“Big Dig” Project
THE CENTRAL ARTERY/TUNNEL PROJECT (CA/T)
A CASE STUDY ON PROJECT COMPLEXITY.
Project Description
Located in Boston, MA, on the
northeast coast of the United
States.
 Includes tunnels, highway
interchange connections, bridges
and pedestrian facilities
Project Map
Project Description
Rerouted the Central Artery (Interstate 93),
into a 3.5-mile (5.6-km) tunnel.
 Construction of the Ted Williams Tunnel.
 Construction of the Leonard P. Zakim Bunker
Hill Memorial Bridge over the Charles River.
 Construction of the Rose Kennedy
Greenway in the space vacated by the
previous I-93 elevated roadway.
Project Description
 Planning Phase started in 1982
 Construction work – 1991-2006
 Estimated Completion - 1998
 Actual Completion – Dec 31, 2007
Estimated Cost - $2.8 billion
Final Cost - $14.6 billion
Cost over run – 190%
Official project owner - Massachusetts
Turnpike Authority
 Joint venture of Bechtel and Parson
Brinkerhoff
Source: http://www.roadtraffic-technology.com
Why Boston Needed the Big Dig?
Traffic improvements and
substantial reductions in
congestion
 Improving mobility in
downtown Boston
 Reconnect neighborhoods
severed by the old elevated
highway
Source: http://www.massdot.state.ma.us
Central Artery: Before and After
Source:http://www.bigdig.com
Problems faced
Escalating costs
Scheduling overruns
Design flaws
Charges of poor execution and use of
substandard materials
Fatal Ceiling Collapse
Criminal arrests and one death
Source: http://www.roadtraffic-technology.com
Complexity Factors - Cost
Contingency Usage
◦ Construction Contracts
◦ Management Contingency
◦ Massachusetts Turnpike Authority CEO Contingency
Risk Analysis
◦ Location
◦ Utilities
Estimate Formation
◦ Ted Williams Tunnel
◦ Zakim Bunker Hill Bridge
◦ Center Artery (I-93)
Complexity Factors - Cost
Figure. Big Dig Project Cost Growth (National Research Council 2003)
55%
15%
8%
7%
5%
3%
2%
5% Inflation
Environmental/Mitigation
Scope Growth
Accounting Changes
Traffic
Schedule Maintenance
Contingency for Unknowns
Other
Complexity Factors - Schedule
Timeline Requirements
◦ Community Conflicts
Milestones
Schedule Control
◦ Software Programs
Complexity Factors - Technical
Scope of Project
Owner’s Internal Structure
Design Method
Complexity Factors - Context
Public
◦ Economic Value of Boston
Utility Coordination
◦ 29 Miles of Underground Utility Relocation and Updating
Land Use Impact
◦ 300 acres of Green Space
Complexity Factors - Financing
Federal Funding
State Funding
Borrowing Against Future Funding
Project Dimension Complexity
Ranking
DIMENSION RANK
Context 5
Cost 4
Technical 3
Financing 2
Schedule 1
Project Dimension Complexity
Rating
DIMENSIONS SCALE (0 – 100)
Cost Dimension
Complexity
99
Schedule Dimension
Complexity
90
Technical Dimension Complexity 95
Context
Dimension Complexity
100
Financing Dimension Complexity 92
Complexity Map
The Big Dig Project
0
10
20
30
40
50
60
70
80
90
100
Technical
Cost
FinancingContext
Schedule
Critical Planning and
Analysis Methods
Method 1: Define Critical Success Factors
◦ Community Needs
◦ Political Restrictions
◦ Federal and State Funding
◦ Major Project Components
◦ Center Artery (I-93)
◦ Ted Williams Tunnel
◦ Zakim Bunker Hill Bridge
Method 2: Assemble Project Team
Communication
Collaboration
◦ Example
◦ Ted Williams Tunnel Ceiling Panel Collapse
Method 3: Project Arrangements
Design-Bid-Build
Value Engineering
Dispute Resolution
Dispute Resolution Board
Method 4: Early Cost Model
and Finance Plan
Incorrect Initial Cost Model and Finance Plan
The cost model would have included
◦ Inflation
◦ Project Risk- Account for Cost Overruns
◦ More detail over Design Costs
Method 5: Develop
Project Action Plans
Major Obstacles
◦ Restrictive Legislation
◦ Acquisition of ROW
◦ Cooperation of Utilities
◦ Community Support
Tools for Managing Complex Projects
The following tools were used in the Big Dig Project:
•Public involvement plan
•Critical permit issues
•Offsite fabrication
•Co-locate team
•Dispute resolution plan
Public Involvement Plan
◦ Project planners worked with community groups, government & business leaders to
