OVERVIEW OF NTPC PLANT
INTRODUCTION
Korba Super Thermal Power Plant is located
at Jamnipali in korba district in the Indian state
of Chhattisgarh.The power plant is one of the coalbased
power plants of NATIONAL THERMAL POWER PLANT
(NTPC). The coal for the power plant is sourced from
Kusmundha and Gevra Mines. The source of water for the
power plant is HASDEO RIVER.
NTPC is India’s largest energy power plant which
was established in 7 Nov. 1975 to generate power
development in India.
There are total 7 units in plant in which 4 units are
of 500MW and 3 units are of 200MW power
produce.
Total consumption of coal for producing 2600MW is
about 48000 tons of coal per day.
BOILER
A boiler is closed vessel in which water is converted
into steam by utilizing the heat of coal combustion.
Steam boilers are broadly classified into following two
types:-
(a) Water tube boiler.
(b) Fire tube boiler.
WATER TUBE BOILER:-
In a water tube boiler, water flows through the tubes
and the hot gases of combustion flow over these tubes.
Water-tube boilers are used for high-pressure boilers.
TURBINE
A turbine is a rotary mechanicaldevice that
extracts energy from a fluid flow and converts it into
useful work. In which there are THREE types of turbine
used in NTPC power plant are as follows:-
a. High pressure turbine (HP).
b. Intermediate pressure turbine (IP).
c. Low pressure turbine LP).
a. HIGH PRESSURE TURBINE:-
HP turbine is a high pressure turbine the steam comes
through the boiler first goes into HP turbine and it is a
unidirectional turbine.
b. INTERMEDIATE PRESSURE TURBINE:-
In IP turbine the steam of HP turbine goes into the air
preheater for reheating and after this steam flows into
an IP turbine.
Hence bigger piping, larger turbine is required to
handle the steam flow. IP section of the turbine is
bigger than HP turbine for this reason.
IP turbine outlet is connected with one or two LP
turbine rotors. LP turbine further expands the steam
generating more energy. Intermediate pressure
turbine is a bi-direction.
c. LOW PRESSURE TURBINE:-
The steam of IP turbine directly goes into a LP turbine
for further expands the steam generating more energy.
LP turbine is large in size as compare to IP because it
requires to handle the steam flow.
LPs are the biggest in size since they have the lowest
steam pressures hence require bigger area to handle the
steam flow rate.
Fig- COMBINATION OF TURBINE MAIN TURBINE.
GENERATOR
Generator is a device which converts mechanicalenergy
of steam comes through the turbine into electrical
energy.
Generating capacity of 500MW is 21KV O/P voltage.
Existing speed of generator is 3000 rpm.
The reverse conversion of electricalenergy into
mechanicalenergy is done by an electricmotor, and
motors and generators have many similarities. Many
motors can be mechanicallydriven to generate
electricityand frequently make acceptablegenerators.
GENERATOR TRANSFORMER
Generator transformer is used to store the power
(ELECTRICITY) which is generated by the generator.
FOR 500MW generator transformer gives output of
21KV of voltage and 9000Amp. Of current and for
200MW generator transformer gives output of 15.47KV
of voltage.
SWITCHYARD
It is the protective part of the whole power system.
Switch yard is also most essential part for transmission,
distribution, and collection.
A substation is a part of an
electrical generation, transmission, and distribution system.
Substations transform voltage from high to low, or the
reverse, or perform any of several other important functions.
Betweenthe generating station and consumer, electric
power may flow through several substations at different
voltage levels.
CONTENTS
 INTRODUCTION.
 BOILER.
 TURBINE.
 GENERATOR.
 SWITCHYARD.

Contenu connexe

Tendances

GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
Utsav Yagnik
 

Tendances (20)

Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
Ntpc barh (bstpp)
Ntpc barh (bstpp)Ntpc barh (bstpp)
Ntpc barh (bstpp)
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
NTPC MECANICAL SUMMER REPORT
NTPC MECANICAL  SUMMER REPORTNTPC MECANICAL  SUMMER REPORT
NTPC MECANICAL SUMMER REPORT
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 
Ntpc simhadri
Ntpc simhadriNtpc simhadri
Ntpc simhadri
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
NTPC PROJECT..
NTPC PROJECT..NTPC PROJECT..
NTPC PROJECT..
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hinge
 
thermal power plant NTPC singrauli
thermal power plant NTPC singrauli thermal power plant NTPC singrauli
thermal power plant NTPC singrauli
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
Training NTPC
Training NTPCTraining NTPC
Training NTPC
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Similaire à report on ntpc plant

HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
GEETESH SHARMA
 
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar
hariom nagar
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
Rama Charan
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
Shrey Dhasmana
 
Bathinda thermal power plant mid semester report
Bathinda thermal power plant mid semester reportBathinda thermal power plant mid semester report
Bathinda thermal power plant mid semester report
Lovesh Singla
 

Similaire à report on ntpc plant (20)

Overview of ntpc power plant
Overview of ntpc power plantOverview of ntpc power plant
Overview of ntpc power plant
 
