SlideShare une entreprise Scribd logo
1  sur  55
Télécharger pour lire hors ligne
TRAINING PRESENTATION
Last Update : 24/09/2018
by Tarek AYEB
1
SCHEDULE
- Training Opening
- SAM Discovery
- Operation Discovery
- Macro element Discovery
Break
- MTM MTM2 Discovery
- SAM & PACE
- What is SAM for( SENS )
- SOT Introduction
Summary & Closing
2
TARGETS
1. Understand the content of a SAM in DECATHLON
2. Understand the “MTM2” method used to calculate the
DECATHLON SAM
3. Understand THE SENS of SAM in DECATHLON
4. Understand the SOT and the main differences with
the DECATHLON SAM
3
WHAT IS A ?
STANDARD Allocated Minute
⇒ A Quantified Operation Breakdown
Analyse of product fabrication steps from cutting to
packaging + associated time
4
THE SAM AT DECATHLON :
CONTAINS
Cutting
Preparation
Marking
Assembling
Ironing
Finishing & Quality
control
Packing
5
There is a « piece » time which gathers those 3 elements. Just count the number
of pieces of each fabric and multiply it by defined time.
CUTTING
Operations included under « Cutting » section
are :
> Spreading
> Cutting
> Bundling &
labelling
6
Operations under "PREPARATION“ section are :
Quilting for quilted products
Thermofusing
PREPARATION
7
Operation under Marking section is:
Heat transfer labels
MARKING
account
8
ASSEMBLING
Operations under Assembling section are :
Stitching Taping Thermobonding
Etc...
9
FINISHING :
Cut and/or evacuate threads.
END OF LINE CONTROL :
• 100% of the pieces are controlled according to Decathlon
Standard
• With Measurement Chart : Only critical & fundamental
measurements
• Following DCS book
• Label control (matching RFID , size , etc.)
QUALITY CONTROL
Operations included in Finishing & Quality
Control are :
10
IRONING
Operations under Ironing section are :
Etc.
Iron finished
clothes 11
Operations under Packing section are :
PACKING
All folding works (put hood in collar,
etc.)
All labelling works (sticked or swifted)
Putting in bag (if necessary)
Putting on hanger (if necessary)
Packing in box
Etc….
12
⇒By splitting up all operations steps.
⇒With a predetermined evaluation time
system of body motion.
13
HOW CAN WE OBTAIN SAM’S TIMES ?
HOW CAN WE OBTAIN SAM’S TIMES ?
Kit SAM
14
EXERCISE
15
CORRECTION
=> A SAM IS BUILT WITH SEVERAL …………………
WHAT IS INSIDE SAM ?
16
=> A SAM IS BUILT WITH SEVERAL OPERATIONS
WHAT IS INSIDE SAM ?
17
• Make a list of all motions made by worker
18
APPLICATION
Code Description Type Repeat Time Default parameters
PP20
PICKUP AND POSITION
ELASTIC TO FRONT BELT Distance 1 0.041
16-30
cm
MA10 SINGLE FOLD Time 1 0.029 time
PP20
PICKUP AND POSITION
ELASTIC TO BACK BELT Distance 1 0.035 6-15 cm
MA10 SINGLE FOLD Time 1 0.029 time
MTPA STRETCH ELASTIC Distance 1 0.008
16-30
cm
PO10 POSITION UNDER FOOT Distance 1 0.02
16-30
cm
MTA0 GUIDE ACTION Time 1 0.009 time
Length1 TOTAL LENGTH Loop 0.335
L : 80
cm
LR : 26,67
cm
MA30 ALIGN 2 FOLDS Distance 3 0.097
16-30
cm
STAB SEWING FORMULAE Formulae 3 0.238
Length
(cm) :
26.67
EndLength
1 EndLoop
MTA0 GUIDE ACTION Time 1 0.009 time
CT70
THREAD CUTTING WITH
FIXED CUTTER Time 1 0.011 time
DI20 DISPOSE(ONE HAND) Distance 1 0.025
16-30
cm
