1. DESIGN
Problem Solving
CONSTRUCTION
METHODS
BIM
Solution Driven
SYSTEM
INTEGRATION
PORTFOLIO OF
SELECTED PROFESSIONAL WORK
STEPHEN THOMAS HINES
2. 5 - PROFESSIONAL PROJECTS
‘ CONTENTS
Centerpoint - Jackson, Wyoming 5.2
Averon Technologies - Mine Hill, New Jersey 5.2
Talley Residence - Fayetteville, Arkansas 5.3
Courtesy Dealership - McKinney, Texas 5.3
Serranos Salsa Company - Lafayette, Louisiana 5.4
Inspiring Body of Christ Church - Dallas, Texas 5.5
St. Matthew Cumberland Presbyterian Church
Fort Worth, Texas 5.6
Armstrong Ballroom - Sheraton Canal Street
New Orleans, Louisiana 5.6
Appelt Aggieland Visitors Center
Texas A&M University - College Station, Texas 5.7
La Belle Maison - New Orleans, Louisiana 5.7
Vet-At-The-Barn - Chestnut Ridge, New York 5.8
Southwood Welcome Center - Tallahassee, Florida 5.8
Besh Steakhouse - Harrah’s Casino
New Orleans, Louisiana 5.9
Windmark Welcome Home Center 5.9
Ganote Residence - Jackson Hole, Wyoming 5.10
Fire Station #5 - City of Plano, Texas 5.11
Southwood Swimming Pool - College Station, Tx. 5.11
Our Mother of Mercy School - Fort Worth, Texas 5.12
Armstrong Ballroom - Sheraton Canal
Street, New Orleans, LA.
Stephen Thomas Hines ˜ April 4, 2009 5.1
3. 5 - PROFESSIONAL PROJECTS
‘ Centerpoint Office Building - Jackson,
Wyoming.
Project Highlights:
˜ 9,600 SF Speculative Office
Space - Two Floors
˜ 1,000 Common and Support
˜ 10,600 SF - $2.2 Million - Not
Centerpoint Office Building - Jackson, Wyoming Built
Construction Composition
‘ Program Accomplishments ˜ EPS Core SIPs for wall and roof
Construction time reduced 4 construction;
months; ˜ Half log veneer and stone;
HRV Systems to recycle energy; wainscot for exterior walls;
Energy consumption reduced ˜ Full log framing and accents
25%. from burned forests;
ArchiCAD Software - BIM Infused ˜ Concentric boilers
‘ Aviron Computer Technology, Inc. -
Mine Hill Industrial Park, Mine Hill, New
Jersey
Project Highlights:
˜ 8,000SF for Mezzanines
˜ 57,000SF operational floor
space
˜ 65,000 SF - $4.3 Million
Aviron Computer Technologies - Mine Hill, New Construction Composition
Jersey ˜ 8quot; tilt-up concrete panels with
three zones of vertical
‘ Program Accomplishments reinforcement to also act as
Construction time reduced 6 retaining walls;
months; ˜ Rigid insulation for walls, roof
Building shell and systems were and foundation perimeter;
30% below maximum allowed by ˜ Building is partially buried.
the New Jersey State Energy
Code requirements.
Steel system reduced 45% from
conventional.
ArchiCAD Software - BIM Infused
Stephen Thomas Hines ˜ April 4, 2009 5.2
4. 5 - PROFESSIONAL PROJECTS
‘ Talley Residence - Fayetteville,
Arkansas
Project Highlights:
˜ Four Bedrooms, 3 ½ Baths,
Formal Living Room, Formal
Dining Room, Great Room,
Kitchen, Study, Bonus Room
over Garage, Lanai, Pool
Cabana, 3 Car Garage
˜ 6,400 SF - $650,000.
Construction Composition
˜ Light Gauge Steel Frame for
Talley Residence - Fayetteville, Arkansas
walls and roof;
˜ Spray applied Bio-base
‘ Program Accomplishments: Urethane insulation for walls
Construction time reduced 4 ½ and roof structure;
months; ˜ Climate Controlled Sealed
HRV Systems to recycle energy; Attic;
Energy consumption reduced
30%.
