5600
5.60
2.151.495
1.95
1.30 20 95 6.05 20 4.55 20 745 205
2.4251565152.025
20
202.052090201.8520
254.7025
202530103010301030103010301030103010301030103010302520
202.052090201.8520
206.1920
2.545
1.522.525
6.585
605195
75
1.481044520
592.555
3.145
182.415
201520
3.1574
74
3.89
2575435
5
1.53
195
2.402074305
2.595
1.29
20475
201.48104452074
202.0020895
2.4094
251.05435
5
1.3053
1.83
185
365
202.61435
5
553.34
-3.89
-0.74
+0.00
-3.34
-0.53
-1.58
-0.53
-3.70
-0.94
-3.69
-0.94
-1.28
-0.53
±0.00
1.50 1.05 1.30 13.10 95
1.50 12 5.55 1.05 50 1.50
155
625
57 15 1.05 15 50 15 50 20 1.53 5.47 20 5.50 20 95
155
625
57 15
12
20 5.35 20 65 70 15 48 9 625 15
205.2020
5.60
20 7.00 20 5.49 21
13.085
20 6.20 20
6.60
20 5.20 20
5.60 2.05 1.30 2.25
20 1.85 175
15
65 15
175
2.05 20
ECHELLE 1/50ème
VUE D'ENSEMBLE ISOMETRIQUE
5
ECHELLE 1/50ème3
PLANS DES RADIERS (DALLES DE FOND)
ECHELLE 1/50ème2
COUPE TRANSVERSALE
ECHELLE 1/50ème
PLAN D'ENSEMBLE
1 ECHELLE 1/50ème4
COUPES TRANSVERSALES
205.2020
VOILE BA ép. 20cm VOILE BA ép. 20cm
VOILE BA ép. 20cm VOILE BA ép. 20cm
VOILEBAép.20cmVOILEBAép.20cm
VOILEBAép.20cm
15 50 15 50 20 75 20
1.30 1.15
muretBAép.20cm
muretBAép.20cm
VOILE BA ép. 20cm
VOILE BA ép. 20cm
VOILEBAép.20cmVOILEBAép.20cm
REGARD BA REGARD BA REGARD BA
-0.72
ép. 20
-0.72
ép. 20
Coupe I - ICoupe G - G
Coupe F - F
20 1.50 5.50 20 5.49 195
11
1.50
15 1.20 15
-3.69
ép. 20
ramp.
ép. 20
-3.70
ép. 20
-3.14
ép. 20
-3.14
ép. 20
ECHELLE 1/50ème3
PLANS DES RADIERS (DALLES DE FOND)
Coupe K - K
202.002094
2.4094
-3.34
-0.94
±0.00
ISOMETRIE
G
E E
G
KK
II
Coupe E - E
FF
195
2.752074
20 25 30 10 30 10 30 10 30 10 30 10 30 10 30 10 30 10 30 10 30 10 30 10 30 25 20
-3.69
-2.875
-0.54
±0.00
-3.89
-1.29
-0.74
±0.00
VOILE BA ép. 20cm
VOILE BA ép. 20cm
VOILE BA ép. 20cmVOILE BA ép. 20cmVOILE BA ép. 20cmVOILE BA ép. 20cm
VOILE BA ép. 20cmVOILE BA ép. 20cm VOILE BA ép. 20cm
VOILEBAép.20cmVOILEBAép.20cm
VOILEBAép.20cmVOILEBAép.20cm
VOILEBAép.20cm
-1.83
±0.00
-3.34
-0.94
±0.00
-3.14
-1.14
Côte projet (voir plan d'ensemble)
Couvercle regard de visite
Voile regard de visite
Dalle supérieure BA ép. 20cm
Voile béton ép. 20cm
Radier BA ép. 20cm
Béton de propreté 5cm
Dalle supérieure
Voile circulaire BA ép. 20cm
Réservation tuyau PVC
Radier BA ép. 20cm
Côte projet (voir plan d'ensemble)Regard d'entrée
en BA ép. 15cm
Regard de visite
en BA ép. 20cm
Regard de visite
en BA ép. 20cm
Regard intermédiaure
en BA ép. 15cm
Regard de sortie
en BA ép. 15cm
Dalle supérieure
BA ep. 20cm
Voile BA
ép. 20cm
Réservations sur voile
intermédiaire
Radier
BA ep. 20cm
Béton de propreté
ép. 5cm
Béton de propreté
ép. 5cm
Radier
BA ep. 20cm
Voile BA
ép. 20cm
Dalle supérieure
