SlideShare une entreprise Scribd logo
1  sur  8
St. Jude Medical IncSt. Jude Medical Inc
Windchill and SAPWindchill and SAP
IntegrationIntegration
10.2MO30
2nd
Phase Success story
• 2nd
Phase success story board.
• 2nd
Phase went Go-Line on june-2014.
• Part, BOM and ECN are successfully published.
• Still now no Windchill and SAP integration errors.
• ZERO errors as of now.
Windchill ESI case study
• Web Services – Part Number
• SAP is the master system for part numbers
• If “PLM Only” is selected as “No” or blank a SAP Part number will be retrieved
during part creation from SAP using the object initialization rules of part
type.
• Object Initialization Rules (OIR) in Windchill will be used to fetch the part
number from SAP during the part creation process in Windchill
• Based on the “PLM_only” attribute value to “No”, the rule will invoke a SOAP
call to a TIBCO process to fetch SAP part number.
• Created new log service for part Number generator in Tibco.
Windchill ESI case study
• Auto Assign Plants ( DTs) to Parts and BOM based SJM requirements.
• Object filtered to publish to SAP which are PLM only “No”.
• Tibco will allow to publish SELECTED Parts only.
• Some of the parts and BOMs are filtered out based on Material Type.
• Tibco prevented to publish some of Parts and some of BOMs to SAP.
• Republishing same ECN multiple times to SAP.
• Windchill ESI service is republishing same ECN again and again to SAP with
new Date Effectivity.
• Tibco Reset ECN effectivity date in SAP if ECN is changed ECN.
Windchill ESI case study
• More Part custom attributes published to SAP
• More BOM custom attributes published to SAP
• Windchill publishing EBOM , MBOM and PBOM to SAP.
Windchill ESI case study
• Automatic Assign Distribution Targets
• Windchill ESI services automatically assign the distribution Targets to Parts
based on Part type.
• Auto Publish Parts and BOMs to SAP
• Windchill ESI service automatically publish Parts and BOMs to SAP based on
Lifecycle State.
• Prevented unchanged components to republish.
Migration & Upgrade
• Windchill ESI ( SAP) 10.1 is migrated and upgrade to 10.2 MO 30.
• All ESI 10.2 MO 30 functional is carried.
• All existing ESI customization applied on 10.2 MO 30.
• New enhancement and customization done in 10.2 MO 30.
• New version of Tibco and Adapters are used which provided by PTC.
3rd
Phase Go-Live
June 28rd 2015
is
3rd
Phase
10.2MO3010.2MO30
Go-LiveGo-Live

Contenu connexe

Similaire à SJM_ESI_Casestudy

how_rockwell_automation_optimized_its_product_costing_process
how_rockwell_automation_optimized_its_product_costing_processhow_rockwell_automation_optimized_its_product_costing_process
how_rockwell_automation_optimized_its_product_costing_process
John Jordan
 

Similaire à SJM_ESI_Casestudy (20)

PTC Windchill ESI 9.x Architecture
PTC Windchill ESI 9.x ArchitecturePTC Windchill ESI 9.x Architecture
PTC Windchill ESI 9.x Architecture
 
Mainframe Application Testing both With and Without Live Data
Mainframe Application Testing both With and Without Live DataMainframe Application Testing both With and Without Live Data
Mainframe Application Testing both With and Without Live Data
 
2016-Automation-Summit_PA_SIMIT.pdf
2016-Automation-Summit_PA_SIMIT.pdf2016-Automation-Summit_PA_SIMIT.pdf
2016-Automation-Summit_PA_SIMIT.pdf
 
OSGi compendium
OSGi compendiumOSGi compendium
OSGi compendium
 
26 story slicing techniques for any scrum team
26 story slicing techniques for any scrum team26 story slicing techniques for any scrum team
26 story slicing techniques for any scrum team
 
Post compiler software optimization for reducing energy
Post compiler software optimization for reducing energyPost compiler software optimization for reducing energy
Post compiler software optimization for reducing energy
 
