SlideShare une entreprise Scribd logo
1  sur  21
Keeping Your Accounting System Compliant:  Hot Issues & Requirements Not to Overlook October 11, 2011 1
First in a series that will discuss selective topics relating to each business system Topics selected fall within  Hot issues for DCAA Overlooked requirements that often create deficiencies MLA is preparing a comprehensive business systems compliance guide  Introduction 2
Interim Business Systems Rule(76 Fed. Reg. 28,856-01, May 18, 2011)  Adopts “existing” evaluation criteria for various systems Revised DFARS Subpart 242.75 and § 252.242-7006 Govern accounting systems for contractors performing flexibly-priced or progress payment eligible work Define “acceptable accounting system” Establish 18 evaluation criteria Accounting System Overview 3
“Accounting system” is the methods, procedures and controls established to gather, record, classify, analyze, summarize, interpret and present accurate and timely financial data, including subsystems for: Indirect costs Compensation Billing Labor Information technology Accounting System Overview (cont.) 4
“Acceptable accounting system” means a system that provides “reasonable assurance” that – Applicable laws and regulations are complied with The cost accounting system and data are reliable Risk of misallocations and mischarges are minimized; and Contract allocations and charges are consistent with billing procedures Accounting System Overview (cont.) 5
“Significant deficiency” means a shortcoming in the system that materially affects the ability of DoD officials to rely upon information produced Must establish and maintain an “acceptable accounting system” Contracting officer disapproval and/or contract withholdings  – “in consultation with auditor or functional specialist” Accounting System Overview (cont.) 6
CO retains ability in connection with field pricing audits to require contractor correction of perceived deficiencies, adjust contract type, segregate certain costs, reduce fee or profit objective and/or insert contract reopener clause to mitigate government risk FAR § 16.301-3(a)(1) precludes cost-type contract unless contractor’s accounting system is “adequate for determining costs applicable to the contract” CO “shall promptly approve a previously disapproved accounting system . . . when . . . there are no remaining significant deficiencies” Accounting System Overview (cont.) 7
Compliance with  CAS FAR/DFARS/Agency Supplements Contract requirements Cost accounting system and data reliability Internal controls Billings Accounting System Priorities  8
CAS-compliance of contract element cost allocations (among CLINs, Sub-CLINS or Units, etc.) Indirect cost allocations Consistent practices  Reflective of beneficial/causal relationship Cost allowability, including costs of subcontracts, bid and proposal, professional and legal services, insurance, etc.   Compliance - Hot Topics 9
Flexibly-priced contracts subject to modified coverage (CAS 401, 402, 405 and 406) also must comply with CAS 412 and 413 (pensions) (FAR § 31.205-6(j)) CAS 415 (deferred compensation) (FAR § 31.205-6(k)) CAS 414 and 417 (cost of money) (FAR § 31.205-10)) CAS 420 (IR&D and B&P) (FAR § 31.205-18) CAS  416 (insurance) (FAR § 31.205-19) Compliance – Do Not Overlook 10
Proper allocation of business generation costs Selling IR&D B&P  Proper allocations generally  Overhead pools Service centers Compliance – Do Not Overlook (cont.) 11
Impact of business decisions Organizational changes, creating accounting practice changes  Pricing decisions for an individual contract, creating CAS 401 issues Training for personnel outside of accounting functions Acceptance of contract terms for reporting and billing that are more detailed than CAS Disclosure Statement Compliance – Do Not Overlook (cont.) 12
Support  for adjusting entries to accounts under general ledger control Systems Are not integrated Cannot be (immediately) reconciled Must have job order accounting  Not correct But must establish ability to develop contract costs using process costing or standard costs System/Data Reliability – Hot Topics 13
Compensation/labor recording system Consistent uncompensated overtime practice Consistent compensatory time practice Disciplined timekeeping compliance  Error corrections/management review Unallowable  cost screening  Disciplined compliance at point of entry Disciplined compliance at home offices System/Data Reliability – Do Not Overlook  14
Ability to produce Source documentation Audit trail System/Data Reliability – Do Not Overlook (cont.) 15
Automated and integrated systems with built-in segregation of employee responsibilities Internal audit activity Functionally and organizationally independent Maintain requisite specialized knowledge to review government contract compliance Periodically performed Internal Controls – Hot Topics 16
Error correction Timely  Accurate Ethics practices timely investigation of issues documented resolution and corrective action appropriate disclosures and follow-up Internal Controls – Do Not Overlook 17
Adequate contract “briefings”  Periodic reconciliation of billings to incurred costs Invoices and supporting information conform to contract billing requirements Job order accounting by CLIN, Sub-CLIN, Unit and/or  lower-level cost element, if contract requires  Timely adjustments, including resolution of items in suspense Billing Systems – Hot Topics 18
Subcontractor billing compliance and supporting documentation Periodic estimates to complete for “Limitation of Costs” and/or “Limitation of Funds” provisions Progress payment limitation and/or liquidation requirements FPI “Quarterly Limitation of Payment” requirements Billing Systems – Do Not Overlook 19
Investments in integrated and automated systems Conduct periodic accounting system evaluations, review results, implement corrective actions  Continuous employee training on key compliance areas Timekeeping Cost allowability Best Practices 20
Thomas A. Lemmer303-634-4350tlemmer@mckennalong.com Steven M. Masiello303-634-4355smasiello@mckennalong.com Presenters 21 DN 32216384

