SlideShare une entreprise Scribd logo
1  sur  23
Dharamapuri District
Dharamapuri HUD - 36 PHCs
Government Hospitals - 4
Med. College - 1
Dharamapuri HUD ; 36 PHCs
S.No PHC Name
Total HT
Screened
Total DM
Screened
Screened for
CaCx
Screened for
CaBr
1 B mallapuram PHC 544 127 167 191
2 Perumbalai 492 274 126 350
3 Boodhanatham 979 764 218 218
4 Thoppur 473 238 131 137
5 Noolahall 489 12 105 370
6 Palayampudhur 565 451 221 225
7 Jakkasamuthira 444 140 138 158
8 Chinnankuppam 510 256 174 163
9 Kadamadai 350 0 125 200
10 Marandahalli 646 368 208 297
HT DM CACx CaBr
State. Avg 420 268 218 248
Dist.Avg 546 270 182 220
S.No PHC Name
Total HT
Screened
Total DM
Screened
Screened for
CaCx
Screened for
CaBr
11 Panchapalli 489 230 213 230
12 Hanumandhapura 495 231 228 232
13 Periyampatty 524 462 172 250
14 Morapur 616 446 218 232
15 Pulikarai 567 269 217 239
16 Eriyur 825 825 186 226
17 Sitheri 296 183 116 113
18 MR Patty 390 170 220 296
19 Karimangalam 397 178 97 67
20 Paparapatty 521 427 234 230
HT DM CACx CaBr
State. Avg 420 268 218 248
Dist.Avg 546 270 182 220
S.No PHC Name
Total HT
Screened
Total DM
Screened
Screened for
CaCx
Screened for
CaBr
21 Solaikottai 494 211 256 256
22 Belramapatty 867 536 245 248
23 Nagadasampatty 601 460 220 251
24 Indoor 455 380 173 182
25 Bairnatham 522 222 222 222
26 Laligam 437 148 136 286
27 Kadathur 421 213 161 210
28 Bandahalli 392 227 141 208
29 Chindhalpadi 665 263 223 234
30 Koodhadipatty 459 261 151 240
HT DM CACx CaBr
State. Avg 420 268 218 248
Dist.Avg 546 270 182 220
S.No PHC Name
Total HT
Screened
Total DM
Screened
Screened for
CaCx
Screened for
CaBr
31 Theerthamalai 800 86 300 300
32 Kottapatty 865 365 178 178
33 Ramiyanahalli 543 472 272 302
34 D Thurinjipatty 339 60 154 177
35 Kambainallur 397 397 241 235
36 Kalipettai 456 200 108 126
37 Municipal Dispensary 259 0 79 108
HT DM CACx CaBr
State. Avg 420 268 218 248
Dist.Avg 546 270 182 220
Slno PHC Name Name of the Facility ISSUES
24 Indur APHC
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for CaCx
screening
2.No display of LSM chart ,protocol chart and BMI
chart
Follow up issues
Follow up drugs are issued on fixed days
only(Friday)
All day OP for follow up Drugs are given 15 days only
Pass book/Drugs issues NCD pass Book not given
Equipments Issues 1.Magnavision lamp is not working
HMS related issues HMS entry not done(Reason Internet not connected)
Register & Reports
1. HT ,DM followup register not maintained
2)NCD Lab register is not available
Other issues
1.Avg per day screening (30.5.13 to 5.6.13) HT-20,
DM-6, VIA/VILI-5 & CBE-5 Screening done
Slno PHC Name Name of the Facility ISSUES
25
Bairanatham
APHC
NCD Staff Nurse issues Improve the FBS/PP test
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for Ca Cx
screening 2. No
display of LSM chart,Protocol chart and BMI chart.
No. of days screening is
done
Weekly 6 days screening done
All day OP for follow up Drugs are given 30 days only
Pass book/Drugs issues NCD pass book not given
Consumables/reagents Cholesterol &creatinine kit not available
Lab issues
1.No lab technician 2.Lab technician comes on
deputation weekly 3 days (Palayampudur PHC)
HMS related issues
Online data entry not done ( Reason Internet not
connected)
Register & Reports
1. HT, DM followup register not maintained as per
protocol 2) NCD lab register not available .
Other issues
1. Avg perday screening (13.6.13 to 19.6.13) HT-
30,DM-11,Cacx-8 & Cabr-8 screening done.
Slno PHC Name Name of the Facility ISSUES
26 Laligam APHC
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for CaCx
screening
2.No display of LSM chart ,protocol chart and BMI
chart
No. of days screening is
done
Weekly 6 days screening done
Separate NCD room for
CaBr& CaCx screening
1.VIA/VILI & CBE screening labour room being
used
Pass book/Drugs issues
1)NCD pass Book not given 2) Pharmacist visits on
deputation weekly 3 days goes to Eriyur BPHC
HMS related issues HMS entry not done(Reason Internet not connected)
Register & Reports
1. HT ,DM,Ca Br &Ca Cx followup register not
maintained (As per protocol) 2) NCD Lab
register is not maintained ( as per protocol)
Other issues
1.Avg per day screening (31.5.13 to 6.6.13) HT-17,
DM-5, VIA/VILI-06 & CBE-9 Screening done
Slno PHC Name Name of the Facility ISSUES
27 Kadathur BPHC
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for CaCx
screening
No. of days screening is
done
Weekly 6 days screening done
Pass book/Drugs issues 1) NCD pass Book not given .
