Regional Development Agency ARLEG S.A.
Katarzyna Matijczak, Murcia, 17.10.2013
Location
of the practice
Country Poland
NUTS 1
NUTS 2 Lower Silesia
City Poland (good practice is
widespread in Poland)
Lower Silesia
Voivodeship
WHAT IS A THERMOMODERNISATION FUND
AND A THERMOMODERNISATION BONUS?
They are funds allocated from the State Budget
which are administered by Bank Gospodarstwa Krajowego
[National Economy Bank].
They are intended to support all eligible subjects in performing
actions aiming at lowering energy consumption
and the amount of energy carriers in both communal
and social & living resources.
WHAT IS A THERMOMODERNISATION FUND
AND A THERMOMODERNISATION BONUS?
Thermomodernisation of buildings is usually highly profitable,
yet it requires bearing substantial costs right from the beginning.
That is why, many building owners cannot carry out
thermomodernisation without extra financial support.
The Act on Supporting Thermomodernisation Investments creates
a system for bulding owners which aims at facilitating the process
of financing thermomodernisation so as to finally lower energy
consumption and costs of both heating buildings and producing
domestic hot water.
PRINCIPLES OF SUPPORTING THERMOMODERNISATION
The system of financial help includes thermomodernisation undertakings
in the following buildings:
- multi and single-family buildings irrespective of their legal form
of ownership which means: private, commonhold, housing associations,
company, city and other buildings except for those belonging to budget
entities,
- social collective accommodation buildings such as nursing homes,
halls of residence, dormitories, hostels, retirement homes and the like,
- buildings used for public activities of local government units such
as schools, commune offices and the like,
- local heat sources (housing estate boiler houses and thermal power
stations) or district heating substations and local heating networks
with the power of 11.6 MW.
PRINCIPLES OF SUPPORTING THERMOMODERNISATION
Provisions under the Act on Supporting Thermomodernisation
Investments are also connected with the overall and partial
replacement of an existing energy source with an unconventional
one e.g. solar panels, heat pumps, boilers using biomass
and the like.
The Act provides for a commercial bank loan to be the main source
of financing for thermomodernisation investments. The owner
of the building may finance 100% of investment costs by means
of such a loan. Both the share of the loan in overall costs
and the credit period shall be negotiated between the investor
and the bank granting the loan.
The thermomodernisation bonus is a form of help which an investor may
get from the State Budget and it constitutes 20% of the used loan yet there
are two conditions which must be met:
- it cannot constitute more than 16% of the overall costs
of the undertaking,
- it cannot constitute more than the expected value of two-year savings
determined by means of an energy audit.
There is a rule that forbids combining statutory loans with EU funding.
An energy audit is the ground for statutory funding. It is a document which
includes a technical & economical analysis which determines what shall
be improved in the building to be modernised. The audit points out
technical actions that may be taken and which ones of the planned
actions may bring best economic benefits (optimal solutions).
One can apply for a thermomodernisation bonus provided that such
thermomodernisation will substantially lower the yearly demand
for energy, especially:
- in buildings with only the heating system being modernised –
by at least 10%,
- in buildings which underwent thermomodernisation of the heating
system after year 1984 – by at least 15%,
- in remaining buildings – by at least 25%,
- in local heat sources and local heating networks – decreasing
annual primary energy losses by at least 25% and by replacing local
heat sources and heating networks with a connection
to a centralised heat source (of a city network) – lowering costs of
purchasing heat supplied to the building by at least 20% per annum.
Those who can apply for a thermomodernisation bonus include
owners and administrators of:
- residential buildings,
- collective accommodation buildings,
- public utility buildings owned by local government units
and used by them for performing their public tasks,
- local heating networks,
- local heat sources.
ACQUIRING A LOAN AND A THERMOMODERNISATION BONUS
After deciding upon thermomodernisation, a building owner submits
all necessary documents to the bank which is going to grant the loan.
The documents are as follows:
- a loan application with all annexes required by the bank,
- a thermomodernisation application, and
- an energy audit.
The bank which may grant a loan is the one which has an agreement with
Bank Gospodarstwa Krajowego [National Economy Bank] on granting loans