⇒ OPERATION : Put elastic on waist
List of all motions needed to make the operation :
19
CORRECTION
20
=> AN OPERATION IS BUILT WITH SEVERAL ……………...
WHAT IS INSIDE SAM ?
21
=> AN OPERATION IS BUILT WITH SEVERAL MACRO ELEMENTS
WHAT IS INSIDE SAM ?
22
PP35: TAKE & PLACE 2 ELEMENTS (L-R)
Left Hand Right Hand
Take 1st piece
Bring Hand near
2nd
piece
Take 2nd
piece
Bring1st
piece Bring 2nd
piece
Adjust piece
Regrasp
EXAMPLE OF DETAILS OF MACRO ELEMENT
23
=> A MACRO ELEMENT IS BUILT WITH SEVERAL ………………….
WHAT IS INSIDE SAM ?
24
=> A MACRO ELEMENT IS BUILT WITH SEVERAL MTM2 ELEMENTS
WHAT IS INSIDE SAM ?
MTM is a predetermined evaluation time system
of body motion created in 1948.
It combines :
Motions + Distances + Weight
(MTM = Methods Time Measurement)
25
MTM
(MTM = Methods Time Measurement)
Have been created in 1965.
MTM2 is an abstract of MTM system.
Second global level of MTM data.
MTM 593 Values
MTM2 39 values
MTM2 is an abstract of MTM system.
Second global level of MTM data.
26
MTM2
MTM2 MOTIONS
27
G
Get = Obtain REACH + GRASP
(hand or finger) + RELEASE later.
GA = grasp contact or grasp very easily.
GB = 1 single grasp motion.
GC = several fingers motion.
28
MTM2 MOTIONS
P
PUT = PLACE Carry a piece (hand or
finger) to a destination
+ put in place.
PA = move + put in place without precision.
PB = move + put in place one direction
or fingers correction.
PC = move + put in place 2 directions
or several fingers correction. 29
MTM2 MOTIONS
G G
G
P
MTM2 MOTIONS
30
A R C E
Apply Pressure Regrasp Crank Eye Action
F S B
Foot Motion Step Bend and Arise
IN COMPLEMENT MOTIONS
31
32
MTM2 DISTANCES
33
MTM2 DISTANCES
W : WEIGHT CORRECTION
DEFINITION :
GET WEIGHT is the action asked to hand and arm
muscles to overcome resistance of object weight during
object taking.
When resistance is equal or
superior to 2 kg,
1 TMU is allowed
for each kilo,
including the 2 first kilos.
34
DEFINITION :
PUT WEIGHT is an added extra to motion PUT,
depending on weight and carrying.
Between 2 kg and 5 kg,
1 TMU is allowed and
symbolized PW5
Between 5 kg and 10 kg,
2 TMU are allowed
and symbolized
PW10, etc….
35
W : WEIGHT CORRECTION
MTM2 TIME UNIT
TMU = Time Measurement Unit
1 TMU* = 1/100000th
of hour
Conversion rate of TMU is
hundred thousandth of an hour :
1 TMU = 0.0006 Min
Because
60/100000 = 0.0006
Minutes
Secondes
TMU
X
60
X
0,0006
:
0,0006
:
60
36
37
MTM2 ELEMENT VALUES
PP35 = ...........TMU = ………. Min = ……. Scd
38
PP35: TAKE & PLACE 2 ELEMENTS (L-R)
Left Hand Codes Right Hand
Take 1st piece GC30 GA30
Bring Hand near
2nd
piece
GC5 Take 2nd
piece
Bring1st
piece PA30 Bring 2nd
piece
Adjust piece PC5
R Regrasp
APPLICATION
PP35 = 75 TMU = 0.045 Min = 2,7 Scd
39
PP35: TAKE & PLACE 2 ELEMENTS (L-R)
Left Hand Codes Right Hand
Take 1st piece GC30 GA30
Bring Hand near
2nd
piece
GC5 Take 2nd
piece
Bring1st
piece PA30 Bring 2nd
piece
Adjust piece PC5
R Regrasp
CORRECTION
EXEMPLE
SAM for OWE 6.774
DETAILS SAM
Cutting 0.748
Marking 0.000
Assembling 5.223
QC 1.090
Packing 0.460
Preparation 0.000
Ironing 0.000
Other 0.000
TOTAL SAM 7.521
Total SAM = 7,521
SAM = 7,521 Min = 7 Min & ---------Scd = ------------- TMU
