Soumettre la recherche
Mettre en ligne
S7 PLCSim Advanced 2.0 - SIMATIC Siemens
•
0 j'aime
•
25 vues
F
FelipeSchaefferFerna
Suivre
Apreentação do PLCSim advanced da Siemens
Lire moins
Lire la suite
Ingénierie
Signaler
Partager
Signaler
Partager
1 sur 24
Télécharger maintenant
Télécharger pour lire hors ligne
Recommandé
PLC BASED AUTOMATED SYSTEM IN PROCESS INDUSTRY (Final Presentation)
PLC BASED AUTOMATED SYSTEM IN PROCESS INDUSTRY (Final Presentation)
Shahid Faizee
plc_training_manual.pdf
plc_training_manual.pdf
MarioHaguila
manuales y guías PLC siemens Simatic S7
manuales y guías PLC siemens Simatic S7
SANTIAGO PABLO ALBERTO
Automation-PLC
Automation-PLC
Pallavi7776
SICAM SCC (6MD55) automation
SICAM SCC (6MD55) automation
ashwini reliserv
Simocode pro presentation for simodode dp customers share by voip.com.vn
Simocode pro presentation for simodode dp customers share by voip.com.vn
Tran Thanh
TIA PORTAL SLIDES SIEMENS EMERSON EDUARDO RODRIGUES
TIA PORTAL SLIDES SIEMENS EMERSON EDUARDO RODRIGUES
EMERSON EDUARDO RODRIGUES
24109937 wincc flexible_kommunikation_ethernet_e
24109937 wincc flexible_kommunikation_ethernet_e
Fercho Oe
Recommandé
PLC BASED AUTOMATED SYSTEM IN PROCESS INDUSTRY (Final Presentation)
PLC BASED AUTOMATED SYSTEM IN PROCESS INDUSTRY (Final Presentation)
Shahid Faizee
plc_training_manual.pdf
plc_training_manual.pdf
MarioHaguila
manuales y guías PLC siemens Simatic S7
manuales y guías PLC siemens Simatic S7
SANTIAGO PABLO ALBERTO
Automation-PLC
Automation-PLC
Pallavi7776
SICAM SCC (6MD55) automation
SICAM SCC (6MD55) automation
ashwini reliserv
Simocode pro presentation for simodode dp customers share by voip.com.vn
Simocode pro presentation for simodode dp customers share by voip.com.vn
Tran Thanh
TIA PORTAL SLIDES SIEMENS EMERSON EDUARDO RODRIGUES
TIA PORTAL SLIDES SIEMENS EMERSON EDUARDO RODRIGUES
EMERSON EDUARDO RODRIGUES
24109937 wincc flexible_kommunikation_ethernet_e
24109937 wincc flexible_kommunikation_ethernet_e
Fercho Oe
Mitsubishi cnc cnc c70 series dienhathe.vn
Mitsubishi cnc cnc c70 series dienhathe.vn
Dien Ha The
Mitsubishi cnc cnc c70 series
Mitsubishi cnc cnc c70 series
Dien Ha The
CNC gateway sales kit
CNC gateway sales kit
Jimmy Hsu
Cpu226
Cpu226
Slamet Pambudi
7694441.ppt
7694441.ppt
AhmedHeskol2
S7 bas-16
S7 bas-16
confidencial
Amp bluac5 specsheet
Amp bluac5 specsheet
Electromate
Plc tg fi
Plc tg fi
linhktdk
Siemens s7-200 starter kit 221
Siemens s7-200 starter kit 221
Dien Ha The
Siemens s7 300 programming
Siemens s7 300 programming
satyajit patra
Siemens catalog tong hop sinumerik & simodrive
Siemens catalog tong hop sinumerik & simodrive
Dien Ha The
Siemens catalog tong hop 3 uf simocode
Siemens catalog tong hop 3 uf simocode
Dien Ha The
Basic Control System unit5
Basic Control System unit5
Asraf Malik
DEVENDRAPLC .pptx
DEVENDRAPLC .pptx
DEVENDRA SHRIVASH
Thesis Presentation (KUET_EEE_1103047_Nissan Imam)
Thesis Presentation (KUET_EEE_1103047_Nissan Imam)
Nissan Imam
Yokogawa CX 2000 DAQ Station
Yokogawa CX 2000 DAQ Station
Miller Energy, Inc.
