CONNECTING
METRO VANCOUVER
WITH
THE MOUNTAINS
THE VALLEY
THE WORLD
AT A GLANCE
➤ 5 Corridors
➤ 4 Regions
➤ 2 Airports
➤ 2 Ferry Terminals
➤ 130,000 Daily Riders
➤ 355 km network
➤ $9.6 Billion ($7.8 B shared)
➤ $0.17 per km ($21 from Waterfront to
Whistler)
THE NEED
➤ Connect Metro Vancouver with
surrounding regions
➤ Energize Economic Growth
➤ Enable Sustainable Growth
➤ Reduce GHG Emissions
The Challenges
PLANNING PRINCIPLES
➤ Maximize Utility
➤ Maximize Connectivity
➤ Allow Incremental Implementation
➤ Superior to Car Travel
➤ Leverage Development
PHASE 1: VANCOUVER-SURREY-ABBOTSFORD LINE
VSA LINE
➤ Cost: $2.63 B (2.30 B with sharing)
➤ Objectives:
➤ Connect regions two largest centres
➤ Connect Abbotsford with Metro
Vancouver
➤ Build E-W regional rail trunk
VANCOUVER-SURREY-ABBOTSFORD LINE TRAVEL TIMES
From-To Transit Car Regional Rail
Downtown Vancouver
- Surrey Central
39m 35m-1h05m 17m
Downtown Vancouver
- Abbotsford Central
1h35m 1h00m-2h00m 41m
Surrey Central - YXX 1h10m 30m-1h15m 21m
PHASE 2: WEST COAST EXPRESS 2.0
WCE 2.0
➤ Cost: $290 M
➤ Objectives:
➤ All-day rail service
➤ Full electri
fi
cation
➤ Maintain rail service to North Fraser
➤ Permit rebuilding of Waterfront Station
WEST COAST EXPRESS 2.0 TRAVEL TIMES
From-To Transit Car North Fraser RR
Downtown Vancouver
- Mission
1h17m 50m-2h00m 46m
Downtown Vancouver
- Maple Ridge
1h06m 40m-1h50m 32m
Downtown Vancouver
- Coquitlam Central
31m 30m-1h20m 22m
PHASE 3: WATERFRONT CONNECTOR
WATERFRONT CONNECTOR
➤ Cost: $391 M ($348 with sharing)
➤ Objectives:
➤ New hub at Waterfront Station
➤ Shared tunnel with Hastings RT
➤ Cross-platform transfers
PHASE 4: WATERFRONT TO WHISTLER
WATERFRONT TO WHISTLER
➤ Cost: $2.41 B ($1.89 B with sharing)
➤ Objectives:
➤ New hub at Waterfront Station
➤ Shared tunnel with Hastings RT
➤ Cross-platform transfers
WATERFRONT TO WHISTLER TRAVEL TIMES
From-To Transit Car Sea-to-Sky RR
Downtown Vancouver
- Whistler
2h00m-2h45m 1h30m-2h20m 1h29m
Downtown Vancouver
- Squamish
1h26m-2h00m 50m-1h20m 48m
Downtown Vancouver
- Horseshoe Bay
52m 22m-45m 12m
PHASE 5: TSAWWASSEN TO YVR
TSAWWASSEN TO YVR LINE
➤ Cost: $1.03 B
➤ Objectives:
➤ Quality transit connection to
Tsawwassen Ferry Terminal (via
Canada Line)
➤ Service to South Delta, Tsawwassen
FN
➤ First phase of N-S corridor
PHASE 6: EAST VANCOUVER ACCESS
EAST VANCOUVER ACCESS
➤ Cost: $1.71 B ($1.09 B shared)
➤ Objectives:
➤ Connect N-S corridor with E-W
corridor
➤ Enable service from YVR, Tsawwassen
Ferry terminal to Vancouver and Surrey
➤ Implement Rapid Transit along
Commercial Victoria corridor
PHASE 7: BURRARD TUNNEL
BURRARD TUNNEL
➤ Cost: $516 M ($258 M shared)
➤ Objectives:
➤ Extend N-S corridor to the North
Shore
➤ Enable service from YVR, Tsawwassen
Ferry terminal to Lower Lonsdale
➤ Provide direct rapid transit connection
between North Vancouver and
Downtown Vancouver
TSAWWASSEN CONNECTOR RR TRAVEL TIMES
From-To Transit Car Tsawwassen Connector
Downtown Vancouver
- Tsawwassen Ferry
1h10m 35m-1h10m 28m
Downtown Vancouver
- YVR
25m 18m-55m 19m
Lower Lonsdale -
YVR
48m 30m-1h30m 21m
Surrey Central - YVR 1h3m 30m-55m 27m
NON-CORE PROJECTS
➤ Cascadia High-Speed Rail
➤ Cost: $362 M
➤ Chilliwack Extension
➤ Cost: $254 M ($236 M shared)
MAKING IT A REALITY
1. Keep Costs Down
2. Leverage Development
3. Cooperate and Integrate
Key Cost-Reducing Concepts
LAST-MILE CONNECTIVITY
➤ Rapid Transit Connections
➤ Gondola Lift Services
➤ Whistler
➤ Squamish
➤ Cypress Mountain
➤ Grouse Mountain
➤ Cycling
➤ Separated Bike Lanes
➤ Parking Garages
RIDERSHIP ESTIMATION
➤ 130 000 Daily Riders
➤ Based on 20% of existing Highway
Tra
ffi
c
➤ Does not factor ridership gains from
development
➤ $21 Trip to Whistler without additional
sources of funding
The Endgame
THANK YOU!

