SlideShare une entreprise Scribd logo
1  sur  9
Saeed Moosavi    
Sr. Process Safety Engineer                South Pars Gas Field Development 
                                                      
Petroleum Industries and Research Engineering Consultant (PIRECO) 
                                                                                                  



► Overview of the Project 
The South Pars Facilities are developed to produce gas and condensate from the South 
Pars Field, located offshore, around 100‐km South West of Assaluyeh, Persian Gulf, Iran. 
National Iranian Oil Company (NIOC) is going to develop South Pars Phase 17&18 of the 
Field, which will allow a gas production of 1000 MMSCFD per phase. 
Each  phase  will  have  two  unmanned  Wellhead  Platforms  (WHPs)  equipped  with 
required Production Facilities. The processed gas and condensate in SPD25 and SPD26 
(Satellite Platforms) will be directed to SPD24 and SPD23 (Main Platforms) respectively 
via  Infield  Pipelines  18"  and  20"  which  collectively  will  be  transferred  to  Onshore 
Facilities  with  two  32"  Subsea  Pipelines  to  transfer  the  Offshore  Gas  Production  from 
Wellhead Platforms to the Onshore Gas Treatment Plant in Assaluyeh. 

 
► Onshore Facilities 
The  Onshore  Facilities  will  treat  the  processed  gas  and  condensate  to  produce  the 
following main products: 
  — Treated lean gas for the domestic gas network. 
  — Ethane as petrochemical feed stock. 
  — Treated C3/C4 LPG. 
  — Stabilized hydrocarbons condensate for export by marine tankers. 


 
► Offshore Facilities 
The  offshore  development  consists  of  four  similar  Wellhead  Platforms  (WHPs)  SPD23, 
SPD24, SPD25 and SPD26 (15 slots each, 11 producing and 4 futures). SPD23 and SPD26 
form Phase 17 and SPD24 and SPD25 form Phase 18 of the field exploitation. 
Each  wellhead  outlet  is  equipped  with  a  hydraulically  actuated  Choke  Valve  to  reduce 
the pressure of the reservoir fluids from the wellhead flowing pressure at the beginning 
of production. 
The purpose of the Topside Process Facilities is to separate Free and Condensed Water 
from the produced fluids, reducing the water content and hence the corrosiveness of the 
exported hydrocarbon stream entering the Sea Line to onshore and hence try to limit the 
demand for MEG and Corrosion Inhibitors. 


                                                I 
 
Saeed Moosavi    
Sr. Process Safety Engineer                South Pars Gas Field Development 
                                                     
Petroleum Industries and Research Engineering Consultant (PIRECO) 
                                                                                                

 
► Safety Concept 
The Safety Systems were designed to satisfy the following requirements:  
 — Achieve the maximum natural ventilation and/or proper mechanical ventilation of 
     any area in order to minimize possible gas accumulation.  
 — To identify the classification of electrical equipment to be employed in Hazardous 
     and  Non‐Hazardous  Areas.  Isolate  potential  ignition  sources  by  means  of  Area 
     Classification and the use of Certified Equipment. 
 — To  detect  any  escape  of  hazardous  products  in  a  prompt  and  efficient  manner, 
     using  Fire  and  Gas  Detection  and  Safety  Alarm  System  in  order  to  monitor  and 
     control possible gas accumulation and any potential fire event. 
 — To  provide  Fire  and  Gas  Detection  and  Safety  Alarm  Systems  able  to  give  an 
     immediate  warning  of  fire  and  gas  event  and  to  start  ESD/PSD  actions.  Activate 
     specific  shutdown  actions  (e.g.  HVAC  Shut‐Down,  Fire  Damper  Closure,  and  Inert 
     Gas System Activation). 
 — Minimize release of hazardous products by automatic Emergency Shut‐Down and 
     Process Shut‐Down.  
 — To  provide  an  adequate  Fire  Fighting  System  to  bring  under  control  and/or 
     extinguishing any moderate fire, so preventing its escalation.  
 — To  provide  at  least  two  alternate  means  of  escape  from  all  areas  throughout  the 
     WHP.  
 — To  check  that  the  integrity  of  the  primary  structures  and  support  equipment  are 
     adequate  to  meet  the  statutory  requirements,  independently  of  the  protection 
     systems activation.  
 — For each threat to a hazard identified, there must be at least two Safety Barriers, so 
     that only the failure of both the barriers could cause a potential incident.  
The Safety Engineering activities for the Project included the following Safety Studies: 
 — Hazard Identification Study (HAZID)  
 — Hazard and Operability Study (HAZOP) 
 — Consequence Analysis  
 — Escape Evacuation & Rescue Analysis (EERA) 
 — Emergency System Survivability Analysis (ESSA) 
 — Flare Location Study 
 — Safety Integrity Level (SIL) Determination Study 
 — Safety Integrity Level (SIL) Verification Study 
 — Noise Study 