Lab issues ICTC Lab technician available.
HMS related issues HMS entry not done(Reason Internet not connected)
Register & Reports
1. HT ,DM followup register not maintained (As per
protocol) 2) NCD Lab register is not maintained
( as per protocol)
Other issues
1.Avg per day screening (29.5.13 to 4.6.13) HT-29,
DM-12, VIA/VILI-11 & CBE-11 Screening done.
Slno PHC Name Name of the Facility ISSUES
28 Bandahalli APHC
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for Ca Cx
screening 2. No display
of LSM chart,Protocol chart and BMI chart.
No. of days screening is
done
Weekly 6 days screening done
Pass book/Drugs issues NCD pass book not given
Consumables/reagents Cholesterol,Creatinine kit not available
Lab issues
Lab technician visits on deputation weekly 3 days
comes to the PHC. (Palayamputhur PHC) 2.
FBS/PP test not done (reason patients not coming )
Register & Reports NCD Lab register not maintained (as per protocol)
Other issues
1. Avg perday screening (11.6.13 to 17.6.13) HT-
25,DM-12,Cacx-7 & Cabr-12 screening done.
Slno PHC Name Name of the Facility ISSUES
29
Cinthalpadi
APHC
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light used for CaCx
screening
No. of days screening is
done Weekly 6 days screening done
Separate NCD room for
CaBr& CaCx screening
1.VIA/VILI & CBE screening labour room being
used
All day OP for follow up Drugs are given 30 days only
Pass book/Drugs issues NCD pass book not given
Equipments Issues
1.Weighing machine & Magnavision lamp is not
working
Training issues
1-Gen S/N untrained for NCD program.
(Maternity leave)
Lab issues
Lab technician visits on deputation weekly 3 days
comes to the PHC. (Kambainallur APHC)
Other issues
1.VHN not refering patient 2. Avg
perday screening (7.6.2013 to 13.6.2013 ) HT-
24,DM-11,Cacx-7 & Cabr-13 screening done.
Slno PHC Name Name of the Facility ISSUES
30
Koothadipatti
APHC
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for Ca Cx
screening 2. No display
of LSM chart and Protocol chart .
No. of days screening is
done 1.Weekly 6 days screening done
Pass book/Drugs issues NCD pass book not given
Equipments Issues
1.Weighing machine &stadiometer not received
from TNHSP
Consumables/reagents Creatinine kit not available
Training issues
1 ) Regular S/N untrained for NCD program
(Maternity leave)
Lab issues
1.No lab technician 2.Lab technician comes on
deputation weekly 2 days (Theerthamalai BPHC)
HMS related issues
Past 20 days NCD S/N Online data entry not
done(reason server problem)
Register & Reports NCD Lab register not maintained (as per protocol)
Other issues
1. Avg perday screening (19.6.13 to 25.6.13) HT-
18,DM-9,Cacx-5 & Cabr-9 screening done.
Slno PHC Name Name of the Facility ISSUES
31
Theerthamalai
BPHC
NCD Staff Nurse issues
1. NCD corner is not properly allotted in our PHC
2. Hight, Weight , Waist circumference not done.
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for Ca Cx
screening 2. No
display of LSM chart,Protocol chart and BMI chart.
No. of days screening is
done
Weekly 6 days screening done
Equipments Issues 1.Magnavision lamp is not working .
Lab issues
1.FBS/PP test not done (Reason NCD staff not
referred to Patients)
HMS related issues
Online data entry not done ( Reason Internet not
connected)
Register & Reports
1. HT, DM CBE &VIA/VILI followup register not
available
Other issues
1.VHN not refering patient 2. Avg
perday screening (10.6.2013 to 15.6.2013 ) HT-
Slno PHC Name Name of the Facility ISSUES
32 Kottapatti APHC
NCD Staff Nurse issues Improve the FBS/PP test
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for Ca Cx
screening 2. No display
of LSM chart,Protocol chart and BMI chart.
No. of days screening is
done
Weekly 6 days screening done
Follow up issues
Follow up drugs are issued on fixed days only(
Friday)
All day OP for follow up Drugs are given 30 days only
Pass book/Drugs issues
1) NCD pass book not given 2)
T.Nifedipine shortage
Consumables/reagents Creatinine kit not available
Lab issues
1.No lab technician 2.Lab technician comes on
deputation weekly 4 days (Theerthamalai BPHC)
HMS related issues HMS entry not done.
Register & Reports
1. HT, DM,CBE & Via /vili followup register not
maintained as per protocol 2) NCD lab register not
Maintained .
Other issues
1. Avg perday screening (18.6.13 to 24.6.13) HT-
17,DM-13,Cacx-3 & Cabr-6 screening done.
Slno PHC Name Name of the Facility ISSUES
33
Ramiyanahalli
APHC