Contenu connexe

Similaire à Project Nexus Regional Rail

Brisbane airport link & Canada Line
Brisbane airport link & Canada LineBrisbane airport link & Canada Line
Brisbane airport link & Canada LineAudrey Mwala
 
TEST4-SLIDESHARE
TEST4-SLIDESHARETEST4-SLIDESHARE
TEST4-SLIDESHAREpgordon004
 
India's preparedness for IWT
India's preparedness for IWTIndia's preparedness for IWT
India's preparedness for IWTcmmindia2017
 
CUBA T.W.I.N.S. PROJECT PROPOSAL
CUBA T.W.I.N.S. PROJECT PROPOSALCUBA T.W.I.N.S. PROJECT PROPOSAL
CUBA T.W.I.N.S. PROJECT PROPOSALJ. (Yon) Friedmann
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014SCVTA
 
HSR Justification Presentation
HSR Justification PresentationHSR Justification Presentation
HSR Justification PresentationMichael Myers
 
Public realm - different transit choices
Public realm - different transit choicesPublic realm - different transit choices
Public realm - different transit choicesAarthiR54
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12cityofevanston
 
WV State Freight Plan
WV State Freight PlanWV State Freight Plan
WV State Freight Planpyoungkyova
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber finalRobertsBankRailCorridor
 
NYC 2030: Accepting The Challenge
NYC 2030: Accepting The ChallengeNYC 2030: Accepting The Challenge
NYC 2030: Accepting The Challengestreetsblog
 
Designing Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsDesigning Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsJill Reeves
 
Tonia Buell, Expanding Fast Charging, November 2017
Tonia Buell, Expanding Fast Charging, November 2017Tonia Buell, Expanding Fast Charging, November 2017
Tonia Buell, Expanding Fast Charging, November 2017Forth
 
Lecture 9 (Water Transport).pptx
Lecture 9 (Water Transport).pptxLecture 9 (Water Transport).pptx
Lecture 9 (Water Transport).pptxneaz2
 

Similaire à Project Nexus Regional Rail (20)

Brisbane airport link & Canada Line
Brisbane airport link & Canada LineBrisbane airport link & Canada Line
Brisbane airport link & Canada Line
 
TEST4-SLIDESHARE
TEST4-SLIDESHARETEST4-SLIDESHARE
TEST4-SLIDESHARE
 
Phil Lawes
Phil LawesPhil Lawes
Phil Lawes
 
Impact of the New Suez Canal on North America
Impact of the New Suez Canal on North AmericaImpact of the New Suez Canal on North America
Impact of the New Suez Canal on North America
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
India's preparedness for IWT
India's preparedness for IWTIndia's preparedness for IWT
India's preparedness for IWT
 
CUBA T.W.I.N.S. PROJECT PROPOSAL
CUBA T.W.I.N.S. PROJECT PROPOSALCUBA T.W.I.N.S. PROJECT PROPOSAL
CUBA T.W.I.N.S. PROJECT PROPOSAL
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
 
HSR Justification Presentation
HSR Justification PresentationHSR Justification Presentation
HSR Justification Presentation
 
Public realm - different transit choices
Public realm - different transit choicesPublic realm - different transit choices
Public realm - different transit choices
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12
 
WV State Freight Plan
WV State Freight PlanWV State Freight Plan
WV State Freight Plan
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber final
 
NYC 2030: Accepting The Challenge
NYC 2030: Accepting The ChallengeNYC 2030: Accepting The Challenge
NYC 2030: Accepting The Challenge
 