                                              II 
 
Saeed Moosavi    
Sr. Process Safety Engineer                South Pars Gas Field Development 
                                                     
Petroleum Industries and Research Engineering Consultant (PIRECO) 
                                                                                               


► Platform Orientation  
The  platform  orientation  was  selected  as  the  best  compromise  between  the  following 
criteria:  
  — Prevailing wind direction through the year;  
  — Supply Boat approach; 
  — Jack‐up approach; 
  — Helicopter approach;  
  — Emergency use of Survival Raft/Life Boat. 



► Plant Layout  
The Plant layout was designed according to the following safety criteria:  
  — To  separate  process  areas  (composed  by  equipment  containing  flammable  and 
     toxic  gas)  from  utility  areas  (composed  by  Utility  Service,  Control  and  Safety 
     Equipment)  by  means  of  Firewall  in  order  to  protect  personnel  and  safety 
     equipment from fire.  
  — To  minimize  the  possibility  of  accumulation  of  flammable  or  toxic  gases  by 
     maintaining ventilation without any danger to personnel.  
  — To  minimize  the  possibility  of  accumulation  of  liquid  hydrocarbons  by  the 
     provision of an adequate Drain System throughout the WHP.  
  — To ensure at least one of the Escape or Evacuation Routes is always available.  
  — To  provide  an  easy  evacuation  by  Boat  or  Helicopter  for  both  Emergency 
     Evacuation and General Platform Emergency.  
  — To  ensure  safe  approach,  landing  and  take‐off  of  the  Helicopter  during  normal 
     operation.  
 
 
 
 
 
 
 
 
 




                                             III 
 
Saeed Moosavi    
Sr. Process Safety Engineer                South Pars Gas Field Development 
                                                    
Petroleum Industries and Research Engineering Consultant (PIRECO) 
                                                                                              


  ► Escape Routes  
Design of Escape Routes will provide easy and safe access ways (Walkways, Corridors, 
Ramps  and  Stairways)  to  direct  personnel  from  any  region  of  the  platform  to  the 
following areas:  
  — Muster Point; 
  — Boat Landing; 
  — Helideck. 

Each  deck  is  provided  with  at  least  two  Escape  Routes  (Primary  and/or  Secondary). 
Primary Escape Routes are situated along the outboard edge of the platform making it 
easy to reach the Muster Point.  
These Escape Paths access to stairways located on platform extremities interconnecting 
all deck levels. Thus it is possible to escape from any areas of the platform to the Muster 
Point by two alternative routes.  
Primary Escape Routes will be 1200 mm wide and 2500 mm high with the exception of 
Drain Deck for which Escape Route height will be 2100 mm and free of obstructions in 
order to assure a quick departure.  
Secondary  Escape  Routes  will  have  an  unobstructed  width  and  height  of  800  mm  and 
2200 mm respectively.  


► Life Saving Appliances  
In  case  of  platform  emergency,  all  personnel  would  be  advised  by  PA/GA 
announcements  (following  a  platform  alarm)  to  return  to  their  Muster  Point,  where 
numbers and names of personnel would be checked.  
The installation will be provided with:  
  — Life Boat; 
  — Life Rafts; 
  — Life Buoys;  
  — Life Jackets.  

Personnel Safety Equipment will also be provided on the WHP. 
 
 




                                             IV 
 
Saeed Moosavi    
Sr. Process Safety Engineer                South Pars Gas Field Development 
                                                        
Petroleum Industries and Research Engineering Consultant (PIRECO) 
                                                                                                     


► Process Safety Philosophy 
All  process  and  production  equipment  and  systems  were  designed  such  that  under 
normal  operating  conditions  the  safety  of  personnel,  equipment  and  the  natural 
environment would not be jeopardised.  
All emergency control and accident prevention equipment were designed to limit, as far 
as practical any losses or damage to personnel, equipment and the environment.    


► Shut‐Down Philosophy  
The  Shut‐Down  Systems  will  be  installed  to  detect  any  abnormal  situations  on  the 
platform  and  to  bring  the  installation  back  to  lower  energy  level  in  a  safe  controlled 
manner. 
Five classes of Shut‐Down were envisaged, in ascending level of emergency:  
  — Local Shut‐Down limited to equipment or package (LSD)  
  — Process Shut‐Down (PSD)  
  — Emergency  Shut‐Down  for  gas  (toxic  and/or  flammable)  presence  resulting  in 
      isolation and DEPRESSURIZATION (YELLOW ESD)  
  — Emergency Shut‐Down for fire presence resulting in isolation and  DEPRESSURIZATION 
      (RED ESD)  
  — Abandonment  Shut‐Down  (ASD)  –  total  power  isolation  including  UPS  except 
      NAVAIDs, Escape Route lighting and Helideck perimeter lighting.  
  — Except for LSD level, all Shut‐Down levels will automatically cause all lower levels 
      and the highest level of alarm will take priority. LSD level will be independent from 
      the higher hierarchical Shut‐Down Systems.  


