1. PMO Mandate
2. Goals & Benefits
3. Scope Definition
4. Key PMO Stakeholders
5. Projected Timeline for Implementation
6. Project Roles and Responsibilities
7. High-Level Budget
8. High-Level Risk Assessment
A project management office (PMO) is usually created to solve a specific problem: generally, the
IT organization’s inability to deliver IT projects on time, on budget and in scope. Project managers
may “live” in the PMO, or in different IT units, such as in application development or in the
business.
Most PMOs start out addressing issues around project management and delivery before
elaborating their remit to program management or portfolio management. The scope of work
changes from tactical to strategic, while the scope of initiatives broadens from IT-intensive
projects to enterprisewide business and IT initiatives. Once the PMO has earned credibility with
the business, it usually receives requests to help manage business projects.
PPM
PPM
PPM
PPM
PPM
PPM
PPM
PPM
PPM
PPM
RM
PM
PM
PM
PM
PM
PM
Reporting for enterprise portfolio and the financial/human resources needed to deliver them
Finance for project/portfolio capital and expense
Customer Management – the customers, sponsors of the project
Strategy Management – projects and programs relate to corporate
Program Management – related projects in the portfolio
Time Accounting
Business Relationship Management (BRM)
Project Information System (PMIS) – organization of project information
Administrative Support – general assistance with Portfolio
Record Keeping – Enterprise Information
Forecasting
Quality Assurance
Procurement and Vendor Management
Project Status Reporting
PM Services
Training
PM SOP
x
ePMO IT PMO PMO CMO CoE
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
OCM
OCM
OCM
Adoption
Benefits Attainment
Change Management
OCM Forecast Benefits
OCM
GOV
GOV
Track Benefits
Governance
Intake
GOV Reporting
x
x
x x
x
x
x
x
x
x
x
x
x
x
x
x x
What is your definition of a PMO?
Use this model to clearly show what is in and out of scope.
Use Info-Tech’s PMO function matrix to help provide role definitions for
your PMO
Portfolio Management
Resource
Management
Project Management
Organization
al Change
Management
PMO Governance
Recordkeeping and
bookkeeping
Strategy management Assessment of available
supply of people and their
their time
Project status reporting
PM SOP
(e.g. feed the
portfolio, project
planning, task
managing)
Benefits management
Technology and infrastructure
Reporting Financial management
Procurement and
vendor management
HR Security
Matching supply to demand
demand based on time, cost,
cost, scope, and skill set
set requirements
PMIS Intake
CRM/RM/BRM Program management
Legal Financial
Tracking of utilization based
based on the allocations
Quality Intake
Time accounting PM services
(e.g. staffing project
project managers or
or coordinators)
Quality assurance
Organizational change
management
Project progress, visibility,
visibility, and process
Forecasting of utilization via
utilization via supply-demand
demand reconciliation
Administrative support PM training
Closure and lessons learned
Info-Tech’s potential PMO capabilities are in the header of the table below. These are
the services a PMO may (or may not) provide depending on the needs of the organization.
Various options for specific PMO job functions are listed below each capability. PMO leaders
need to decide which of these functions are required for their organization.
The rest of this blueprint will help you choose the right
capabilities and accompanying job functions for your PMO.
Sample SWOT analysis
1.1.2
continued
Strengths
• Knowledge, skills, and talent of project staff.
• We have fairly effective project management processes.
• Motivation to get things done when priorities, goals, and action
plans are clear.
Weaknesses
• IT-business communication and alignment.
• No standards are currently in place across departments. Staff are
unsure which templates to use and how/when/why to use them.
• There are no formal intake structures in place. Projects are
approved and it’s up to us to “figure it out.”
• We have no prioritization practices to keep up with constantly
changing priorities and shifts in the marketplace.
Opportunities
• Establish portfolio discipline to improve IT-business
communication through more effective and efficient project
coordination.
• Stronger initiation processes should translate to smoother project
execution.
• Establish more disciplined and efficient weekly/monthly project
reporting practices that should facilitate more effective
communication with senior leaders.
Threats
• Risk of introducing burdensome processes and documentation
that takes more time away from getting things done.
• We tried to formalize a PMO in the past and it failed after eight
months.
• We have no insight into project resourcing.
Portfolio Management
Resource
Management
Project Management
Organization
al Change
Management
PMO Governance
Recordkeeping and
bookkeeping
Strategy management Assessment of available
supply of people and their
their time
Project status reporting
PM SOP
(e.g. feed the
portfolio, project
planning, task
managing)
Benefits management