Designing Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsDesigning Airport Whitetopping Projects
Designing Airport Whitetopping Projects
 
Tonia Buell, Expanding Fast Charging, November 2017
Tonia Buell, Expanding Fast Charging, November 2017Tonia Buell, Expanding Fast Charging, November 2017
Tonia Buell, Expanding Fast Charging, November 2017
 
Beaches to Bay
Beaches to Bay Beaches to Bay
Beaches to Bay
 
Network Rail Developments
Network Rail DevelopmentsNetwork Rail Developments
Network Rail Developments
 
Lecture 9 (Water Transport).pptx
Lecture 9 (Water Transport).pptxLecture 9 (Water Transport).pptx
Lecture 9 (Water Transport).pptx
 
Panama Canal Expansion Impacts on North America Trade
Panama Canal Expansion Impacts on North America TradePanama Canal Expansion Impacts on North America Trade
Panama Canal Expansion Impacts on North America Trade
 

Dernier

PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438ahcitycouncil
 
Everything you need to know about your Parish or Town council website & .gov....
Everything you need to know about your Parish or Town council website & .gov....Everything you need to know about your Parish or Town council website & .gov....
Everything you need to know about your Parish or Town council website & .gov....Scribe
 
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.Christina Parmionova
 
YHRGeorgetown Spring 2024 America should Take Her Share
YHRGeorgetown Spring 2024 America should Take Her ShareYHRGeorgetown Spring 2024 America should Take Her Share
YHRGeorgetown Spring 2024 America should Take Her Shareyalehistoricalreview
 
Tennessee DOT- TEVI Plan coordination & EV
Tennessee DOT- TEVI Plan coordination & EVTennessee DOT- TEVI Plan coordination & EV
Tennessee DOT- TEVI Plan coordination & EVRPO America
 
Rocky Mount Greenville Willson Regional Transit Plan
Rocky Mount Greenville Willson Regional Transit PlanRocky Mount Greenville Willson Regional Transit Plan
Rocky Mount Greenville Willson Regional Transit PlanRobert Hiett
 
Value, protect, respect and invest in our nuses for a sustainable future for ...
Value, protect, respect and invest in our nuses for a sustainable future for ...Value, protect, respect and invest in our nuses for a sustainable future for ...
Value, protect, respect and invest in our nuses for a sustainable future for ...Christina Parmionova
 
World Migratory Bird day 2024; May 11 and October 12
World Migratory Bird day 2024; May 11 and October 12World Migratory Bird day 2024; May 11 and October 12
World Migratory Bird day 2024; May 11 and October 12Christina Parmionova
 
Characterizing wildlife trafficking and associated crime.
Characterizing wildlife trafficking and associated crime.Characterizing wildlife trafficking and associated crime.
Characterizing wildlife trafficking and associated crime.Christina Parmionova
 
Harbin-Gross-Spring2022.pdf Yale Historical Review
Harbin-Gross-Spring2022.pdf Yale Historical ReviewHarbin-Gross-Spring2022.pdf Yale Historical Review
Harbin-Gross-Spring2022.pdf Yale Historical Reviewyalehistoricalreview
 
Spring 2024 Issue Punitive and Productive Suffering
Spring 2024 Issue Punitive and Productive SufferingSpring 2024 Issue Punitive and Productive Suffering
Spring 2024 Issue Punitive and Productive Sufferingyalehistoricalreview
 
2024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 332024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 33JSchaus & Associates
 
NGO working for orphan children’s education kurnool
NGO working for orphan children’s education kurnoolNGO working for orphan children’s education kurnool
NGO working for orphan children’s education kurnoolSERUDS INDIA
 
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...VICTOR MAESTRE RAMIREZ
 
"Plant health, safe trade and digital technology." International Day of Plant...
"Plant health, safe trade and digital technology." International Day of Plant..."Plant health, safe trade and digital technology." International Day of Plant...
"Plant health, safe trade and digital technology." International Day of Plant...Christina Parmionova
 
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...Christina Parmionova
 
Yale Historical Review Machava Interview PDF Spring 2024
Yale Historical Review Machava Interview PDF Spring 2024Yale Historical Review Machava Interview PDF Spring 2024
Yale Historical Review Machava Interview PDF Spring 2024yalehistoricalreview
 
International Day of Families - 15 May 2024 - UNDESA.
International Day of Families - 15 May 2024 - UNDESA.International Day of Families - 15 May 2024 - UNDESA.
International Day of Families - 15 May 2024 - UNDESA.Christina Parmionova
 
Plant health, safe trade and digital technology.
Plant health, safe trade and digital technology.Plant health, safe trade and digital technology.
Plant health, safe trade and digital technology.Christina Parmionova
 

Dernier (20)

PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
 
Everything you need to know about your Parish or Town council website & .gov....
Everything you need to know about your Parish or Town council website & .gov....Everything you need to know about your Parish or Town council website & .gov....
Everything you need to know about your Parish or Town council website & .gov....
 
