 9 1/2" 0' - 2 7/8" 5' - 0" 0' - 2 7/8" 5' - 0" 0' - 2 7/8" 7' - 2" A 5.0 5 A 5.0 6 SF1 SS1 4" TOEKICK 3' - 7" 2' - 6" 5' - 11" 3' - 6" 2X2 ACT SYSTEM IN RECEPTION & WAITING AREA 13' - 0" 9' - 6" 0' - 4" P1 7' - 0 7/8" 5' - 0" 5' - 0" 5' - 9 1/2" 3' - 7 3/8" 3' - 5 1/2" 0' - 2 7/8" 0' - 2 7/8" 0' - 2 7/8" PL1 SS1 4" TOEKICK PL2 PL1 SS1 3' - 7" 2' - 6" 5' - 6" PENDANT LIGHTS ADA COMPLIANT CHECKOUT SF1 1' - 5 1/2" 3' - 0" SS1 PL1 GLASS FRONT BEVERAGE FRIDGE (BY OWNER) 3' - 6" FURR DOWN WITH RECESSED LIGHTS; TBC 6' - 8" 2' - 10" 6" SS TRASH CHUTE IN COUNTER; PULL-OUT TRASH BELOW 50" VIEWABLE TV;BY OWNER; CONFIRM MOUNTING HEIGT IN FIELD PL1 SS1 PL2 UNDER-COUNTER PENCIL DRAWERS; (BY MILLWORK) 2' - 6" 3' - 7" 5' - 11" 0' - 6" 3 A 3.0 2' - 6" 3' - 7" 5' - 10 1/8" 5' - 0 5/8" 5' - 0 5/8" 3' - 6 1/4" 3' - 7 3/8" 5' - 7 5/8" 1' - 6" 1' - 6" 3' - 6 5/8" 1' - 6" 4' - 4 1/8" 1' - 6" 3' - 6 5/8" 5' - 6" 3' - 6" 1' - 0" 7' - 1 5/8" PL1 SS1 PL2 PL1 UNDER-COUNTER PENCIL DRAWERS; (BY MILLWORK) Scale Date Drawn By Checked By Project Number Consultant Address Address Address Phone Consultant Address Address Address Phone Consultant Address Address Address Phone Consultant Address Address Address Phone Consultant Address Address Address Phone www.desergo.com PO Box 3630 767 Main Road Westport MA 02790 508 636 3600 © 2014 DESIGN ERGONOMICS INC. THESE DRAWINGS ARE THE PROPERTY OF DESIGN ERGONOMICS INC. AND MAY NOT BE SOLD, COPIED, OR USED IN ANYWAY WITHOUT OUR WRITTEN PERMISSION DO NOT SCALE As indicated 11/7/2017 11:10:49 AM A 5.0 ENLARGED RECEPTION/ CHECKOUT PLAN AND DETAILS PJL DK 5/13/16 3/4" = 1'-0" 1 RECEPTION DESK - SECTION (PENDANT) 1/2" = 1'-0" 2 ENLARGED RECEPTION, BUSINESS, & CHECK-OUT 1/2" = 1'-0" 4 RECEPTION 1/2" = 1'-0" 3 CHECKOUT 1/2" = 1'-0" 8 REFRESHMENTS 1/2" = 1'-0" 5 RECEPTION - STAFF SIDE 1/2" = 1'-0" 6 CHECKOUT - STAFF SIDE No. Description Date • Interior Elevation Drawings • Material & Finish Schedules - Walls & Baseboards - Mill Work - Floor Coverings - Ceiling • Door Schedule • Lighting Plan PHASE THREE • DESIGN DEVELOPMENT Exterior Design Our design specialty lies in interiors – establishing unmatched clinical efficiencies & creating an excep- tional patient experience, with the most cost-effective use of space in the industry. While your Exterior Design will be dictated in part by the floor plans we may produce, your Architect will handle the details of design development. We will, however, work with them to ensure a cohesive exe- cution of your overall vision. Time Frame: 1-2 Weeks
  • 14. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 14 – 6.26.18 PHASE FOUR • DESIGN EXECUTION Construction Documents At this point, the vision of your future practice is clear – but you can’t put up a building on vision alone. The documents created up to now have been schematics – accurate, but limited to layout. To move forward to the bidding & permitting pro- cesses and eventually to construction, you need a very comprehensive set of plans, referred to as “Construction Documents”. Generating Construction Documents is a time consuming process. Be prepared for this phase to take up to 12 weeks. These documents are developed by your Architect in conjunction with a variety of engineers, including Mechanical/Plumbing, Electrical and Structural engineers. As with your initial Floor Plan, the Construction Documents follow a development process from initial to final. Your architect will co-ordinate communications, and you will be asked to review and approve each step, as follows. Progress Set (preliminary engineering schematics) Bid Set (used for Construction Estimates) MEP Final Approval (Finalized Construction Documents - “Permit Set”) Bidding Depending on your Contractor candidates, construction estimates may be based on Architectural drawings at varying levels of completion. Known as a “Bid Set”, you will provide this package to your chosen candidates (typically 3 or 4 com- panies). When you have selected a Contractor, they will handle the next step, Permitting. Permitting The time frame to obtain Permits can vary widely – from as little as a few weeks, to 4 or 5 months. Minor design or engineering changes may require re-submittal (in whole or in part). However, the most common source of delay is the current work-load at your municipal building department. We suggest you and/or your Contractor speak to the local agencies early in the process. Try to get a feel for how quickly they can move you through this step, as it can significantly impact your overall project time-line. Time Frame: 8-12 weeks Time Frame: 3-4 weeks Time Frame: As little as 2 weeks, but may take several months