Technology and infrastructure
Reporting Financial management
Procurement and
vendor management
HR Security
Matching supply to demand
demand based on time, cost,
cost, scope, and skill set
set requirements
PMIS Intake
CRM/RM/BRM Program management
Legal Financial
Tracking of utilization based
based on the allocations
Quality Intake
Time accounting PM services
(e.g. staffing project
project managers or
or coordinators)
Quality assurance
Organizational change
management
Project progress, visibility,
visibility, and process
Forecasting of utilization via
utilization via supply-demand
demand reconciliation
Administrative support PM training
Closure and lessons learned
Job description content
Current State
Business
Strategies
PMO Initiatives Future-State
Business
Goals
Portfolio
Management
Resource
Management
Project
Management
Organizational
Change
Management
Governance
Long Term
Medium Term
Short Term
Documentation
Project progress, visibility, and
process
Project Intake Process
Prioritization
Project Levelling
Approval
Triage Process
Resource Allocation
Book of Record
Reporting
Standardize Project
Management Methodologies
PM Training
Benefits
Screenshot of PMO MS Project Plan Sample
Top-level
hierarchy
Second-level
hierarchy
Q1 Q2 Q3 Q4 Q1
Task
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Establish
Transition
Establish
Governance
Organizational
Chart
Technology
and
Infrastructure
Assess Status Quo
Project Progress, Visibility, and Process
Documentation
Clarify PMO Roles and Responsibilities
Performance Reviews
PPM Software
PM Software
Sample roadmap
Top-level
hierarchy
Second-level
hierarchy
Jan Feb Mar Apr May Jun
Develop Portfolio
Management Capabilities and
Guidelines
Design Resource
Management Process
Standardize
Project Management
Methodology
In progress Planned
Completed
Triage Process Project Classification and Leveling
Project Classification and
Leveling
Business Cases Steering Committees
Prioritizing and Scoring
Ticketing System
Content review
Performance
management
Administrative Support
Quality Assurance
Procurement and Vendor
Management
PM Training and
Mentoring
Staffing
Record and Book
Keeping
Cloud support
Legal generation
Project Methodology
Market analysis
Project Status
Reporting
Approval Process
Standard Operating Procedure
Customer outreach
Establish Resource Allocation Strategies
Sample roadmap
Committee Overview
Committee Name Committee Membership Mandate
Executive Leadership
Committee
CEO, CFO, CTO, CDO, CISO/CRO, CIO,
Enterprise Architect/Chief Architect, CPO
Provide strategic and operational leadership to the company by establishing goals, developing strategy, and
directing/validating strategic execution.
Enterprise Risk Committee CISO/CRO, CPO, Enterprise Risk Manager, BU
Leaders, CFO, CTO, CDO
Govern enterprise risks to ensure that risk information is available and integrated to support governance
decision making. Ensure the definition of the organizational risk posture and that an enterprise risk
approach is in place.
IT Steering Committee CIO, Product Owner, Service Owner, IT VPs,
BRM, PMO Director, CISO/CRO
Ensure business value is achieved through information and technology (IT) investments by aligning
strategic objectives and client needs with IT initiatives and their outcomes.
IT Risk Council IT Risk Manager, CISO, IT Directors Govern IT risks within the context of business strategy and objectives to align the decision-making
processes towards the achievement of performance goals. It will also ensure that a risk management
framework is in place and risk posture (risk appetite/threshold) is defined.
PPM Portfolio Manager, Project Managers, BRMs Ensure the best alignment of IT initiatives and program activity to meet the goals of the business.
Architectural Review Board Service/Product Owners, Enterprise Architects,
Chief Architect, Domain Architects
Ensure enterprise and related architectures are managed and applied enterprise-wise. Ensure the
alignment of IT initiatives to business strategy and architecture and compliance to regulatory standards.
Establish architectural standards and guidelines. Review and recommend initiatives.
Change Advisory Board Service/Product Owner, Change Manager, IT
Directors or Managers
Ensure changes are assessed, prioritized, and approved to support the change management purpose of
optimizing the throughput of successful changes with a minimum of disruption to business function.
Sample Governance Model
Strategic:
Ensures IT initiatives, products, and services
are aligned to organizational goals and
strategy and provide expected value. Ensure
adherence to key principles.
Tactical:
Ensures key activities and planning are in
place to execute strategic initiatives.
Operational:
Ensures effective execution of day-to-day
functions and practices to meet their key
objectives.
IT Steering Committee
IT Risk Council
IT PMO
Change Advisory Board
Enterprise:
Defines organizational goals. Directs or
regulates the performance and behavior of
the enterprise, ensuring it has the structure
and capabilities to achieve its goals.
Enterprise Risk
Committee
Executive Leadership
Committee
Board
Architectural Review
Board