create a consensus of how the project would be built
◦ Mitigation: The process of keeping the city open and making certain all
affected groups would be treated fairly
◦ Informed, organized interest groups press for their demands
◦ Public involvement plan produces early project wins of consensus but at the
expense of late project soaring project costs
Critical Permit Issues
◦ Bechtel/Parsons Brinkerhoff (B/PB):
◦ Engineering authority that approved, permitted, and released designs for construction
◦ Construction managers in charge of contractors & sub-contractors
◦ B/PB operated the project with the philosophy of getting this done, ask questions later
◦ Many plans that were permitted and released for construction were incomplete, contained
numerous errors, and lacked proper subsurface exploration
◦ The lax oversight produced an estimated $750 million in construction over-runs
Offsite Fabrication
◦ Utilized successfully on the CA/T project
◦ Several examples are:
◦ Immersed steel tubes for the Ted Williams Tunnel
◦ Steel box girder sections for the Bunker Hill Bridge
◦ Utilized successfully on the CA/T project
◦ Offsite fabrication of box girders and steel tubes produced accurate sections per specification that could
be test connected at the factory to insure smooth and timely installation
◦ Quicker assembly time at the job site with smaller construction crews as compared to onsite fabrication
◦ Exposure of construction workers to difficult job environments was reduced as compared to onsite
fabrication
Co-Locate Team
◦ Co-Locate elements of the project team to produce a cohesive team effort to complete a project
◦ Perhaps the most controversial tool
◦ In 1998, State of Massachusetts combined B/PB with state workers into one integrated project
organization
◦ Massachusetts Turnpike Authority was at the top of the organization chart
◦ State of Massachusetts designated B/PB as “owner’s representative” in several instances
◦ Who is in charge?
Dispute Resolution Plan
◦ Two noteworthy dispute resolution plan techniques were utilized on the CA/T project:
◦ Partnering
◦ Mediation
◦ Partnering was practiced on the CA/T project for construction projects with a duration of least
one year and a value of $1 million or more
◦ Mediation was utilized to resolve the dispute of responsibility for leaks at the Fort Point
Channel tunnel area
References
◦ Bartlett School of Planning (UCL). (2011). “The Central Artery/Third Harbor Tunnel Project (‘The Big Dig’), Omega Centre.” Bloomsbury, London.
◦ Gelinas, N. (2007). “Lessons of Boston’s Big Dig.” City Journal Autumn. New York, New York.
◦ Greirman, V. (2010). “The Big Dig: Learning from a Mega Project.” NASA, <http://appel.nasa.gov/2010/07/15/the-big-dig-learning-from-a-mega-project/>
(November 13, 2013).
◦ Hsu, J. Mckay, S., McKnight, M. (2003). “Cost-Benefit Analysis of Boston’s Central Artery/Tunnel Project” Carnegie Mello University. Pittsburgh, PA.
◦ Lewis, R. and Murphy, S. (2003). “Artery Errors Cost More Than $1b.” The Boston Globe, <http://www.boston.com/globe/metro/packages/bechtel/>
(November 13, 2013).
◦ Massachusetts Department of Transportation (MassDOT). (2013). “The Central Artery/Tunnel Project-The Big Dig.” MassDOT Highway Division.
<http://www.massdot.state.ma.us/highway/TheBigDig.aspx> (October 5, 2013).
◦ National Research Council. “Completing the "Big Dig": Managing the Final Stages of Boston's Central Artery/Tunnel Project. Washington, DC: The National
Academies Press, 2003.
◦ Poole, R.W., Samuel, P. (2011). “Transportation Mega-Projects and Risk.” Reason Foundation Policy Brief 97. Los Angeles, CA.
◦ Saltzman, J. (2009). “Big Dig Contractor Modern Continental Pleads Guilty.” Boston Globe.
<http://www.boston.com/news/local/breaking_news/2009/05/modern_continen_2.html> (October 5, 2013).
◦ Salvucci, F. P. (2008). “Unearthing the Big Dig.” Massachusetts Institute of Technology. Cambridge, MA.
◦ Wood, D. (2001). “Learning From the Big Dig.” Federal Highway Administration: Public Roads,
<http://www.fhwa.dot.gov/publications/publicroads/01julaug/bigdig.cfm> (November 13, 2013).