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for CaCx
screening
2.No display of LSM chart ,protocol chart and BMI
chart
No. of days screening is
done
Weekly 6 days screening done
All day OP for follow up Drugs are given 30 days only
Pass book/Drugs issues NCD pass Book not given
Register & Reports
1) General Lab register is maintained / But NCD
lab register not maintained ( as per protocol)
Other issues
1.Avg per day screening (4.6.13 to 10.6.13) HT-22,
DM-19, VIA/VILI-11 & CBE-12 Screening done.
Slno PHC Name Name of the Facility ISSUES
34
D.Thurinjipatti
BPHC
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for CaCx
screening
2.No display of BMI chart
No. of days screening is
done
1).Weekly 6 days screening done 2). Past 2
months DM Screening not done ( Reason semi
autoanalyzer not working ) DM pt referred to
Solakottai PHC.
All day OP for follow up Drugs are given 30 days only
Pass book/Drugs issues NCD pass Book not given
Equipments Issues
1.Semi autoanalyzer is not working ( But) On the
day visits new semi autoanalyzer supply to TNHSP
Other issues
1.Avg per day screening (05.6.13 to 11.6.13) HT-
21, DM-00, VIA/VILI-9 & CBE-10 Screening done
Slno PHC Name Name of the Facility ISSUES
35
Kambainallur
APHC
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for CaCx
screening
2.No display of LSM chart ,protocol chart and BMI
chart
No. of days screening is
done
Weekly 6 days screening done
Pass book/Drugs issues NCD pass Book not given
Lab issues
Lab technician visits on deputation weekly 3 days
goes to the Cinthalpadi APHC.
HMS related issues
Last two weeks Online data entry not done(reason
server problem)
Register & Reports
1. HT ,DM followup register not maintained
2)NCD Lab register is not available (as per
protocol)
Other issues
1.Avg per day screening (3.6.13 to 8.6.13) HT-21,
DM-12, VIA/VILI-7 & CBE-9 Screening done
Slno PHC Name Name of the Facility ISSUES
36 Kalipettai APHC
Initiation of Screening &
protocol deviations if any
1.Power cut time torch light to be used for Ca Cx
screening 2. No
display of LSM chart,Protocol chart and BMI chart.
No. of days screening is
done
1) Weekly 6 days screening done 2)
DM screening not done (Reason semi autoanalyzer
not available)
All day OP for follow up Drugs are given 30 days only
Pass book/Drugs issues NCD pass book not given
Equipments Issues 1.Semi-auto analyzer is not available
Lab issues
1.No lab technician 2.Lab technician comes on
deputation weekly 2 days (Boothanatham PHC)
HMS related issues
Online data entry not done ( Reason NCD Staff not
trained ( Newly joined) )
Register & Reports
1. HT, DM followup register not available 2) NCD
lab register not maintained as per protocol
Other issues
1. Avg perday screening (12.6.13 to 18.6.13) HT-
19,DM-00,Cacx-4 & Cabr-8 screening done.
S.No PHC Name
Total HT
Screened
Total DM
Screened
Screened for
CaCx
Screened for
CaBr
1 Harur 1309 832 563 592
2 Pennagagam 1421 790 338 329
3 PR Patty 1100 690 453 543
4 Palacode 1277 918 501 522
5 Medical college 1381 1378 411 1020
HT DM CACx CaBr
State. Avg
Dist.Avg
Slno PHC Name Name of the Facility ISSUES
4 Palacode GH
Initiation of Screening &
protocol deviations if any
1.NCD name board not available
No. of days screening is
done
1.Weekly 6 days screening done
All day OP for follow up Drugs are given 30 days only
Pass book/Drugs issues NCD pass book not given
Equipments Issues 1. Magnavision Lamp is not working
Training issues 1 ) Regular S/N untrained for NCD program
Register & Reports NCD Lab register not maintained (as per protocol)
Other issues
1. Avg perday screening (20.6.13 to 26.6.13) HT-
45,DM-32,Cacx-15 & Cabr-16 screening done.
Slno PHC Name Name of the Facility ISSUES
5
Dharmapuri
medical college &
Hospital
Initiation of Screening &
protocol deviations if any
1.Serum is used for blood glucose test
No. of days screening is
done
Weekly 6 days screening done
Follow up issues
Follow up drugs are issued on fixed days only(
Tuesday ,Thursday)
All day OP for follow up Drugs are given 30 days only
Pass book/Drugs issues NCD pass book not given
Equipments Issues Stadiometer not received from TNHSP
Lab issues 1.Serum is used for blood glucose test
HMS related issues
NCD S/N HMS entry not started (Reason user ID &
pass word not given)
Register & Reports 1) NCD lab register not maintained as per protocol
Other issues
1. Avg perday screening (17.6.13 to 22.6.13) HT-
61,DM-63,Cacx-45 & Cabr-12 screening done.
Dharamapuri