SAM UNIT
40
31 12535
OPERATION TIME =
MTM2 TIME (min) + MACHINE TIME (min) + ALLOWANCES (% )
TO SUM UP
( Motions + Distances + Weight )
MTM2 Time= Combination of Motions time and distance time + Weight
time
41
L = Sewing length (cm)
NP = Number of stitch per cm
TM = Speed reached during sewing section
(rotations per minute)
0.010 = machine time control
+ acceleration + deceleration
42
MACHINE TIME
HUMAN:
– Personal Time
– Tired
MACHINE: ( depending on machine typology and number of needles )
– Damages
– Spool changing
– Incidents
POSITION:
– Sit down (with or without reflexion)
– Standing (with or without reflexion)
– Lying (with or without reflexion)
– Etc …..
43
ALLOWANCES ( % )
Define a time
Determinate working methods
Do workstation improvements
Symbolised in the same way all around the world
44
MTM 2 ADVANTAGES
TREE VIEW
MACRO ELEMENT
• Several elements of
MTM2 (and MTM)
• Several macro
elements
• Several Micro
Elements Manual
• Several operations
SAM
MTM – MTM2
OPERATIONS
45
TREE VIEW
1. SAM
⇒ Assemble several operations
2. OPERATIONS
=> Assemble several macro
elements
3. MACRO ELEMENTS
=> Assemble several elements
MTM 1&2
4. MTM-MTM2
=> Micro Elements Manuals
46
47
EXAMPLE OF SAM
WHERE TO FIND IT ?
Intranet Decathlon => PACE
« Technical data » => « METHOD » => SAM tool
Request => Pattern Maker (90%)
Made by Methods Engineer / Sample Maker
Use only validated SAM not
in progress SAM
48
WHAT IS SAM FOR ?
49
Help for decision during product development or improvement (design to cost).
Line Balancing / supplier help or evaluation.
Encourage continuous improvement => improve productivity.
Easy to evaluate the real capacity in advance.
Guiding for production planning for the factory & forecast the precise shipment date.
During Conception Process
During Production Process
During Supply studies
During Costing Process
Negociation help tool with supplier SOT.
50
Quantified Operating Breakdown, adapted to
supplier equipment, to his technical skills, to his
assembling logic. Also without efficiency and
speed notion.
It can be made under supplier sofware’s choice.
If supplier is motivated to get trained, he can
access to SAMPACE software for a better
comparison.
SOT ?
(Supplier Operating Time)
SOT INTRODUCTION
51
DIFFERENCE SAM & SOT TIME
– If gap < + or - 10% => OK
– If gap > + or - 10%
=> analyse possible reasons (parallel with SAM API,
unnecessary operation, over quality, …)
– In case value is still over range, contact API
(with video or pictures) .
SAM vs SOT
52
PAPER BOARD GAME + POST IT TO PUT ON
THE RIGHT PLACE
SAM vs SOT
SAM SOT
standard sewing method ? Post it
? Post it based on supplier’s actual
machine quantity
standard allowance ?
? Post it based on supplier’s sewing flow
Post it… = (output * SAM) /
working time
Post it… = (output * SOT) /
working time
53
CORRECTION
SAM vs SOT
SAM SOT
Standard sewing method Based on supplier’s know-how &
experience
standard machine based on supplier’s actual
machine quantity
standard allowance based on supplier’s management
level
standard bundle time based on supplier’s sewing flow
OWE Efficiency
54
55