  • 15. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 15 – 6.26.18 PHASE FIVE • CONSTRUCTION Construction Equipment Installation Final Inspection & CO We’re committed to the success of your project, from start to finish. When you enter the Construction phase, we’ll continue communicating with both you and your Contractor. We are happy to review progress photos, and in some cases, will make site visits if issues arise for which we can help advise or provide solutions. Equipment installation – who does it, and what will it cost – will vary by item type and supplier. Your Contractor will generally handle non-clinical cabinetry, general lighting etc. This should have been clearly delineated in the bid- ding process. The installation of Clinical Equipment – Chairs, X-ray, Delivery, Compressor, Vacuum and more – is commonly done by the suppliers, and prices will vary significantly. Here again, your Clinical Specialist can provide valuable guidance. During this period, you will also be setting up ad- ministrative elements; clerical, computers, phone systems etc. Everything is in place, but you need your local building authority to sign off on a wide range of items, including structural, mechanical, plumbing, electrical – even your clinical systems (lighting, motorized patient chairs). Your Contractor and Archi- tect should be on hand during the inspection to provide necessary information. When the inspection is complete, you’ll receive a Certificate of Occupancy (“CO”). Congratulations! You can now open for business...but have you considered how? Page 4 6 Time Frame: 6 months ±3 months (weather & other variables dependent) Time Frame: 2-4 weeks Time Frame: 2-4 weeks (post Install)
  • 16. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 16 – 6.26.18 A Few Suggestions to Consider Before Your GRAND OPENING...
  • 17. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 17 – 6.26.18 Leave Adequate Time to Set Up Your Systems. Try a Soft Opening with Friends and Family. Want to Optimize? Get Help. Your new office is beautiful, but it’s a blank slate. It won’t become a highly-efficient power-house of productivity until all the systems are up and running. And running together. It’s a new space, and it will take some time to pre- pare and settle in to a rhythm. Sterilization, phone systems, software, imaging...all the interdependent activities you’ve come to take for granted are going to be new to both you and your staff. Before the balloons, confetti, press releases and ribbon-cutting – see some live patients! This will give you an opportunity to work the last of the equipment and system bugs out in a much more low-key fashion. Many of our clients run several days to a week or more seeing only friends and family. Performing a Soft Opening can help ease tensions in what is often an anxious time. This will also give you an opportunity to finalize any last-minute painting touch ups, art-work or furnishing acquisitions as well. After opening thousands of offices, we realized that the Effi- ciency and Productivity guidance we give during design could be magnified tremendously with some hands-on instruction. To that end, we now offer Clinical Systems Training Programs. These programs can help practices during any stage of growth, but they provide truly remarkable results when applied to start ups. Our certified Trainers will help establish Inventory, Steriliza- tion & Resupply systems now that will propel your practice to unparalleled heights in the years to come.