Contenu connexe

Similaire à Dharamapuri

Informatics Tools and Patient Handovers
Informatics Tools and Patient HandoversInformatics Tools and Patient Handovers
Informatics Tools and Patient HandoversAalap Shah
 
Notes on sensitization workshop on recent initiatives.
Notes on sensitization workshop on recent initiatives.Notes on sensitization workshop on recent initiatives.
Notes on sensitization workshop on recent initiatives.dpmo123
 
Massachusetts General Hospital (PATA).pptx
Massachusetts General Hospital (PATA).pptxMassachusetts General Hospital (PATA).pptx
Massachusetts General Hospital (PATA).pptxAhmadHamalawy1
 
Case presentation (lab analytical quality assurance problem )
Case presentation (lab analytical quality assurance problem )Case presentation (lab analytical quality assurance problem )
Case presentation (lab analytical quality assurance problem )Rania Elsharkawy
 
Big data analytics to step change in pathology services
Big data analytics to step change in pathology servicesBig data analytics to step change in pathology services
Big data analytics to step change in pathology servicesRichard Littlewood
 
Global Clinical Tirals.pptx (GCP) Global Clinical Trial means any clinical tr...
Global Clinical Tirals.pptx (GCP) Global Clinical Trial means any clinical tr...Global Clinical Tirals.pptx (GCP) Global Clinical Trial means any clinical tr...
Global Clinical Tirals.pptx (GCP) Global Clinical Trial means any clinical tr...cisukraine00
 
introductiontoclinicalchemistry-150421021353-conversion-gate01.pdf
introductiontoclinicalchemistry-150421021353-conversion-gate01.pdfintroductiontoclinicalchemistry-150421021353-conversion-gate01.pdf
introductiontoclinicalchemistry-150421021353-conversion-gate01.pdfSyedMuhammadZakria
 

Similaire à Dharamapuri (20)

