Soumettre la recherche
Mettre en ligne
The Mythical Man-Month #2 The Mythical Man-Month
•
1 j'aime
•
380 vues
楼
楼閣 砂上
Suivre
The Mythical Man-Month #2 The Mythical Man-Month
Lire moins
Lire la suite
Ingénierie
Affichage du diaporama
Signaler
Partager
Affichage du diaporama
Signaler
Partager
1 sur 48
Télécharger maintenant
Télécharger pour lire hors ligne
Recommandé
The Mythical Man-Month #3 The Surgical Team
The Mythical Man-Month #3 The Surgical Team
楼閣 砂上
The Mythical Man Month
The Mythical Man Month
Mr Cracker
Mythical Man-Month
Mythical Man-Month
dandb-technology
Mythical Man Month Essays on Software Engineering
Mythical Man Month Essays on Software Engineering
mustafa sarac
Lecture 01
Lecture 01
Rana Ali
Software Sucks
Software Sucks
Hans-Jörg Schnedlitz
9. risk-management
9. risk-management
Muhammad Sikandar Mustafa
11. estimation-1
11. estimation-1
Muhammad Sikandar Mustafa
Recommandé
The Mythical Man-Month #3 The Surgical Team
The Mythical Man-Month #3 The Surgical Team
楼閣 砂上
The Mythical Man Month
The Mythical Man Month
Mr Cracker
Mythical Man-Month
Mythical Man-Month
dandb-technology
Mythical Man Month Essays on Software Engineering
Mythical Man Month Essays on Software Engineering
mustafa sarac
Lecture 01
Lecture 01
Rana Ali
Software Sucks
Software Sucks
Hans-Jörg Schnedlitz
9. risk-management
9. risk-management
Muhammad Sikandar Mustafa
11. estimation-1
11. estimation-1
Muhammad Sikandar Mustafa
What is Software Development Productivity Anyway?
What is Software Development Productivity Anyway?
Gail Murphy
Deadly Sins Estimation
Deadly Sins Estimation
Gerrit Klaschke, CSM
Producer / QA Relation and Hiring your successor
Producer / QA Relation and Hiring your successor
Thomas Hulvershorn
First things first
First things first
May Farrah Detuya - Vidal
SQuADpresentation2014 vpdf
SQuADpresentation2014 vpdf
Scott Allman
Chapter 1 2 - some size factors
Chapter 1 2 - some size factors
NancyBeaulah_R
Glenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineering
atr2006
Project Estimation Presentation - Donte's 8th level of estimating level of ef...
Project Estimation Presentation - Donte's 8th level of estimating level of ef...
Promet Source
Sandstorm or Significant? The evolving role of situational context in inciden...
Sandstorm or Significant? The evolving role of situational context in inciden...
Matthew Boeckman
Myths
Myths
crocketthopper
Rewriting DevOps
Rewriting DevOps
Matthew Boeckman
DevOps Roadtrip Final Speaking Deck
DevOps Roadtrip Final Speaking Deck
VictorOps
DevOps: A Practical Guide
DevOps: A Practical Guide
VictorOps
Working effectively with legacy codes
Working effectively with legacy codes
Ali Shariat
Applying SRE techniques to micro service design
Applying SRE techniques to micro service design
Theo Schlossnagle
Performance Testing And Beyond
Performance Testing And Beyond
Peter Brown
Peak Com Monday Seminar on problem solving
Peak Com Monday Seminar on problem solving
Chris Decroix
End to end testing - strategies
End to end testing - strategies
anuvip
Portfolio test
Portfolio test
michaelpair
Risk adjusted engineering management
Risk adjusted engineering management
Glen Alleman
Paper mythical manmonth
Paper mythical manmonth
Vu Hung Nguyen
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
infinitepestcontrol
Contenu connexe
Tendances
What is Software Development Productivity Anyway?
What is Software Development Productivity Anyway?
Gail Murphy
Deadly Sins Estimation
Deadly Sins Estimation
Gerrit Klaschke, CSM
Producer / QA Relation and Hiring your successor
Producer / QA Relation and Hiring your successor
Thomas Hulvershorn
First things first
First things first
May Farrah Detuya - Vidal
SQuADpresentation2014 vpdf
SQuADpresentation2014 vpdf
Scott Allman
Chapter 1 2 - some size factors
Chapter 1 2 - some size factors
NancyBeaulah_R
Glenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineering
atr2006
Project Estimation Presentation - Donte's 8th level of estimating level of ef...
Project Estimation Presentation - Donte's 8th level of estimating level of ef...
Promet Source
Sandstorm or Significant? The evolving role of situational context in inciden...
Sandstorm or Significant? The evolving role of situational context in inciden...