Contenu connexe

Similaire à pmos.pptx

Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
flexibleresources
 
Harris Ahmed (PMP) - Senior Project Manager
Harris Ahmed (PMP) - Senior Project ManagerHarris Ahmed (PMP) - Senior Project Manager
Harris Ahmed (PMP) - Senior Project Manager
Harris Ahmed, PMP
 
Jarrel Thomas Resume 2017
Jarrel Thomas Resume 2017Jarrel Thomas Resume 2017
Jarrel Thomas Resume 2017
Jarrel Thomas
 
L1-Project Integration Management.pdf
L1-Project Integration Management.pdfL1-Project Integration Management.pdf
L1-Project Integration Management.pdf
MUST
 
Using cmmi, itil, and pm bo k to improve proposal operations - brenda crist 6...
Using cmmi, itil, and pm bo k to improve proposal operations - brenda crist 6...Using cmmi, itil, and pm bo k to improve proposal operations - brenda crist 6...
Using cmmi, itil, and pm bo k to improve proposal operations - brenda crist 6...
Lohfeld Consulting Group
 

Similaire à pmos.pptx (20)

Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
 
Integrated Enterprise PPM, ALM and APM on force.com cloud
Integrated Enterprise PPM, ALM and APM on force.com cloudIntegrated Enterprise PPM, ALM and APM on force.com cloud
Integrated Enterprise PPM, ALM and APM on force.com cloud
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
Subash Tavares
Subash TavaresSubash Tavares
Subash Tavares
 
Harris Ahmed (PMP) - Senior Project Manager
Harris Ahmed (PMP) - Senior Project ManagerHarris Ahmed (PMP) - Senior Project Manager
Harris Ahmed (PMP) - Senior Project Manager
 
Pmipmo
PmipmoPmipmo
Pmipmo
 
Project Management Fundamentals Course
Project Management Fundamentals CourseProject Management Fundamentals Course
Project Management Fundamentals Course
 
Crag Summary Framework V2.1
Crag Summary Framework V2.1Crag Summary Framework V2.1
Crag Summary Framework V2.1
 
Mhc 2008
Mhc 2008Mhc 2008
Mhc 2008
 
AVendryes_resume
AVendryes_resumeAVendryes_resume
AVendryes_resume
 
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloudCloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
25 BENEFITS OF A PROJECT MANAGEMENT OFFICE
25 BENEFITS OF A PROJECT MANAGEMENT OFFICE25 BENEFITS OF A PROJECT MANAGEMENT OFFICE
25 BENEFITS OF A PROJECT MANAGEMENT OFFICE
 
Project Methods Intro Pack
Project Methods Intro PackProject Methods Intro Pack
Project Methods Intro Pack
 
My Single Point project portfolio and demand
My Single Point project portfolio and demandMy Single Point project portfolio and demand
My Single Point project portfolio and demand
 
Jarrel Thomas Resume 2017
Jarrel Thomas Resume 2017Jarrel Thomas Resume 2017
Jarrel Thomas Resume 2017
 
L1-Project Integration Management.pdf
L1-Project Integration Management.pdfL1-Project Integration Management.pdf
L1-Project Integration Management.pdf
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management Services
 
Using cmmi, itil, and pm bo k to improve proposal operations - brenda crist 6...
Using cmmi, itil, and pm bo k to improve proposal operations - brenda crist 6...Using cmmi, itil, and pm bo k to improve proposal operations - brenda crist 6...
Using cmmi, itil, and pm bo k to improve proposal operations - brenda crist 6...
 
