Path to reach Level 3 test
process maturity in TMMi
framework
M C Nagaraj
nagaraj@stagsoftware.com
in.linkedin.com/in/mcnagaraj
Copyright STAG Software Pvt. Ltd., 2011
Agenda
TMMi – Level 1 to 5
 Requirement interpretation
 Linking current process to TMMi Specific practices
All TMMi related information are taken from TMMi framework document
V 3.1 created and Copyrights owned by TMMi foundation.
www.tmmifoundation.org
Copyright STAG Software Pvt. Ltd., 2011
Test Measurement
Software Quality Evaluation
Advanced Peer Reviews
Defect Prevention
Total Process Optimization
Quality Control
Test Policy and Strategy, Test Planning, Test Monitoring and
Control, Test Design and Execution, Test Environment
Test Organization, Test Training Program, Test Lifecycle and
Integration, Non-functional Testing, Peer Reviews
Level 1 : Initial
TMMi Framework
Five levels of Testing Process Maturity
Level 2 : Managed
Level 3 : Defined
Level 4 : Measured
Level 5 : Optimization
Copyright STAG Software Pvt. Ltd., 2011
Test Measurement
Software Quality Evaluation
Advanced Peer Reviews
Defect Prevention
Total Process Optimization
Quality Control
Test Policy and Strategy, Test Planning, Test Monitoring and
Control, Test Design and Execution, Test Environment
Test Organization, Test Training Program, Test Lifecycle and
Integration, Non-functional Testing, Peer Reviews
Level 1 : Initial
TMMi Framework
Five levels of Testing Process Maturity
Level 2 : Managed
Level 3 : Defined
Level 4 : Measured
Level 5 : Optimization
Copyright STAG Software Pvt. Ltd., 2011
Level-1
• Testing is a chaotic process
• Not distinguished from debugging
• Documented set of specification not available
• Tests are developed in ad-hoc way after
coding is completed
• The objective of testing is to show that
software works
Copyright STAG Software Pvt. Ltd., 2011
Test Measurement
Software Quality Evaluation
Advanced Peer Reviews
Defect Prevention
Total Process Optimization
Quality Control
Test Policy and Strategy, Test Planning, Test Monitoring and
Control, Test Design and Execution, Test Environment
Test Organization, Test Training Program, Test Lifecycle and
Integration, Non-functional Testing, Peer Reviews
Level 1 : Initial
TMMi Level 2
Five levels of Testing Process Maturity
Level 2 : Managed
Level 3 : Defined
Level 4 : Measured
Level 5 : Optimization
Process areas at TMMi Level 2
2.1 Test Policy and strategy
2.2 Test Planning
2.3 Test Monitoring and Control
2.4 Test Design and Execution
2.5 Test Environment
Copyright STAG Software Pvt. Ltd., 2011
2.1 Test Policy and Strategy
Specific Goals Specific Practices Guidelines to implement
SG 1 - Establish a Test Policy SP 1.1 Define test goals
SP 1.2 Define test policy
SP 1.3 Distribute the test policy to
stakeholders
-Look at organization business goal
and role of testing in achieving the
same
- Policy should address test cycle
activities are planned, done by
trained engineers, process improve
with management support/focus
SG 2 - Establish a Test Strategy SP 2.1 Perform generic product
risk assessment
SP 2.2 Define test strategy
SP 2.3 Distribute the test strategy
to stakeholders
-Use organization standard way of
identifying risks in a project
-Define quality levels and
objectives
SG 3 - Establish Test Performance
Indicators
SP 3.1 Define test performance
indicators
SP 3.2 Deploy test performance
indicators
-Define how you measure success
of test process
-Set some target for key metrics
and measure what you achieved
Copyright STAG Software Pvt. Ltd., 2011
Process areas at TMMi Level 2
2.1 Test Policy and strategy
2.2 Test Planning
2.3 Test Monitoring and Control
2.4 Test Design and Execution
2.5 Test Environment
Copyright STAG Software Pvt. Ltd., 2011
2.2 Test Planning
Specific Goals Specific Practices Guidelines to implement
SG 1- Perform Product Risk
Assessment
SP 1.1 Define product risk
categories
SP 1.2 Identify product risks
SP 1.3 Analyze product risks
-Look at from end users
perspective value & prioritize
requirements
-Can you predict what can upset
end users?
SG 2 - Establish a Test Approach SP 2.1 Identify items and features
to be tested
SP 2.2 Define the test approach
SP 2.3 Define entry criteria
SP 2.4 Define exit criteria
SP 2.5 Define suspension and
resumption criteria
- Extract list of features
-Extract list of user types and
business use cases they use
-Extract potential defect types
-Quality levels and types of defects
to be uncovered at each levels
-Entry, exit, suspension and
resumption criteria for all levels
SG 3 - Establish Test Estimates SP 3.1 Establish a top-level work
breakdown structure
SP 3.2 Define test life cycle
SP 3.3 Determine estimates for test
effort and cost
-Have organization standard test
life cycle activity list
-Customize this to project specific
-Estimate effort, review update
and baseline
-Track number of cycles of re-
estimation done
Copyright STAG Software Pvt. Ltd., 2011
2.2 Test Planning
Specific Goals Specific Practices Guidelines to implement
SG 4 – Develop a Test Plan SP 4.1 Establish the test schedule
SP 4.2 Plan for test staffing
SP 4.3 Plan for stakeholders
involvement
SP 4.4 Identify test project risks
SP 4.5 Establish the test plan
-Milestone definition
-Detail schedule
-Risk assessment and prioritization
-Plan document with important
sections in place
SG 5 – Obtain Commitment to the
Test Plan
SP 5.1 Review test plan
SP 5.2 Reconcile work and resource
levels
SP 5.3 Obtain test plan
commitments
-Review plan with all concerned
-Update feedback and ensure
confidence is high to meet the plan
-Team commitments for all
dependency will help
Copyright STAG Software Pvt. Ltd., 2011
Process areas at TMMi Level 2
2.1 Test Policy and strategy
2.2 Test Planning
2.3 Test Monitoring and Control
2.4 Test Design and Execution
2.5 Test Environment
Copyright STAG Software Pvt. Ltd., 2011
2.3 Test Monitoring and Control
Specific Goals Specific Practices Guidelines to implement
SG 1 – Monitor Test Progress against Plan SP 1.1 Monitor test planning parameters
SP 1.2 Monitor test environment
resources provided and used
SP 1.3 Monitor test commitments
SP 1.4 Monitor test project risks
SP 1.5 Monitor stakeholder involvement
SP 1.6 Conduct test progress reviews
SP 1.7 Conduct test progress milestone
reviews
-Monitor effort/cost, schedule variance
against plan
-Ensure test environment is same as
stated in expectation in document
-Milestone review, weekly review etc.
-Stakeholders update on key milestone
and seek feedback
-Risk tracking
SG 2 – Monitor Product Quality against
Plan and Expectations
SP 2.1 Check against entry criteria