Contenu connexe

Similaire à SAM_METHOD 1 _Training Presentation .pptx.pdf

Maynards operation sequence technique
Maynards operation sequence techniqueMaynards operation sequence technique
Maynards operation sequence technique
GAJANANPATHAK2
 
001 QM Stage 1-7 ACME final
001 QM Stage 1-7 ACME final001 QM Stage 1-7 ACME final
001 QM Stage 1-7 ACME final
Sachin Dhawale
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
Issa Alshaikh
 
Besi - TSV Summit 2015 - Handout
Besi - TSV Summit 2015 - HandoutBesi - TSV Summit 2015 - Handout
Besi - TSV Summit 2015 - Handout
Hugo Pristauz
 

Similaire à SAM_METHOD 1 _Training Presentation .pptx.pdf (20)

IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...
Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...
Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...
 
A012430106
A012430106A012430106
A012430106
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
 
Ie microsoft office power point presentation
Ie  microsoft office power point presentationIe  microsoft office power point presentation
Ie microsoft office power point presentation
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
Project Reportof Velocity Apparelz Nort Africa
Project Reportof Velocity Apparelz  Nort AfricaProject Reportof Velocity Apparelz  Nort Africa
Project Reportof Velocity Apparelz Nort Africa
 
Line balancing
Line balancingLine balancing
Line balancing
 
Maynards operation sequence technique
Maynards operation sequence techniqueMaynards operation sequence technique
Maynards operation sequence technique
 
six sigma project
six sigma projectsix sigma project
six sigma project
 
Final Report Defense 021509
Final Report Defense 021509Final Report Defense 021509
Final Report Defense 021509
 
Sustainable Manufacturing: Optimization of single pass Turning machining oper...
Sustainable Manufacturing: Optimization of single pass Turning machining oper...Sustainable Manufacturing: Optimization of single pass Turning machining oper...
Sustainable Manufacturing: Optimization of single pass Turning machining oper...
 
001 QM Stage 1-7 ACME final
001 QM Stage 1-7 ACME final001 QM Stage 1-7 ACME final
001 QM Stage 1-7 ACME final
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
 
Introduction to TPS (Toyota Production System)
Introduction to TPS (Toyota Production System)Introduction to TPS (Toyota Production System)
Introduction to TPS (Toyota Production System)
 
Design of PID CONTROLLER FOR ENGINEERING
Design of PID CONTROLLER FOR ENGINEERINGDesign of PID CONTROLLER FOR ENGINEERING
Design of PID CONTROLLER FOR ENGINEERING
 
Besi - TSV Summit 2015 - Handout
Besi - TSV Summit 2015 - HandoutBesi - TSV Summit 2015 - Handout
Besi - TSV Summit 2015 - Handout
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
 
Value analysis 2
Value analysis  2Value analysis  2
Value analysis 2
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 

Dernier

一比一原版加利福尼亚大学尔湾分校毕业证成绩单如何办理
一比一原版加利福尼亚大学尔湾分校毕业证成绩单如何办理一比一原版加利福尼亚大学尔湾分校毕业证成绩单如何办理
一比一原版加利福尼亚大学尔湾分校毕业证成绩单如何办理
pyhepag
 
一比一原版(Monash毕业证书)莫纳什大学毕业证成绩单如何办理
一比一原版(Monash毕业证书)莫纳什大学毕业证成绩单如何办理一比一原版(Monash毕业证书)莫纳什大学毕业证成绩单如何办理
一比一原版(Monash毕业证书)莫纳什大学毕业证成绩单如何办理
pyhepag
 
一比一原版西悉尼大学毕业证成绩单如何办理
一比一原版西悉尼大学毕业证成绩单如何办理一比一原版西悉尼大学毕业证成绩单如何办理
一比一原版西悉尼大学毕业证成绩单如何办理
pyhepag
 
一比一原版纽卡斯尔大学毕业证成绩单如何办理
一比一原版纽卡斯尔大学毕业证成绩单如何办理一比一原版纽卡斯尔大学毕业证成绩单如何办理
一比一原版纽卡斯尔大学毕业证成绩单如何办理
cyebo
 
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
Valters Lauzums
 
Abortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotec
Abortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotecAbortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotec
Abortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 

Dernier (20)

Atlantic Grupa Case Study (Mintec Data AI)
Atlantic Grupa Case Study (Mintec Data AI)Atlantic Grupa Case Study (Mintec Data AI)
Atlantic Grupa Case Study (Mintec Data AI)
 
Data Visualization Exploring and Explaining with Data 1st Edition by Camm sol...
Data Visualization Exploring and Explaining with Data 1st Edition by Camm sol...Data Visualization Exploring and Explaining with Data 1st Edition by Camm sol...
Data Visualization Exploring and Explaining with Data 1st Edition by Camm sol...
 