and procedures of transferring thermomodernisation bonuses provided for
in the Act. Detailed requirements concerning loan applications
and the form of loan collateral are determined individually by each loan-
granting bank.
EFFECTS OF THE THERMOMODERNISATION SUPPORT SYSTEM
EXAMPLE
Residential building of 11 storeys, total floor space 4,880 m2.
Thermomodernisation costs 612.,000 PLN, including:
Own funds 122.,000 PLN (20%)
Loan 490.,000 PLN (80%)
2 x monthly savings 132.2 thousand PLN
Thermomodernisation bonus 98,000 PLN (20% of the loan)
Monthly loan instalment with interest 3.9 thousand PLN (with interest at 12%)
Before thermomodernisation
annual costs of heating and domestic hot water
192.7 thousand PLN
After thermomodernisation
(in the first year of repaying the loan)
annual costs of heating and domestic hot water
126.6 thousand PLN
Annual loan service payments
(12 monthly instalments)
46.8 thousand PLN
Overall costs
(heating + loan service)
173.4 thousand PLN
After repaying the loan
annual costs of heating and domestic hot water
126.6 thousand PLN
EFFECTS:
After modernisation, during the loan repayment period, all expenses
connected with heating and domestic hot water are lowered by
around 10%, and they ultimately lower by 34% after the loan has been
repaid completely.
The thermomodernisation investments support system is beneficial to all
interested parties. It allows an investor to start and carry out investments
which aim at improving conditions of using a residential building
and at the same time lower all the connected costs.
Starting thermomodernisation investments also directly influences
the State by lowering the overall demand for heat. It indirectly leads to
improving ecological conditions and lowering CO2 emissions into
the atmosphere. Thermomodernisation is done using relatively low funds
from the State Budget, yet at the same time, some of the expenses come
back to the budget as taxes on purchased devices and materials as well
as taxes on contractors' income.
THE RULES OF SUPPORTING RENOVATIONS
The Act concerns supporting not only investments connected with
thermomodernisation but also with renovation. Help in form of
a renovation bonus is particularly directed at multi-family residential
buildings which have been used since earlier than 14 August 1961 and its
object is:
- overall renovation of a given building (without renovating flats),
- windows replacement and renovation of balconies even when the only
user is the owner of a given flat,
- alteration of a building leading to its improvement,
- providing building with installations and devices required in buildings
which are currently being open to use in accordance with technical
& construction regulations.
The Act does not concern renovations of single-family buildings.
The renovation bonus may be grated to an investor who is a natural person,
a housing association or a social housing association.
The bonus (as a form of help for the partial repayment of a loan) constitutes
20% of the used loan, yet no more than 15% of the cost of the undertaking.
It is granted if the following conditions are met:
- the renovation undertaking cost indicator is between 0.15 to 0.70 (the ratio
of renovation costs per 1m2 of floor space to the price of 1m2 determined for the purposes
of calculating the guarantee bonus).
- the renovation will lower the annual demand for energy necessary
for heating the building and heating water by at least 10% and when the cost
indicator is over 0.3 – by at least 25%. Lowering the demand for energy is not
required when the building meets the requirements connected with energy
savings determined in valid provisions of technical&construction regulations.
- it is impossible to get a renovation bonus if there is another bank loan with
a thermomodernisation or renovation bonus or if there is any other EU funding.
According to the hereinabove mentioned date for the buildings eligible
for a renovation bonus (year 1961), the Act concerns buildings built about
15 years after the II World War and some older ones, yet it does not concern
any newer buildings e.g. large-panel buildings.
For the buildings mentioned in the Act, there is a possibility of getting a bonus
sometimes more easily than as a thermomodernisation bonus. It is worth
highlighting, that almost any works carried out as thermomodernisation may
also be done as renovation.
The Act states that loans cannot be allotted for financing works for which
there has been granted another loan with a thermomodernisation
or renovation bonus. It means that the same scope of works cannot be
financed from two sources. However, there are no obstacles for using both
a renovation and a thermomodernisation loan for works in the same building,
as long as they are to finance different types of works.
Thank you for your attention!