ArchiCAD Software - BIM Infused
‘ Courtesy Dealership - McKinney,
Texas
Project Scope
˜ New Nissan and Buick
Automobile Dealerships Side-
Nissan of McKinney Courtesy Dealership
McKinney, Texas by-Side
˜ Seven Buildings including
Showrooms,
˜ 93,000 SF - $10 Million
Construction Composition
Lonestar Buick Courtesy Dealership - McKinney, Tx.
˜ 4quot; Spray applied urethane
roof system;
‘ Program Accomplishments
˜ Spray applied urethane foam
Structural steel system reduced
insulation;
40% from conventional;
˜ Energy Star light fixtures;
Energy efficiency was 40% below
˜ Central chiller plant for
State of Texas maximum;
optimum efficiency.
Construction time reduced 30%.
Stephen Thomas Hines ˜ April 4, 2009 5.3
5. 5 - PROFESSIONAL PROJECTS
‘ Serranos Salsa Company - Lafayette,
Louisiana
Project Highlights:
˜ Stand-alone Brand marquee
restaurant for company as
showcase image across the
I-10 Louisiana Corridor serving
Latin American Cuisine
˜ 3 dining areas and patio, bar
and bar patio; kitchen and
Serranos - Main Bar Dining office
˜ 6,000 SF - $1.4 Million
Construction Composition
˜ EPS core SIPs for walls and
roof deck construction;
˜ Spray applied Bio-base
Urethane Foam insulation for
entry stick-built walls;
˜ 3quot; Spray applied bio-based
Urethane foam roof
membrane;
˜ Mechanical equipment size
reduced 25%.
Program Accomplishments:
˜ Construction time reduced 3
Serranos - Main Entry and Dining Patio
months;
˜ HRV Systems to recycle
energy;
˜ Energy consumption reduced
30%.
˜ ArchiCAD Software - BIM
Infused.
Serranos - Accent and Banquette Dining
Stephen Thomas Hines ˜ April 4, 2009 5.4
6. 5 - PROFESSIONAL PROJECTS
‘ Inspiring Body of Christ Church (IBOC)
Dallas, Texas
Project Highlights:
˜ 4,200 Seat Auditorium
˜ Fellowship Hall to Seat 400
with Dining Patio and Full
Commercial Kitchen;
˜ Choir Practice Room; Youth
and Teen Facilities,
IBOC - South (M ain) Entrance from Fountain ˜ Administration and Pastoral
Suite
˜ 172,677 SF - $34 Million
Construction Composition
˜ 9quot; tilt-up concrete panels;
˜ Rigid insulation for panel walls
and roof;
˜ TPO membrane roof for lower
roofs - white reflective color;
˜ 70,000 gallon salt water
aquarium used as heat sink;
˜ Three Trane air-cooled chillers
with scroll compressors that
will load shed and ramp-up
as required for optimum
efficiency;
˜ Trane EMS to balance and
IBOC - Inside South Entry through 70,000 Gallon manage energy consump-
Saltwater Aquarium tion goals which also controls
lighting
Program accomplishments
˜ Building shell energy
consumption is 40% better
than State of Texas Energy
Code requirements;
˜ Energy consumption to be
approximate 25% less than
conventional
˜ ArchiCAD Software - BIM
Infused
IBOC - East Aerial - Dallas, Texas
Stephen Thomas Hines ˜ April 4, 2009 5.5
7. 5 - PROFESSIONAL PROJECTS
‘ St. Matthew Cumberland Presbyterian
Church - Fort Worth, Texas (Not Built)
Project Highlights
˜ 1,000 Seat Sanctuary
˜ Renovated Lobby,
˜ Classrooms and Offices;
˜ New Church and Facade
Image
St. Matthew CPC - Main Entry ˜ 20,000 SF - $2.9 Million
Construction Concepts
˜ Insulated Concrete Forms
(ICF) exterior walls;
˜ Glu-Laminated arch and
deck structural system for
sanctuary and addition;
˜ Spray applied bio-based
urethane foam insulation to
retrofit existing fellowship hall.