Coimbatore
CoimbatoreCoimbatore
Coimbatore
 
Theni
TheniTheni
Theni
 
Karur
KarurKarur
Karur
 
Nagapattinam
NagapattinamNagapattinam
Nagapattinam
 
Dindugul
DindugulDindugul
Dindugul
 
Pudukottai
PudukottaiPudukottai
Pudukottai
 
Virudhunagar
VirudhunagarVirudhunagar
Virudhunagar
 
Cuddalore
CuddaloreCuddalore
Cuddalore
 
Madurai
MaduraiMadurai
Madurai
 
Sivagangai
SivagangaiSivagangai
Sivagangai
 
Informatics Tools and Patient Handovers
Informatics Tools and Patient HandoversInformatics Tools and Patient Handovers
Informatics Tools and Patient Handovers
 
How to set up a TDM unit dr. Shakeeb Dhorajiwala
How to set up a TDM unit dr. Shakeeb Dhorajiwala How to set up a TDM unit dr. Shakeeb Dhorajiwala
How to set up a TDM unit dr. Shakeeb Dhorajiwala
 
Notes on sensitization workshop on recent initiatives.
Notes on sensitization workshop on recent initiatives.Notes on sensitization workshop on recent initiatives.
Notes on sensitization workshop on recent initiatives.
 
Massachusetts General Hospital (PATA).pptx
Massachusetts General Hospital (PATA).pptxMassachusetts General Hospital (PATA).pptx
Massachusetts General Hospital (PATA).pptx
 
Trichy
TrichyTrichy
Trichy
 
Case presentation (lab analytical quality assurance problem )
Case presentation (lab analytical quality assurance problem )Case presentation (lab analytical quality assurance problem )
Case presentation (lab analytical quality assurance problem )
 
Big data analytics to step change in pathology services
Big data analytics to step change in pathology servicesBig data analytics to step change in pathology services
Big data analytics to step change in pathology services
 
TAM-D.5
TAM-D.5TAM-D.5
TAM-D.5
 
Global Clinical Tirals.pptx (GCP) Global Clinical Trial means any clinical tr...
Global Clinical Tirals.pptx (GCP) Global Clinical Trial means any clinical tr...Global Clinical Tirals.pptx (GCP) Global Clinical Trial means any clinical tr...
Global Clinical Tirals.pptx (GCP) Global Clinical Trial means any clinical tr...
 
introductiontoclinicalchemistry-150421021353-conversion-gate01.pdf
introductiontoclinicalchemistry-150421021353-conversion-gate01.pdfintroductiontoclinicalchemistry-150421021353-conversion-gate01.pdf
introductiontoclinicalchemistry-150421021353-conversion-gate01.pdf
 

Dernier

Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 

Dernier (20)

Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 

Dharamapuri

  • 1. Dharamapuri District Dharamapuri HUD - 36 PHCs Government Hospitals - 4 Med. College - 1
  • 3. S.No PHC Name Total HT Screened Total DM Screened Screened for CaCx Screened for CaBr 1 B mallapuram PHC 544 127 167 191 2 Perumbalai 492 274 126 350 3 Boodhanatham 979 764 218 218 4 Thoppur 473 238 131 137 5 Noolahall 489 12 105 370 6 Palayampudhur 565 451 221 225 7 Jakkasamuthira 444 140 138 158 8 Chinnankuppam 510 256 174 163 9 Kadamadai 350 0 125 200 10 Marandahalli 646 368 208 297 HT DM CACx CaBr State. Avg 420 268 218 248 Dist.Avg 546 270 182 220
  • 4. S.No PHC Name Total HT Screened Total DM Screened Screened for CaCx Screened for CaBr 11 Panchapalli 489 230 213 230 12 Hanumandhapura 495 231 228 232 13 Periyampatty 524 462 172 250 14 Morapur 616 446 218 232 15 Pulikarai 567 269 217 239 16 Eriyur 825 825 186 226 17 Sitheri 296 183 116 113 18 MR Patty 390 170 220 296 19 Karimangalam 397 178 97 67 20 Paparapatty 521 427 234 230 HT DM CACx CaBr State. Avg 420 268 218 248 Dist.Avg 546 270 182 220
  • 5. S.No PHC Name Total HT Screened Total DM Screened Screened for CaCx Screened for CaBr 21 Solaikottai 494 211 256 256 22 Belramapatty 867 536 245 248 23 Nagadasampatty 601 460 220 251 24 Indoor 455 380 173 182 25 Bairnatham 522 222 222 222 26 Laligam 437 148 136 286 27 Kadathur 421 213 161 210 28 Bandahalli 392 227 141 208 29 Chindhalpadi 665 263 223 234 30 Koodhadipatty 459 261 151 240 HT DM CACx CaBr State. Avg 420 268 218 248 Dist.Avg 546 270 182 220
  • 6. S.No PHC Name Total HT Screened Total DM Screened Screened for CaCx Screened for CaBr 31 Theerthamalai 800 86 300 300 32 Kottapatty 865 365 178 178 33 Ramiyanahalli 543 472 272 302 34 D Thurinjipatty 339 60 154 177 35 Kambainallur 397 397 241 235 36 Kalipettai 456 200 108 126 37 Municipal Dispensary 259 0 79 108 HT DM CACx CaBr State. Avg 420 268 218 248 Dist.Avg 546 270 182 220
  • 7. Slno PHC Name Name of the Facility ISSUES 24 Indur APHC Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for CaCx screening 2.No display of LSM chart ,protocol chart and BMI chart Follow up issues Follow up drugs are issued on fixed days only(Friday) All day OP for follow up Drugs are given 15 days only Pass book/Drugs issues NCD pass Book not given Equipments Issues 1.Magnavision lamp is not working HMS related issues HMS entry not done(Reason Internet not connected) Register & Reports 1. HT ,DM followup register not maintained 2)NCD Lab register is not available Other issues 1.Avg per day screening (30.5.13 to 5.6.13) HT-20, DM-6, VIA/VILI-5 & CBE-5 Screening done
  • 8. Slno PHC Name Name of the Facility ISSUES 25 Bairanatham APHC NCD Staff Nurse issues Improve the FBS/PP test Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for Ca Cx screening 2. No display of LSM chart,Protocol chart and BMI chart. No. of days screening is done Weekly 6 days screening done All day OP for follow up Drugs are given 30 days only Pass book/Drugs issues NCD pass book not given Consumables/reagents Cholesterol &creatinine kit not available Lab issues 1.No lab technician 2.Lab technician comes on deputation weekly 3 days (Palayampudur PHC) HMS related issues Online data entry not done ( Reason Internet not connected) Register & Reports 1. HT, DM followup register not maintained as per protocol 2) NCD lab register not available . Other issues 1. Avg perday screening (13.6.13 to 19.6.13) HT- 30,DM-11,Cacx-8 & Cabr-8 screening done.
  • 9. Slno PHC Name Name of the Facility ISSUES 26 Laligam APHC Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for CaCx screening 2.No display of LSM chart ,protocol chart and BMI chart No. of days screening is done Weekly 6 days screening done Separate NCD room for CaBr& CaCx screening 1.VIA/VILI & CBE screening labour room being used Pass book/Drugs issues 1)NCD pass Book not given 2) Pharmacist visits on deputation weekly 3 days goes to Eriyur BPHC HMS related issues HMS entry not done(Reason Internet not connected) Register & Reports 1. HT ,DM,Ca Br &Ca Cx followup register not maintained (As per protocol) 2) NCD Lab register is not maintained ( as per protocol) Other issues 1.Avg per day screening (31.5.13 to 6.6.13) HT-17, DM-5, VIA/VILI-06 & CBE-9 Screening done