Vt training plc_1
Vt training plc_1
Kumar Navaneethan
SIMATIC manager سيماتك منجر سيمنز
SIMATIC manager سيماتك منجر سيمنز
EssosElectronic
PRESENTATION ON PLC AND SCADA
PRESENTATION ON PLC AND SCADA
AnandKumarJha33
Plc and hmi based stenter machine poster
Plc and hmi based stenter machine poster
Rakshita Upadhyay
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Suman Mia
Contenu connexe
Similaire à S7 PLCSim Advanced 2.0 - SIMATIC Siemens
Mitsubishi cnc cnc c70 series dienhathe.vn
Mitsubishi cnc cnc c70 series dienhathe.vn
Dien Ha The
Mitsubishi cnc cnc c70 series
Mitsubishi cnc cnc c70 series
Dien Ha The
CNC gateway sales kit
CNC gateway sales kit
Jimmy Hsu
Cpu226
Cpu226
Slamet Pambudi
7694441.ppt
7694441.ppt
AhmedHeskol2
S7 bas-16
S7 bas-16
confidencial
Amp bluac5 specsheet
Amp bluac5 specsheet
Electromate
Plc tg fi
Plc tg fi
linhktdk
Siemens s7-200 starter kit 221
Siemens s7-200 starter kit 221
Dien Ha The
Siemens s7 300 programming
Siemens s7 300 programming
satyajit patra
Siemens catalog tong hop sinumerik & simodrive
Siemens catalog tong hop sinumerik & simodrive
Dien Ha The
Siemens catalog tong hop 3 uf simocode
Siemens catalog tong hop 3 uf simocode
Dien Ha The
Basic Control System unit5
Basic Control System unit5
Asraf Malik
DEVENDRAPLC .pptx
DEVENDRAPLC .pptx
DEVENDRA SHRIVASH
Thesis Presentation (KUET_EEE_1103047_Nissan Imam)
Thesis Presentation (KUET_EEE_1103047_Nissan Imam)
Nissan Imam
Yokogawa CX 2000 DAQ Station
Yokogawa CX 2000 DAQ Station
Miller Energy, Inc.
Vt training plc_1
Vt training plc_1
Kumar Navaneethan
SIMATIC manager سيماتك منجر سيمنز
SIMATIC manager سيماتك منجر سيمنز
EssosElectronic
PRESENTATION ON PLC AND SCADA
PRESENTATION ON PLC AND SCADA
AnandKumarJha33
Plc and hmi based stenter machine poster
Plc and hmi based stenter machine poster
Rakshita Upadhyay
Similaire à S7 PLCSim Advanced 2.0 - SIMATIC Siemens
(20)
Mitsubishi cnc cnc c70 series dienhathe.vn
Mitsubishi cnc cnc c70 series dienhathe.vn
Mitsubishi cnc cnc c70 series
Mitsubishi cnc cnc c70 series
CNC gateway sales kit
CNC gateway sales kit
Cpu226
Cpu226
7694441.ppt
7694441.ppt
S7 bas-16
S7 bas-16
Amp bluac5 specsheet
Amp bluac5 specsheet
Plc tg fi
Plc tg fi
Siemens s7-200 starter kit 221
Siemens s7-200 starter kit 221
Siemens s7 300 programming
Siemens s7 300 programming
Siemens catalog tong hop sinumerik & simodrive
Siemens catalog tong hop sinumerik & simodrive
Siemens catalog tong hop 3 uf simocode
Siemens catalog tong hop 3 uf simocode
Basic Control System unit5
Basic Control System unit5
DEVENDRAPLC .pptx
DEVENDRAPLC .pptx
Thesis Presentation (KUET_EEE_1103047_Nissan Imam)
Thesis Presentation (KUET_EEE_1103047_Nissan Imam)
Yokogawa CX 2000 DAQ Station
Yokogawa CX 2000 DAQ Station
Vt training plc_1
Vt training plc_1
SIMATIC manager سيماتك منجر سيمنز
SIMATIC manager سيماتك منجر سيمنز
PRESENTATION ON PLC AND SCADA
PRESENTATION ON PLC AND SCADA
Plc and hmi based stenter machine poster
Plc and hmi based stenter machine poster
Dernier
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Suman Mia
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
purnimasatapathy1234
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
Asst.prof M.Gokilavani
result management system report for college project
result management system report for college project
Tonystark477637
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Dr.Costas Sachpazis
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
ssuser5c9d4b1
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
rakeshbaidya232001
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
RajaP95
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
RajkumarAkumalla
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
upamatechverse
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ranjana rawat
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
rknatarajan
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
slot gacor bisa pakai pulsa
Dernier
(20)
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
result management system report for college project
result management system report for college project
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
S7 PLCSim Advanced 2.0 - SIMATIC Siemens
1.