Program Accomplishments
˜ Construction time reduced 6
months;
˜ Building shell energy
St. Matthew CPC - Aerial Showing New Sanctuary
consumption is 40% better
than State of Texas Energy
Code requirements.
˜ ArchiCAD Software - BIM
Infused
‘ Armstrong Ballroom - Sheraton Canal
Street New Orleans, Louisiana
Project Highlights
˜ Restore and renovate to the
room Armstrong resulting
damage caused by
Hurricane Katrina.
˜ Work included ballroom,
cabana rooms, corridor and
Armstrong Ballroom - Sheraton Canal Street break-out rooms
˜ 20,000 SF - Cost not
disclosed
Stephen Thomas Hines ˜ April 4, 2009 5.6
8. 5 - PROFESSIONAL PROJECTS
‘ Appelt Aggieland Visitor Center in
Rudder Tower, Texas A&M University
College Station, Texas
Project Highlights
˜ Provide a new and inviting
single point of service for
visitors to Texas A&M
University.
˜ Multi-media mini-theater with
Aggieland Visitor Center - Main Entry
16 screen computer-
generated program and
music
˜ Three computer stations for
user interactive application
providing information to
students and visitors about
the university, the community
and the region
˜ Information Desk, Commons
Area and Storage.
˜ 3,500 SF - $1.3 Million
‘ La Belle Maison - New Orleans,
Louisiana - Fairfield Timeshare Resorts
Visitor Center - Information Project Highlights:
Desk ˜ 134 Key Timeshare
Condominium incorporating
four civil war era masonry
structures and adding floors
up to nine stories;
˜ 228,000 SF +, $28 million
Construction Concepts
˜ Unreinforced masonry walls
insulated and strengthened
with 4quot; spray applied bio-
based urethane foam;
La Belle Maison - Magazine
Street Elevation
Stephen Thomas Hines ˜ April 4, 2009 5.7
9. 5 - PROFESSIONAL PROJECTS
‘ Vet-At-The-Barn - Chestnut Ridge,
New York
Project Highlights:
˜ Eight Exam Rooms. Lobby,
Retail Sales, Treatment
Area, Surgical Suite,
Boarding Kennel,
Amenities,
˜ 9,400 SF - $1.5 Million
Construction Composition
˜ 8quot; EPS Core SIPs for wall
Vet-at-the-Barn - Main Entrance and roof construction;
˜ Mechanical equipment
size reduced 25%;
Program Accomplishments
˜ Construction time
reduced 4 months;
˜ HRV System to recycle
energy;
˜ Energy consumption
reduced 25%;
˜ ArchiCAD Software- BIM
Infused.
Southwood - Living Room ‘ Southwood Welcome Home Center
Tallahassee, Florida - St. Joe Land
Company
Project Highlights:
˜ Prototype facility for a new
concept in the
development of healthy
communities and selling
homes utilizing electronic
technology to link all the
St. Joe communities
together
Southwood - Reception Area ˜ 9,800 SF - $750,000.00
including specialty
interactive technology
Stephen Thomas Hines ˜ April 14, 2009 5.8
10. 5 - PROFESSIONAL PROJECTS
‘ Besh Steakhouse at Harrah’s Casino -
New Orleans, Louisiana
Project Highlights
˜ Renovation and Addition
enlarging the existing
restaurant and adjacent
public restrooms;
˜ Renovate kitchen, staff
areas and dining facilities
˜ Re-opened after Hurricane
Besh Steakhouse - Main Dining Area Katrina
Besh Steakhouse - Horseshoe Bar ‘ WindMark Beach Welcome Center -
Port St. Joe, Florida for St. Joe Towns
and Resorts.