SP 2.2 Monitor defects
SP 2.3 Monitor product risks
SP 2.4 Monitor exit criteria
SP 2.5 Monitor suspension and
resumption criteria
SP 2.6 Conduct product quality reviews
SP 2.7 Conduct product quality
milestone reviews
-Quality levels exit criteria defined and
actual
- Monitor suspension and resumptions
cycles
- Test summary report at key quality
levels achievement
Copyright STAG Software Pvt. Ltd., 2011
2.3 Test Monitoring and Control
Specific Goals Specific Practices Guideline to implement
SG 3 – Manage Corrective Action to
Closure
SP 3.1 Analyze issues
SP 3.2 Take corrective action
SP 3.3 Manage corrective action
-Track project issues formally
-Track action items and ensure closure
Copyright STAG Software Pvt. Ltd., 2011
Process areas at TMMi Level 2
2.1 Test Policy and strategy
2.2 Test Planning
2.3 Test Monitoring and Control
2.4 Test Design and Execution
2.5 Test Environment
Copyright STAG Software Pvt. Ltd., 2011
2.4 Test Design and Execution
Specific Goals Specific Practices Guidelines to implement
SG 1 – Perform Test Analysis and
Design using Test Design
Techniques
SP 1.1 Identify and prioritize test
conditions
SP 1.2 Identify and prioritize test
cases
SP 1.3 Identify necessary specific
test data
SP 1.4 Maintain horizontal
traceability with requirements
-Have a clear test case
architecture to be followed across
organization
-Organize test cases at quality level
-Maintain requirement traceability
to test scenarios/test cases, fault
type, types of test applicable
SG 2 – Perform Test
Implementation
SP 2.1 Develop and prioritize test
procedures
SP 2.2 Create specific test data
SP 2.3 Specify intake test
procedure
SP 2.4 Develop test execution
schedule
-Test cycle schedule
-Build health check criteria
-Create re-usable test data
- Quality level entry/exit criteria
Copyright STAG Software Pvt. Ltd., 2011
2.4 Test Design and Execution
Specific Goals Specific Practices Guidelines to implement
SG 3 – Perform Test Execution SP 3.1 Perform intake test
SP 3.2 Execute test cases
SP 3.3 Report test incidents
SP 3.4 Write test log
-Verify entry criteria before
starting any levels of testing
- Execute test as per plan and
record outcome
-Capture defects to track and
close
SG 4 – Manage test incident to
closure
SP 4.1 Decide deposition of
test incidents in configuration
control board
SP 4.2 Perform appropriate
action to close the test
incident
SP 4.3 Track the status of test
incidents
-Be part of change control
board to resolve all issues
reported during testing
- Ensure defects fixed are
verified and closed in each
release
- Defect tracking report in
various forms so that helps to
take right decision
Copyright STAG Software Pvt. Ltd., 2011
Process areas at TMMi Level 2
2.1 Test Policy and strategy
2.2 Test Planning
2.3 Test Monitoring and Control
2.4 Test Design and Execution
2.5 Test Environment
Copyright STAG Software Pvt. Ltd., 2011
2.5 Test Environment
Specific Goals Specific Practices Guidelines to implement
SG 1 – Develop Test
Environment Requirements
SP 1.1 Elicit test environments
needs
SP 1.2 Develop the test
environment requirements
SP 1.3 Analyze the test
environment requirements
-Capture required
environment clearly at one
place
- Ensure environment available
and required are identified
SG 2 – Perform Test
Environment Implementation
SP 2.1 Implement the test
environment
SP 2.2 Create generic test data
SP 2.3 Specify test
environment intake test
procedure
SP 2.4 Perform test
environment intake test
-Set up test environment as
needed
- Create generic test data and
archive for re-use
- Verify whether needs of
environment required for
testing is met formally
Copyright STAG Software Pvt. Ltd., 2011
2.5 Test Environment
Specific Goals Specific Practices Guidelines to implement
SG 3 – Manage and Control
Test Environments
SP 3.1 Perform systems
management
SP 3.2 Perform test data
management
SP 3.3 Co-ordinate the
availability and usage of
the test environments
SP 3.4 Report and manage
test environment incidents
-Plan and track system
requirements
-Plan development of test
data and ensure it is
version controlled
- Ensure required co-
ordination process in place
when environment are
shared
- If environment issues
found capture and track till
it is closed
Copyright STAG Software Pvt. Ltd., 2011
Copyright STAG Software Pvt. Ltd., 2011
What you can see in L2 organization?
• Organization test goals and policy published
• There is a clear separation between debugging and
testing phase
• It is a planned activity in project plan
• Plan starts after coding is complete (only execution
based testing visible)
• Basic testing techniques in place
• Testing is multi-leveled
• Test environment managed as required
Copyright STAG Software Pvt. Ltd., 2011
Test Measurement
Software Quality Evaluation
Advanced Peer Reviews
Defect Prevention
Total Process Optimization
Quality Control
Test Policy and Strategy, Test Planning, Test Monitoring and
Control, Test Design and Execution, Test Environment
Test Organization, Test Training Program, Test Lifecycle and
Integration, Non-functional Testing, Peer Reviews
Level 1 : Initial
TMMi Framework
Five levels of Testing Process Maturity
Level 2 : Managed
Level 3 : Defined
Level 4 : Measured
Level 5 : Optimization
Process areas at TMMi Level 3
3.1 Test Organization
3.2 Test Training Program
3.3 Test Lifecycle and Integration
3.4 Non-functional testing
3.5 Peer Reviews
Copyright STAG Software Pvt. Ltd., 2011
3.1 Test Organization
Specific Goals Specific Practices Guidelines to implement
SG 1 – Establish a Test
Organization
SP 1.1 Define the test
organization
SP 1.2 Obtain commitment for
the test organization
SP 1.3 Implement the test
organization
-Clear definition of test team
organization
- Management commitment to
support the test organization
- Create team to fill all roles
SG 2 – Establish Test Functions
for Test Specialists
SP 2.1 Identify test functions
SP 2.2 Develop job
descriptions
SP 2.3 Assign staff members
to test functions
-Define key test lifecycle
activities
-Map role and responsibilities
to key test life cycle activities
SG 3 – Establish Test Career
Paths
SP 3.1 Establish test career
path
SP 3.2 Develop personal test
career development plans
-Ensure there is clear
definition of career path for
test engineers
- Ensure individual career
plans prepared and tracked by
managers
Copyright STAG Software Pvt. Ltd., 2011
3.1 Test Organization
Specific Goals Specific Practices Guidelines to implement
SG 4 – Determine, Plan and
Implement Test Process
Improvement
SP 4.1 Assess the organization’s
test process