Launching Activiti v6 (Activiti Community Day Paris 2015)
Launching Activiti v6 (Activiti Community Day Paris 2015) Launching Activiti v6 (Activiti Community Day Paris 2015)
Launching Activiti v6 (Activiti Community Day Paris 2015)
 
how_rockwell_automation_optimized_its_product_costing_process
how_rockwell_automation_optimized_its_product_costing_processhow_rockwell_automation_optimized_its_product_costing_process
how_rockwell_automation_optimized_its_product_costing_process
 
Itential Automation Platform 2020.2 Release
Itential Automation Platform 2020.2 ReleaseItential Automation Platform 2020.2 Release
Itential Automation Platform 2020.2 Release
 
Past Experiences and Future Challenges using Automatic Performance Modelling ...
Past Experiences and Future Challenges using Automatic Performance Modelling ...Past Experiences and Future Challenges using Automatic Performance Modelling ...
Past Experiences and Future Challenges using Automatic Performance Modelling ...
 
Auto Code Generation and Rapid Brewery/Distillery Automation
Auto Code Generation and Rapid Brewery/Distillery AutomationAuto Code Generation and Rapid Brewery/Distillery Automation
Auto Code Generation and Rapid Brewery/Distillery Automation
 
Is your ABAP Code Ready for the Cloud?
Is your ABAP Code Ready for the Cloud?Is your ABAP Code Ready for the Cloud?
Is your ABAP Code Ready for the Cloud?
 
Siebel best practices
Siebel best practicesSiebel best practices
Siebel best practices
 
Automatic Performance Modelling from Application Performance Management (APM)...
Automatic Performance Modelling from Application Performance Management (APM)...Automatic Performance Modelling from Application Performance Management (APM)...
Automatic Performance Modelling from Application Performance Management (APM)...
 
What Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problemsWhat Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problems
 
GTL INITIATIVES 2
GTL INITIATIVES 2GTL INITIATIVES 2
GTL INITIATIVES 2
 
Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?
Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?
Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?
 
Impact 2014 1147 - Bridging Business Process Management and Integration use c...
Impact 2014 1147 - Bridging Business Process Management and Integration use c...Impact 2014 1147 - Bridging Business Process Management and Integration use c...
Impact 2014 1147 - Bridging Business Process Management and Integration use c...
 
Resume 2015 SW
Resume 2015 SWResume 2015 SW
Resume 2015 SW
 
Continuous Deployment of your Application @JUGtoberfest
Continuous Deployment of your Application @JUGtoberfestContinuous Deployment of your Application @JUGtoberfest
Continuous Deployment of your Application @JUGtoberfest
 

Plus de Gandhavalla Informatics Pvt Ltd.

Plus de Gandhavalla Informatics Pvt Ltd. (11)

best GIFT to your believed customers
best GIFT to your believed customersbest GIFT to your believed customers
best GIFT to your believed customers
 
WEBridge 4 EBS ( Windchill and Oracle EBS Integration )
WEBridge 4 EBS ( Windchill and Oracle EBS Integration )WEBridge 4 EBS ( Windchill and Oracle EBS Integration )
WEBridge 4 EBS ( Windchill and Oracle EBS Integration )
 
WEBridge 4 SAP ( Windchill and SAP Integration)
WEBridge 4 SAP ( Windchill and SAP Integration)WEBridge 4 SAP ( Windchill and SAP Integration)
WEBridge 4 SAP ( Windchill and SAP Integration)
 
Why join in letsGAIN.ney\t
Why join in letsGAIN.ney\tWhy join in letsGAIN.ney\t
Why join in letsGAIN.ney\t
 
www.letsgain.net
www.letsgain.netwww.letsgain.net
www.letsgain.net
 
WEBridge 4 SAP V1.0 (RTM) on 11/11 of 2014
WEBridge 4 SAP V1.0 (RTM) on 11/11 of 2014 WEBridge 4 SAP V1.0 (RTM) on 11/11 of 2014
WEBridge 4 SAP V1.0 (RTM) on 11/11 of 2014
 