► Relief and Blow‐Down Systems  
The Relief and Depressurising Valves to be installed on WHP topside will function as a 
Safe  Relief  and  disposal  device  for  vapour,  gas  and  liquids  to  the  Blow‐Down/Flare 
Systems. Pressure Relieving devices will be installed to ensure that the Process System 
or  any  of  its  components  are  not  subjected  to  pressures  that  exceed  the  equipment 
design  pressure.  Blow‐Down  or  Depressurising  Valves  will  be  provided  in  order  to 
achieve a rapid reduction of inventories in equipment and systems.  
 




                                                 V 
 
Saeed Moosavi    
Sr. Process Safety Engineer                South Pars Gas Field Development 
                                                       
Petroleum Industries and Research Engineering Consultant (PIRECO) 
                                                                                                    


► Flare‐Vent System  
The Flare System includes: 
 — LP (Low Pressure) Flare System;  
 — HP (High Pressure) Flare System. 

During  normal  operating  condition  the  flare  will  burn  continuously,  with  H2S  rich  gas 
from the Water Degassing Drum.  
In  an  emergency  situation  the  Flare  System  will  be  capable  of  handling  the  full  flow 
released from the PSVs installed on the well flow lines. It will be capable of burning gas 
from an emergency depressurisation of process equipment should a platform ESD occur.  
The  waste  gas  and  liquid  collected  in  the  system  headers  are  piped  to  the  Flare  K.O. 
Drum  located  on  wellhead  platform.  The  gas  coming  out  from  the  K.O.  Drum  will  be 
piped to the HP Flare Stack Tip.  


► Field Control System 
The instrumentation system was designed to guarantee the continuity of the production 
in a safe manner, continuous remote monitoring, perform adjustments, modify specified 
control  parameters  and  to  anticipate  hazardous  situations  or  interventions  by  local 
protection systems.  
The  control  system  will  comprise  a  redundant  microprocessor  unit  to  perform  control 
functions.  
For  safety,  automatic  control  of  the  SDVs  is  autonomous  through  the  logic  of  the 
platform ESD system.  
 
 
 
 
 
 
 
 
 
 




                                                VI 
 
Saeed Moosavi    
Sr. Process Safety Engineer                South Pars Gas Field Development 
                                                      
Petroleum Industries and Research Engineering Consultant (PIRECO) 
                                                                                                 


► Fire and Gas Detection System  
The WHP will be equipped with a Fire and Gas Detection and Protection System, which 
covers the entire facility (wellhead, process, utilities areas and survival shelter).  
The  Flammable  and  H2S  Gas  Detectors  will  be  employed  and  located  in  those  parts  of 
installation where a gas accumulation is possible in case of hydrocarbon leak.  
Flammable  Gas  Detectors  will  be  mainly  IR  Open‐Path  Type.  Where  clear  line  of  sight 
was not available; IR Point Type Detectors were used.  
The produced gas on the platform contains a high concentration of H2S gas. Hydrogen 
Sulphide  Fixed  Gas  Detectors  of  Electrochemical  Cell  Type  will  be  installed  with 
particular care in order to obtain the earliest possible detection to protect people during 
normal operation, drilling and maintenance phases.  
Hydrogen  Gas  Detector  will  be  located  in  Battery  Room  if  hydrogen  accumulation  is 
expected. 
The followings Fire Detector types have been employed:  
  — Fusible Plugs  
  — Flame Detectors  
  — Heat Detectors  
  — Smoke Detectors  
  — Manual Alarm Call Points 



► Telecommunication Systems 
The telecommunications links will be provided by a Fibre Optic System.  
The  telecommunication  equipment will  be  able  to perform  in  a  safe  and  reliable  mode 
the following tasks:  
  — Mandatory and operational communications within platform and manned centers; 
  — Transmission of the main process and safety data to the remote control systems. 