SP 4.2 Identify the organization
test process improvements
SP 4.3 Plan test process
improvements
SP 4.4 Implement test process
improvements
-Assess organization test process
formally
- Identify improvement areas
- Plan test process improvements
by having a team
- Ensure team work as per plan and
achieve improvements planned
SG 5 – Deploy the Organization
Test Process and Incorporate
Lessons Learned
SP 5.1 Deploy standard test
process and test process assets
SP 5.2 Monitor implementation
SP 5.3 Incorporate lessons learnt
into the organizational test process
-Define standard process
- Capture test process assets
- Monitor adherence to process by
planned audits
- Analyze completed projects and
recommend any improvement to
process needed
Copyright STAG Software Pvt. Ltd., 2011
3.2 Test Training Program
Specific Goals Specific Practices Guidelines to implement
SG 1 – Establish an
Organizational Test Training
Capability
SP 1.1 Establish the strategic
test training needs
SP 1.2 Align the organizational
and project test training needs
SP 1.3 Establish an
organizational test training
plan
SP 1.4 Establish test training
capability
-Define role based
competency and standard
training needs
- Identify project specific
competency required and plan
training
- Have clear training plan for
team and project specific
training on need basis
-Ensure trainers
internal/external identified
and ready for all topics
SG 2 – Provide Necessary Test
Training
SP 2.1 Deliver test training
SP 2.2 Establish test training
records
SP 2.3 Assess test training
effectiveness
-Conduct training as per plan
- Maintain test training records
- Verify the effectiveness of
training conducted on job
Copyright STAG Software Pvt. Ltd., 2011
3.3 Test Lifecycle and Integration
Specific Goals Specific Practices Guidelines to implement
SG 1 – Establish Organizational Test
Process and Assets
SP 1.1 Establish standard test process
SP 1.2 Establish test lifecycle model
descriptions addressing all test levels
SP 1.3 Establish tailoring criteria and
guidelines
SP 1.4 Establish the organization’s test
process database
SP 1.5 Establish the organization's test
process asset library
SP 1.6 Establish work environment
standards
-Have organization standard test process
approved
- Define standard test lifecycle activities
-Establish tailoring guidelines and criteria
-Capture test process followed at project
level as data
- Capture process assets including
tailoring done
- Ensure work environment is defined
and adhered to as per plan
SG 2 – Integrate Test Lifecycle Models
with Development Models
SP 2.1 Establish integrated test lifecycle
models
SP 2.2 Review integrated lifecycle models
SP 2.3 Obtain commitments on the role
of testing within the integrated lifecycle
models
-Ensure multiple test cycles are planned
with focus on all levels of testing
- Review with all concerned on depends
across each team and agree on
entry/exit criteria
Copyright STAG Software Pvt. Ltd., 2011
3.3 Test Lifecycle and Integration
Specific Goals Specific Practices Guidelines to implement
SG 3 – Establish a Master Test
Plan
SP 3.1 Perform product risk
assessment
SP 3.2 Establish the test
approach
SP 3.3 Establish test estimates
SP 3.4 Define the organization
for testing
SP 3.5 Develop the master
test plan
SP 3.6 Obtain commitment to
the master test plan
-Prioritize customer
expectation
- Define test strategy
- Estimate effort required
- Define team required
-Have master test plan with
milestone
- Have detail plan for all
milestone
- Have commitment from all
concerned in team on
schedule
Copyright STAG Software Pvt. Ltd., 2011
3.4 Non-functional Testing
Specific Goals Specific Practices Guidelines to implement
SG 1 – Perform a Non-
Functional Product Risk
Assessment
SP 1.1 Identify non-functional
product risks
SP 1.2 Analyze non-functional
product risks
-Identify non-functional
product requirements
- Analyze what can go wrong
here
SG 2 – Establish a Non-
Functional Test Approach
SP 2.1 Identify features to be
tested
SP 2.2 Define the non-
functional test approach
SP 2.3 Define non-functional
exit criteria
-Identify scope for NF testing
- Define test approach for NF
testing
- Define exit criteria for all
planned NF tests
Copyright STAG Software Pvt. Ltd., 2011
3.4 Non-functional Testing
Specific Goals Specific Practices Guidelines to implement
SG 3 – Perform Non-Functional
Test Analysis and Design
SP 3.1 Identify and prioritize non-
functional test conditions
SP 3.2 Identify and prioritize non-
functional test cases
SP 3.3 Identify necessary specific
test data
SP 3.4 Maintain horizontal
traceability with non-functional
requirements
-Identify use cases where NF
requirements may not be fully met
- Have scenarios and tests cases to
replicate the identified use case
- Ensure NF requirement to test
assets traceability is established
SG 4 – Perform Non-Functional
Test Implementation
SP 4.1 Develop and prioritize non-
functional test requirements
SP 4.2 Create specific test data
-Scope and plan for NF testing
-Create required scripts to produce
the targeted use case scenario
SG 5 – Perform Non-Functional
Test Execution
SP 5.1 Execute non-functional test
cases
SP 5.2 Report non-functional test
incidents
SP 5.3 Write test log
-Execute planned NF tests
-Report NF test issues and track till
closure
-Capture test outcome
Copyright STAG Software Pvt. Ltd., 2011
3.5 Peer Reviews
Specific Goals Specific Practices Guidelines to implement
SG 1 – Establish a Peer Review
Approach
SP 1.1 Identify work products
to be reviewed
SP 1.2 Define Peer Review
Criteria
-Agree upon work products
which will go through peer
review
- Expectation defined for peer
review
SG 2 – Perform Peer Reviews SP 2.1 Conduct peer reviews
SP 2.2 Testers review test
basis documents
SP 2.3 Analyze peer review
data
-Peer review happens as per
plan
- Test engineers are part work
product reviews which impacts
their deliverables
-Analyze peer review outcome
and improve organization
checklist
Copyright STAG Software Pvt. Ltd., 2011
Copyright STAG Software Pvt. Ltd., 2011
What you can see in L3 organizations?
• There is an established test organization
• Testing is integrated to SDLC
• Test plan is developed, tracked and controlled (Integrated
with project plan)
• Key work products go through peer reviews
• Organization review checklist for all documents evolve
• Test engineers drive test process improvement
• Users/clients attend milestone meeting
• User/clients support in developing usability test plans
Copyright STAG Software Pvt. Ltd., 2011
Thank You
Email ID: nagaraj@stagsoftware.com