WEMT ( Windchill Esi Monitoring Tool)
WEMT ( Windchill Esi Monitoring Tool)WEMT ( Windchill Esi Monitoring Tool)
WEMT ( Windchill Esi Monitoring Tool)
 
Released WEBridge 4 SAP R 4 on 10/10 of 2014
Released WEBridge 4 SAP R 4 on 10/10 of 2014Released WEBridge 4 SAP R 4 on 10/10 of 2014
Released WEBridge 4 SAP R 4 on 10/10 of 2014
 
Released WEBridge 4 SAP R 3 on 9/9 of 2014
Released WEBridge 4 SAP R 3 on 9/9 of 2014Released WEBridge 4 SAP R 3 on 9/9 of 2014
Released WEBridge 4 SAP R 3 on 9/9 of 2014
 
WEBridge 4 SAP R 1.0
WEBridge 4 SAP R 1.0WEBridge 4 SAP R 1.0
WEBridge 4 SAP R 1.0
 
About Gandhavalla Informatics Pvt Ltd.
About Gandhavalla Informatics Pvt Ltd.About Gandhavalla Informatics Pvt Ltd.
About Gandhavalla Informatics Pvt Ltd.
 

SJM_ESI_Casestudy

  • 1. St. Jude Medical IncSt. Jude Medical Inc Windchill and SAPWindchill and SAP IntegrationIntegration 10.2MO30
  • 2. 2nd Phase Success story • 2nd Phase success story board. • 2nd Phase went Go-Line on june-2014. • Part, BOM and ECN are successfully published. • Still now no Windchill and SAP integration errors. • ZERO errors as of now.
  • 3. Windchill ESI case study • Web Services – Part Number • SAP is the master system for part numbers • If “PLM Only” is selected as “No” or blank a SAP Part number will be retrieved during part creation from SAP using the object initialization rules of part type. • Object Initialization Rules (OIR) in Windchill will be used to fetch the part number from SAP during the part creation process in Windchill • Based on the “PLM_only” attribute value to “No”, the rule will invoke a SOAP call to a TIBCO process to fetch SAP part number. • Created new log service for part Number generator in Tibco.
  • 4. Windchill ESI case study • Auto Assign Plants ( DTs) to Parts and BOM based SJM requirements. • Object filtered to publish to SAP which are PLM only “No”. • Tibco will allow to publish SELECTED Parts only. • Some of the parts and BOMs are filtered out based on Material Type. • Tibco prevented to publish some of Parts and some of BOMs to SAP. • Republishing same ECN multiple times to SAP. • Windchill ESI service is republishing same ECN again and again to SAP with new Date Effectivity. • Tibco Reset ECN effectivity date in SAP if ECN is changed ECN.
  • 5. Windchill ESI case study • More Part custom attributes published to SAP • More BOM custom attributes published to SAP • Windchill publishing EBOM , MBOM and PBOM to SAP.
  • 6. Windchill ESI case study • Automatic Assign Distribution Targets • Windchill ESI services automatically assign the distribution Targets to Parts based on Part type. • Auto Publish Parts and BOMs to SAP • Windchill ESI service automatically publish Parts and BOMs to SAP based on Lifecycle State. • Prevented unchanged components to republish.
  • 7. Migration & Upgrade • Windchill ESI ( SAP) 10.1 is migrated and upgrade to 10.2 MO 30. • All ESI 10.2 MO 30 functional is carried. • All existing ESI customization applied on 10.2 MO 30. • New enhancement and customization done in 10.2 MO 30. • New version of Tibco and Adapters are used which provided by PTC.
  • 8. 3rd Phase Go-Live June 28rd 2015 is 3rd Phase 10.2MO3010.2MO30 Go-LiveGo-Live