Proposal Management: Best Industry Practices
Proposal Management: Best Industry PracticesProposal Management: Best Industry Practices
Proposal Management: Best Industry Practices
 

Dernier

Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
instagramfab782445
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Dernier (20)

How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 

pmos.pptx

  • 1. 1. PMO Mandate 2. Goals & Benefits 3. Scope Definition 4. Key PMO Stakeholders 5. Projected Timeline for Implementation 6. Project Roles and Responsibilities 7. High-Level Budget 8. High-Level Risk Assessment A project management office (PMO) is usually created to solve a specific problem: generally, the IT organization’s inability to deliver IT projects on time, on budget and in scope. Project managers may “live” in the PMO, or in different IT units, such as in application development or in the business. Most PMOs start out addressing issues around project management and delivery before elaborating their remit to program management or portfolio management. The scope of work changes from tactical to strategic, while the scope of initiatives broadens from IT-intensive projects to enterprisewide business and IT initiatives. Once the PMO has earned credibility with the business, it usually receives requests to help manage business projects.
  • 2.
  • 3. PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM RM PM PM PM PM PM PM Reporting for enterprise portfolio and the financial/human resources needed to deliver them Finance for project/portfolio capital and expense Customer Management – the customers, sponsors of the project Strategy Management – projects and programs relate to corporate Program Management – related projects in the portfolio Time Accounting Business Relationship Management (BRM) Project Information System (PMIS) – organization of project information Administrative Support – general assistance with Portfolio Record Keeping – Enterprise Information Forecasting Quality Assurance Procurement and Vendor Management Project Status Reporting PM Services Training PM SOP x ePMO IT PMO PMO CMO CoE x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x OCM OCM OCM Adoption Benefits Attainment Change Management OCM Forecast Benefits OCM GOV GOV Track Benefits Governance Intake GOV Reporting x x x x x x x x x x x x x x x x x What is your definition of a PMO? Use this model to clearly show what is in and out of scope.
  • 4. Use Info-Tech’s PMO function matrix to help provide role definitions for your PMO Portfolio Management Resource Management Project Management Organization al Change Management PMO Governance Recordkeeping and bookkeeping Strategy management Assessment of available supply of people and their their time Project status reporting PM SOP (e.g. feed the portfolio, project planning, task managing) Benefits management Technology and infrastructure Reporting Financial management Procurement and vendor management HR Security Matching supply to demand demand based on time, cost, cost, scope, and skill set set requirements PMIS Intake CRM/RM/BRM Program management Legal Financial Tracking of utilization based based on the allocations Quality Intake Time accounting PM services (e.g. staffing project project managers or or coordinators) Quality assurance Organizational change management Project progress, visibility, visibility, and process Forecasting of utilization via utilization via supply-demand demand reconciliation Administrative support PM training Closure and lessons learned Info-Tech’s potential PMO capabilities are in the header of the table below. These are the services a PMO may (or may not) provide depending on the needs of the organization. Various options for specific PMO job functions are listed below each capability. PMO leaders need to decide which of these functions are required for their organization. The rest of this blueprint will help you choose the right capabilities and accompanying job functions for your PMO.
  • 5. Sample SWOT analysis 1.1.2 continued Strengths • Knowledge, skills, and talent of project staff. • We have fairly effective project management processes. • Motivation to get things done when priorities, goals, and action plans are clear. Weaknesses • IT-business communication and alignment. • No standards are currently in place across departments. Staff are unsure which templates to use and how/when/why to use them. • There are no formal intake structures in place. Projects are approved and it’s up to us to “figure it out.” • We have no prioritization practices to keep up with constantly changing priorities and shifts in the marketplace. Opportunities • Establish portfolio discipline to improve IT-business communication through more effective and efficient project coordination. • Stronger initiation processes should translate to smoother project execution. • Establish more disciplined and efficient weekly/monthly project reporting practices that should facilitate more effective communication with senior leaders. Threats • Risk of introducing burdensome processes and documentation that takes more time away from getting things done. • We tried to formalize a PMO in the past and it failed after eight months. • We have no insight into project resourcing.