Project Scope Included:
˜ The second of a new
concept in the develop-
ment of healthy commu--
nities and selling homes
utilizing electronic
technology to link all the
St. Joe communities
together.
Windmark Beach - Living Room ˜ 10,000 SF - $1.1 million
including interactive
technology
Stephen Thomas Hines ˜ April 14, 2009 5.9
11. 5 - PROFESSIONAL PROJECTS
‘ Ganote Residence - Jackson,
Wyoming
Project Highlights:
˜ Main House
Four Bedrooms, Formal
Living Room, Formal
Dining Room
Area: 7,100 SF
˜ Guest House
Two Bedrooms, Kitchen,
Ganote Residence - Rear (West) Elevation Great Room, Two Car
Garage
Area: 1,000 SF
Construction Composition:
˜ Wood Frame Walls, Half
Log Siding:
˜ Log Roof Purlins and
Elements
˜ Interior Full Log Walls, River
Rock Wainscot.
˜ 8,100 SF - $4.4 Million
Ganote Residence - Main Entry Stair
Stephen Thomas Hines ˜ April 14, 2009 5.10
12. 5 - PROFESSIONAL PROJECTS
‘ Fire Station #5 - Plano, Texas
Project Highlights:
˜ Three apparatus bays
˜ Day Room, Kitchen,
Watch Room, Dorm Area,
Dressing and Showers
˜ Equipment Storage, Site
Fire Department #5 - Plano, Texas
Work
˜ 6,000 SF - $555,000
Construction Composition
˜ Structural Steel Frame;
˜ Light Gauge Steel Walls
with Brick Veneer
˜ CMU for apparatus bays
with Brick Veneer;
˜ 4 Ply Roof Membrane
Fire Station #5 - Plano, Texas
‘ Southwood Swimming Pool - College
Station, Texas
Project Highlights:
˜ Repairs to Pool Shell and
Beach Entry
˜ Install new stainless steel
(OGRS); overflow gutter
recirculating system;
˜ Install Chemical Injection
and Monitor System, Flow
Southwood Swimming Pool - College Station. Tx. Meter and Automatic Fill
System
Program Accomplishments ˜ Replace Valves and
˜ Increased filter system upper layer of sand in the
efficiency by 50%; existing Filter System
˜ Stopped leaking through shell ˜ Service Pumps and
and construction joints; replace catch basket.
˜ Reduced pool operation costs ˜ Pool Size: 145,000 Gallons
30%. - $225,000
Stephen Thomas Hines ˜ May 14, 2009 5.11
13. 5 - PROFESSIONAL PROJECTS
‘ Our Mother of Mercy School - Fort
Worth, Texas
Project Highlights:
˜ Demolition of the existing
Pre-World War II Facility
Our Mother of Mercy School - Fort Worth, Texas ˜ New Facility is for K-8.
˜ 8 Classrooms, Library,
Music Room, Cafeteria
Commercial Kitchen,
Administration Offices
˜ 16,000 SF - $2.4 Million
Our Mother of Mercy School - Fort Worth, Texas Construction Composition
˜ 8quot; ICF Exterior Walls with
Program Accomplishments EIFS Coating;
˜ Energy consumption reduced ˜ Wood Truss Roof with
30%; Composition Shingles;
˜ Energy efficiency is reduced ˜ 4quot; Spray applied Urethane
30% better than State of Texas Insulation for Roof
requirements; ˜ Mechanical Equipment
˜ ArchiCAD Software - BIM Infused Size Reduced 25%
‘ Classroom and Gymnasium Addition
to Caldwell Middle School -
McKinney ISD
Project Highlights:
˜ Replacement after fire
burned fifty year old
gymnasium
˜ Four Classrooms, Teacher
Caldwell Middle School - McKinney, Texas Lounge
˜ Restrooms and Junior High
Gymnasium
˜ 9,200 SF - $550,000
Stephen Thomas Hines ˜ May 14, 2009 5.12