BA ep. 20cm
Niveau TN
voir plan d'ensemble
Tuyauterie d'évacuation
Niveau TN
voir plan d'ensemble
RESERVATIONS SUR VOILE
206520
1.05
3.30
-0.72
ép. 20
3.10
Béton de propreté
ép. 5cm
Radier
BA ep. 20cm
Voile BA
ép. 20cm
Dalle supérieure
BA ep. 20cm
Niveau TN
voir plan d'ensemble
Tuyauterie d'évacuation
REGARD D'ENTREE
BASSIN PRINCIPAL
REGARD INTERMEDIAIRE
BASSIN CIRCULAIRE
REGARD DE SORTIE
01.16 m3
53.03 m3
02.25 m3
22.10 m3
01.35 m3
TOTAL 78.89 m3
METRE BETON
Index
00
Date Nom Modifications/Ajouts/Etat
Créé10/07/2017 SALIF
H/L = 841 / 1189 (1.00m²) Allplan 2015
proBATIS
----------------
Etude de
charpente béton
armé bois et métal
Réalisation de travaux
bâtiment tous corps d'états
et de génie civil
Maitrise d'oeuvre,
suivi et controle technique
----------------
n° 121 cité du stade
Léopold Sédar Senghor
Tél. 00221 338 358156
probatis@ymail.com
M.Ouvrage
Bureau de contrôle
M.Oeuvre
Architecte
lesprofessionnelsdubâtiment
proBATIS
10/07/2017
10/07/2017
adresse :
rue :
nom :
phase :
n° affaire : n° plan :
auteur :
date :
1
10/07/2017
2017
PLAN DE COFFRAGE
PLAN DE BETON ARME
SALIF
DMCEES PREMIERE EMISSION
SALIFDMCEES
UNIVERSITE ZIGUINCHOR
033.2017
SENEGAL
MINI STATION D'EPURATION
VILLE DE ZIGUINCHOR
HYDROCONSULT
SENECONSTRUCTION
EXECUTION
UNIVERSITE A. SECK
STATION DE PRE-TRAITEMENT
MESR

Plan de coffrage 1

  • 1.
    5600 5.60 2.151.495 1.95 1.30 20 956.05 20 4.55 20 745 205 2.4251565152.025 20 202.052090201.8520 254.7025 202530103010301030103010301030103010301030103010302520 202.052090201.8520 206.1920 2.545 1.522.525 6.585 605195 75 1.481044520 592.555 3.145 182.415 201520 3.1574 74 3.89 2575435 5 1.53 195 2.402074305 2.595 1.29 20475 201.48104452074 202.0020895 2.4094 251.05435 5 1.3053 1.83 185 365 202.61435 5 553.34 -3.89 -0.74 +0.00 -3.34 -0.53 -1.58 -0.53 -3.70 -0.94 -3.69 -0.94 -1.28 -0.53 ±0.00 1.50 1.05 1.30 13.10 95 1.50 12 5.55 1.05 50 1.50 155 625 57 15 1.05 15 50 15 50 20 1.53 5.47 20 5.50 20 95 155 625 57 15 12 20 5.35 20 65 70 15 48 9 625 15 205.2020 5.60 20 7.00 20 5.49 21 13.085 20 6.20 20 6.60 20 5.20 20 5.60 2.05 1.30 2.25 20 1.85 175 15 65 15 175 2.05 20 ECHELLE 1/50ème VUE D'ENSEMBLE ISOMETRIQUE 5 ECHELLE 1/50ème3 PLANS DES RADIERS (DALLES DE FOND) ECHELLE 1/50ème2 COUPE TRANSVERSALE ECHELLE 1/50ème PLAN D'ENSEMBLE 1 ECHELLE 1/50ème4 COUPES TRANSVERSALES 205.2020 VOILE BA ép. 20cm VOILE BA ép. 20cm VOILE BA ép. 20cm VOILE BA ép. 20cm VOILEBAép.20cmVOILEBAép.20cm VOILEBAép.20cm 15 50 15 50 20 75 20 1.30 1.15 muretBAép.20cm muretBAép.20cm VOILE BA ép. 20cm VOILE BA ép. 20cm VOILEBAép.20cmVOILEBAép.20cm REGARD BA REGARD BA REGARD BA -0.72 ép. 20 -0.72 ép. 20 Coupe I - ICoupe G - G