  • 10. Slno PHC Name Name of the Facility ISSUES 27 Kadathur BPHC Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for CaCx screening No. of days screening is done Weekly 6 days screening done Pass book/Drugs issues 1) NCD pass Book not given . Lab issues ICTC Lab technician available. HMS related issues HMS entry not done(Reason Internet not connected) Register & Reports 1. HT ,DM followup register not maintained (As per protocol) 2) NCD Lab register is not maintained ( as per protocol) Other issues 1.Avg per day screening (29.5.13 to 4.6.13) HT-29, DM-12, VIA/VILI-11 & CBE-11 Screening done.
  • 11. Slno PHC Name Name of the Facility ISSUES 28 Bandahalli APHC Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for Ca Cx screening 2. No display of LSM chart,Protocol chart and BMI chart. No. of days screening is done Weekly 6 days screening done Pass book/Drugs issues NCD pass book not given Consumables/reagents Cholesterol,Creatinine kit not available Lab issues Lab technician visits on deputation weekly 3 days comes to the PHC. (Palayamputhur PHC) 2. FBS/PP test not done (reason patients not coming ) Register & Reports NCD Lab register not maintained (as per protocol) Other issues 1. Avg perday screening (11.6.13 to 17.6.13) HT- 25,DM-12,Cacx-7 & Cabr-12 screening done.
  • 12. Slno PHC Name Name of the Facility ISSUES 29 Cinthalpadi APHC Initiation of Screening & protocol deviations if any 1.Power cut time torch light used for CaCx screening No. of days screening is done Weekly 6 days screening done Separate NCD room for CaBr& CaCx screening 1.VIA/VILI & CBE screening labour room being used All day OP for follow up Drugs are given 30 days only Pass book/Drugs issues NCD pass book not given Equipments Issues 1.Weighing machine & Magnavision lamp is not working Training issues 1-Gen S/N untrained for NCD program. (Maternity leave) Lab issues Lab technician visits on deputation weekly 3 days comes to the PHC. (Kambainallur APHC) Other issues 1.VHN not refering patient 2. Avg perday screening (7.6.2013 to 13.6.2013 ) HT- 24,DM-11,Cacx-7 & Cabr-13 screening done.
  • 13. Slno PHC Name Name of the Facility ISSUES 30 Koothadipatti APHC Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for Ca Cx screening 2. No display of LSM chart and Protocol chart . No. of days screening is done 1.Weekly 6 days screening done Pass book/Drugs issues NCD pass book not given Equipments Issues 1.Weighing machine &stadiometer not received from TNHSP Consumables/reagents Creatinine kit not available Training issues 1 ) Regular S/N untrained for NCD program (Maternity leave) Lab issues 1.No lab technician 2.Lab technician comes on deputation weekly 2 days (Theerthamalai BPHC) HMS related issues Past 20 days NCD S/N Online data entry not done(reason server problem) Register & Reports NCD Lab register not maintained (as per protocol) Other issues 1. Avg perday screening (19.6.13 to 25.6.13) HT- 18,DM-9,Cacx-5 & Cabr-9 screening done.
  • 14. Slno PHC Name Name of the Facility ISSUES 31 Theerthamalai BPHC NCD Staff Nurse issues 1. NCD corner is not properly allotted in our PHC 2. Hight, Weight , Waist circumference not done. Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for Ca Cx screening 2. No display of LSM chart,Protocol chart and BMI chart. No. of days screening is done Weekly 6 days screening done Equipments Issues 1.Magnavision lamp is not working . Lab issues 1.FBS/PP test not done (Reason NCD staff not referred to Patients) HMS related issues Online data entry not done ( Reason Internet not connected) Register & Reports 1. HT, DM CBE &VIA/VILI followup register not available Other issues 1.VHN not refering patient 2. Avg perday screening (10.6.2013 to 15.6.2013 ) HT-
  • 15. Slno PHC Name Name of the Facility ISSUES 32 Kottapatti APHC NCD Staff Nurse issues Improve the FBS/PP test Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for Ca Cx screening 2. No display of LSM chart,Protocol chart and BMI chart. No. of days screening is done Weekly 6 days screening done Follow up issues Follow up drugs are issued on fixed days only( Friday) All day OP for follow up Drugs are given 30 days only Pass book/Drugs issues 1) NCD pass book not given 2) T.Nifedipine shortage Consumables/reagents Creatinine kit not available Lab issues 1.No lab technician 2.Lab technician comes on deputation weekly 4 days (Theerthamalai BPHC) HMS related issues HMS entry not done. Register & Reports 1. HT, DM,CBE & Via /vili followup register not maintained as per protocol 2) NCD lab register not Maintained . Other issues 1. Avg perday screening (18.6.13 to 24.6.13) HT- 17,DM-13,Cacx-3 & Cabr-6 screening done.