Contenu connexe

Tendances

4. Management and optimisation
4. Management and optimisation4. Management and optimisation
4. Management and optimisationRian van der Merwe
 
Topic 3 Accounting System And Control
Topic 3 Accounting System And ControlTopic 3 Accounting System And Control
Topic 3 Accounting System And Controlguest441011
 
The Revenue Cycle
The Revenue Cycle The Revenue Cycle
The Revenue Cycle Qamar Farooq
 
Sarbanes oxley internal controls
Sarbanes oxley internal controlsSarbanes oxley internal controls
Sarbanes oxley internal controlsIllumeo
 
Lecture 16 internal control - james a. hall book chapter 3
Lecture 16  internal control - james a. hall book chapter 3Lecture 16  internal control - james a. hall book chapter 3
Lecture 16 internal control - james a. hall book chapter 3Habib Ullah Qamar
 
Control and audit of information System (hendri eka saputra)
Control and audit of information System (hendri eka saputra)Control and audit of information System (hendri eka saputra)
Control and audit of information System (hendri eka saputra)Hendri Eka Saputra
 
Ais Romney 2006 Slides 09 Auditing Computer Based Is
Ais Romney 2006 Slides 09 Auditing Computer Based IsAis Romney 2006 Slides 09 Auditing Computer Based Is
Ais Romney 2006 Slides 09 Auditing Computer Based IsSharing Slides Training
 
Compliance Management | Compliance Solutions
Compliance Management | Compliance SolutionsCompliance Management | Compliance Solutions
Compliance Management | Compliance SolutionsCorporater
 
Accounting Information System ch 01 ppt1
Accounting Information System ch 01 ppt1Accounting Information System ch 01 ppt1
Accounting Information System ch 01 ppt1Eloise Mae Hersane
 
Lecture 15 fraud schemes - james a. hall book chapter 3
Lecture 15  fraud schemes - james a. hall book chapter 3Lecture 15  fraud schemes - james a. hall book chapter 3
Lecture 15 fraud schemes - james a. hall book chapter 3Habib Ullah Qamar
 
Accounting Information system
Accounting Information systemAccounting Information system
Accounting Information systemanishpr15
 
The Six Business System Rules
The Six Business System RulesThe Six Business System Rules
The Six Business System RulesGlen Alleman
 