                                              VII 
 
Saeed Moosavi    
Sr. Process Safety Engineer                South Pars Gas Field Development 
                                                      
Petroleum Industries and Research Engineering Consultant (PIRECO) 
                                                                                                  


► Public Address and General Alarm System  
An Audible Alarm System will be available on the WHP, which will be audible at all decks 
with a tone at 450 Hz.  
A  number  of  Loudspeakers  will  be  placed  in  the  plant.  The  Loudspeakers  will  permit 
audible  alarm  as  well  as  the  voice  communication  to  the  Loudspeakers  System.  These 
Loudspeakers will reproduce four different audible alarms plus voice and will be located 
on all levels of the WHP.  
Visual Alarm will be provided on Helideck (Beacons) to alert about the platform alarm 
status. Flashing Beacons will be also provided on all decks of the WHP when the ambient 
noise exceeds the 85 dBA. 


► Electrical Systems 
Electrical  Systems  were  designed  according  to  IEC  Codes.  The  Wellhead  Platforms 
consist of two load categories:  
  — Continuous Loads: identified as the consumers necessary for production operation, 
     as well as the essential and safety loads.  
  — Maintenance  Loads:  identified  as  the  consumers  necessary  for  maintenance 
     operation and living accommodation.  

The  Electrical  System  of  the  platforms  was  designed  to  cover  all  load  categories  and 
include  
  — Main Power Generation to feed both Continuous and Maintenance Loads. 
  — Emergency Power Generation.  
  — Safety System, with dedicated Battery System, for safety users.  
  — Distribution  System,  with  separated  sections  for  Continuous  and  Maintenance 
     Loads.  

Hazardous Area Classification were developed in accordance with IP Code, Part 15 3rd 
Edition.  
The Navigation Aids (NAVAID) System has a proper Battery System at 24V ensuring 96 
hours operation after Abandonment Shut‐Down.  
 
 
 




                                              VIII 
 
Saeed Moosavi    
Sr. Process Safety Engineer                South Pars Gas Field Development 
                                                       
Petroleum Industries and Research Engineering Consultant (PIRECO) 
                                                                                                   


► Passive Fire Protection  
Firewalls will be provided in order to protect utility, control and safety equipment from 
the process area. For this purpose J‐60 Class (suitable to resist Jet Fire for 60 minutes) 
divisions will be specified for Firewalls located at the following levels:  
  — Cellar Deck 
  — Lower Deck 
  — Upper Deck 
The  Fire  Partitions  for  enclosures  were  assessed  based  on  potential  fire  scenarios  and 
SOLAS  guidelines.  Fire  Ratings  of  the  walls  and  enclosures  were  recommended  as  per 
the Analysis of Fire Hazards. 


► Blast Protection 
The  facilities  design  provides  natural  ventilation  to  areas  where  flammable  gases  may 
build‐up  thus  minimising  explosion  potential.  This  is  achieved  by  maximising  grated 
decks  and  open  platform  construction.  These  two  approaches  combine  to  provide 
overall explosion mitigation for the project facilities. 
Based on analysis, explosion risk can be considered a low frequency event.  


 ► Active Fire Fighting Systems  
The following Fire Fighting Systems will be provided on the WHP:  
     — Fire Water System comprising Firewater Ring Main, Deluge Systems, Hydrants and 
       Hose Reels;  
     — Inert Gas  extinguishing  Systems;  (stand  alone  system  in  Generator  And  Technical 
       Rooms);  
     — Portable  and  Wheeled  Fire  Extinguishers  (CO2,  Dry  chemical  Powder,  AFFF  and 
       AR‐AFFF); 
     — Helideck Fire Fighting System (AFFF, Pre‐mixed System) and Dry Chemical Powder 
       System. 
 
  
 

 




                                                IX 
 

Contenu connexe

Similaire à South Pars Gas Field Development Project Overview

OSHA demolition
OSHA demolitionOSHA demolition
OSHA demolitionHni Amiera
 
FINALIZED PRESENTATION SLIDES.pdf
FINALIZED PRESENTATION SLIDES.pdfFINALIZED PRESENTATION SLIDES.pdf
FINALIZED PRESENTATION SLIDES.pdfAdamAiman22
 
essa cv 2016 updated sept
essa cv 2016 updated septessa cv 2016 updated sept
essa cv 2016 updated septSaid Diploma
 
Industrial health and safety seminar(r)
Industrial health and safety seminar(r)Industrial health and safety seminar(r)
Industrial health and safety seminar(r)_fahad_shaikh
 
Rocket testing
Rocket testingRocket testing
Rocket testingvinitha41
 
Rdmc v04-general safety induction (head-office )
Rdmc v04-general safety induction (head-office )Rdmc v04-general safety induction (head-office )
Rdmc v04-general safety induction (head-office )AliAdel74
 
404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.ppt404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.pptMoolRaj3
 
Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir Patel
 
Safety Products in Oman | Ahjar Safety
Safety Products in Oman | Ahjar SafetySafety Products in Oman | Ahjar Safety
Safety Products in Oman | Ahjar SafetyAhjarSafety
 
Rig Safety Awareness
Rig Safety AwarenessRig Safety Awareness
Rig Safety AwarenesspetroEDGE
 
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...AnupamaPanoli
 

Similaire à South Pars Gas Field Development Project Overview (20)

Ex Products - nuovo
Ex Products - nuovoEx Products - nuovo
Ex Products - nuovo
 
CV 2016
CV 2016CV 2016
CV 2016
 
OSHA demolition
OSHA demolitionOSHA demolition
OSHA demolition
 
iab-suc-prosafe-en
iab-suc-prosafe-eniab-suc-prosafe-en
iab-suc-prosafe-en
 
FINALIZED PRESENTATION SLIDES.pdf
FINALIZED PRESENTATION SLIDES.pdfFINALIZED PRESENTATION SLIDES.pdf
FINALIZED PRESENTATION SLIDES.pdf
 
Muhammad Resume
Muhammad ResumeMuhammad Resume
Muhammad Resume
 
essa cv 2016 updated sept
essa cv 2016 updated septessa cv 2016 updated sept
essa cv 2016 updated sept
 
Industrial health and safety seminar(r)
Industrial health and safety seminar(r)Industrial health and safety seminar(r)
Industrial health and safety seminar(r)
 
Osama's_CV
Osama's_CVOsama's_CV
Osama's_CV
 
Rocket testing
Rocket testingRocket testing
Rocket testing
 
FYP Final Thesis
FYP Final ThesisFYP Final Thesis
FYP Final Thesis
 
1 11-006-06
1 11-006-061 11-006-06
1 11-006-06
 
Rdmc v04-general safety induction (head-office )
Rdmc v04-general safety induction (head-office )Rdmc v04-general safety induction (head-office )
Rdmc v04-general safety induction (head-office )
 
404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.ppt404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.ppt
 
Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017
 
Safety Products in Oman | Ahjar Safety
Safety Products in Oman | Ahjar SafetySafety Products in Oman | Ahjar Safety
Safety Products in Oman | Ahjar Safety
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Rig Safety Awareness
Rig Safety AwarenessRig Safety Awareness
Rig Safety Awareness
 
Catalogue Aiditec Systems (EN)
Catalogue Aiditec Systems (EN)Catalogue Aiditec Systems (EN)
Catalogue Aiditec Systems (EN)
 
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
 

Dernier

From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 

Dernier (20)