  • 16. Slno PHC Name Name of the Facility ISSUES 33 Ramiyanahalli APHC Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for CaCx screening 2.No display of LSM chart ,protocol chart and BMI chart No. of days screening is done Weekly 6 days screening done All day OP for follow up Drugs are given 30 days only Pass book/Drugs issues NCD pass Book not given Register & Reports 1) General Lab register is maintained / But NCD lab register not maintained ( as per protocol) Other issues 1.Avg per day screening (4.6.13 to 10.6.13) HT-22, DM-19, VIA/VILI-11 & CBE-12 Screening done.
  • 17. Slno PHC Name Name of the Facility ISSUES 34 D.Thurinjipatti BPHC Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for CaCx screening 2.No display of BMI chart No. of days screening is done 1).Weekly 6 days screening done 2). Past 2 months DM Screening not done ( Reason semi autoanalyzer not working ) DM pt referred to Solakottai PHC. All day OP for follow up Drugs are given 30 days only Pass book/Drugs issues NCD pass Book not given Equipments Issues 1.Semi autoanalyzer is not working ( But) On the day visits new semi autoanalyzer supply to TNHSP Other issues 1.Avg per day screening (05.6.13 to 11.6.13) HT- 21, DM-00, VIA/VILI-9 & CBE-10 Screening done
  • 18. Slno PHC Name Name of the Facility ISSUES 35 Kambainallur APHC Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for CaCx screening 2.No display of LSM chart ,protocol chart and BMI chart No. of days screening is done Weekly 6 days screening done Pass book/Drugs issues NCD pass Book not given Lab issues Lab technician visits on deputation weekly 3 days goes to the Cinthalpadi APHC. HMS related issues Last two weeks Online data entry not done(reason server problem) Register & Reports 1. HT ,DM followup register not maintained 2)NCD Lab register is not available (as per protocol) Other issues 1.Avg per day screening (3.6.13 to 8.6.13) HT-21, DM-12, VIA/VILI-7 & CBE-9 Screening done
  • 19. Slno PHC Name Name of the Facility ISSUES 36 Kalipettai APHC Initiation of Screening & protocol deviations if any 1.Power cut time torch light to be used for Ca Cx screening 2. No display of LSM chart,Protocol chart and BMI chart. No. of days screening is done 1) Weekly 6 days screening done 2) DM screening not done (Reason semi autoanalyzer not available) All day OP for follow up Drugs are given 30 days only Pass book/Drugs issues NCD pass book not given Equipments Issues 1.Semi-auto analyzer is not available Lab issues 1.No lab technician 2.Lab technician comes on deputation weekly 2 days (Boothanatham PHC) HMS related issues Online data entry not done ( Reason NCD Staff not trained ( Newly joined) ) Register & Reports 1. HT, DM followup register not available 2) NCD lab register not maintained as per protocol Other issues 1. Avg perday screening (12.6.13 to 18.6.13) HT- 19,DM-00,Cacx-4 & Cabr-8 screening done.
  • 20. S.No PHC Name Total HT Screened Total DM Screened Screened for CaCx Screened for CaBr 1 Harur 1309 832 563 592 2 Pennagagam 1421 790 338 329 3 PR Patty 1100 690 453 543 4 Palacode 1277 918 501 522 5 Medical college 1381 1378 411 1020 HT DM CACx CaBr State. Avg Dist.Avg
  • 21. Slno PHC Name Name of the Facility ISSUES 4 Palacode GH Initiation of Screening & protocol deviations if any 1.NCD name board not available No. of days screening is done 1.Weekly 6 days screening done All day OP for follow up Drugs are given 30 days only Pass book/Drugs issues NCD pass book not given Equipments Issues 1. Magnavision Lamp is not working Training issues 1 ) Regular S/N untrained for NCD program Register & Reports NCD Lab register not maintained (as per protocol) Other issues 1. Avg perday screening (20.6.13 to 26.6.13) HT- 45,DM-32,Cacx-15 & Cabr-16 screening done.
  • 22. Slno PHC Name Name of the Facility ISSUES 5 Dharmapuri medical college & Hospital Initiation of Screening & protocol deviations if any 1.Serum is used for blood glucose test No. of days screening is done Weekly 6 days screening done Follow up issues Follow up drugs are issued on fixed days only( Tuesday ,Thursday) All day OP for follow up Drugs are given 30 days only Pass book/Drugs issues NCD pass book not given Equipments Issues Stadiometer not received from TNHSP Lab issues 1.Serum is used for blood glucose test HMS related issues NCD S/N HMS entry not started (Reason user ID & pass word not given) Register & Reports 1) NCD lab register not maintained as per protocol Other issues 1. Avg perday screening (17.6.13 to 22.6.13) HT- 61,DM-63,Cacx-45 & Cabr-12 screening done.