How to Safely Race to an Optimized Financial Accounting Close?
How to Safely Race to an Optimized Financial Accounting Close?How to Safely Race to an Optimized Financial Accounting Close?
How to Safely Race to an Optimized Financial Accounting Close?Cogneesol
 
Lecture 1 accounting information system, an overview
Lecture 1  accounting information system, an overviewLecture 1  accounting information system, an overview
Lecture 1 accounting information system, an overviewHabib Ullah Qamar
 
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011IBM Sverige
 

Tendances (20)

4. Management and optimisation
4. Management and optimisation4. Management and optimisation
4. Management and optimisation
 
James hall ch 3
James hall ch 3James hall ch 3
James hall ch 3
 
Topic 3 Accounting System And Control
Topic 3 Accounting System And ControlTopic 3 Accounting System And Control
Topic 3 Accounting System And Control
 
The Revenue Cycle
The Revenue Cycle The Revenue Cycle
The Revenue Cycle
 
Accounting Systems
Accounting SystemsAccounting Systems
Accounting Systems
 
Sarbanes oxley internal controls
Sarbanes oxley internal controlsSarbanes oxley internal controls
Sarbanes oxley internal controls
 
Lecture 16 internal control - james a. hall book chapter 3
Lecture 16  internal control - james a. hall book chapter 3Lecture 16  internal control - james a. hall book chapter 3
Lecture 16 internal control - james a. hall book chapter 3
 
Control and audit of information System (hendri eka saputra)
Control and audit of information System (hendri eka saputra)Control and audit of information System (hendri eka saputra)
Control and audit of information System (hendri eka saputra)
 
Ais presentation
Ais presentationAis presentation
Ais presentation
 
Ais Romney 2006 Slides 09 Auditing Computer Based Is
Ais Romney 2006 Slides 09 Auditing Computer Based IsAis Romney 2006 Slides 09 Auditing Computer Based Is
Ais Romney 2006 Slides 09 Auditing Computer Based Is
 
Compliance assessor brochure
Compliance assessor brochureCompliance assessor brochure
Compliance assessor brochure
 
Compliance Management | Compliance Solutions
Compliance Management | Compliance SolutionsCompliance Management | Compliance Solutions
Compliance Management | Compliance Solutions
 
James hall ch 6
James hall ch 6James hall ch 6
James hall ch 6
 
Accounting Information System ch 01 ppt1
Accounting Information System ch 01 ppt1Accounting Information System ch 01 ppt1
Accounting Information System ch 01 ppt1
 
Lecture 15 fraud schemes - james a. hall book chapter 3
Lecture 15  fraud schemes - james a. hall book chapter 3Lecture 15  fraud schemes - james a. hall book chapter 3
Lecture 15 fraud schemes - james a. hall book chapter 3
 
Accounting Information system
Accounting Information systemAccounting Information system
Accounting Information system
 
The Six Business System Rules
The Six Business System RulesThe Six Business System Rules
The Six Business System Rules
 
How to Safely Race to an Optimized Financial Accounting Close?
How to Safely Race to an Optimized Financial Accounting Close?How to Safely Race to an Optimized Financial Accounting Close?
How to Safely Race to an Optimized Financial Accounting Close?
 
Lecture 1 accounting information system, an overview
Lecture 1  accounting information system, an overviewLecture 1  accounting information system, an overview
Lecture 1 accounting information system, an overview
 
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011
 

En vedette

Tech America Part 227 Rewrite
Tech America Part 227 RewriteTech America Part 227 Rewrite
Tech America Part 227 Rewritesmasie
 
Google Adwords
Google AdwordsGoogle Adwords
Google Adwordskels
 
Subcontractor Cost Allowability And Systems Adequacy
Subcontractor Cost Allowability And Systems AdequacySubcontractor Cost Allowability And Systems Adequacy
Subcontractor Cost Allowability And Systems Adequacysmasie
 
