This company presentation provides an overview of Maxuni, a mold manufacturing company with offices in China, Germany, and plans to open an office in North America. It summarizes Maxuni's international team, sales and production figures from 2008, facilities and automated manufacturing capabilities, and customer industries served which include automotive and packaging. Maxuni aims to provide high quality molds on schedule through their engineering, manufacturing, and quality control processes.
17. Mold Manufacturing Lead Time Reference Complex Mold General Mold Mold Tonnage Project Finished Time 1 TON 7-8 Weeks 3 TON 8-10 Weeks 5 TON 12-14 Weeks Mold Tonnage Project Finished Time 1 TON 8-9 Weeks 3 TON 10-11 Weeks 5 TON 14-16 Weeks
18. Project Flow Chart Quotation Approval & P.O. Design & Engineering Design Check & Revision Design Approval Mold Construction Mold Testing & Refinement Mold Approval Final Mold Test Part Samples DELIVERY
20. ERP Manufacturing System We use personalized Enterprise Resource Planning (ERP) software, which is similar to SAP AG’s flagship platform ERP. These programs are being used by such companies as Porsche, Verizon Telcom, and Nissan. All parts are bar-coded, and then scanned at each step of the manufacturing process. The ERP program ensures tracking for every part and person involved in the complete manufacturing process. The ERP software integrates and controls: Machine capacity planning Manufacturing planning Warehouse planning Purchasing software (the software results in less lag time on project start times) Quality Control (i.e. when Q.C. passes or fails a part). The above information is integrated into the rest of the system. The system instantly updates the machine planning capacity, manufacturing planning, purchasing planning (repurchasing if required), and warehouse planning (location tracking all components of every mould). Changes required by the customer are updated and integrated by the system, flagging potential delays for finishing the product on schedule. If delays are expected, the system can give parts a priority status. Automatic tracking, reporting, and correcting deviations in projected timelines allows us to hit our T1 target date 96% of the time; averaging over 700 moulds built per year.
21.
22.
23.
24.
25. Zhuhai Factory with Advanced Automated Flexible Manufacturing System Completely automated logistics, storage, and manufacturing system
26. New Machines Coming August, 2009 Machines Qty. Origin DEPO HC 2012 (3 simultaneous & 1 adjustable axis) 1 German Gantry EAGLE 500 (EDM) 1 German OPS-ingersoll Gantry EAGLE 1200 (EDM) 1 German OPS-ingersoll HSC-machine SPEEDHAWK 550 (5-Axis's CNC) 1 German OPS-ingersoll HSC-machine SPEEDHAWK 750 (5-Axis's CNC) 2 German OPS-ingersoll DEPO Mill2012 (5 axis) 1 German DEPO HF2012 (5 simultaneous & 2 adjustable axis) 1 German DEPO VC3016 (5 simultaneous & 1 adjustable axis) 1 German DEPO VF3016 (5-Axis's CNC) 1 German
27. CNC Milling Machines Qty. Origin ShenZhen Factory Equipment List MORI-SEIKI NVD4000 DCG 1 Japan (Purchased 2006) MORI-SEIKI NVD5000 Alpha 1 (High speed milling – up to 20,000 RPM) 2 Japan (Purchased 2005) HARDINGE VMC800II 6 USA (3 Purchased 2005) HARDINGE VMC1250II 1 USA (Purchased 2006) Extrem DH1000 Gun Drill 1 Hong Kong (Purchased 2007)
29. Wire Cutting Machines Qty. Origin Machining Centers Qty. Origin ShenZhen Factory Equipment List CHARMILLES ROBOFIL380 1 Switzerland SuSanGuang 7725 2 China HuaFang 7732 1 China HuaFang 7740 2 China HuaFang 7750 1 China YSG-614 Precision Grinding Machine 4 Japan M7312H Automatic Surface Grinding Machine 5 China Okamoto OGM-250UEXB Cylindrical Grinder 1 Japan (Purchased 2006)
30. Mold Fitting Machines Qty. Origin ShenZhen Factory Equipment List AQUAmate LS-120t 1 Hong Kong (Purchased 2005) AQUAmate LS-200t 1 Hong Kong (Purchased 2006)