Contenu connexe

Tendances

Midland Energy Resources, Inc. Cost of Capital
Midland Energy Resources, Inc. Cost of CapitalMidland Energy Resources, Inc. Cost of Capital
Midland Energy Resources, Inc. Cost of CapitalKivanc Ozuolmez
 
Case analysis boeing 787
Case analysis boeing 787Case analysis boeing 787
Case analysis boeing 787Ashish Michael
 
Pillsbury cookie challenge
Pillsbury cookie challengePillsbury cookie challenge
Pillsbury cookie challengePrasanth Ramdas
 
American Airlines Business Model Analysis Presentation
American Airlines Business Model Analysis PresentationAmerican Airlines Business Model Analysis Presentation
American Airlines Business Model Analysis PresentationBrandon Thomson
 
JetBlue Airways: Starting from Scratch
JetBlue Airways: Starting from ScratchJetBlue Airways: Starting from Scratch
JetBlue Airways: Starting from ScratchDhroov Sharma
 
Zipcar case analysis
Zipcar case analysisZipcar case analysis
Zipcar case analysisAndrew Olsen
 
Jet Blue Syndicate Presentation
Jet Blue Syndicate PresentationJet Blue Syndicate Presentation
Jet Blue Syndicate PresentationMahammad Khadafi
 
Netflix vs. Blockbuster Case Study
Netflix vs. Blockbuster Case StudyNetflix vs. Blockbuster Case Study
Netflix vs. Blockbuster Case StudyLily Zimmerman
 
Project Report on Merger of American airlines and US airlines
Project Report on Merger of American airlines and US airlinesProject Report on Merger of American airlines and US airlines
Project Report on Merger of American airlines and US airlinesReena Sisodiya
 
Southwest airlines pitch brief
Southwest airlines pitch briefSouthwest airlines pitch brief
Southwest airlines pitch briefCubeyou Inc
 
The Enron case: from success to scandal to bankruptcy
The Enron case: from success to scandal to bankruptcy�The Enron case: from success to scandal to bankruptcy�
The Enron case: from success to scandal to bankruptcySuzzanne Uhland
 
Case Solution for Moonka Auto: Recruiting Salespeople
Case Solution for Moonka Auto: Recruiting SalespeopleCase Solution for Moonka Auto: Recruiting Salespeople
Case Solution for Moonka Auto: Recruiting Salespeoplecasesolutions34
 
FedEx Brand presentation
FedEx Brand presentationFedEx Brand presentation
FedEx Brand presentationmayankl jain
 
Fed ex strategic management
Fed ex strategic managementFed ex strategic management
Fed ex strategic managementYuki Hana
 
Nucor Case Analysis
Nucor Case AnalysisNucor Case Analysis
Nucor Case AnalysisBskwarski87
 
Case Analysis: The Battle for Value, 2004: FedEx Crop vs United Parcel Servic...
Case Analysis: The Battle for Value, 2004: FedEx Crop vs United Parcel Servic...Case Analysis: The Battle for Value, 2004: FedEx Crop vs United Parcel Servic...
Case Analysis: The Battle for Value, 2004: FedEx Crop vs United Parcel Servic...Afifah Nabilah
 
Jetblue airlines: start from the scratch.case study analysis
Jetblue airlines: start from the scratch.case study analysisJetblue airlines: start from the scratch.case study analysis
Jetblue airlines: start from the scratch.case study analysisPriyanka Banerjee
 
The jaguar project case
The jaguar project caseThe jaguar project case
The jaguar project caseEssaysREasy
 
Accenture- Mini Case
Accenture- Mini CaseAccenture- Mini Case
Accenture- Mini CaseSunil Swaroop
 

Tendances (20)

Midland Energy Resources, Inc. Cost of Capital
Midland Energy Resources, Inc. Cost of CapitalMidland Energy Resources, Inc. Cost of Capital
Midland Energy Resources, Inc. Cost of Capital
 
Case analysis boeing 787
Case analysis boeing 787Case analysis boeing 787
Case analysis boeing 787
 
Pillsbury cookie challenge
Pillsbury cookie challengePillsbury cookie challenge
Pillsbury cookie challenge
 
American Airlines Business Model Analysis Presentation
American Airlines Business Model Analysis PresentationAmerican Airlines Business Model Analysis Presentation
American Airlines Business Model Analysis Presentation
 
JetBlue Airways: Starting from Scratch
JetBlue Airways: Starting from ScratchJetBlue Airways: Starting from Scratch
JetBlue Airways: Starting from Scratch
 
Zipcar case analysis
Zipcar case analysisZipcar case analysis
Zipcar case analysis
 
Jet Blue Syndicate Presentation
Jet Blue Syndicate PresentationJet Blue Syndicate Presentation
Jet Blue Syndicate Presentation
 