Contenu connexe

Tendances

Role Of Qa And Testing In Agile 1225221397167302 8
Role Of Qa And Testing In Agile 1225221397167302 8Role Of Qa And Testing In Agile 1225221397167302 8
Role Of Qa And Testing In Agile 1225221397167302 8
a34sharm
 

Tendances (20)

Chapter 1 - Testing Process
Chapter 1 - Testing ProcessChapter 1 - Testing Process
Chapter 1 - Testing Process
 
Chapter 2 - Test Management
Chapter 2 - Test ManagementChapter 2 - Test Management
Chapter 2 - Test Management
 
Test Process
Test ProcessTest Process
Test Process
 
Chapter 4 - Defect Management
Chapter 4 - Defect ManagementChapter 4 - Defect Management
Chapter 4 - Defect Management
 
Role Of Qa And Testing In Agile 1225221397167302 8
Role Of Qa And Testing In Agile 1225221397167302 8Role Of Qa And Testing In Agile 1225221397167302 8
Role Of Qa And Testing In Agile 1225221397167302 8
 
Software Testing Life Cycle (STLC) | Software Testing Tutorial | Edureka
Software Testing Life Cycle (STLC) | Software Testing Tutorial | EdurekaSoftware Testing Life Cycle (STLC) | Software Testing Tutorial | Edureka
Software Testing Life Cycle (STLC) | Software Testing Tutorial | Edureka
 
QA Best Practices in Agile World_new
QA Best Practices in Agile World_newQA Best Practices in Agile World_new
QA Best Practices in Agile World_new
 
stlc
stlcstlc
stlc
 
Istqb chapter 5
Istqb chapter 5Istqb chapter 5
Istqb chapter 5
 
Chapter 5 - Tools
Chapter 5 - ToolsChapter 5 - Tools
Chapter 5 - Tools
 
STLC
STLCSTLC
STLC
 
Chapter 3 - Reviews
Chapter 3 - ReviewsChapter 3 - Reviews
Chapter 3 - Reviews
 
ISTQB Advanced Test Manager Training 2012 - Testing Process
ISTQB Advanced Test Manager Training 2012 - Testing Process ISTQB Advanced Test Manager Training 2012 - Testing Process
ISTQB Advanced Test Manager Training 2012 - Testing Process
 
Chapter 6 - Tool Support for Testing
Chapter 6 - Tool Support for TestingChapter 6 - Tool Support for Testing
Chapter 6 - Tool Support for Testing
 
Test planning
Test planningTest planning
Test planning
 
Chapter 3 - Static Testing
Chapter 3 - Static TestingChapter 3 - Static Testing
Chapter 3 - Static Testing
 
Test Strategy
Test StrategyTest Strategy
Test Strategy
 
ISTQB Foundation Level Basic
ISTQB Foundation Level BasicISTQB Foundation Level Basic
ISTQB Foundation Level Basic
 
Software Testing Maturity Model and Assessment by Abstracta
Software Testing Maturity Model and Assessment by AbstractaSoftware Testing Maturity Model and Assessment by Abstracta
Software Testing Maturity Model and Assessment by Abstracta
 
ISTQB / ISEB Foundation Exam Practice - 4
ISTQB / ISEB Foundation Exam Practice - 4ISTQB / ISEB Foundation Exam Practice - 4
ISTQB / ISEB Foundation Exam Practice - 4
 

Similaire à TMMi Implementation Guideline

Health Care Project Testing Process
Health Care Project Testing ProcessHealth Care Project Testing Process
Health Care Project Testing Process
H2Kinfosys
 
ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2
Yogindernath Gupta
 
Process and product quality Assurance
Process and product quality AssuranceProcess and product quality Assurance
Process and product quality Assurance
Joydip Bhattacharya
 
Software Testing Life Cycle
Software Testing Life CycleSoftware Testing Life Cycle
Software Testing Life Cycle
Udayakumar Sree
 

Similaire à TMMi Implementation Guideline (20)

Stlc ppt
Stlc pptStlc ppt
Stlc ppt
 
Tesda css correction
Tesda css correctionTesda css correction
Tesda css correction
 
Health Care Project Testing Process
Health Care Project Testing ProcessHealth Care Project Testing Process
Health Care Project Testing Process
 
Fundamental test process
Fundamental test processFundamental test process
Fundamental test process
 
SDET UNIT 3.pptx
SDET UNIT 3.pptxSDET UNIT 3.pptx
SDET UNIT 3.pptx
 
ISTQBCH2.ppt
ISTQBCH2.pptISTQBCH2.ppt
ISTQBCH2.ppt
 
ISTQBCH2.ppt
ISTQBCH2.pptISTQBCH2.ppt
ISTQBCH2.ppt
 
Introduction to CMMI-DEV v1.3 - Day 3
Introduction to CMMI-DEV v1.3  - Day 3Introduction to CMMI-DEV v1.3  - Day 3
Introduction to CMMI-DEV v1.3 - Day 3
 