From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 

South Pars Gas Field Development Project Overview

  • 1. Saeed Moosavi     Sr. Process Safety Engineer                South Pars Gas Field Development           Petroleum Industries and Research Engineering Consultant (PIRECO)    ► Overview of the Project  The South Pars Facilities are developed to produce gas and condensate from the South  Pars Field, located offshore, around 100‐km South West of Assaluyeh, Persian Gulf, Iran.  National Iranian Oil Company (NIOC) is going to develop South Pars Phase 17&18 of the  Field, which will allow a gas production of 1000 MMSCFD per phase.  Each  phase  will  have  two  unmanned  Wellhead  Platforms  (WHPs)  equipped  with  required Production Facilities. The processed gas and condensate in SPD25 and SPD26  (Satellite Platforms) will be directed to SPD24 and SPD23 (Main Platforms) respectively  via  Infield  Pipelines  18"  and  20"  which  collectively  will  be  transferred  to  Onshore  Facilities  with  two  32"  Subsea  Pipelines  to  transfer  the  Offshore  Gas  Production  from  Wellhead Platforms to the Onshore Gas Treatment Plant in Assaluyeh.    ► Onshore Facilities  The  Onshore  Facilities  will  treat  the  processed  gas  and  condensate  to  produce  the  following main products:  — Treated lean gas for the domestic gas network.  — Ethane as petrochemical feed stock.  — Treated C3/C4 LPG.  — Stabilized hydrocarbons condensate for export by marine tankers.    ► Offshore Facilities  The  offshore  development  consists  of  four  similar  Wellhead  Platforms  (WHPs)  SPD23,  SPD24, SPD25 and SPD26 (15 slots each, 11 producing and 4 futures). SPD23 and SPD26  form Phase 17 and SPD24 and SPD25 form Phase 18 of the field exploitation.  Each  wellhead  outlet  is  equipped  with  a  hydraulically  actuated  Choke  Valve  to  reduce  the pressure of the reservoir fluids from the wellhead flowing pressure at the beginning  of production.  The purpose of the Topside Process Facilities is to separate Free and Condensed Water  from the produced fluids, reducing the water content and hence the corrosiveness of the  exported hydrocarbon stream entering the Sea Line to onshore and hence try to limit the  demand for MEG and Corrosion Inhibitors.  I   
  • 2. Saeed Moosavi     Sr. Process Safety Engineer                South Pars Gas Field Development           Petroleum Industries and Research Engineering Consultant (PIRECO)      ► Safety Concept  The Safety Systems were designed to satisfy the following requirements:   — Achieve the maximum natural ventilation and/or proper mechanical ventilation of  any area in order to minimize possible gas accumulation.   — To identify the classification of electrical equipment to be employed in Hazardous  and  Non‐Hazardous  Areas.  Isolate  potential  ignition  sources  by  means  of  Area  Classification and the use of Certified Equipment.  — To  detect  any  escape  of  hazardous  products  in  a  prompt  and  efficient  manner,  using  Fire  and  Gas  Detection  and  Safety  Alarm  System  in  order  to  monitor  and  control possible gas accumulation and any potential fire event.  — To  provide  Fire  and  Gas  Detection  and  Safety  Alarm  Systems  able  to  give  an  immediate  warning  of  fire  and  gas  event  and  to  start  ESD/PSD  actions.  Activate  specific  shutdown  actions  (e.g.  HVAC  Shut‐Down,  Fire  Damper  Closure,  and  Inert  Gas System Activation).  — Minimize release of hazardous products by automatic Emergency Shut‐Down and  Process Shut‐Down.   — To  provide  an  adequate  Fire  Fighting  System  to  bring  under  control  and/or  extinguishing any moderate fire, so preventing its escalation.   — To  provide  at  least  two  alternate  means  of  escape  from  all  areas  throughout  the  WHP.   — To  check  that  the  integrity  of  the  primary  structures  and  support  equipment  are  adequate  to  meet  the  statutory  requirements,  independently  of  the  protection  systems activation.   — For each threat to a hazard identified, there must be at least two Safety Barriers, so  that only the failure of both the barriers could cause a potential incident.   The Safety Engineering activities for the Project included the following Safety Studies:  — Hazard Identification Study (HAZID)   — Hazard and Operability Study (HAZOP)  — Consequence Analysis   — Escape Evacuation & Rescue Analysis (EERA)  — Emergency System Survivability Analysis (ESSA)  — Flare Location Study  — Safety Integrity Level (SIL) Determination Study  — Safety Integrity Level (SIL) Verification Study  — Noise Study  II   
  • 3. Saeed Moosavi     Sr. Process Safety Engineer                South Pars Gas Field Development           Petroleum Industries and Research Engineering Consultant (PIRECO)    ► Platform Orientation   The  platform  orientation  was  selected  as  the  best  compromise  between  the  following  criteria:   — Prevailing wind direction through the year;   — Supply Boat approach;  — Jack‐up approach;  — Helicopter approach;   — Emergency use of Survival Raft/Life Boat.  ► Plant Layout   The Plant layout was designed according to the following safety criteria:   — To  separate  process  areas  (composed  by  equipment  containing  flammable  and  toxic  gas)  from  utility  areas  (composed  by  Utility  Service,  Control  and  Safety  Equipment)  by  means  of  Firewall  in  order  to  protect  personnel  and  safety  equipment from fire.   — To  minimize  the  possibility  of  accumulation  of  flammable  or  toxic  gases  by  maintaining ventilation without any danger to personnel.   — To  minimize  the  possibility  of  accumulation  of  liquid  hydrocarbons  by  the  provision of an adequate Drain System throughout the WHP.   — To ensure at least one of the Escape or Evacuation Routes is always available.   — To  provide  an  easy  evacuation  by  Boat  or  Helicopter  for  both  Emergency  Evacuation and General Platform Emergency.   — To  ensure  safe  approach,  landing  and  take‐off  of  the  Helicopter  during  normal  operation.                     III   