Contenu connexe

En vedette

Legea privind transparenţa în procesul decizional
Legea privind transparenţa în procesul decizionalLegea privind transparenţa în procesul decizional
Legea privind transparenţa în procesul decizionalDIB ULIM
 
Codex Alimentarius
Codex Alimentarius Codex Alimentarius
Codex Alimentarius fnbgorg
 
Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...
Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...
Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...Artur75
 
P5. Audyt efektywności
P5. Audyt efektywnościP5. Audyt efektywności
P5. Audyt efektywnościInwenta
 
Jak budować zespół, który realizuje cele firmy?
Jak budować zespół, który realizuje cele firmy?Jak budować zespół, który realizuje cele firmy?
Jak budować zespół, który realizuje cele firmy?Sylwia Bogucka
 
Despre credinţă - Emanuel Swedenborg
Despre credinţă - Emanuel SwedenborgDespre credinţă - Emanuel Swedenborg
Despre credinţă - Emanuel Swedenborgbillydean
 
[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x
[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x
[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11xWojciech Podgórski
 
2 Organizatia Si Mediul Sau Extern
2 Organizatia Si Mediul Sau Extern2 Organizatia Si Mediul Sau Extern
2 Organizatia Si Mediul Sau ExternNiceTimeGo
 
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...w_strone_piekna
 
Pamięć wirtualna oraz pamięć cache
Pamięć wirtualna oraz pamięć cachePamięć wirtualna oraz pamięć cache
Pamięć wirtualna oraz pamięć cacheBorek12345
 
Zmiana kierunku jazdy lub pasa ruchu
Zmiana kierunku jazdy lub pasa ruchu Zmiana kierunku jazdy lub pasa ruchu
Zmiana kierunku jazdy lub pasa ruchu Dariusz Dahm
 

En vedette (16)

Legea privind transparenţa în procesul decizional
Legea privind transparenţa în procesul decizionalLegea privind transparenţa în procesul decizional
Legea privind transparenţa în procesul decizional
 
ArchiCAD 10
ArchiCAD 10ArchiCAD 10
ArchiCAD 10
 
Codex Alimentarius
Codex Alimentarius Codex Alimentarius
Codex Alimentarius
 
Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...
Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...
Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...
 
The condition of and prospects for the private equity funds market in Poland
The condition of and prospects for the private equity funds market in PolandThe condition of and prospects for the private equity funds market in Poland
The condition of and prospects for the private equity funds market in Poland
 
Dws Gemius 2004
Dws Gemius 2004Dws Gemius 2004
Dws Gemius 2004
 
P5. Audyt efektywności
P5. Audyt efektywnościP5. Audyt efektywności
P5. Audyt efektywności
 
Jak budować zespół, który realizuje cele firmy?
Jak budować zespół, który realizuje cele firmy?Jak budować zespół, który realizuje cele firmy?
Jak budować zespół, który realizuje cele firmy?
 
Zabiegi pielegnacyjne na biust
Zabiegi pielegnacyjne na biustZabiegi pielegnacyjne na biust
Zabiegi pielegnacyjne na biust
 
Despre credinţă - Emanuel Swedenborg
Despre credinţă - Emanuel SwedenborgDespre credinţă - Emanuel Swedenborg
Despre credinţă - Emanuel Swedenborg
 
4.4 Naprawa układu jezdnego
4.4 Naprawa układu jezdnego4.4 Naprawa układu jezdnego
4.4 Naprawa układu jezdnego
 
[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x
[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x
[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x
 
2 Organizatia Si Mediul Sau Extern
2 Organizatia Si Mediul Sau Extern2 Organizatia Si Mediul Sau Extern
2 Organizatia Si Mediul Sau Extern
 
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
 
Pamięć wirtualna oraz pamięć cache
Pamięć wirtualna oraz pamięć cachePamięć wirtualna oraz pamięć cache
Pamięć wirtualna oraz pamięć cache
 
Zmiana kierunku jazdy lub pasa ruchu
Zmiana kierunku jazdy lub pasa ruchu Zmiana kierunku jazdy lub pasa ruchu
Zmiana kierunku jazdy lub pasa ruchu
 

Plus de Step Interreg Ivc

SARGA. Better implementation of sustainable energy policies at local level. D...
SARGA. Better implementation of sustainable energy policies at local level. D...SARGA. Better implementation of sustainable energy policies at local level. D...
SARGA. Better implementation of sustainable energy policies at local level. D...Step Interreg Ivc
 
Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"
Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"
Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"Step Interreg Ivc
 
Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...
Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...
Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...Step Interreg Ivc
 
FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...
FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...
FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...Step Interreg Ivc
 
Good Practice Summary. Mid West Regional Authority. Michael Bell
Good Practice Summary. Mid West Regional Authority. Michael BellGood Practice Summary. Mid West Regional Authority. Michael Bell
Good Practice Summary. Mid West Regional Authority. Michael BellStep Interreg Ivc
 
Regional Needs Assessment. Mid West Regional Authority. Michael Bell
Regional Needs Assessment.  Mid West Regional Authority. Michael BellRegional Needs Assessment.  Mid West Regional Authority. Michael Bell
Regional Needs Assessment. Mid West Regional Authority. Michael BellStep Interreg Ivc
 
INNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona Casey
INNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona CaseyINNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona Casey
INNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona CaseyStep Interreg Ivc
 
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán MagyarSUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán MagyarStep Interreg Ivc
 
WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.
WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.
WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.Step Interreg Ivc
 
SUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYI
SUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYISUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYI
SUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYIStep Interreg Ivc
 
COVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCE
COVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCECOVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCE
COVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCEStep Interreg Ivc
 
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECTLAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECTStep Interreg Ivc
 
RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS
RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS
RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS Step Interreg Ivc
 
FINANCING ENERGY EFFICIENCY PROJECTS
FINANCING ENERGY EFFICIENCY PROJECTS FINANCING ENERGY EFFICIENCY PROJECTS
FINANCING ENERGY EFFICIENCY PROJECTS Step Interreg Ivc
 

Plus de Step Interreg Ivc (15)

SARGA. Better implementation of sustainable energy policies at local level. D...
SARGA. Better implementation of sustainable energy policies at local level. D...SARGA. Better implementation of sustainable energy policies at local level. D...
SARGA. Better implementation of sustainable energy policies at local level. D...
 
Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"
Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"
Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"
 
Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...
Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...
Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...
 
FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...
FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...
FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...
 
Good Practice Summary. Mid West Regional Authority. Michael Bell
Good Practice Summary. Mid West Regional Authority. Michael BellGood Practice Summary. Mid West Regional Authority. Michael Bell
Good Practice Summary. Mid West Regional Authority. Michael Bell
 
Regional Needs Assessment. Mid West Regional Authority. Michael Bell
Regional Needs Assessment.  Mid West Regional Authority. Michael BellRegional Needs Assessment.  Mid West Regional Authority. Michael Bell
Regional Needs Assessment. Mid West Regional Authority. Michael Bell
 
INNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona Casey
INNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona CaseyINNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona Casey
INNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona Casey
 
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán MagyarSUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
 
WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.
WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.
WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.
 
SUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYI
SUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYISUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYI
SUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYI
 
COVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCE
COVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCECOVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCE
COVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCE
 
LAUNCH OF MWRA GP TRANSFER
LAUNCH OF MWRA GP TRANSFERLAUNCH OF MWRA GP TRANSFER
LAUNCH OF MWRA GP TRANSFER
 
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECTLAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
 
RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS
RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS
RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS
 
FINANCING ENERGY EFFICIENCY PROJECTS
FINANCING ENERGY EFFICIENCY PROJECTS FINANCING ENERGY EFFICIENCY PROJECTS
FINANCING ENERGY EFFICIENCY PROJECTS
 

Dernier

AI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxAI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxNeoV2
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Open Access Research Paper
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...CIFOR-ICRAF
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 
Slide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian ParliamentariansSlide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian Parliamentariansipcc-media
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp202215407
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-Kawther MEKNI
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量sehgh15heh
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...Aqsa Yasmin
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact AssessmentTesfahunTesema
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Open Access Research Paper
 
Water Conservation.pptxfgggggggggggggggggggggggggggggggggggggg
Water Conservation.pptxfggggggggggggggggggggggggggggggggggggggWater Conservation.pptxfgggggggggggggggggggggggggggggggggggggg
Water Conservation.pptxfggggggggggggggggggggggggggggggggggggggkhulekanimkhize2
 
Making a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceMaking a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceSwag Cycle
 

Dernier (20)

AI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxAI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptx
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 
Slide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian ParliamentariansSlide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian Parliamentarians
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp
 
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact Assessment
 
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...
 