ISTQB, ISEB Lecture Notes- 2
ISTQB, ISEB Lecture Notes- 2ISTQB, ISEB Lecture Notes- 2
ISTQB, ISEB Lecture Notes- 2
 
ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2
 
PECB Webinar: Aligning ISO 25000 and CMMI for Development
PECB Webinar: Aligning ISO 25000 and CMMI for DevelopmentPECB Webinar: Aligning ISO 25000 and CMMI for Development
PECB Webinar: Aligning ISO 25000 and CMMI for Development
 
ISTQB Foundation - Chapter 2
ISTQB Foundation - Chapter 2ISTQB Foundation - Chapter 2
ISTQB Foundation - Chapter 2
 
Quality Assurance vs. Quality Control, Future of Software Quality
Quality Assurance vs. Quality Control, Future of Software Quality Quality Assurance vs. Quality Control, Future of Software Quality
Quality Assurance vs. Quality Control, Future of Software Quality
 
STLC-ppt-1.pptx
STLC-ppt-1.pptxSTLC-ppt-1.pptx
STLC-ppt-1.pptx
 
Process and product quality Assurance
Process and product quality AssuranceProcess and product quality Assurance
Process and product quality Assurance
 
Software Testing Life Cycle
Software Testing Life CycleSoftware Testing Life Cycle
Software Testing Life Cycle
 
Zmitrowicz Test Strategy Test Forum Milan 2019
Zmitrowicz Test Strategy Test Forum Milan 2019Zmitrowicz Test Strategy Test Forum Milan 2019
Zmitrowicz Test Strategy Test Forum Milan 2019
 
Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!”
Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!” Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!”
Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!”
 
CMMI Agile Mapping
CMMI Agile MappingCMMI Agile Mapping
CMMI Agile Mapping
 
Chapter 1 - Testing Process
Chapter 1 - Testing ProcessChapter 1 - Testing Process
Chapter 1 - Testing Process
 

Plus de STAG Software Private Limited

Are your quality metrics insightful?
Are your quality metrics insightful?Are your quality metrics insightful?
Are your quality metrics insightful?
STAG Software Private Limited
 
Weighed down by automation?
Weighed down by automation?Weighed down by automation?
Weighed down by automation?
STAG Software Private Limited
 

Plus de STAG Software Private Limited (20)

Application Scenarios of "doSmartQA -Smart Probing Assistant"
Application Scenarios of "doSmartQA -Smart Probing Assistant"Application Scenarios of "doSmartQA -Smart Probing Assistant"
Application Scenarios of "doSmartQA -Smart Probing Assistant"
 
Choked by technical debt?
Choked by technical debt?Choked by technical debt?
Choked by technical debt?
 
Are your quality metrics insightful?
Are your quality metrics insightful?Are your quality metrics insightful?
Are your quality metrics insightful?
 
Weighed down by automation?
Weighed down by automation?Weighed down by automation?
Weighed down by automation?
 
Covid19 and Clean Code Part 2 - Process & Criteria
Covid19 and Clean Code Part 2 - Process & CriteriaCovid19 and Clean Code Part 2 - Process & Criteria
Covid19 and Clean Code Part 2 - Process & Criteria
 
Seven Thinking Tools to Test Rapidly
Seven Thinking Tools to Test RapidlySeven Thinking Tools to Test Rapidly
Seven Thinking Tools to Test Rapidly
 
How to test less and accomplish more
How to test less and accomplish moreHow to test less and accomplish more
How to test less and accomplish more
 
Is regression hindering your progression?
Is regression hindering your progression?Is regression hindering your progression?
Is regression hindering your progression?
 
The Power of Checklist
The Power of ChecklistThe Power of Checklist
The Power of Checklist
 
The power of checklist
The power of checklist The power of checklist
The power of checklist
 
Webinar - 'Test Case Immunity’- Optimize testing
Webinar - 'Test Case Immunity’- Optimize testing Webinar - 'Test Case Immunity’- Optimize testing
Webinar - 'Test Case Immunity’- Optimize testing
 
Design Scientifically (How to test a user story)
Design Scientifically (How to test a user story)Design Scientifically (How to test a user story)
Design Scientifically (How to test a user story)
 
Setting a clear baseline (How to test an user story #2)
Setting a clear baseline (How to test an user story #2)Setting a clear baseline (How to test an user story #2)
Setting a clear baseline (How to test an user story #2)
 
Question to Understand (How to test an User Story #1)
Question to Understand (How to test an User Story #1)Question to Understand (How to test an User Story #1)
Question to Understand (How to test an User Story #1)
 
Language shapes the way you think
Language shapes the way you thinkLanguage shapes the way you think
Language shapes the way you think
 
Deliver Superior Outcomes Using HBT Visualization Tool
Deliver Superior Outcomes Using HBT Visualization ToolDeliver Superior Outcomes Using HBT Visualization Tool
Deliver Superior Outcomes Using HBT Visualization Tool
 
Hypothesis Based Testing – Application and Adaptation for testing Enterprise ...
Hypothesis Based Testing – Application and Adaptation for testing Enterprise ...Hypothesis Based Testing – Application and Adaptation for testing Enterprise ...
Hypothesis Based Testing – Application and Adaptation for testing Enterprise ...
 
Are Your Test Cases Fit For Automation?
Are Your Test Cases Fit For Automation?Are Your Test Cases Fit For Automation?
Are Your Test Cases Fit For Automation?
 