Coupe F - F 20 1.50 5.50 20 5.49 195 11 1.50 15 1.20 15 -3.69 ép. 20 ramp. ép. 20 -3.70 ép. 20 -3.14 ép. 20 -3.14 ép. 20 ECHELLE 1/50ème3 PLANS DES RADIERS (DALLES DE FOND) Coupe K - K 202.002094 2.4094 -3.34 -0.94 ±0.00 ISOMETRIE G E E G KK II Coupe E - E FF 195 2.752074 20 25 30 10 30 10 30 10 30 10 30 10 30 10 30 10 30 10 30 10 30 10 30 10 30 25 20 -3.69 -2.875 -0.54 ±0.00 -3.89 -1.29 -0.74 ±0.00 VOILE BA ép. 20cm VOILE BA ép. 20cm VOILE BA ép. 20cmVOILE BA ép. 20cmVOILE BA ép. 20cmVOILE BA ép. 20cm VOILE BA ép. 20cmVOILE BA ép. 20cm VOILE BA ép. 20cm VOILEBAép.20cmVOILEBAép.20cm VOILEBAép.20cmVOILEBAép.20cm VOILEBAép.20cm -1.83 ±0.00 -3.34 -0.94 ±0.00 -3.14 -1.14 Côte projet (voir plan d'ensemble) Couvercle regard de visite Voile regard de visite Dalle supérieure BA ép. 20cm Voile béton ép. 20cm Radier BA ép. 20cm Béton de propreté 5cm Dalle supérieure Voile circulaire BA ép. 20cm Réservation tuyau PVC Radier BA ép. 20cm Côte projet (voir plan d'ensemble)Regard d'entrée en BA ép. 15cm Regard de visite en BA ép. 20cm Regard de visite en BA ép. 20cm Regard intermédiaure en BA ép. 15cm Regard de sortie en BA ép. 15cm Dalle supérieure BA ep. 20cm Voile BA ép. 20cm Réservations sur voile intermédiaire Radier BA ep. 20cm Béton de propreté ép. 5cm Béton de propreté ép. 5cm Radier BA ep. 20cm Voile BA ép. 20cm Dalle supérieure BA ep. 20cm Niveau TN voir plan d'ensemble Tuyauterie d'évacuation Niveau TN voir plan d'ensemble RESERVATIONS SUR VOILE 206520 1.05 3.30 -0.72 ép. 20 3.10 Béton de propreté ép. 5cm Radier BA ep. 20cm Voile BA ép. 20cm Dalle supérieure BA ep. 20cm Niveau TN voir plan d'ensemble Tuyauterie d'évacuation REGARD D'ENTREE BASSIN PRINCIPAL REGARD INTERMEDIAIRE BASSIN CIRCULAIRE REGARD DE SORTIE 01.16 m3 53.03 m3 02.25 m3 22.10 m3 01.35 m3 TOTAL 78.89 m3 METRE BETON Index 00 Date Nom Modifications/Ajouts/Etat Créé10/07/2017 SALIF H/L = 841 / 1189 (1.00m²) Allplan 2015 proBATIS ---------------- Etude de charpente béton armé bois et métal Réalisation de travaux bâtiment tous corps d'états et de génie civil Maitrise d'oeuvre, suivi et controle technique ---------------- n° 121 cité du stade Léopold Sédar Senghor Tél. 00221 338 358156 probatis@ymail.com M.Ouvrage Bureau de contrôle M.Oeuvre Architecte lesprofessionnelsdubâtiment proBATIS 10/07/2017 10/07/2017 adresse : rue : nom : phase : n° affaire : n° plan : auteur : date : 1 10/07/2017 2017 PLAN DE COFFRAGE PLAN DE BETON ARME SALIF DMCEES PREMIERE EMISSION SALIFDMCEES UNIVERSITE ZIGUINCHOR 033.2017 SENEGAL MINI STATION D'EPURATION VILLE DE ZIGUINCHOR HYDROCONSULT SENECONSTRUCTION EXECUTION UNIVERSITE A. SECK STATION DE PRE-TRAITEMENT MESR