Netflix vs. Blockbuster Case Study
Netflix vs. Blockbuster Case StudyNetflix vs. Blockbuster Case Study
Netflix vs. Blockbuster Case Study
 
Project Report on Merger of American airlines and US airlines
Project Report on Merger of American airlines and US airlinesProject Report on Merger of American airlines and US airlines
Project Report on Merger of American airlines and US airlines
 
Southwest airlines pitch brief
Southwest airlines pitch briefSouthwest airlines pitch brief
Southwest airlines pitch brief
 
The Enron case: from success to scandal to bankruptcy
The Enron case: from success to scandal to bankruptcy�The Enron case: from success to scandal to bankruptcy�
The Enron case: from success to scandal to bankruptcy
 
Case Solution for Moonka Auto: Recruiting Salespeople
Case Solution for Moonka Auto: Recruiting SalespeopleCase Solution for Moonka Auto: Recruiting Salespeople
Case Solution for Moonka Auto: Recruiting Salespeople
 
FedEx Brand presentation
FedEx Brand presentationFedEx Brand presentation
FedEx Brand presentation
 
arthur anderson
arthur andersonarthur anderson
arthur anderson
 
Fed ex strategic management
Fed ex strategic managementFed ex strategic management
Fed ex strategic management
 
Nucor Case Analysis
Nucor Case AnalysisNucor Case Analysis
Nucor Case Analysis
 
Case Analysis: The Battle for Value, 2004: FedEx Crop vs United Parcel Servic...
Case Analysis: The Battle for Value, 2004: FedEx Crop vs United Parcel Servic...Case Analysis: The Battle for Value, 2004: FedEx Crop vs United Parcel Servic...
Case Analysis: The Battle for Value, 2004: FedEx Crop vs United Parcel Servic...
 
Jetblue airlines: start from the scratch.case study analysis
Jetblue airlines: start from the scratch.case study analysisJetblue airlines: start from the scratch.case study analysis
Jetblue airlines: start from the scratch.case study analysis
 
The jaguar project case
The jaguar project caseThe jaguar project case
The jaguar project case
 
Accenture- Mini Case
Accenture- Mini CaseAccenture- Mini Case
Accenture- Mini Case
 

Similaire à Project Complexity (Case study)

ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...Lucas de Brito Nascimento
 
Walton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearWalton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearOHM Advisors
 
Torrey pines road corridor study final
Torrey pines road corridor study finalTorrey pines road corridor study final
Torrey pines road corridor study finalkday1
 
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_AkhtarJavad Akhtar
 
2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs2016-07-28 Martin Jacobs
2016-07-28 Martin JacobsMartin Jacobs
 
megaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfmegaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfAdina Levin
 
Final acec design summit pres 2017
Final acec design summit pres 2017Final acec design summit pres 2017
Final acec design summit pres 2017melissanatech
 
LEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxLEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxcroysierkathey
 
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsJames Chuck
 
Tim McAnallen - Construction Inspector 2104
Tim McAnallen - Construction Inspector 2104Tim McAnallen - Construction Inspector 2104
Tim McAnallen - Construction Inspector 2104Timothy McAnallen
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & ResumeRichard Rask
 
OTEC Presentation: Complete Streets for Akron's East End Development
OTEC Presentation: Complete Streets for Akron's East End DevelopmentOTEC Presentation: Complete Streets for Akron's East End Development
OTEC Presentation: Complete Streets for Akron's East End DevelopmentFrancesca Wagner
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Daniel X. O'Neil
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010Daniel X. O'Neil
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaul Blaetz
 

Similaire à Project Complexity (Case study) (20)

BigDig_KeyFacts_Dec2006
BigDig_KeyFacts_Dec2006BigDig_KeyFacts_Dec2006
BigDig_KeyFacts_Dec2006
 
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...
ANALYSIS OF VIADUCT REHABILITATION PROJECTS IN MASSACHUSETTS AND CALIFORNIA: ...
 