SIMATIC S7-PLCSIM Advanced V2.0 Overview
over the highlights of the V2.0 and V2.0 SP1 siemens.com/tia-portal Unrestricted © Siemens AG 2018
2.
Highlights V2.0 SP1
3.
Unrestricted © Siemens
AG 2017 S7-PLCSIM Advanced – Control Panel enhancements Function The Control Panel can be used in two different ways • A right-click on the tray icon opens the Control Panel as before (quick view) • A double left-click on the tray icon opens the Control Panel as a floating window, which allows you to • Move the floating window around freely • Drag-and-drop instances from an Explorer window to the Control Panel • Pin the Control Panel to the desktop (always on top) PLC_1 PLC_2 PLC_3 Pin to desktop
4.
Unrestricted © Siemens
AG 2017 S7-PLCSIM Advanced – Max. cycle time handling through the API Function Through the API the maximum cycle time can be either ignored or taken into account, depending on the goal of the simulation In general there are three operating modes: • Ignore the max. cycle time; ignore = 1 minute max. cycle time (default) • Keep the max. cycle time of the downloaded project • Define another max. cycle time which can be set through the API Customer value • This feature helps prevent the virtual controller from changing to stop if the max. cycle time is exceeded in a virtual environment. • No change of the max. cycle time of the TIA Portal project necessary. API Adapt the max. cycle time of the virtual controller through the API
5.
Highlights V2.0
6.
Unrestricted © Siemens
AG 2018 Licensing concept PLCSIM Advanced can be upgrade to the newest version with an upgrade key. One license enables up to two PLCSIM Advanced instances on one PC. Licensing possibilities: Floating License Trial: free 21 day trial as download: https://support.industry.siemens.com/cs/ww/en/view/10 9754093 Licensing concept overview New PLCSIM Adv. V1.0 PLCSIM Adv. V2.0 Upgade Instance 1 Instance 2 Page 6
7.
Unrestricted © Siemens
AG 2018 Supported firmware Strategy PLCSIM Adv. V2.0 supports the firmware 2.5 which was released with TIA Portal V15 and all earlier firmware releases up to firmware 1.8. Higher firmware versions will be supported with future PLCSIM Advanced versions adequately. PLCSIM Adv. V2.0 FW 2.1 FW 2.5 FW 2.0 FW 1.8 … PLCSIM Adv. V1.0 … FW 2.0 FW 1.8 Page 7
8.
Unrestricted © Siemens
AG 2018 Compatibility PLCSIM Adv. V1.0 (SP1) and V2.0 are both compatible to TIA Portal V14 (SP1) and V15 as long as the firmware used in TIA Portal is supported by PLCSIM Advanced PLCSIM Advanced V2.0 supports both APIs: V1.0 and V2.0 Compatibility to TIA Portal and API versions * Not valid for FW2.1, as this fiwmware is not supported by PLCSIM Adv. V1.0 V1.0 V2.0 RT Manager V1.0 API V1.0 API V2.0 FW 2.0 FW 1.8 FW 2.5 FW 2.1 FW 2.0 FW 1.8 FW 2.1 FW 2.5 FW 2.0 FW 1.8 FW 2.1 FW 2.0 FW 1.8 TIA Portal V14 V15 PLCSIM Advanced Co-Simulation RT Manager V2.0 * Page 8
9.
Unrestricted © Siemens
AG 2018 Synchronisation at Process Image Parts through the API of PLCSIM Advanced with Co- Simulation-Tools when calling cyclic OBs through a process image part attached to a cyclic OB (e.g. cyclic interrupt, MC Servo) In the application program with SFCs Advantage Synchronisation at Process Image Parts Verification of the application program including consistent and up to date I/O areas when calling cyclic OBs Simulation of Motion Control tasks possible read IOs write IOs API Co-Simulation read IOs write IOs OB 1 cyclic OB cyclic OB OB 1 Synchronisation can take place at a cycle control point and / or at a process image part Page 9
10.
Unrestricted © Siemens
AG 2018 Different time-based synchronisation modes in between Co- Simulation and PLCSIM Advanced Synchronization modes: synchronization at each cycle control point (beginning of OB1) synchronization at each cyclic OB synchronization at each cycle control point and each cyclic OB Timespan mode: after a defined timespan x the synchronization takes places at the next cycle control point and / or cyclic OB PLCSIM Advanced API OB 1 OB 1 cyclic OB cyclic OB Co-Simulation Seite 10
11.