Pre-ProductionImproveddsfjgndflghtgg.pptx
Pre-ProductionImproveddsfjgndflghtgg.pptxPre-ProductionImproveddsfjgndflghtgg.pptx
Pre-ProductionImproveddsfjgndflghtgg.pptx
 
2024 Q1 Tableau User Group Leader Quarterly Call
2024 Q1 Tableau User Group Leader Quarterly Call2024 Q1 Tableau User Group Leader Quarterly Call
2024 Q1 Tableau User Group Leader Quarterly Call
 
Supply chain analytics to combat the effects of Ukraine-Russia-conflict
Supply chain analytics to combat the effects of Ukraine-Russia-conflictSupply chain analytics to combat the effects of Ukraine-Russia-conflict
Supply chain analytics to combat the effects of Ukraine-Russia-conflict
 
社内勉強会資料  Mamba - A new era or ephemeral
社内勉強会資料   Mamba - A new era or ephemeral社内勉強会資料   Mamba - A new era or ephemeral
社内勉強会資料  Mamba - A new era or ephemeral
 
How I opened a fake bank account and didn't go to prison
How I opened a fake bank account and didn't go to prisonHow I opened a fake bank account and didn't go to prison
How I opened a fake bank account and didn't go to prison
 
一比一原版加利福尼亚大学尔湾分校毕业证成绩单如何办理
一比一原版加利福尼亚大学尔湾分校毕业证成绩单如何办理一比一原版加利福尼亚大学尔湾分校毕业证成绩单如何办理
一比一原版加利福尼亚大学尔湾分校毕业证成绩单如何办理
 
AI Imagen for data-storytelling Infographics.pdf
AI Imagen for data-storytelling Infographics.pdfAI Imagen for data-storytelling Infographics.pdf
AI Imagen for data-storytelling Infographics.pdf
 
一比一原版(Monash毕业证书)莫纳什大学毕业证成绩单如何办理
一比一原版(Monash毕业证书)莫纳什大学毕业证成绩单如何办理一比一原版(Monash毕业证书)莫纳什大学毕业证成绩单如何办理
一比一原版(Monash毕业证书)莫纳什大学毕业证成绩单如何办理
 
Generative AI for Trailblazers_ Unlock the Future of AI.pdf
Generative AI for Trailblazers_ Unlock the Future of AI.pdfGenerative AI for Trailblazers_ Unlock the Future of AI.pdf
Generative AI for Trailblazers_ Unlock the Future of AI.pdf
 
Machine Learning for Accident Severity Prediction
Machine Learning for Accident Severity PredictionMachine Learning for Accident Severity Prediction
Machine Learning for Accident Severity Prediction
 
一比一原版西悉尼大学毕业证成绩单如何办理
一比一原版西悉尼大学毕业证成绩单如何办理一比一原版西悉尼大学毕业证成绩单如何办理
一比一原版西悉尼大学毕业证成绩单如何办理
 
Artificial_General_Intelligence__storm_gen_article.pdf
Artificial_General_Intelligence__storm_gen_article.pdfArtificial_General_Intelligence__storm_gen_article.pdf
Artificial_General_Intelligence__storm_gen_article.pdf
 
一比一原版纽卡斯尔大学毕业证成绩单如何办理
一比一原版纽卡斯尔大学毕业证成绩单如何办理一比一原版纽卡斯尔大学毕业证成绩单如何办理
一比一原版纽卡斯尔大学毕业证成绩单如何办理
 