Recent Trends in Government Contract Cost Recovery and DCAA Audit Issues
Recent Trends in Government Contract Cost Recovery and DCAA Audit IssuesRecent Trends in Government Contract Cost Recovery and DCAA Audit Issues
Recent Trends in Government Contract Cost Recovery and DCAA Audit Issuessmasie
 
Important Tva
Important   TvaImportant   Tva
Important Tvazenovia
 
Poland Report
Poland ReportPoland Report
Poland Reportkels
 
State_Farm_Campaign
State_Farm_CampaignState_Farm_Campaign
State_Farm_Campaignkels
 
Poland Presentation
Poland PresentationPoland Presentation
Poland Presentationkels
 
State Farm Presentation
State Farm PresentationState Farm Presentation
State Farm Presentationkels
 

En vedette (17)

Tech America Part 227 Rewrite
Tech America Part 227 RewriteTech America Part 227 Rewrite
Tech America Part 227 Rewrite
 
Frunzenskiy raon 26
Frunzenskiy raon 26Frunzenskiy raon 26
Frunzenskiy raon 26
 
Frunz 16
Frunz 16Frunz 16
Frunz 16
 
Frunz 08
Frunz 08Frunz 08
Frunz 08
 
Google Adwords
Google AdwordsGoogle Adwords
Google Adwords
 
Frunz03
Frunz03Frunz03
Frunz03
 
Subcontractor Cost Allowability And Systems Adequacy
Subcontractor Cost Allowability And Systems AdequacySubcontractor Cost Allowability And Systems Adequacy
Subcontractor Cost Allowability And Systems Adequacy
 
Recent Trends in Government Contract Cost Recovery and DCAA Audit Issues
Recent Trends in Government Contract Cost Recovery and DCAA Audit IssuesRecent Trends in Government Contract Cost Recovery and DCAA Audit Issues
Recent Trends in Government Contract Cost Recovery and DCAA Audit Issues
 
02 Novosty
02 Novosty02 Novosty
02 Novosty
 
27 novosty
27 novosty27 novosty
27 novosty
 
23 novosty
23 novosty23 novosty
23 novosty
 
Important Tva
Important   TvaImportant   Tva
Important Tva
 
Poland Report
Poland ReportPoland Report
Poland Report
 
State_Farm_Campaign
State_Farm_CampaignState_Farm_Campaign
State_Farm_Campaign
 
Transcendentalism
TranscendentalismTranscendentalism
Transcendentalism
 
Poland Presentation
Poland PresentationPoland Presentation
Poland Presentation
 
State Farm Presentation
State Farm PresentationState Farm Presentation
State Farm Presentation
 

Similaire à GC Accounting System Compliance

Implementing a FAR Part 31 Compliant Cost Accounting System
Implementing a FAR Part 31 Compliant Cost Accounting SystemImplementing a FAR Part 31 Compliant Cost Accounting System
Implementing a FAR Part 31 Compliant Cost Accounting SystemRobert E Jones
 
2013-09-26 Government Contractors Project Management Systems
2013-09-26 Government Contractors Project Management Systems2013-09-26 Government Contractors Project Management Systems
2013-09-26 Government Contractors Project Management SystemsRaffa Learning Community
 
Back to Basics: Good Accounting & Finance Practices
Back to Basics: Good Accounting & Finance Practices Back to Basics: Good Accounting & Finance Practices
Back to Basics: Good Accounting & Finance Practices TEDCO
 
3. dcaa small_business_outreach
3. dcaa small_business_outreach3. dcaa small_business_outreach
3. dcaa small_business_outreachColorado PTAC
 
Obtaining an Adequate ("Approved") Accounting System
Obtaining an Adequate ("Approved") Accounting SystemObtaining an Adequate ("Approved") Accounting System
Obtaining an Adequate ("Approved") Accounting SystemRobert E Jones
 