Unrestricted © Siemens
AG 2018 Synchronisation – different modes (1/4) Operating Mode: Single Step C / CT Single Step C (cycle control point): SROM_SINGLE_STEP_C = 1 Single Step CT (cycle control point; minimal cycle time overwritten): SROM_SINGLE_STEP_CT = 2 OB 1 cyclic OB cyclic OB RunToNextSyncPoint() cyclic OB RunToNextSyncPoint() OB 1 OB 1 OB 1 RunToNextSyncPoint() Page 11
12.
Unrestricted © Siemens
AG 2018 Synchronisation – different modes (2/4) Operating Mode: Single Step P Single Step P (process image part): SROM_SINGLE_STEP_P = 4 Operating Mode: Single Step CP / CPT Single Step CP (cycle control point & process image part): SROM_SINGLE_STEP_CP = 6 Single Step CPT (cycle control point & partial process image part; minimal cycle time overwritten): SROM_SINGLE_STEP_CPT = 7 OB 1 cyclic OB cyclic OB RunToNextSyncPoint() cyclic OB RunToNextSyncPoint() OB 1 OB 1 OB 1 OB 1 cyclic OB cyclic OB RunToNextSyncPoint() cyclic OB OB 1 OB 1 OB 1 Page 12
13.
Unrestricted © Siemens
AG 2018 Synchronisation – different modes (3/4) Operating Mode: Timespan Synchronized C Timespan Synchronized C (cycle control point): SROM_TIMESPAN_SYNCHNRONIZED_C = 3 „RunToNextSyncPoint“ will continue to run the simulation until the virtual time x is reached – after the time x is reached the I/O data will be exchanged at the next cycle control point Operating Mode: Timespan Synchronized P Timespan Synchronized P (process image part): SROM_TIMESPAN_SYNCHNRONIZED_P = 5 „RunToNextSyncPoint“ will continue to run the simulation until the virtual time x is reached – after the time x is reached the I/O data will be exchanged at the next cyclic OB OB 1 cyclic OB cyclic OB RunToNextSyncPoint() cyclic OB Virtual time 0 x OB 1 OB 1 OB 1 OB 1 cyclic OB cyclic OB RunToNextSyncPoint() cyclic OB Virtual time 0 x OB 1 OB 1 OB 1 Page 13
14.
Unrestricted © Siemens
AG 2018 Synchronisation – different modes (4/4) Operating Mode: Timespan synchronized CP Timespan Synchronized CP (cycle control point & partial process image update): SROM_TIMESPAN_SYNCHNRONIZED_CP = 8 „RunToNextSyncPoint“ will continue to run the simulation until the virtual time x is reached – after the time x is reached the I/O data will be exchanged either at the next cyclic OB or the next cycle control point OB 1 cyclic OB cyclic OB RunToNextSyncPoint() cyclic OB RunToNextSyncPoint() Virtuelle Zeit 0 x Virtuelle Zeit OB 1 OB 1 OB 1 x Page 14
15.
Unrestricted © Siemens
AG 2018 Advantage Possibility to exchange acyclic data of external modules (central or decentral periphery) in betwen a co-simulation tool and the PLCSIM Advanced API (e.g. PROFINET diagnosis/status data, RFID data) Test of what happens when spontaneous errors ocurre in a plant/machine Support of acyclical services and alarms Different alarms can be triggered through the API: Hardware interrupt (OB40) Status Alarm (OB55) Update Alarm (OB56) Profile Alarm (OB57) Diagnostic error interrupt (OB82) Pull or plug of modules (OB83) Rack or Station failure (OB86) Triggering alarms through the API C# Acyclical services Support of read and write actions of parameter data through SFB52 (RDREC) and SFB53 (WRREC). Page 15
16.
Unrestricted © Siemens
AG 2018 Read in TIA Portal configured hardware interrupts through the API GetConfiguredProcessEvents: a list of all in TIA Portal configured hardware interrupts (OB40) can be accessed through the API with the following information: 1) HardwareID 2) Channel number 3) Event type 4) Name Read hardware interrupts through the API Advantage A TIA Portal expert and a simulation expert can work independently from each other The accessed hardware interrupts can be easily integrated into the Co-simulation tool When downloading a PLCSIM Advanced instance, the hardware interrupts are part of the download and therefore can be accessed through the API GetConfiguredProcessEvents() C# Page 16
17.