Easy and simple project file on mp online
Easy and simple project file on mp onlineEasy and simple project file on mp online
Easy and simple project file on mp online
 
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
 
Webinar One View, Multiple Systems No-Code Integration of Salesforce and ERPs
Webinar One View, Multiple Systems No-Code Integration of Salesforce and ERPsWebinar One View, Multiple Systems No-Code Integration of Salesforce and ERPs
Webinar One View, Multiple Systems No-Code Integration of Salesforce and ERPs
 
Abortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotec
Abortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotecAbortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotec
Abortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotec
 
basics of data science with application areas.pdf
basics of data science with application areas.pdfbasics of data science with application areas.pdf
basics of data science with application areas.pdf
 

SAM_METHOD 1 _Training Presentation .pptx.pdf

  • 1. TRAINING PRESENTATION Last Update : 24/09/2018 by Tarek AYEB 1
  • 2. SCHEDULE - Training Opening - SAM Discovery - Operation Discovery - Macro element Discovery Break - MTM MTM2 Discovery - SAM & PACE - What is SAM for( SENS ) - SOT Introduction Summary & Closing 2
  • 3. TARGETS 1. Understand the content of a SAM in DECATHLON 2. Understand the “MTM2” method used to calculate the DECATHLON SAM 3. Understand THE SENS of SAM in DECATHLON 4. Understand the SOT and the main differences with the DECATHLON SAM 3
  • 4. WHAT IS A ? STANDARD Allocated Minute ⇒ A Quantified Operation Breakdown Analyse of product fabrication steps from cutting to packaging + associated time 4
  • 5. THE SAM AT DECATHLON : CONTAINS Cutting Preparation Marking Assembling Ironing Finishing & Quality control Packing 5
  • 6. There is a « piece » time which gathers those 3 elements. Just count the number of pieces of each fabric and multiply it by defined time. CUTTING Operations included under « Cutting » section are : > Spreading > Cutting > Bundling & labelling 6
  • 7. Operations under "PREPARATION“ section are : Quilting for quilted products Thermofusing PREPARATION 7
  • 8. Operation under Marking section is: Heat transfer labels MARKING account 8
  • 9. ASSEMBLING Operations under Assembling section are : Stitching Taping Thermobonding Etc... 9
  • 10. FINISHING : Cut and/or evacuate threads. END OF LINE CONTROL : • 100% of the pieces are controlled according to Decathlon Standard • With Measurement Chart : Only critical & fundamental measurements • Following DCS book • Label control (matching RFID , size , etc.) QUALITY CONTROL Operations included in Finishing & Quality Control are : 10
  • 11. IRONING Operations under Ironing section are : Etc. Iron finished clothes 11
  • 12. Operations under Packing section are : PACKING All folding works (put hood in collar, etc.) All labelling works (sticked or swifted) Putting in bag (if necessary) Putting on hanger (if necessary) Packing in box Etc…. 12
  • 13. ⇒By splitting up all operations steps. ⇒With a predetermined evaluation time system of body motion. 13 HOW CAN WE OBTAIN SAM’S TIMES ? HOW CAN WE OBTAIN SAM’S TIMES ?
  • 16. => A SAM IS BUILT WITH SEVERAL ………………… WHAT IS INSIDE SAM ? 16
  • 17. => A SAM IS BUILT WITH SEVERAL OPERATIONS WHAT IS INSIDE SAM ? 17
  • 18. • Make a list of all motions made by worker 18 APPLICATION