Thermal Power Plant.pptx
Thermal Power Plant.pptxThermal Power Plant.pptx
Thermal Power Plant.pptx
 
NTPC BY PANKAJ
NTPC BY PANKAJNTPC BY PANKAJ
NTPC BY PANKAJ
 
Talwandi sabo power plant (t
Talwandi sabo power plant (tTalwandi sabo power plant (t
Talwandi sabo power plant (t
 
power plant ppt
power plant pptpower plant ppt
power plant ppt
 
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
 
compalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docxcompalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docx
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
kota super thermal power plant (kstps)
kota super thermal power plant (kstps)kota super thermal power plant (kstps)
kota super thermal power plant (kstps)
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
 
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar
 
H.T.P.S., Korba West
H.T.P.S., Korba WestH.T.P.S., Korba West
H.T.P.S., Korba West
 
RASHID ANWAR RAAZ ppt
RASHID ANWAR RAAZ pptRASHID ANWAR RAAZ ppt
RASHID ANWAR RAAZ ppt
 
Durgapur Projects Limited
Durgapur Projects LimitedDurgapur Projects Limited
Durgapur Projects Limited
 
THERMAL POWER PLANT
THERMAL POWER PLANTTHERMAL POWER PLANT
THERMAL POWER PLANT
 
KTPS
KTPSKTPS
KTPS
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
 
Bathinda thermal power plant mid semester report
Bathinda thermal power plant mid semester reportBathinda thermal power plant mid semester report
Bathinda thermal power plant mid semester report
 

Dernier

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Dernier (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 

report on ntpc plant

  • 1. OVERVIEW OF NTPC PLANT INTRODUCTION Korba Super Thermal Power Plant is located at Jamnipali in korba district in the Indian state of Chhattisgarh.The power plant is one of the coalbased power plants of NATIONAL THERMAL POWER PLANT (NTPC). The coal for the power plant is sourced from Kusmundha and Gevra Mines. The source of water for the power plant is HASDEO RIVER. NTPC is India’s largest energy power plant which was established in 7 Nov. 1975 to generate power development in India. There are total 7 units in plant in which 4 units are of 500MW and 3 units are of 200MW power produce. Total consumption of coal for producing 2600MW is about 48000 tons of coal per day.
  • 2. BOILER A boiler is closed vessel in which water is converted into steam by utilizing the heat of coal combustion. Steam boilers are broadly classified into following two types:- (a) Water tube boiler. (b) Fire tube boiler. WATER TUBE BOILER:- In a water tube boiler, water flows through the tubes and the hot gases of combustion flow over these tubes. Water-tube boilers are used for high-pressure boilers.
  • 3. TURBINE A turbine is a rotary mechanicaldevice that extracts energy from a fluid flow and converts it into useful work. In which there are THREE types of turbine used in NTPC power plant are as follows:- a. High pressure turbine (HP). b. Intermediate pressure turbine (IP). c. Low pressure turbine LP). a. HIGH PRESSURE TURBINE:- HP turbine is a high pressure turbine the steam comes through the boiler first goes into HP turbine and it is a unidirectional turbine.
  • 4. b. INTERMEDIATE PRESSURE TURBINE:- In IP turbine the steam of HP turbine goes into the air preheater for reheating and after this steam flows into an IP turbine. Hence bigger piping, larger turbine is required to handle the steam flow. IP section of the turbine is bigger than HP turbine for this reason. IP turbine outlet is connected with one or two LP turbine rotors. LP turbine further expands the steam generating more energy. Intermediate pressure turbine is a bi-direction.
  • 5. c. LOW PRESSURE TURBINE:- The steam of IP turbine directly goes into a LP turbine for further expands the steam generating more energy. LP turbine is large in size as compare to IP because it requires to handle the steam flow. LPs are the biggest in size since they have the lowest steam pressures hence require bigger area to handle the steam flow rate.
  • 6. Fig- COMBINATION OF TURBINE MAIN TURBINE.
  • 7. GENERATOR Generator is a device which converts mechanicalenergy of steam comes through the turbine into electrical energy. Generating capacity of 500MW is 21KV O/P voltage. Existing speed of generator is 3000 rpm. The reverse conversion of electricalenergy into mechanicalenergy is done by an electricmotor, and motors and generators have many similarities. Many motors can be mechanicallydriven to generate electricityand frequently make acceptablegenerators.
  • 8. GENERATOR TRANSFORMER Generator transformer is used to store the power (ELECTRICITY) which is generated by the generator. FOR 500MW generator transformer gives output of 21KV of voltage and 9000Amp. Of current and for 200MW generator transformer gives output of 15.47KV of voltage.
  • 9. SWITCHYARD It is the protective part of the whole power system. Switch yard is also most essential part for transmission, distribution, and collection. A substation is a part of an electrical generation, transmission, and distribution system. Substations transform voltage from high to low, or the reverse, or perform any of several other important functions. Betweenthe generating station and consumer, electric power may flow through several substations at different voltage levels.
  • 10. CONTENTS  INTRODUCTION.  BOILER.  TURBINE.  GENERATOR.  SWITCHYARD.