Water Conservation.pptxfgggggggggggggggggggggggggggggggggggggg
Water Conservation.pptxfggggggggggggggggggggggggggggggggggggggWater Conservation.pptxfgggggggggggggggggggggggggggggggggggggg
Water Conservation.pptxfgggggggggggggggggggggggggggggggggggggg
 
Making a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceMaking a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling Difference
 

Katarzyna Matijczak. Loans and thermo-modernisation bonuses as innovative financial tools-good practice from Poland

  • 1. Regional Development Agency ARLEG S.A. Katarzyna Matijczak, Murcia, 17.10.2013
  • 2. Location of the practice Country Poland NUTS 1 NUTS 2 Lower Silesia City Poland (good practice is widespread in Poland) Lower Silesia Voivodeship
  • 3. WHAT IS A THERMOMODERNISATION FUND AND A THERMOMODERNISATION BONUS? They are funds allocated from the State Budget which are administered by Bank Gospodarstwa Krajowego [National Economy Bank]. They are intended to support all eligible subjects in performing actions aiming at lowering energy consumption and the amount of energy carriers in both communal and social & living resources.
  • 4. WHAT IS A THERMOMODERNISATION FUND AND A THERMOMODERNISATION BONUS? Thermomodernisation of buildings is usually highly profitable, yet it requires bearing substantial costs right from the beginning. That is why, many building owners cannot carry out thermomodernisation without extra financial support. The Act on Supporting Thermomodernisation Investments creates a system for bulding owners which aims at facilitating the process of financing thermomodernisation so as to finally lower energy consumption and costs of both heating buildings and producing domestic hot water.
  • 5. PRINCIPLES OF SUPPORTING THERMOMODERNISATION The system of financial help includes thermomodernisation undertakings in the following buildings: - multi and single-family buildings irrespective of their legal form of ownership which means: private, commonhold, housing associations, company, city and other buildings except for those belonging to budget entities, - social collective accommodation buildings such as nursing homes, halls of residence, dormitories, hostels, retirement homes and the like, - buildings used for public activities of local government units such as schools, commune offices and the like, - local heat sources (housing estate boiler houses and thermal power stations) or district heating substations and local heating networks with the power of 11.6 MW.
  • 6. PRINCIPLES OF SUPPORTING THERMOMODERNISATION Provisions under the Act on Supporting Thermomodernisation Investments are also connected with the overall and partial replacement of an existing energy source with an unconventional one e.g. solar panels, heat pumps, boilers using biomass and the like. The Act provides for a commercial bank loan to be the main source of financing for thermomodernisation investments. The owner of the building may finance 100% of investment costs by means of such a loan. Both the share of the loan in overall costs and the credit period shall be negotiated between the investor and the bank granting the loan.
  • 7. The thermomodernisation bonus is a form of help which an investor may get from the State Budget and it constitutes 20% of the used loan yet there are two conditions which must be met: - it cannot constitute more than 16% of the overall costs of the undertaking, - it cannot constitute more than the expected value of two-year savings determined by means of an energy audit. There is a rule that forbids combining statutory loans with EU funding. An energy audit is the ground for statutory funding. It is a document which includes a technical & economical analysis which determines what shall be improved in the building to be modernised. The audit points out technical actions that may be taken and which ones of the planned actions may bring best economic benefits (optimal solutions).
  • 8. One can apply for a thermomodernisation bonus provided that such thermomodernisation will substantially lower the yearly demand for energy, especially: - in buildings with only the heating system being modernised – by at least 10%, - in buildings which underwent thermomodernisation of the heating system after year 1984 – by at least 15%, - in remaining buildings – by at least 25%, - in local heat sources and local heating networks – decreasing annual primary energy losses by at least 25% and by replacing local heat sources and heating networks with a connection to a centralised heat source (of a city network) – lowering costs of purchasing heat supplied to the building by at least 20% per annum.
  • 9. Those who can apply for a thermomodernisation bonus include owners and administrators of: - residential buildings, - collective accommodation buildings, - public utility buildings owned by local government units and used by them for performing their public tasks, - local heating networks, - local heat sources.