  • 18. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 18 – 6.26.18 Thank You,again for the trust you’ve placed in Design Ergonomics. Our goal is your complete satisfaction. We realize an overview document such as this won’t answer every question you have now, or that will come up during the design process. Please don’t hesitate to call or email us if you need clarification on topics covered here. We’re part of your Team. If we don’t have the answers you’re looking for, we will work with you to find them. We look forward to helping you turn the Practice of Your Dreams into a Reality.
  • 19. 5 Step Playbook to Building the Practice of Your Dreams © 2018 Design Ergonomics, Fall River MA – 19 – 6.26.18 GLOSSARY • As Builts - CAD drawings showing complete internal and external dimensions of an existing building (new or previously built), including walls, load-bearing structures, stairs, doors, windows and utilities. • Authority Having Jurisdiction (“AHJ”) - the governing body regulating construction and development of commercial enterprises in a specified region. • CAD - “Computer Assisted Design,” an electronic file created by Architects, Designers and Draftsmen. • Construction Documentation - The complete, formal set of plans required by the AHJ to construct an office, including but not limited to; floor-plans, interior and exterior elevations, ID elevations and materials schedules, mechanical/electrical/plumbing/structural plans, and site plans. • Due Diligence - A period of time included in the P&S used by the purchaser to determine that the proper- ty is suited to their goals and that all elements of the sale as represented by the seller are true and accu- rate. • Elevation - A architectural drawing showing the face of something (as opposed to a view from above). This may be a building exterior, or interior elements such as cabinetry, reception desks etc. • Engineering Disciplines (as they relate to a Construction project) Civil, relating to environmental/exterior elements including landscaping, building and parking location and availability, utilities, water remediation, offsets, site entries/exits, and site planning approval. Mechanical/Plumbing, covers HVAC and all fluid flow systems. As a subset, Plumbing Engineers address water service connection to municipal infrastructure (feed and sewage) and develop all piping schematics including feed lines, venting, drainage and waste. In the dental industry, this also covers compressors, vacuum and plumbed nitrous. Electrical, addressing electrical loads, service, wiring schematics and electrical code compliance. • Escrow - an amount of money or other documents kept in the custody of a third party, transfered only when a specified condition has been fulfilled (eg a Due Diligence period). Depending on the terms of the P&S, this is essentially a deposit which may be refundable during the Due Diligence period. • HVAC - “Heating, Ventilation and Air Conditioning” • Letter of Intent (“LOI”) - An informal agreement including an offer for purchase at an expressed amount. The LOI is the beginning of the Negotiation process and several rounds of offers and counter-offers may be required before both parties accept and sign the LOI. • Purchase and Sale Agreement (“P&S”) - The agreed upon conditions relating to the transfer of a prop- erty from seller to buyer. This is typically drafted after the LOI has been accepted by both parties and includes relevant conditions such as the length and terms of the Due Diligence period and Escrow. • Screen Share - An interactive method of presenting drawings and other material in which your computer monitor is set to mirror what your designer is presenting remotely. • Site Engineering Survey - A comprehensive study of a lot including plat map generation/confirmation, topography, soil analysis, availability of utilities, parking concerns, abutment issues, water remediation and other environmental issues that may impact a lot’s suitability for development. • Value Engineering (“VE”) - Determining the need – and evaluating the suitability – of alternative finish ma- terials. This may occur in the field during construction and will require the input of your Interior Designer.