  • 19. Code Description Type Repeat Time Default parameters PP20 PICKUP AND POSITION ELASTIC TO FRONT BELT Distance 1 0.041 16-30 cm MA10 SINGLE FOLD Time 1 0.029 time PP20 PICKUP AND POSITION ELASTIC TO BACK BELT Distance 1 0.035 6-15 cm MA10 SINGLE FOLD Time 1 0.029 time MTPA STRETCH ELASTIC Distance 1 0.008 16-30 cm PO10 POSITION UNDER FOOT Distance 1 0.02 16-30 cm MTA0 GUIDE ACTION Time 1 0.009 time Length1 TOTAL LENGTH Loop 0.335 L : 80 cm LR : 26,67 cm MA30 ALIGN 2 FOLDS Distance 3 0.097 16-30 cm STAB SEWING FORMULAE Formulae 3 0.238 Length (cm) : 26.67 EndLength 1 EndLoop MTA0 GUIDE ACTION Time 1 0.009 time CT70 THREAD CUTTING WITH FIXED CUTTER Time 1 0.011 time DI20 DISPOSE(ONE HAND) Distance 1 0.025 16-30 cm ⇒ OPERATION : Put elastic on waist List of all motions needed to make the operation : 19 CORRECTION
  • 20. 20 => AN OPERATION IS BUILT WITH SEVERAL ……………... WHAT IS INSIDE SAM ?
  • 21. 21 => AN OPERATION IS BUILT WITH SEVERAL MACRO ELEMENTS WHAT IS INSIDE SAM ?
  • 22. 22 PP35: TAKE & PLACE 2 ELEMENTS (L-R) Left Hand Right Hand Take 1st piece Bring Hand near 2nd piece Take 2nd piece Bring1st piece Bring 2nd piece Adjust piece Regrasp EXAMPLE OF DETAILS OF MACRO ELEMENT
  • 23. 23 => A MACRO ELEMENT IS BUILT WITH SEVERAL …………………. WHAT IS INSIDE SAM ?
  • 24. 24 => A MACRO ELEMENT IS BUILT WITH SEVERAL MTM2 ELEMENTS WHAT IS INSIDE SAM ?
  • 25. MTM is a predetermined evaluation time system of body motion created in 1948. It combines : Motions + Distances + Weight (MTM = Methods Time Measurement) 25 MTM
  • 26. (MTM = Methods Time Measurement) Have been created in 1965. MTM2 is an abstract of MTM system. Second global level of MTM data. MTM 593 Values MTM2 39 values MTM2 is an abstract of MTM system. Second global level of MTM data. 26 MTM2
  • 28. G Get = Obtain REACH + GRASP (hand or finger) + RELEASE later. GA = grasp contact or grasp very easily. GB = 1 single grasp motion. GC = several fingers motion. 28 MTM2 MOTIONS
  • 29. P PUT = PLACE Carry a piece (hand or finger) to a destination + put in place. PA = move + put in place without precision. PB = move + put in place one direction or fingers correction. PC = move + put in place 2 directions or several fingers correction. 29 MTM2 MOTIONS
  • 31. A R C E Apply Pressure Regrasp Crank Eye Action F S B Foot Motion Step Bend and Arise IN COMPLEMENT MOTIONS 31
  • 34. W : WEIGHT CORRECTION DEFINITION : GET WEIGHT is the action asked to hand and arm muscles to overcome resistance of object weight during object taking. When resistance is equal or superior to 2 kg, 1 TMU is allowed for each kilo, including the 2 first kilos. 34
  • 35. DEFINITION : PUT WEIGHT is an added extra to motion PUT, depending on weight and carrying. Between 2 kg and 5 kg, 1 TMU is allowed and symbolized PW5 Between 5 kg and 10 kg, 2 TMU are allowed and symbolized PW10, etc…. 35 W : WEIGHT CORRECTION
  • 36. MTM2 TIME UNIT TMU = Time Measurement Unit 1 TMU* = 1/100000th of hour Conversion rate of TMU is hundred thousandth of an hour : 1 TMU = 0.0006 Min Because 60/100000 = 0.0006 Minutes Secondes TMU X 60 X 0,0006 : 0,0006 : 60 36
  • 38. PP35 = ...........TMU = ………. Min = ……. Scd 38 PP35: TAKE & PLACE 2 ELEMENTS (L-R) Left Hand Codes Right Hand Take 1st piece GC30 GA30 Bring Hand near 2nd piece GC5 Take 2nd piece Bring1st piece PA30 Bring 2nd piece Adjust piece PC5 R Regrasp APPLICATION
  • 39. PP35 = 75 TMU = 0.045 Min = 2,7 Scd 39 PP35: TAKE & PLACE 2 ELEMENTS (L-R) Left Hand Codes Right Hand Take 1st piece GC30 GA30 Bring Hand near 2nd piece GC5 Take 2nd piece Bring1st piece PA30 Bring 2nd piece Adjust piece PC5 R Regrasp CORRECTION