Think better using “Descriptive-Prescriptive” Approach
Think better using “Descriptive-Prescriptive” ApproachThink better using “Descriptive-Prescriptive” Approach
Think better using “Descriptive-Prescriptive” Approach
 
Improving Defect Yield - a three step approach
Improving Defect Yield - a three step approachImproving Defect Yield - a three step approach
Improving Defect Yield - a three step approach
 

Dernier

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Dernier (20)

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 

TMMi Implementation Guideline

  • 1. Path to reach Level 3 test process maturity in TMMi framework M C Nagaraj nagaraj@stagsoftware.com in.linkedin.com/in/mcnagaraj
  • 2. Copyright STAG Software Pvt. Ltd., 2011 Agenda TMMi – Level 1 to 5  Requirement interpretation  Linking current process to TMMi Specific practices All TMMi related information are taken from TMMi framework document V 3.1 created and Copyrights owned by TMMi foundation. www.tmmifoundation.org
  • 3. Copyright STAG Software Pvt. Ltd., 2011 Test Measurement Software Quality Evaluation Advanced Peer Reviews Defect Prevention Total Process Optimization Quality Control Test Policy and Strategy, Test Planning, Test Monitoring and Control, Test Design and Execution, Test Environment Test Organization, Test Training Program, Test Lifecycle and Integration, Non-functional Testing, Peer Reviews Level 1 : Initial TMMi Framework Five levels of Testing Process Maturity Level 2 : Managed Level 3 : Defined Level 4 : Measured Level 5 : Optimization
  • 4. Copyright STAG Software Pvt. Ltd., 2011 Test Measurement Software Quality Evaluation Advanced Peer Reviews Defect Prevention Total Process Optimization Quality Control Test Policy and Strategy, Test Planning, Test Monitoring and Control, Test Design and Execution, Test Environment Test Organization, Test Training Program, Test Lifecycle and Integration, Non-functional Testing, Peer Reviews Level 1 : Initial TMMi Framework Five levels of Testing Process Maturity Level 2 : Managed Level 3 : Defined Level 4 : Measured Level 5 : Optimization
  • 5. Copyright STAG Software Pvt. Ltd., 2011 Level-1 • Testing is a chaotic process • Not distinguished from debugging • Documented set of specification not available • Tests are developed in ad-hoc way after coding is completed • The objective of testing is to show that software works
  • 6. Copyright STAG Software Pvt. Ltd., 2011 Test Measurement Software Quality Evaluation Advanced Peer Reviews Defect Prevention Total Process Optimization Quality Control Test Policy and Strategy, Test Planning, Test Monitoring and Control, Test Design and Execution, Test Environment Test Organization, Test Training Program, Test Lifecycle and Integration, Non-functional Testing, Peer Reviews Level 1 : Initial TMMi Level 2 Five levels of Testing Process Maturity Level 2 : Managed Level 3 : Defined Level 4 : Measured Level 5 : Optimization
  • 7. Process areas at TMMi Level 2 2.1 Test Policy and strategy 2.2 Test Planning 2.3 Test Monitoring and Control 2.4 Test Design and Execution 2.5 Test Environment Copyright STAG Software Pvt. Ltd., 2011
  • 8. 2.1 Test Policy and Strategy Specific Goals Specific Practices Guidelines to implement SG 1 - Establish a Test Policy SP 1.1 Define test goals SP 1.2 Define test policy SP 1.3 Distribute the test policy to stakeholders -Look at organization business goal and role of testing in achieving the same - Policy should address test cycle activities are planned, done by trained engineers, process improve with management support/focus SG 2 - Establish a Test Strategy SP 2.1 Perform generic product risk assessment SP 2.2 Define test strategy SP 2.3 Distribute the test strategy to stakeholders -Use organization standard way of identifying risks in a project -Define quality levels and objectives SG 3 - Establish Test Performance Indicators SP 3.1 Define test performance indicators SP 3.2 Deploy test performance indicators -Define how you measure success of test process -Set some target for key metrics and measure what you achieved Copyright STAG Software Pvt. Ltd., 2011
  • 9. Process areas at TMMi Level 2 2.1 Test Policy and strategy 2.2 Test Planning 2.3 Test Monitoring and Control 2.4 Test Design and Execution 2.5 Test Environment Copyright STAG Software Pvt. Ltd., 2011
  • 10. 2.2 Test Planning Specific Goals Specific Practices Guidelines to implement SG 1- Perform Product Risk Assessment SP 1.1 Define product risk categories SP 1.2 Identify product risks SP 1.3 Analyze product risks -Look at from end users perspective value & prioritize requirements -Can you predict what can upset end users? SG 2 - Establish a Test Approach SP 2.1 Identify items and features to be tested SP 2.2 Define the test approach SP 2.3 Define entry criteria SP 2.4 Define exit criteria SP 2.5 Define suspension and resumption criteria - Extract list of features -Extract list of user types and business use cases they use -Extract potential defect types -Quality levels and types of defects to be uncovered at each levels -Entry, exit, suspension and resumption criteria for all levels SG 3 - Establish Test Estimates SP 3.1 Establish a top-level work breakdown structure SP 3.2 Define test life cycle SP 3.3 Determine estimates for test effort and cost -Have organization standard test life cycle activity list -Customize this to project specific -Estimate effort, review update and baseline -Track number of cycles of re- estimation done Copyright STAG Software Pvt. Ltd., 2011
  • 11. 2.2 Test Planning Specific Goals Specific Practices Guidelines to implement SG 4 – Develop a Test Plan SP 4.1 Establish the test schedule SP 4.2 Plan for test staffing SP 4.3 Plan for stakeholders involvement SP 4.4 Identify test project risks SP 4.5 Establish the test plan -Milestone definition -Detail schedule -Risk assessment and prioritization -Plan document with important sections in place SG 5 – Obtain Commitment to the Test Plan SP 5.1 Review test plan SP 5.2 Reconcile work and resource levels SP 5.3 Obtain test plan commitments -Review plan with all concerned -Update feedback and ensure confidence is high to meet the plan -Team commitments for all dependency will help Copyright STAG Software Pvt. Ltd., 2011
  • 12. Process areas at TMMi Level 2 2.1 Test Policy and strategy 2.2 Test Planning 2.3 Test Monitoring and Control 2.4 Test Design and Execution 2.5 Test Environment Copyright STAG Software Pvt. Ltd., 2011