Government Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory EnvironmentGovernment Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory EnvironmentRaffa Learning Community
 
Ch cie client onboarding - teaser
Ch cie   client onboarding - teaserCh cie   client onboarding - teaser
Ch cie client onboarding - teaserStephane Eyraud
 
DCAA Audits Without Tears
DCAA Audits Without TearsDCAA Audits Without Tears
DCAA Audits Without TearsUnanet
 
Accounting System Requirements
Accounting System RequirementsAccounting System Requirements
Accounting System RequirementsMaria Nguyen
 
Going Beyond Business Systems
Going Beyond Business SystemsGoing Beyond Business Systems
Going Beyond Business SystemsKarl Fultz
 
Introduction IS Utilities - Indian DISCOM
Introduction IS Utilities - Indian DISCOMIntroduction IS Utilities - Indian DISCOM
Introduction IS Utilities - Indian DISCOMSougata Mitra
 
Accounting System Compliance for Non-Accountants
Accounting System Compliance for Non-AccountantsAccounting System Compliance for Non-Accountants
Accounting System Compliance for Non-AccountantsRobert E Jones
 
Four points-to-keep-in-mind-when-your-facility-is-presented-with-a-payor-audi...
Four points-to-keep-in-mind-when-your-facility-is-presented-with-a-payor-audi...Four points-to-keep-in-mind-when-your-facility-is-presented-with-a-payor-audi...
Four points-to-keep-in-mind-when-your-facility-is-presented-with-a-payor-audi...MEDHOST
 
Government Contracting Compliance & Ethics Programs (General Counsel, P.C.); ...
Government Contracting Compliance & Ethics Programs (General Counsel, P.C.); ...Government Contracting Compliance & Ethics Programs (General Counsel, P.C.); ...
Government Contracting Compliance & Ethics Programs (General Counsel, P.C.); ...govWin
 
Billing accuracy guidelines
Billing accuracy guidelinesBilling accuracy guidelines
Billing accuracy guidelinestraoman
 
Test scenario preparation_approach_document & estimates
Test scenario preparation_approach_document & estimatesTest scenario preparation_approach_document & estimates
Test scenario preparation_approach_document & estimatesvishalbali0
 
Conceptual Framework in Accounting
Conceptual Framework in AccountingConceptual Framework in Accounting
Conceptual Framework in AccountingDeady Rizky Yunanto
 

Similaire à GC Accounting System Compliance (20)

Implementing a FAR Part 31 Compliant Cost Accounting System
Implementing a FAR Part 31 Compliant Cost Accounting SystemImplementing a FAR Part 31 Compliant Cost Accounting System
Implementing a FAR Part 31 Compliant Cost Accounting System
 
Accounting Systems for Government Contractors
Accounting Systems for Government ContractorsAccounting Systems for Government Contractors
Accounting Systems for Government Contractors
 
2013-09-26 Government Contractors Project Management Systems
2013-09-26 Government Contractors Project Management Systems2013-09-26 Government Contractors Project Management Systems
2013-09-26 Government Contractors Project Management Systems
 
Back to Basics: Good Accounting & Finance Practices
Back to Basics: Good Accounting & Finance Practices Back to Basics: Good Accounting & Finance Practices
Back to Basics: Good Accounting & Finance Practices
 
3. dcaa small_business_outreach
3. dcaa small_business_outreach3. dcaa small_business_outreach
3. dcaa small_business_outreach
 
Obtaining an Adequate ("Approved") Accounting System
Obtaining an Adequate ("Approved") Accounting SystemObtaining an Adequate ("Approved") Accounting System
Obtaining an Adequate ("Approved") Accounting System
 
Government Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory EnvironmentGovernment Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory Environment
 
Ch cie client onboarding - teaser
Ch cie   client onboarding - teaserCh cie   client onboarding - teaser
Ch cie client onboarding - teaser
 
