6. Response to Query- LamdonStongdhe School: One of the most remote schools in the Lamdon chain Residential school with 85 students from class I-VIII Lack of basic amenities School has requested classroom furniture for students
7. Response to Query- LADF Residential Hostel ( supported by MJ last year ) Hostel for remote students studying in Leh Strength of 80 students for Class I-XII Request for upgrading their kitchen equipment
8. Response to query- Govt Schools Govt Middle School- Saspoche ( supported by MJ last year ) Sufficient grants provided since flashfloods to rebuild classrooms Sufficient funds available for 2 extra classrooms Need for classroom furniture for new classrooms but no space for storage till structure is complete Classrooms to be completed by next year
9. Response to query- Govt Schools Govt Residential Middle School- Lingshed (supported by MJ last year) Very remote residential school 103 boys and girls From Primary to Class VIII Students studying on uneven stone floor Request for Classroom Furniture Request for Primary School furniture Request for Battery operated PA System
10. Action recommended by Mission Julley Design, Prototype, Manufacture & Provide Classroom Furniture
11. Schools Recommended Lingshed Govt. Residential Middle School LamdonStongdhe School Govt. Middle School, Timisgang(requirements awaited) LamdonKhaltse School (subject to availability of funds) Spituk Monastery School(requirements awaited)
13. Mission Julley Classroom Furniture Severe need for classroom furniture Off-the-shelf solution not available due to numerous constraints of Anthropometry of Ladakh school children Classroom sizes and finish Transport & Packaging Materials Climate Manufacturing Pilferage and misappropriation Constraints will be highlighted with a case study of Lingshed Govt. Residential Middle School
14. Govt Residential Middle School, Lingshed Case Study for design constraints and recommendations
16. Govt Residential Middle School, Lingshed Only residential school in a radius of 150km Caters to children of 8 surrounding villages Student Strength- 101 boys & girls From Kg to classes VIII 17 teachers and wardens
22. Available Infrastructure (School) 8 Classrooms 4 rooms of 12’ X 12’ 4 rooms of 16’ X 12’ 1 room of 14’ X 12’ (Primary) 1 Principal’s office cum staff room Height of all rooms: 8’ Flooring: Stone and mud plaster Floor Covering: Bare or Matting
23. Student Strength (Class-wise) Pre-primary to KG- 25 Class 1- 3 Class 2- 20 Class 3- 15 Class 4- 6 Class 5- 12 Class 6- 8 Class 7- 4 Class 8- 8 TOTAL 101
37. Design Constraints: Transport and PackagingHorseback: Nyerak to Lingshed Horses can carry 60-80Kgs Donkeys can carry 40-50Kgs Routes are very steep with vertical sides in places Very steep gradients (50-600) Weight distribution on animal is critical