  • 10. ACQUIRING A LOAN AND A THERMOMODERNISATION BONUS After deciding upon thermomodernisation, a building owner submits all necessary documents to the bank which is going to grant the loan. The documents are as follows: - a loan application with all annexes required by the bank, - a thermomodernisation application, and - an energy audit. The bank which may grant a loan is the one which has an agreement with Bank Gospodarstwa Krajowego [National Economy Bank] on granting loans and procedures of transferring thermomodernisation bonuses provided for in the Act. Detailed requirements concerning loan applications and the form of loan collateral are determined individually by each loan- granting bank.
  • 11. EFFECTS OF THE THERMOMODERNISATION SUPPORT SYSTEM EXAMPLE Residential building of 11 storeys, total floor space 4,880 m2. Thermomodernisation costs 612.,000 PLN, including: Own funds 122.,000 PLN (20%) Loan 490.,000 PLN (80%) 2 x monthly savings 132.2 thousand PLN Thermomodernisation bonus 98,000 PLN (20% of the loan) Monthly loan instalment with interest 3.9 thousand PLN (with interest at 12%)
  • 12. Before thermomodernisation annual costs of heating and domestic hot water 192.7 thousand PLN After thermomodernisation (in the first year of repaying the loan) annual costs of heating and domestic hot water 126.6 thousand PLN Annual loan service payments (12 monthly instalments) 46.8 thousand PLN Overall costs (heating + loan service) 173.4 thousand PLN After repaying the loan annual costs of heating and domestic hot water 126.6 thousand PLN EFFECTS:
  • 13. After modernisation, during the loan repayment period, all expenses connected with heating and domestic hot water are lowered by around 10%, and they ultimately lower by 34% after the loan has been repaid completely. The thermomodernisation investments support system is beneficial to all interested parties. It allows an investor to start and carry out investments which aim at improving conditions of using a residential building and at the same time lower all the connected costs. Starting thermomodernisation investments also directly influences the State by lowering the overall demand for heat. It indirectly leads to improving ecological conditions and lowering CO2 emissions into the atmosphere. Thermomodernisation is done using relatively low funds from the State Budget, yet at the same time, some of the expenses come back to the budget as taxes on purchased devices and materials as well as taxes on contractors' income.
  • 14.
  • 15.
  • 16. THE RULES OF SUPPORTING RENOVATIONS The Act concerns supporting not only investments connected with thermomodernisation but also with renovation. Help in form of a renovation bonus is particularly directed at multi-family residential buildings which have been used since earlier than 14 August 1961 and its object is: - overall renovation of a given building (without renovating flats), - windows replacement and renovation of balconies even when the only user is the owner of a given flat, - alteration of a building leading to its improvement, - providing building with installations and devices required in buildings which are currently being open to use in accordance with technical & construction regulations. The Act does not concern renovations of single-family buildings.
  • 17. The renovation bonus may be grated to an investor who is a natural person, a housing association or a social housing association. The bonus (as a form of help for the partial repayment of a loan) constitutes 20% of the used loan, yet no more than 15% of the cost of the undertaking. It is granted if the following conditions are met: - the renovation undertaking cost indicator is between 0.15 to 0.70 (the ratio of renovation costs per 1m2 of floor space to the price of 1m2 determined for the purposes of calculating the guarantee bonus). - the renovation will lower the annual demand for energy necessary for heating the building and heating water by at least 10% and when the cost indicator is over 0.3 – by at least 25%. Lowering the demand for energy is not required when the building meets the requirements connected with energy savings determined in valid provisions of technical&construction regulations. - it is impossible to get a renovation bonus if there is another bank loan with a thermomodernisation or renovation bonus or if there is any other EU funding.
  • 18. According to the hereinabove mentioned date for the buildings eligible for a renovation bonus (year 1961), the Act concerns buildings built about 15 years after the II World War and some older ones, yet it does not concern any newer buildings e.g. large-panel buildings. For the buildings mentioned in the Act, there is a possibility of getting a bonus sometimes more easily than as a thermomodernisation bonus. It is worth highlighting, that almost any works carried out as thermomodernisation may also be done as renovation. The Act states that loans cannot be allotted for financing works for which there has been granted another loan with a thermomodernisation or renovation bonus. It means that the same scope of works cannot be financed from two sources. However, there are no obstacles for using both a renovation and a thermomodernisation loan for works in the same building, as long as they are to finance different types of works.