  • 4. Saeed Moosavi     Sr. Process Safety Engineer                South Pars Gas Field Development           Petroleum Industries and Research Engineering Consultant (PIRECO)      ► Escape Routes   Design of Escape Routes will provide easy and safe access ways (Walkways, Corridors,  Ramps  and  Stairways)  to  direct  personnel  from  any  region  of  the  platform  to  the  following areas:   — Muster Point;  — Boat Landing;  — Helideck.  Each  deck  is  provided  with  at  least  two  Escape  Routes  (Primary  and/or  Secondary).  Primary Escape Routes are situated along the outboard edge of the platform making it  easy to reach the Muster Point.   These Escape Paths access to stairways located on platform extremities interconnecting  all deck levels. Thus it is possible to escape from any areas of the platform to the Muster  Point by two alternative routes.   Primary Escape Routes will be 1200 mm wide and 2500 mm high with the exception of  Drain Deck for which Escape Route height will be 2100 mm and free of obstructions in  order to assure a quick departure.   Secondary  Escape  Routes  will  have  an  unobstructed  width  and  height  of  800  mm  and  2200 mm respectively.   ► Life Saving Appliances   In  case  of  platform  emergency,  all  personnel  would  be  advised  by  PA/GA  announcements  (following  a  platform  alarm)  to  return  to  their  Muster  Point,  where  numbers and names of personnel would be checked.   The installation will be provided with:   — Life Boat;  — Life Rafts;  — Life Buoys;   — Life Jackets.   Personnel Safety Equipment will also be provided on the WHP.      IV   
  • 5. Saeed Moosavi     Sr. Process Safety Engineer                South Pars Gas Field Development           Petroleum Industries and Research Engineering Consultant (PIRECO)    ► Process Safety Philosophy  All  process  and  production  equipment  and  systems  were  designed  such  that  under  normal  operating  conditions  the  safety  of  personnel,  equipment  and  the  natural  environment would not be jeopardised.   All emergency control and accident prevention equipment were designed to limit, as far  as practical any losses or damage to personnel, equipment and the environment.     ► Shut‐Down Philosophy   The  Shut‐Down  Systems  will  be  installed  to  detect  any  abnormal  situations  on  the  platform  and  to  bring  the  installation  back  to  lower  energy  level  in  a  safe  controlled  manner.  Five classes of Shut‐Down were envisaged, in ascending level of emergency:   — Local Shut‐Down limited to equipment or package (LSD)   — Process Shut‐Down (PSD)   — Emergency  Shut‐Down  for  gas  (toxic  and/or  flammable)  presence  resulting  in  isolation and DEPRESSURIZATION (YELLOW ESD)   — Emergency Shut‐Down for fire presence resulting in isolation and  DEPRESSURIZATION  (RED ESD)   — Abandonment  Shut‐Down  (ASD)  –  total  power  isolation  including  UPS  except  NAVAIDs, Escape Route lighting and Helideck perimeter lighting.   — Except for LSD level, all Shut‐Down levels will automatically cause all lower levels  and the highest level of alarm will take priority. LSD level will be independent from  the higher hierarchical Shut‐Down Systems.   ► Relief and Blow‐Down Systems   The Relief and Depressurising Valves to be installed on WHP topside will function as a  Safe  Relief  and  disposal  device  for  vapour,  gas  and  liquids  to  the  Blow‐Down/Flare  Systems. Pressure Relieving devices will be installed to ensure that the Process System  or  any  of  its  components  are  not  subjected  to  pressures  that  exceed  the  equipment  design  pressure.  Blow‐Down  or  Depressurising  Valves  will  be  provided  in  order  to  achieve a rapid reduction of inventories in equipment and systems.     V   
  • 6. Saeed Moosavi     Sr. Process Safety Engineer                South Pars Gas Field Development           Petroleum Industries and Research Engineering Consultant (PIRECO)    ► Flare‐Vent System   The Flare System includes:  — LP (Low Pressure) Flare System;   — HP (High Pressure) Flare System.  During  normal  operating  condition  the  flare  will  burn  continuously,  with  H2S  rich  gas  from the Water Degassing Drum.   In  an  emergency  situation  the  Flare  System  will  be  capable  of  handling  the  full  flow  released from the PSVs installed on the well flow lines. It will be capable of burning gas  from an emergency depressurisation of process equipment should a platform ESD occur.   The  waste  gas  and  liquid  collected  in  the  system  headers  are  piped  to  the  Flare  K.O.  Drum  located  on  wellhead  platform.  The  gas  coming  out  from  the  K.O.  Drum  will  be  piped to the HP Flare Stack Tip.   ► Field Control System  The instrumentation system was designed to guarantee the continuity of the production  in a safe manner, continuous remote monitoring, perform adjustments, modify specified  control  parameters  and  to  anticipate  hazardous  situations  or  interventions  by  local  protection systems.   The  control  system  will  comprise  a  redundant  microprocessor  unit  to  perform  control  functions.   For  safety,  automatic  control  of  the  SDVs  is  autonomous  through  the  logic  of  the  platform ESD system.                       VI   