  • 6. Portfolio Management Resource Management Project Management Organization al Change Management PMO Governance Recordkeeping and bookkeeping Strategy management Assessment of available supply of people and their their time Project status reporting PM SOP (e.g. feed the portfolio, project planning, task managing) Benefits management Technology and infrastructure Reporting Financial management Procurement and vendor management HR Security Matching supply to demand demand based on time, cost, cost, scope, and skill set set requirements PMIS Intake CRM/RM/BRM Program management Legal Financial Tracking of utilization based based on the allocations Quality Intake Time accounting PM services (e.g. staffing project project managers or or coordinators) Quality assurance Organizational change management Project progress, visibility, visibility, and process Forecasting of utilization via utilization via supply-demand demand reconciliation Administrative support PM training Closure and lessons learned
  • 8. Current State Business Strategies PMO Initiatives Future-State Business Goals Portfolio Management Resource Management Project Management Organizational Change Management Governance Long Term Medium Term Short Term Documentation Project progress, visibility, and process Project Intake Process Prioritization Project Levelling Approval Triage Process Resource Allocation Book of Record Reporting Standardize Project Management Methodologies PM Training Benefits
  • 9. Screenshot of PMO MS Project Plan Sample Top-level hierarchy Second-level hierarchy
  • 10. Q1 Q2 Q3 Q4 Q1 Task Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Establish Transition Establish Governance Organizational Chart Technology and Infrastructure Assess Status Quo Project Progress, Visibility, and Process Documentation Clarify PMO Roles and Responsibilities Performance Reviews PPM Software PM Software Sample roadmap Top-level hierarchy Second-level hierarchy
  • 11. Jan Feb Mar Apr May Jun Develop Portfolio Management Capabilities and Guidelines Design Resource Management Process Standardize Project Management Methodology In progress Planned Completed Triage Process Project Classification and Leveling Project Classification and Leveling Business Cases Steering Committees Prioritizing and Scoring Ticketing System Content review Performance management Administrative Support Quality Assurance Procurement and Vendor Management PM Training and Mentoring Staffing Record and Book Keeping Cloud support Legal generation Project Methodology Market analysis Project Status Reporting Approval Process Standard Operating Procedure Customer outreach Establish Resource Allocation Strategies Sample roadmap
  • 12. Committee Overview Committee Name Committee Membership Mandate Executive Leadership Committee CEO, CFO, CTO, CDO, CISO/CRO, CIO, Enterprise Architect/Chief Architect, CPO Provide strategic and operational leadership to the company by establishing goals, developing strategy, and directing/validating strategic execution. Enterprise Risk Committee CISO/CRO, CPO, Enterprise Risk Manager, BU Leaders, CFO, CTO, CDO Govern enterprise risks to ensure that risk information is available and integrated to support governance decision making. Ensure the definition of the organizational risk posture and that an enterprise risk approach is in place. IT Steering Committee CIO, Product Owner, Service Owner, IT VPs, BRM, PMO Director, CISO/CRO Ensure business value is achieved through information and technology (IT) investments by aligning strategic objectives and client needs with IT initiatives and their outcomes. IT Risk Council IT Risk Manager, CISO, IT Directors Govern IT risks within the context of business strategy and objectives to align the decision-making processes towards the achievement of performance goals. It will also ensure that a risk management framework is in place and risk posture (risk appetite/threshold) is defined. PPM Portfolio Manager, Project Managers, BRMs Ensure the best alignment of IT initiatives and program activity to meet the goals of the business. Architectural Review Board Service/Product Owners, Enterprise Architects, Chief Architect, Domain Architects Ensure enterprise and related architectures are managed and applied enterprise-wise. Ensure the alignment of IT initiatives to business strategy and architecture and compliance to regulatory standards. Establish architectural standards and guidelines. Review and recommend initiatives. Change Advisory Board Service/Product Owner, Change Manager, IT Directors or Managers Ensure changes are assessed, prioritized, and approved to support the change management purpose of optimizing the throughput of successful changes with a minimum of disruption to business function.
  • 13. Sample Governance Model Strategic: Ensures IT initiatives, products, and services are aligned to organizational goals and strategy and provide expected value. Ensure adherence to key principles. Tactical: Ensures key activities and planning are in place to execute strategic initiatives. Operational: Ensures effective execution of day-to-day functions and practices to meet their key objectives. IT Steering Committee IT Risk Council IT PMO Change Advisory Board Enterprise: Defines organizational goals. Directs or regulates the performance and behavior of the enterprise, ensuring it has the structure and capabilities to achieve its goals. Enterprise Risk Committee Executive Leadership Committee Board Architectural Review Board