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
 
YHRGeorgetown Spring 2024 America should Take Her Share
YHRGeorgetown Spring 2024 America should Take Her ShareYHRGeorgetown Spring 2024 America should Take Her Share
YHRGeorgetown Spring 2024 America should Take Her Share
 
Tennessee DOT- TEVI Plan coordination & EV
Tennessee DOT- TEVI Plan coordination & EVTennessee DOT- TEVI Plan coordination & EV
Tennessee DOT- TEVI Plan coordination & EV
 
Rocky Mount Greenville Willson Regional Transit Plan
Rocky Mount Greenville Willson Regional Transit PlanRocky Mount Greenville Willson Regional Transit Plan
Rocky Mount Greenville Willson Regional Transit Plan
 
Value, protect, respect and invest in our nuses for a sustainable future for ...
Value, protect, respect and invest in our nuses for a sustainable future for ...Value, protect, respect and invest in our nuses for a sustainable future for ...
Value, protect, respect and invest in our nuses for a sustainable future for ...
 
World Migratory Bird day 2024; May 11 and October 12
World Migratory Bird day 2024; May 11 and October 12World Migratory Bird day 2024; May 11 and October 12
World Migratory Bird day 2024; May 11 and October 12
 
Characterizing wildlife trafficking and associated crime.
Characterizing wildlife trafficking and associated crime.Characterizing wildlife trafficking and associated crime.
Characterizing wildlife trafficking and associated crime.
 
Harbin-Gross-Spring2022.pdf Yale Historical Review
Harbin-Gross-Spring2022.pdf Yale Historical ReviewHarbin-Gross-Spring2022.pdf Yale Historical Review
Harbin-Gross-Spring2022.pdf Yale Historical Review
 
Spring 2024 Issue Punitive and Productive Suffering
Spring 2024 Issue Punitive and Productive SufferingSpring 2024 Issue Punitive and Productive Suffering
Spring 2024 Issue Punitive and Productive Suffering
 
2024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 332024: The FAR - Federal Acquisition Regulations, Part 33
2024: The FAR - Federal Acquisition Regulations, Part 33
 
NGO working for orphan children’s education kurnool
NGO working for orphan children’s education kurnoolNGO working for orphan children’s education kurnool
NGO working for orphan children’s education kurnool
 
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
 
"Plant health, safe trade and digital technology." International Day of Plant...
"Plant health, safe trade and digital technology." International Day of Plant..."Plant health, safe trade and digital technology." International Day of Plant...
"Plant health, safe trade and digital technology." International Day of Plant...
 
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
 
Yale Historical Review Machava Interview PDF Spring 2024
Yale Historical Review Machava Interview PDF Spring 2024Yale Historical Review Machava Interview PDF Spring 2024
Yale Historical Review Machava Interview PDF Spring 2024
 
International Day of Families - 15 May 2024 - UNDESA.
International Day of Families - 15 May 2024 - UNDESA.International Day of Families - 15 May 2024 - UNDESA.
International Day of Families - 15 May 2024 - UNDESA.
 
Plant health, safe trade and digital technology.
Plant health, safe trade and digital technology.Plant health, safe trade and digital technology.
Plant health, safe trade and digital technology.
 
The Outlook for the Budget and the Economy
The Outlook for the Budget and the EconomyThe Outlook for the Budget and the Economy
The Outlook for the Budget and the Economy
 