  • 40. EXEMPLE SAM for OWE 6.774 DETAILS SAM Cutting 0.748 Marking 0.000 Assembling 5.223 QC 1.090 Packing 0.460 Preparation 0.000 Ironing 0.000 Other 0.000 TOTAL SAM 7.521 Total SAM = 7,521 SAM = 7,521 Min = 7 Min & ---------Scd = ------------- TMU SAM UNIT 40 31 12535
  • 41. OPERATION TIME = MTM2 TIME (min) + MACHINE TIME (min) + ALLOWANCES (% ) TO SUM UP ( Motions + Distances + Weight ) MTM2 Time= Combination of Motions time and distance time + Weight time 41
  • 42. L = Sewing length (cm) NP = Number of stitch per cm TM = Speed reached during sewing section (rotations per minute) 0.010 = machine time control + acceleration + deceleration 42 MACHINE TIME
  • 43. HUMAN: – Personal Time – Tired MACHINE: ( depending on machine typology and number of needles ) – Damages – Spool changing – Incidents POSITION: – Sit down (with or without reflexion) – Standing (with or without reflexion) – Lying (with or without reflexion) – Etc ….. 43 ALLOWANCES ( % )
  • 44. Define a time Determinate working methods Do workstation improvements Symbolised in the same way all around the world 44 MTM 2 ADVANTAGES
  • 45. TREE VIEW MACRO ELEMENT • Several elements of MTM2 (and MTM) • Several macro elements • Several Micro Elements Manual • Several operations SAM MTM – MTM2 OPERATIONS 45
  • 46. TREE VIEW 1. SAM ⇒ Assemble several operations 2. OPERATIONS => Assemble several macro elements 3. MACRO ELEMENTS => Assemble several elements MTM 1&2 4. MTM-MTM2 => Micro Elements Manuals 46
  • 48. WHERE TO FIND IT ? Intranet Decathlon => PACE « Technical data » => « METHOD » => SAM tool Request => Pattern Maker (90%) Made by Methods Engineer / Sample Maker Use only validated SAM not in progress SAM 48
  • 49. WHAT IS SAM FOR ? 49 Help for decision during product development or improvement (design to cost). Line Balancing / supplier help or evaluation. Encourage continuous improvement => improve productivity. Easy to evaluate the real capacity in advance. Guiding for production planning for the factory & forecast the precise shipment date. During Conception Process During Production Process During Supply studies During Costing Process Negociation help tool with supplier SOT.
  • 50. 50 Quantified Operating Breakdown, adapted to supplier equipment, to his technical skills, to his assembling logic. Also without efficiency and speed notion. It can be made under supplier sofware’s choice. If supplier is motivated to get trained, he can access to SAMPACE software for a better comparison. SOT ? (Supplier Operating Time) SOT INTRODUCTION
  • 52. – If gap < + or - 10% => OK – If gap > + or - 10% => analyse possible reasons (parallel with SAM API, unnecessary operation, over quality, …) – In case value is still over range, contact API (with video or pictures) . SAM vs SOT 52
  • 53. PAPER BOARD GAME + POST IT TO PUT ON THE RIGHT PLACE SAM vs SOT SAM SOT standard sewing method ? Post it ? Post it based on supplier’s actual machine quantity standard allowance ? ? Post it based on supplier’s sewing flow Post it… = (output * SAM) / working time Post it… = (output * SOT) / working time 53
  • 54. CORRECTION SAM vs SOT SAM SOT Standard sewing method Based on supplier’s know-how & experience standard machine based on supplier’s actual machine quantity standard allowance based on supplier’s management level standard bundle time based on supplier’s sewing flow OWE Efficiency 54
  • 55. 55