  • 13. 2.3 Test Monitoring and Control Specific Goals Specific Practices Guidelines to implement SG 1 – Monitor Test Progress against Plan SP 1.1 Monitor test planning parameters SP 1.2 Monitor test environment resources provided and used SP 1.3 Monitor test commitments SP 1.4 Monitor test project risks SP 1.5 Monitor stakeholder involvement SP 1.6 Conduct test progress reviews SP 1.7 Conduct test progress milestone reviews -Monitor effort/cost, schedule variance against plan -Ensure test environment is same as stated in expectation in document -Milestone review, weekly review etc. -Stakeholders update on key milestone and seek feedback -Risk tracking SG 2 – Monitor Product Quality against Plan and Expectations SP 2.1 Check against entry criteria SP 2.2 Monitor defects SP 2.3 Monitor product risks SP 2.4 Monitor exit criteria SP 2.5 Monitor suspension and resumption criteria SP 2.6 Conduct product quality reviews SP 2.7 Conduct product quality milestone reviews -Quality levels exit criteria defined and actual - Monitor suspension and resumptions cycles - Test summary report at key quality levels achievement Copyright STAG Software Pvt. Ltd., 2011
  • 14. 2.3 Test Monitoring and Control Specific Goals Specific Practices Guideline to implement SG 3 – Manage Corrective Action to Closure SP 3.1 Analyze issues SP 3.2 Take corrective action SP 3.3 Manage corrective action -Track project issues formally -Track action items and ensure closure Copyright STAG Software Pvt. Ltd., 2011
  • 15. Process areas at TMMi Level 2 2.1 Test Policy and strategy 2.2 Test Planning 2.3 Test Monitoring and Control 2.4 Test Design and Execution 2.5 Test Environment Copyright STAG Software Pvt. Ltd., 2011
  • 16. 2.4 Test Design and Execution Specific Goals Specific Practices Guidelines to implement SG 1 – Perform Test Analysis and Design using Test Design Techniques SP 1.1 Identify and prioritize test conditions SP 1.2 Identify and prioritize test cases SP 1.3 Identify necessary specific test data SP 1.4 Maintain horizontal traceability with requirements -Have a clear test case architecture to be followed across organization -Organize test cases at quality level -Maintain requirement traceability to test scenarios/test cases, fault type, types of test applicable SG 2 – Perform Test Implementation SP 2.1 Develop and prioritize test procedures SP 2.2 Create specific test data SP 2.3 Specify intake test procedure SP 2.4 Develop test execution schedule -Test cycle schedule -Build health check criteria -Create re-usable test data - Quality level entry/exit criteria Copyright STAG Software Pvt. Ltd., 2011
  • 17. 2.4 Test Design and Execution Specific Goals Specific Practices Guidelines to implement SG 3 – Perform Test Execution SP 3.1 Perform intake test SP 3.2 Execute test cases SP 3.3 Report test incidents SP 3.4 Write test log -Verify entry criteria before starting any levels of testing - Execute test as per plan and record outcome -Capture defects to track and close SG 4 – Manage test incident to closure SP 4.1 Decide deposition of test incidents in configuration control board SP 4.2 Perform appropriate action to close the test incident SP 4.3 Track the status of test incidents -Be part of change control board to resolve all issues reported during testing - Ensure defects fixed are verified and closed in each release - Defect tracking report in various forms so that helps to take right decision Copyright STAG Software Pvt. Ltd., 2011
  • 18. Process areas at TMMi Level 2 2.1 Test Policy and strategy 2.2 Test Planning 2.3 Test Monitoring and Control 2.4 Test Design and Execution 2.5 Test Environment Copyright STAG Software Pvt. Ltd., 2011
  • 19. 2.5 Test Environment Specific Goals Specific Practices Guidelines to implement SG 1 – Develop Test Environment Requirements SP 1.1 Elicit test environments needs SP 1.2 Develop the test environment requirements SP 1.3 Analyze the test environment requirements -Capture required environment clearly at one place - Ensure environment available and required are identified SG 2 – Perform Test Environment Implementation SP 2.1 Implement the test environment SP 2.2 Create generic test data SP 2.3 Specify test environment intake test procedure SP 2.4 Perform test environment intake test -Set up test environment as needed - Create generic test data and archive for re-use - Verify whether needs of environment required for testing is met formally Copyright STAG Software Pvt. Ltd., 2011
  • 20. 2.5 Test Environment Specific Goals Specific Practices Guidelines to implement SG 3 – Manage and Control Test Environments SP 3.1 Perform systems management SP 3.2 Perform test data management SP 3.3 Co-ordinate the availability and usage of the test environments SP 3.4 Report and manage test environment incidents -Plan and track system requirements -Plan development of test data and ensure it is version controlled - Ensure required co- ordination process in place when environment are shared - If environment issues found capture and track till it is closed Copyright STAG Software Pvt. Ltd., 2011
  • 21. Copyright STAG Software Pvt. Ltd., 2011 What you can see in L2 organization? • Organization test goals and policy published • There is a clear separation between debugging and testing phase • It is a planned activity in project plan • Plan starts after coding is complete (only execution based testing visible) • Basic testing techniques in place • Testing is multi-leveled • Test environment managed as required
  • 22. Copyright STAG Software Pvt. Ltd., 2011 Test Measurement Software Quality Evaluation Advanced Peer Reviews Defect Prevention Total Process Optimization Quality Control Test Policy and Strategy, Test Planning, Test Monitoring and Control, Test Design and Execution, Test Environment Test Organization, Test Training Program, Test Lifecycle and Integration, Non-functional Testing, Peer Reviews Level 1 : Initial TMMi Framework Five levels of Testing Process Maturity Level 2 : Managed Level 3 : Defined Level 4 : Measured Level 5 : Optimization
  • 23. Process areas at TMMi Level 3 3.1 Test Organization 3.2 Test Training Program 3.3 Test Lifecycle and Integration 3.4 Non-functional testing 3.5 Peer Reviews Copyright STAG Software Pvt. Ltd., 2011
  • 24. 3.1 Test Organization Specific Goals Specific Practices Guidelines to implement SG 1 – Establish a Test Organization SP 1.1 Define the test organization SP 1.2 Obtain commitment for the test organization SP 1.3 Implement the test organization -Clear definition of test team organization - Management commitment to support the test organization - Create team to fill all roles SG 2 – Establish Test Functions for Test Specialists SP 2.1 Identify test functions SP 2.2 Develop job descriptions SP 2.3 Assign staff members to test functions -Define key test lifecycle activities -Map role and responsibilities to key test life cycle activities SG 3 – Establish Test Career Paths SP 3.1 Establish test career path SP 3.2 Develop personal test career development plans -Ensure there is clear definition of career path for test engineers - Ensure individual career plans prepared and tracked by managers Copyright STAG Software Pvt. Ltd., 2011