Unrestricted © Siemens
AG 2018 Supported organization blocks Internal program OBs V1.0 V2.0 Main (OB1) Startup (OB100) Time delay interrupt (OB20) Cyclic interrupt (OB30) Time error interrupt (OB80) Programming error (OB121) IO access error (OB122) MC-Interpolator (OB92) MC-Servo (OB91) Synchronous OB(OB61) * Can be triggered by the API V1.0 V2.0 Hardware interrupt (OB40) Diagnostic error interrupt (OB82) Pull or Plug of modules (OB83) Rack or station failure (OB86) Status alarm (OB55) Update alarm (OB56) Profile alarm(OB57) * Works already in V1.0 but without up to date data at cyclic OBs Page 17
18.
Unrestricted © Siemens
AG 2018 Backup and restore of software and hardware configuration Backup of the software- and hardware configuration of a PLCSIM Advanced controller in TIA Portal incl. remanent actual values Restore of a backup of the software and hardware configuration into a PLCSIM Advanced instance through TIA Portal Pre-requisite: Online Access is set to PLCSIM Virtual Eth. Adapter Advantage Backup from online device A simulation can be paused and resumed with the backed up data 2 3 1 Page 18
19.
Unrestricted © Siemens
AG 2018 Individual storage path of the virtual SIMATIC Memory Card As soon as a virtual controller is started in PLCSIM Advanced a virtual SIMATIC Memory Card is being created. The storage path of this virtual Memory Card can be chosen freely. Pre-requisite: no instance of PLCSIM Advanced is running As soon as an instance is started the chosen storage path is valid for all instances created afterwards Individual storage path Advantage Virtual SIMATIC Memory Cards can be saved per project A click on the box next to „Virtual SIMATIC Memory Card“ opens up the windows explorer where you can choose the storage path Page 19
20.
Unrestricted © Siemens
AG 2018 GUI Enhancements: Auto-fill If a controller was already created in the past, a drop-down menu will be displayed when starting to enter the name of this already known controller. From this drop down menu you can select the apropriate controller (wildcard search) and start it immediately. Advantage Detection of known controllers Once definded controllers can be found easily and started quickly. If the name of the controller is already know the field below will get greyed-out (IP Adresse, subnet mask, default gateway) and the start button will get active. Page 20
21.
Unrestricted © Siemens
AG 2018 GUI Enhancements: RUN / STOP and Memory Reset Change the CPU state of one or more controllers to run/stopp directly in the GUI. Advantage Change the CPU state to Run/Stop Quick and intuitive change of the state of the controllers. Easy possibility to perform a memory reset to bring the controllers into a well known and defined state. Perform a memory reset of one or more controllers directly in the GUI. Perform a Memory Reset Memory Reset Run/Stop Buttons Selection of both controllers and click on Run / Stop / MRES LEDs display the current status of the controllers Page 21
22.
Unrestricted © Siemens
AG 2018 Some more helpful functional enhancements (1/2) Independance of the Windows Scheduler Leads to a higher performance and a more reliable deterministics simulation of Motion Tasks hint: Windows needs one core and each instance within PLCSIM Advanced needs another core Getting access to SIMATIC virtual memory cards through the API The virtual SIMATIC Memory Card can be transferred through the API from one PC to another ArchiveStorage: saves the SIMATIC Memory Card in a .zip format Retrieve Storage: rebuilds the SIMATIC Memory Card out of the saved.zip data Page 22
23.
Unrestricted © Siemens
AG 2018 Some more helpful functional enhancements (2/2) Performance enhancements when using symbolic adressing Symbolic adressing and direct adressing are adequate in their performance Installaion of PCLSIM and PLCSIM Advanced on the same PC PLCSIM V15 and PLCSIM Advanced V2.0 can be installed on the same PC. A concurrent use of both simulation tools at the same time is not possible. Page 23
24.
Unrestricted © Siemens
AG 2018 Thank you for your attention! PLCSIM Advanced Team siemens.com/tia-portal Page 24 Subject to changes and errors. The information given in this document only contains general descriptions and/or performance features which may not always specifically reflect those described, or which may undergo modification in the course of further development of the products. The requested performance features are binding only when they are expressly agreed upon in the concluded contract. All product designations, product names, etc. may contain trademarks or other rights of Siemens AG, its affiliated companies or third parties. Their unauthorized use may infringe the rights of the respective owner. siemens.com/tia-portal
Télécharger maintenant