DCAA Audits Without Tears
DCAA Audits Without TearsDCAA Audits Without Tears
DCAA Audits Without Tears
 
Dcaa audits without tears final
Dcaa audits without tears finalDcaa audits without tears final
Dcaa audits without tears final
 
DCAA Audits Without Tears
DCAA Audits Without TearsDCAA Audits Without Tears
DCAA Audits Without Tears
 
Accounting System Requirements
Accounting System RequirementsAccounting System Requirements
Accounting System Requirements
 
Going Beyond Business Systems
Going Beyond Business SystemsGoing Beyond Business Systems
Going Beyond Business Systems
 
Introduction IS Utilities - Indian DISCOM
Introduction IS Utilities - Indian DISCOMIntroduction IS Utilities - Indian DISCOM
Introduction IS Utilities - Indian DISCOM
 
Accounting System Compliance for Non-Accountants
Accounting System Compliance for Non-AccountantsAccounting System Compliance for Non-Accountants
Accounting System Compliance for Non-Accountants
 
Four points-to-keep-in-mind-when-your-facility-is-presented-with-a-payor-audi...
Four points-to-keep-in-mind-when-your-facility-is-presented-with-a-payor-audi...Four points-to-keep-in-mind-when-your-facility-is-presented-with-a-payor-audi...
Four points-to-keep-in-mind-when-your-facility-is-presented-with-a-payor-audi...
 
Government Contracting Compliance & Ethics Programs (General Counsel, P.C.); ...
Government Contracting Compliance & Ethics Programs (General Counsel, P.C.); ...Government Contracting Compliance & Ethics Programs (General Counsel, P.C.); ...
Government Contracting Compliance & Ethics Programs (General Counsel, P.C.); ...
 
Billing accuracy guidelines
Billing accuracy guidelinesBilling accuracy guidelines
Billing accuracy guidelines
 
Test scenario preparation_approach_document & estimates
Test scenario preparation_approach_document & estimatesTest scenario preparation_approach_document & estimates
Test scenario preparation_approach_document & estimates
 
Conceptual Framework in Accounting
Conceptual Framework in AccountingConceptual Framework in Accounting
Conceptual Framework in Accounting
 