Matthew Boeckman
Myths
Myths
crocketthopper
Rewriting DevOps
Rewriting DevOps
Matthew Boeckman
DevOps Roadtrip Final Speaking Deck
DevOps Roadtrip Final Speaking Deck
VictorOps
DevOps: A Practical Guide
DevOps: A Practical Guide
VictorOps
Working effectively with legacy codes
Working effectively with legacy codes
Ali Shariat
Applying SRE techniques to micro service design
Applying SRE techniques to micro service design
Theo Schlossnagle
Performance Testing And Beyond
Performance Testing And Beyond
Peter Brown
Peak Com Monday Seminar on problem solving
Peak Com Monday Seminar on problem solving
Chris Decroix
End to end testing - strategies
End to end testing - strategies
anuvip
Portfolio test
Portfolio test
michaelpair
Risk adjusted engineering management
Risk adjusted engineering management
Glen Alleman
Tendances
(20)
What is Software Development Productivity Anyway?
What is Software Development Productivity Anyway?
Deadly Sins Estimation
Deadly Sins Estimation
Producer / QA Relation and Hiring your successor
Producer / QA Relation and Hiring your successor
First things first
First things first
SQuADpresentation2014 vpdf
SQuADpresentation2014 vpdf
Chapter 1 2 - some size factors
Chapter 1 2 - some size factors
Glenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineering
Project Estimation Presentation - Donte's 8th level of estimating level of ef...
Project Estimation Presentation - Donte's 8th level of estimating level of ef...
Sandstorm or Significant? The evolving role of situational context in inciden...
Sandstorm or Significant? The evolving role of situational context in inciden...
Myths
Myths
Rewriting DevOps
Rewriting DevOps
DevOps Roadtrip Final Speaking Deck
DevOps Roadtrip Final Speaking Deck
DevOps: A Practical Guide
DevOps: A Practical Guide
Working effectively with legacy codes
Working effectively with legacy codes
Applying SRE techniques to micro service design
Applying SRE techniques to micro service design
Performance Testing And Beyond
Performance Testing And Beyond
Peak Com Monday Seminar on problem solving
Peak Com Monday Seminar on problem solving
End to end testing - strategies
End to end testing - strategies
Portfolio test
Portfolio test
Risk adjusted engineering management
Risk adjusted engineering management
Similaire à The Mythical Man-Month #2 The Mythical Man-Month
Paper mythical manmonth
Paper mythical manmonth
Vu Hung Nguyen
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
infinitepestcontrol
Is your ladder leaning against the right wall?
Is your ladder leaning against the right wall?
Stephen Morris
Management Skills for a VUCA World
Management Skills for a VUCA World
Improvement Skills Consulting Ltd.
M&l case
M&l case
Clarence Yoou
8.project management chapter 8
8.project management chapter 8
Warui Maina
Question 1 1. With CPM, we are able to calculate the probabi.docx
Question 1 1. With CPM, we are able to calculate the probabi.docx
IRESH3
Fin 200 week 1 assignment cash flow preparation part 2 of 2
Fin 200 week 1 assignment cash flow preparation part 2 of 2
micyclohi1987
Instructions3 Implementing and Evaluating the Future at Galaxy .docx
Instructions3 Implementing and Evaluating the Future at Galaxy .docx
normanibarber20063
operation research notes
operation research notes
Renu Thakur
Untitled
Untitled
Kaizenlogcom
How I reduced by 50% the duration of a project
How I reduced by 50% the duration of a project
Giorgio Marcenaro
IEEE Happiness an inside job asoman 2017
IEEE Happiness an inside job asoman 2017
Jose Berengueres
ViewPoint - Why Your Projects Are Late
ViewPoint - Why Your Projects Are Late
Pinnacle Strategies
YEG DPM Talk - January 16, 2017
YEG DPM Talk - January 16, 2017
Kayla Baretta
Why should your organisation use timesheets?
Why should your organisation use timesheets?
David Walton
Pert Cpm Nis
Pert Cpm Nis
Naveed Salman
Project Priority MatrixProject NameProject Priority MatrixConstrai.docx
Project Priority MatrixProject NameProject Priority MatrixConstrai.docx
wkyra78
Five days of kaizen
Five days of kaizen
Robert Simmons
CSI approach to your Production Management
CSI approach to your Production Management
Andrius Gudaitis
Similaire à The Mythical Man-Month #2 The Mythical Man-Month
(20)
Paper mythical manmonth
Paper mythical manmonth
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
Is your ladder leaning against the right wall?
Is your ladder leaning against the right wall?
Management Skills for a VUCA World
Management Skills for a VUCA World
M&l case
M&l case
8.project management chapter 8
8.project management chapter 8
Question 1 1. With CPM, we are able to calculate the probabi.docx
Question 1 1. With CPM, we are able to calculate the probabi.docx
Fin 200 week 1 assignment cash flow preparation part 2 of 2
Fin 200 week 1 assignment cash flow preparation part 2 of 2
Instructions3 Implementing and Evaluating the Future at Galaxy .docx
Instructions3 Implementing and Evaluating the Future at Galaxy .docx
operation research notes
operation research notes
Untitled
Untitled
How I reduced by 50% the duration of a project
How I reduced by 50% the duration of a project
IEEE Happiness an inside job asoman 2017
IEEE Happiness an inside job asoman 2017
ViewPoint - Why Your Projects Are Late
ViewPoint - Why Your Projects Are Late
YEG DPM Talk - January 16, 2017
YEG DPM Talk - January 16, 2017
Why should your organisation use timesheets?