  • 7. Saeed Moosavi     Sr. Process Safety Engineer                South Pars Gas Field Development           Petroleum Industries and Research Engineering Consultant (PIRECO)    ► Fire and Gas Detection System   The WHP will be equipped with a Fire and Gas Detection and Protection System, which  covers the entire facility (wellhead, process, utilities areas and survival shelter).   The  Flammable  and  H2S  Gas  Detectors  will  be  employed  and  located  in  those  parts  of  installation where a gas accumulation is possible in case of hydrocarbon leak.   Flammable  Gas  Detectors  will  be  mainly  IR  Open‐Path  Type.  Where  clear  line  of  sight  was not available; IR Point Type Detectors were used.   The produced gas on the platform contains a high concentration of H2S gas. Hydrogen  Sulphide  Fixed  Gas  Detectors  of  Electrochemical  Cell  Type  will  be  installed  with  particular care in order to obtain the earliest possible detection to protect people during  normal operation, drilling and maintenance phases.   Hydrogen  Gas  Detector  will  be  located  in  Battery  Room  if  hydrogen  accumulation  is  expected.  The followings Fire Detector types have been employed:   — Fusible Plugs   — Flame Detectors   — Heat Detectors   — Smoke Detectors   — Manual Alarm Call Points  ► Telecommunication Systems  The telecommunications links will be provided by a Fibre Optic System.   The  telecommunication  equipment will  be  able  to perform  in  a  safe  and  reliable  mode  the following tasks:   — Mandatory and operational communications within platform and manned centers;  — Transmission of the main process and safety data to the remote control systems.  VII   
  • 8. Saeed Moosavi     Sr. Process Safety Engineer                South Pars Gas Field Development           Petroleum Industries and Research Engineering Consultant (PIRECO)    ► Public Address and General Alarm System   An Audible Alarm System will be available on the WHP, which will be audible at all decks  with a tone at 450 Hz.   A  number  of  Loudspeakers  will  be  placed  in  the  plant.  The  Loudspeakers  will  permit  audible  alarm  as  well  as  the  voice  communication  to  the  Loudspeakers  System.  These  Loudspeakers will reproduce four different audible alarms plus voice and will be located  on all levels of the WHP.   Visual Alarm will be provided on Helideck (Beacons) to alert about the platform alarm  status. Flashing Beacons will be also provided on all decks of the WHP when the ambient  noise exceeds the 85 dBA.  ► Electrical Systems  Electrical  Systems  were  designed  according  to  IEC  Codes.  The  Wellhead  Platforms  consist of two load categories:   — Continuous Loads: identified as the consumers necessary for production operation,  as well as the essential and safety loads.   — Maintenance  Loads:  identified  as  the  consumers  necessary  for  maintenance  operation and living accommodation.   The  Electrical  System  of  the  platforms  was  designed  to  cover  all  load  categories  and  include   — Main Power Generation to feed both Continuous and Maintenance Loads.  — Emergency Power Generation.   — Safety System, with dedicated Battery System, for safety users.   — Distribution  System,  with  separated  sections  for  Continuous  and  Maintenance  Loads.   Hazardous Area Classification were developed in accordance with IP Code, Part 15 3rd  Edition.   The Navigation Aids (NAVAID) System has a proper Battery System at 24V ensuring 96  hours operation after Abandonment Shut‐Down.         VIII   
  • 9. Saeed Moosavi     Sr. Process Safety Engineer                South Pars Gas Field Development           Petroleum Industries and Research Engineering Consultant (PIRECO)    ► Passive Fire Protection   Firewalls will be provided in order to protect utility, control and safety equipment from  the process area. For this purpose J‐60 Class (suitable to resist Jet Fire for 60 minutes)  divisions will be specified for Firewalls located at the following levels:   — Cellar Deck  — Lower Deck  — Upper Deck  The  Fire  Partitions  for  enclosures  were  assessed  based  on  potential  fire  scenarios  and  SOLAS  guidelines.  Fire  Ratings  of  the  walls  and  enclosures  were  recommended  as  per  the Analysis of Fire Hazards.  ► Blast Protection  The  facilities  design  provides  natural  ventilation  to  areas  where  flammable  gases  may  build‐up  thus  minimising  explosion  potential.  This  is  achieved  by  maximising  grated  decks  and  open  platform  construction.  These  two  approaches  combine  to  provide  overall explosion mitigation for the project facilities.  Based on analysis, explosion risk can be considered a low frequency event.    ► Active Fire Fighting Systems   The following Fire Fighting Systems will be provided on the WHP:   — Fire Water System comprising Firewater Ring Main, Deluge Systems, Hydrants and  Hose Reels;   — Inert Gas  extinguishing  Systems;  (stand  alone  system  in  Generator  And  Technical  Rooms);   — Portable  and  Wheeled  Fire  Extinguishers  (CO2,  Dry  chemical  Powder,  AFFF  and  AR‐AFFF);  — Helideck Fire Fighting System (AFFF, Pre‐mixed System) and Dry Chemical Powder  System.           IX