GC Accounting System Compliance

  • 1. Keeping Your Accounting System Compliant: Hot Issues & Requirements Not to Overlook October 11, 2011 1
  • 2. First in a series that will discuss selective topics relating to each business system Topics selected fall within Hot issues for DCAA Overlooked requirements that often create deficiencies MLA is preparing a comprehensive business systems compliance guide Introduction 2
  • 3. Interim Business Systems Rule(76 Fed. Reg. 28,856-01, May 18, 2011) Adopts “existing” evaluation criteria for various systems Revised DFARS Subpart 242.75 and § 252.242-7006 Govern accounting systems for contractors performing flexibly-priced or progress payment eligible work Define “acceptable accounting system” Establish 18 evaluation criteria Accounting System Overview 3
  • 4. “Accounting system” is the methods, procedures and controls established to gather, record, classify, analyze, summarize, interpret and present accurate and timely financial data, including subsystems for: Indirect costs Compensation Billing Labor Information technology Accounting System Overview (cont.) 4
  • 5. “Acceptable accounting system” means a system that provides “reasonable assurance” that – Applicable laws and regulations are complied with The cost accounting system and data are reliable Risk of misallocations and mischarges are minimized; and Contract allocations and charges are consistent with billing procedures Accounting System Overview (cont.) 5
  • 6. “Significant deficiency” means a shortcoming in the system that materially affects the ability of DoD officials to rely upon information produced Must establish and maintain an “acceptable accounting system” Contracting officer disapproval and/or contract withholdings – “in consultation with auditor or functional specialist” Accounting System Overview (cont.) 6
  • 7. CO retains ability in connection with field pricing audits to require contractor correction of perceived deficiencies, adjust contract type, segregate certain costs, reduce fee or profit objective and/or insert contract reopener clause to mitigate government risk FAR § 16.301-3(a)(1) precludes cost-type contract unless contractor’s accounting system is “adequate for determining costs applicable to the contract” CO “shall promptly approve a previously disapproved accounting system . . . when . . . there are no remaining significant deficiencies” Accounting System Overview (cont.) 7
  • 8. Compliance with CAS FAR/DFARS/Agency Supplements Contract requirements Cost accounting system and data reliability Internal controls Billings Accounting System Priorities 8
  • 9. CAS-compliance of contract element cost allocations (among CLINs, Sub-CLINS or Units, etc.) Indirect cost allocations Consistent practices Reflective of beneficial/causal relationship Cost allowability, including costs of subcontracts, bid and proposal, professional and legal services, insurance, etc. Compliance - Hot Topics 9
  • 10. Flexibly-priced contracts subject to modified coverage (CAS 401, 402, 405 and 406) also must comply with CAS 412 and 413 (pensions) (FAR § 31.205-6(j)) CAS 415 (deferred compensation) (FAR § 31.205-6(k)) CAS 414 and 417 (cost of money) (FAR § 31.205-10)) CAS 420 (IR&D and B&P) (FAR § 31.205-18) CAS 416 (insurance) (FAR § 31.205-19) Compliance – Do Not Overlook 10
  • 11. Proper allocation of business generation costs Selling IR&D B&P Proper allocations generally Overhead pools Service centers Compliance – Do Not Overlook (cont.) 11
  • 12. Impact of business decisions Organizational changes, creating accounting practice changes Pricing decisions for an individual contract, creating CAS 401 issues Training for personnel outside of accounting functions Acceptance of contract terms for reporting and billing that are more detailed than CAS Disclosure Statement Compliance – Do Not Overlook (cont.) 12
  • 13. Support for adjusting entries to accounts under general ledger control Systems Are not integrated Cannot be (immediately) reconciled Must have job order accounting Not correct But must establish ability to develop contract costs using process costing or standard costs System/Data Reliability – Hot Topics 13
  • 14. Compensation/labor recording system Consistent uncompensated overtime practice Consistent compensatory time practice Disciplined timekeeping compliance Error corrections/management review Unallowable cost screening Disciplined compliance at point of entry Disciplined compliance at home offices System/Data Reliability – Do Not Overlook 14
  • 15. Ability to produce Source documentation Audit trail System/Data Reliability – Do Not Overlook (cont.) 15
  • 16. Automated and integrated systems with built-in segregation of employee responsibilities Internal audit activity Functionally and organizationally independent Maintain requisite specialized knowledge to review government contract compliance Periodically performed Internal Controls – Hot Topics 16
  • 17. Error correction Timely Accurate Ethics practices timely investigation of issues documented resolution and corrective action appropriate disclosures and follow-up Internal Controls – Do Not Overlook 17
  • 18. Adequate contract “briefings” Periodic reconciliation of billings to incurred costs Invoices and supporting information conform to contract billing requirements Job order accounting by CLIN, Sub-CLIN, Unit and/or lower-level cost element, if contract requires Timely adjustments, including resolution of items in suspense Billing Systems – Hot Topics 18
  • 19. Subcontractor billing compliance and supporting documentation Periodic estimates to complete for “Limitation of Costs” and/or “Limitation of Funds” provisions Progress payment limitation and/or liquidation requirements FPI “Quarterly Limitation of Payment” requirements Billing Systems – Do Not Overlook 19
  • 20. Investments in integrated and automated systems Conduct periodic accounting system evaluations, review results, implement corrective actions Continuous employee training on key compliance areas Timekeeping Cost allowability Best Practices 20
  • 21. Thomas A. Lemmer303-634-4350tlemmer@mckennalong.com Steven M. Masiello303-634-4355smasiello@mckennalong.com Presenters 21 DN 32216384