  • 25. 3.1 Test Organization Specific Goals Specific Practices Guidelines to implement SG 4 – Determine, Plan and Implement Test Process Improvement SP 4.1 Assess the organization’s test process SP 4.2 Identify the organization test process improvements SP 4.3 Plan test process improvements SP 4.4 Implement test process improvements -Assess organization test process formally - Identify improvement areas - Plan test process improvements by having a team - Ensure team work as per plan and achieve improvements planned SG 5 – Deploy the Organization Test Process and Incorporate Lessons Learned SP 5.1 Deploy standard test process and test process assets SP 5.2 Monitor implementation SP 5.3 Incorporate lessons learnt into the organizational test process -Define standard process - Capture test process assets - Monitor adherence to process by planned audits - Analyze completed projects and recommend any improvement to process needed Copyright STAG Software Pvt. Ltd., 2011
  • 26. 3.2 Test Training Program Specific Goals Specific Practices Guidelines to implement SG 1 – Establish an Organizational Test Training Capability SP 1.1 Establish the strategic test training needs SP 1.2 Align the organizational and project test training needs SP 1.3 Establish an organizational test training plan SP 1.4 Establish test training capability -Define role based competency and standard training needs - Identify project specific competency required and plan training - Have clear training plan for team and project specific training on need basis -Ensure trainers internal/external identified and ready for all topics SG 2 – Provide Necessary Test Training SP 2.1 Deliver test training SP 2.2 Establish test training records SP 2.3 Assess test training effectiveness -Conduct training as per plan - Maintain test training records - Verify the effectiveness of training conducted on job Copyright STAG Software Pvt. Ltd., 2011
  • 27. 3.3 Test Lifecycle and Integration Specific Goals Specific Practices Guidelines to implement SG 1 – Establish Organizational Test Process and Assets SP 1.1 Establish standard test process SP 1.2 Establish test lifecycle model descriptions addressing all test levels SP 1.3 Establish tailoring criteria and guidelines SP 1.4 Establish the organization’s test process database SP 1.5 Establish the organization's test process asset library SP 1.6 Establish work environment standards -Have organization standard test process approved - Define standard test lifecycle activities -Establish tailoring guidelines and criteria -Capture test process followed at project level as data - Capture process assets including tailoring done - Ensure work environment is defined and adhered to as per plan SG 2 – Integrate Test Lifecycle Models with Development Models SP 2.1 Establish integrated test lifecycle models SP 2.2 Review integrated lifecycle models SP 2.3 Obtain commitments on the role of testing within the integrated lifecycle models -Ensure multiple test cycles are planned with focus on all levels of testing - Review with all concerned on depends across each team and agree on entry/exit criteria Copyright STAG Software Pvt. Ltd., 2011
  • 28. 3.3 Test Lifecycle and Integration Specific Goals Specific Practices Guidelines to implement SG 3 – Establish a Master Test Plan SP 3.1 Perform product risk assessment SP 3.2 Establish the test approach SP 3.3 Establish test estimates SP 3.4 Define the organization for testing SP 3.5 Develop the master test plan SP 3.6 Obtain commitment to the master test plan -Prioritize customer expectation - Define test strategy - Estimate effort required - Define team required -Have master test plan with milestone - Have detail plan for all milestone - Have commitment from all concerned in team on schedule Copyright STAG Software Pvt. Ltd., 2011
  • 29. 3.4 Non-functional Testing Specific Goals Specific Practices Guidelines to implement SG 1 – Perform a Non- Functional Product Risk Assessment SP 1.1 Identify non-functional product risks SP 1.2 Analyze non-functional product risks -Identify non-functional product requirements - Analyze what can go wrong here SG 2 – Establish a Non- Functional Test Approach SP 2.1 Identify features to be tested SP 2.2 Define the non- functional test approach SP 2.3 Define non-functional exit criteria -Identify scope for NF testing - Define test approach for NF testing - Define exit criteria for all planned NF tests Copyright STAG Software Pvt. Ltd., 2011
  • 30. 3.4 Non-functional Testing Specific Goals Specific Practices Guidelines to implement SG 3 – Perform Non-Functional Test Analysis and Design SP 3.1 Identify and prioritize non- functional test conditions SP 3.2 Identify and prioritize non- functional test cases SP 3.3 Identify necessary specific test data SP 3.4 Maintain horizontal traceability with non-functional requirements -Identify use cases where NF requirements may not be fully met - Have scenarios and tests cases to replicate the identified use case - Ensure NF requirement to test assets traceability is established SG 4 – Perform Non-Functional Test Implementation SP 4.1 Develop and prioritize non- functional test requirements SP 4.2 Create specific test data -Scope and plan for NF testing -Create required scripts to produce the targeted use case scenario SG 5 – Perform Non-Functional Test Execution SP 5.1 Execute non-functional test cases SP 5.2 Report non-functional test incidents SP 5.3 Write test log -Execute planned NF tests -Report NF test issues and track till closure -Capture test outcome Copyright STAG Software Pvt. Ltd., 2011
  • 31. 3.5 Peer Reviews Specific Goals Specific Practices Guidelines to implement SG 1 – Establish a Peer Review Approach SP 1.1 Identify work products to be reviewed SP 1.2 Define Peer Review Criteria -Agree upon work products which will go through peer review - Expectation defined for peer review SG 2 – Perform Peer Reviews SP 2.1 Conduct peer reviews SP 2.2 Testers review test basis documents SP 2.3 Analyze peer review data -Peer review happens as per plan - Test engineers are part work product reviews which impacts their deliverables -Analyze peer review outcome and improve organization checklist Copyright STAG Software Pvt. Ltd., 2011
  • 32. Copyright STAG Software Pvt. Ltd., 2011 What you can see in L3 organizations? • There is an established test organization • Testing is integrated to SDLC • Test plan is developed, tracked and controlled (Integrated with project plan) • Key work products go through peer reviews • Organization review checklist for all documents evolve • Test engineers drive test process improvement • Users/clients attend milestone meeting • User/clients support in developing usability test plans
  • 33. Copyright STAG Software Pvt. Ltd., 2011 Thank You Email ID: nagaraj@stagsoftware.com