Project Nexus Regional Rail

  • 2. AT A GLANCE ➤ 5 Corridors ➤ 4 Regions ➤ 2 Airports ➤ 2 Ferry Terminals ➤ 130,000 Daily Riders ➤ 355 km network ➤ $9.6 Billion ($7.8 B shared) ➤ $0.17 per km ($21 from Waterfront to Whistler)
  • 3. THE NEED ➤ Connect Metro Vancouver with surrounding regions ➤ Energize Economic Growth ➤ Enable Sustainable Growth ➤ Reduce GHG Emissions
  • 5. PLANNING PRINCIPLES ➤ Maximize Utility ➤ Maximize Connectivity ➤ Allow Incremental Implementation ➤ Superior to Car Travel ➤ Leverage Development
  • 6.
  • 8. VSA LINE ➤ Cost: $2.63 B (2.30 B with sharing) ➤ Objectives: ➤ Connect regions two largest centres ➤ Connect Abbotsford with Metro Vancouver ➤ Build E-W regional rail trunk
  • 9. VANCOUVER-SURREY-ABBOTSFORD LINE TRAVEL TIMES From-To Transit Car Regional Rail Downtown Vancouver - Surrey Central 39m 35m-1h05m 17m Downtown Vancouver - Abbotsford Central 1h35m 1h00m-2h00m 41m Surrey Central - YXX 1h10m 30m-1h15m 21m
  • 10. PHASE 2: WEST COAST EXPRESS 2.0
  • 11. WCE 2.0 ➤ Cost: $290 M ➤ Objectives: ➤ All-day rail service ➤ Full electri fi cation ➤ Maintain rail service to North Fraser ➤ Permit rebuilding of Waterfront Station
  • 12. WEST COAST EXPRESS 2.0 TRAVEL TIMES From-To Transit Car North Fraser RR Downtown Vancouver - Mission 1h17m 50m-2h00m 46m Downtown Vancouver - Maple Ridge 1h06m 40m-1h50m 32m Downtown Vancouver - Coquitlam Central 31m 30m-1h20m 22m
  • 13. PHASE 3: WATERFRONT CONNECTOR
  • 14. WATERFRONT CONNECTOR ➤ Cost: $391 M ($348 with sharing) ➤ Objectives: ➤ New hub at Waterfront Station ➤ Shared tunnel with Hastings RT ➤ Cross-platform transfers
  • 15. PHASE 4: WATERFRONT TO WHISTLER
  • 16. WATERFRONT TO WHISTLER ➤ Cost: $2.41 B ($1.89 B with sharing) ➤ Objectives: ➤ New hub at Waterfront Station ➤ Shared tunnel with Hastings RT ➤ Cross-platform transfers
  • 17. WATERFRONT TO WHISTLER TRAVEL TIMES From-To Transit Car Sea-to-Sky RR Downtown Vancouver - Whistler 2h00m-2h45m 1h30m-2h20m 1h29m Downtown Vancouver - Squamish 1h26m-2h00m 50m-1h20m 48m Downtown Vancouver - Horseshoe Bay 52m 22m-45m 12m
  • 19. TSAWWASSEN TO YVR LINE ➤ Cost: $1.03 B ➤ Objectives: ➤ Quality transit connection to Tsawwassen Ferry Terminal (via Canada Line) ➤ Service to South Delta, Tsawwassen FN ➤ First phase of N-S corridor
  • 20. PHASE 6: EAST VANCOUVER ACCESS
  • 21. EAST VANCOUVER ACCESS ➤ Cost: $1.71 B ($1.09 B shared) ➤ Objectives: ➤ Connect N-S corridor with E-W corridor ➤ Enable service from YVR, Tsawwassen Ferry terminal to Vancouver and Surrey ➤ Implement Rapid Transit along Commercial Victoria corridor
  • 23. BURRARD TUNNEL ➤ Cost: $516 M ($258 M shared) ➤ Objectives: ➤ Extend N-S corridor to the North Shore ➤ Enable service from YVR, Tsawwassen Ferry terminal to Lower Lonsdale ➤ Provide direct rapid transit connection between North Vancouver and Downtown Vancouver
  • 24. TSAWWASSEN CONNECTOR RR TRAVEL TIMES From-To Transit Car Tsawwassen Connector Downtown Vancouver - Tsawwassen Ferry 1h10m 35m-1h10m 28m Downtown Vancouver - YVR 25m 18m-55m 19m Lower Lonsdale - YVR 48m 30m-1h30m 21m Surrey Central - YVR 1h3m 30m-55m 27m
  • 25.
  • 26. NON-CORE PROJECTS ➤ Cascadia High-Speed Rail ➤ Cost: $362 M ➤ Chilliwack Extension ➤ Cost: $254 M ($236 M shared)
  • 27. MAKING IT A REALITY 1. Keep Costs Down 2. Leverage Development 3. Cooperate and Integrate
  • 29. LAST-MILE CONNECTIVITY ➤ Rapid Transit Connections ➤ Gondola Lift Services ➤ Whistler ➤ Squamish ➤ Cypress Mountain ➤ Grouse Mountain ➤ Cycling ➤ Separated Bike Lanes ➤ Parking Garages
  • 30. RIDERSHIP ESTIMATION ➤ 130 000 Daily Riders ➤ Based on 20% of existing Highway Tra ffi c ➤ Does not factor ridership gains from development ➤ $21 Trip to Whistler without additional sources of funding