Why should your organisation use timesheets?
Pert Cpm Nis
Pert Cpm Nis
Project Priority MatrixProject NameProject Priority MatrixConstrai.docx
Project Priority MatrixProject NameProject Priority MatrixConstrai.docx
Five days of kaizen
Five days of kaizen
CSI approach to your Production Management
CSI approach to your Production Management
Dernier
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Call Girls in Nagpur High Profile
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
Call Girls in Nagpur High Profile
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
Asutosh Ranjan
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
rknatarajan
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
rknatarajan
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
Tsuyoshi Horigome
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
ranjana rawat
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
purnimasatapathy1234
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Call Girls in Nagpur High Profile
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
SIVASHANKAR N
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
ssuser5c9d4b1
result management system report for college project
result management system report for college project
Tonystark477637
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
ranjana rawat
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Suhani Kapoor
Extrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
120cr0395
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
ranjana rawat
Dernier
(20)
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
result management system report for college project
result management system report for college project
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Extrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
The Mythical Man-Month #2 The Mythical Man-Month
1.
The Mythical Man-Month #2
The Mythical Man-Month
2.
Index 1. Intro 3-10 2.
Optimism 11-16 3. The Man-Month 17-24 4. Systems Test 25-31 5. Gutless Estimating 32-35 6. Regenerative Schedule Disaster 36-46 2
3.
Intro 3
4.
4 Good cooking takes
time. If you are made to wait, it is to serve you better, and to please you. MENU OF RESTAURANT ANTOINE. NEW ORLEANS
5.
Intro 5 More software projects
have gone awry for lack of calendar time than for all other causes combined.
6.
Intro Our techniques of
estimating are poorly developed. 6
7.
Intro Our estimating techniques
hiding the assumption that men and months are interchangeable. 7
8.
Intro Software managers often lack
the courteous stubbornness of Antoine's chef. 8
9.
Intro Schedule progress is
poorly monitored. 9
10.
Intro The natural (and
traditional) response is to add manpower. 10
11.
Optimism 11
12.
All programmers are optimists. 12
13.
Optimism 13 Creative activity into
three stages: 1. the idea 2. the implementation 3. the interaction
14.
Optimism In many creative
activities the medium of execution is intractable. 14
15.
Optimism But, Computer programming
creates with an exceedingly tractable medium. 15
16.
Our optimism is unjustified. 16
17.
The Man-Month 17
18.
The man-month is a
deceptive myth. 18
19.
19 Man Month Fig. 2.1 Time versus
number of workers —perfectly partitionable task
20.
20 Man Month Fig. 2.2 Time versus
number of workers —unpartitionable task
21.
21 Man Month Fig. 2.3 Time versus
number of workers —partitionable task requiring communication
22.
The Man-Month The added
burden of communication is made up of two parts, training and intercommunication. 22
23.
23 Man Month Fig. 2.4 Time versus
number of workers —task with complex interrelationships
24.
Adding more men then
lengthens. 24
25.
Systems Test 25
26.
Testing is usually the
most mis-scheduled part of programming. 26
27.
System Test 27 I have
been successfully using the following rule: ● l/3 planning ● l/6 coding ● l/4 component test and early system test ● l/4 system test, all components in hand.
28.
System Test The fraction
devoted to planning is larger than normal. 28
29.
System Test The half
of the schedule devoted to debugging of completed code is much larger than normal. 29
30.
System Test The part
that is easy to estimate, i.e., coding, is given only one-sixth of the schedule. 30
31.
Very important to allow
enough system test time. 31
32.
Gutless Estimating 32
33.
But it cannot
govern the actual completion. 33
34.
Gutless Estimating 34 It is
very difficult to make jobrisking defense of an estimate that is certified chiefly by the hunches of the managers.
35.
Gutless Estimating 35 We need
to develop and publicize productivity figures, bug-incidence figures, estimating rules, and so on.
36.
Managers will need
to defend their estimates. 36
37.
Regenerative Schedule Disaster 37
38.
38 A task is
estimated at 12 man-months and assigned to three men for four months. Figure 2.5
39.
39 What are the
alternatives facing the manager? Figure 2.6
40.
40 1st: Assume that only
the first part of the task was misestimated. -> Add 2 men to the 3 assigned. Figure 2.6
41.
41 Figure 2.7 2nd: Assume that
the whole estimate was uniformly low. -> Add 6 men to the 3 assigned.
42.
Regenerative Schedule Disaster 3rd: Reschedule. (But
rescheduling will not have to be done again.) 42
43.
Regenerative Schedule Disaster 4th: Trim
the task. (This is the only feasible action.) 43
44.
Regenerative Schedule Disaster In
the first two cases, insisting that the unaltered task be completed in four months is disastrous. 44
45.
45 Figure 2.8 Substantially more
than 7 man-months of effort remain, and 5 trained people and one month are available.
46.
Regenerative Schedule Disaster The
temptation is very strong to repeat the cycle, adding yet more manpower. Therein lies madness. 46
47.
Adding manpower to a
late software project makes it later. Brooks's Law 47
48.
More software projects have
gone awry. 48