Resume
ResumeResume
Resume
 
Walton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearWalton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the Year
 
Torrey pines road corridor study final
Torrey pines road corridor study finalTorrey pines road corridor study final
Torrey pines road corridor study final
 
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs
 
megaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfmegaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdf
 
Final acec design summit pres 2017
Final acec design summit pres 2017Final acec design summit pres 2017
Final acec design summit pres 2017
 
LEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxLEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docx
 
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
 
Deh Cho Bridge
Deh Cho BridgeDeh Cho Bridge
Deh Cho Bridge
 
Tim McAnallen - Construction Inspector 2104
Tim McAnallen - Construction Inspector 2104Tim McAnallen - Construction Inspector 2104
Tim McAnallen - Construction Inspector 2104
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
OTEC Presentation: Complete Streets for Akron's East End Development
OTEC Presentation: Complete Streets for Akron's East End DevelopmentOTEC Presentation: Complete Streets for Akron's East End Development
OTEC Presentation: Complete Streets for Akron's East End Development
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 

Plus de Sunny Mahajan

Usage of RAP on gravel roads
Usage of RAP on gravel roadsUsage of RAP on gravel roads
Usage of RAP on gravel roadsSunny Mahajan
 
Off site fabrication
Off site fabricationOff site fabrication
Off site fabricationSunny Mahajan
 
Frugal innovation-sankalp
Frugal innovation-sankalpFrugal innovation-sankalp
Frugal innovation-sankalpSunny Mahajan
 
Marketing101-The Geek
Marketing101-The GeekMarketing101-The Geek
Marketing101-The GeekSunny Mahajan
 
Optimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota RoadsOptimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota RoadsSunny Mahajan
 
Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)Sunny Mahajan
 

Plus de Sunny Mahajan (7)

Usage of RAP on gravel roads
Usage of RAP on gravel roadsUsage of RAP on gravel roads
Usage of RAP on gravel roads
 
Off site fabrication
Off site fabricationOff site fabrication
Off site fabrication
 
Frugal innovation-sankalp
Frugal innovation-sankalpFrugal innovation-sankalp
Frugal innovation-sankalp
 
Marketing101-The Geek
Marketing101-The GeekMarketing101-The Geek
Marketing101-The Geek
 
Optimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota RoadsOptimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota Roads
 
BIM case study
BIM case studyBIM case study
BIM case study
 
Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)
 

Dernier

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Dernier (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Project Complexity (Case study)

  • 1. “Big Dig” Project THE CENTRAL ARTERY/TUNNEL PROJECT (CA/T) A CASE STUDY ON PROJECT COMPLEXITY.
  • 2. Project Description Located in Boston, MA, on the northeast coast of the United States.  Includes tunnels, highway interchange connections, bridges and pedestrian facilities
  • 4. Project Description Rerouted the Central Artery (Interstate 93), into a 3.5-mile (5.6-km) tunnel.  Construction of the Ted Williams Tunnel.  Construction of the Leonard P. Zakim Bunker Hill Memorial Bridge over the Charles River.  Construction of the Rose Kennedy Greenway in the space vacated by the previous I-93 elevated roadway.
  • 5. Project Description  Planning Phase started in 1982  Construction work – 1991-2006  Estimated Completion - 1998  Actual Completion – Dec 31, 2007 Estimated Cost - $2.8 billion Final Cost - $14.6 billion Cost over run – 190% Official project owner - Massachusetts Turnpike Authority  Joint venture of Bechtel and Parson Brinkerhoff Source: http://www.roadtraffic-technology.com
  • 6. Why Boston Needed the Big Dig? Traffic improvements and substantial reductions in congestion  Improving mobility in downtown Boston  Reconnect neighborhoods severed by the old elevated highway Source: http://www.massdot.state.ma.us
  • 7. Central Artery: Before and After Source:http://www.bigdig.com
  • 8. Problems faced Escalating costs Scheduling overruns Design flaws Charges of poor execution and use of substandard materials Fatal Ceiling Collapse Criminal arrests and one death Source: http://www.roadtraffic-technology.com
  • 9. Complexity Factors - Cost Contingency Usage ◦ Construction Contracts ◦ Management Contingency ◦ Massachusetts Turnpike Authority CEO Contingency Risk Analysis ◦ Location ◦ Utilities Estimate Formation ◦ Ted Williams Tunnel ◦ Zakim Bunker Hill Bridge ◦ Center Artery (I-93)
  • 10. Complexity Factors - Cost Figure. Big Dig Project Cost Growth (National Research Council 2003) 55% 15% 8% 7% 5% 3% 2% 5% Inflation Environmental/Mitigation Scope Growth Accounting Changes Traffic Schedule Maintenance Contingency for Unknowns Other
  • 11. Complexity Factors - Schedule Timeline Requirements ◦ Community Conflicts Milestones Schedule Control ◦ Software Programs
  • 12. Complexity Factors - Technical Scope of Project Owner’s Internal Structure Design Method
  • 13. Complexity Factors - Context Public ◦ Economic Value of Boston Utility Coordination ◦ 29 Miles of Underground Utility Relocation and Updating Land Use Impact ◦ 300 acres of Green Space
  • 14. Complexity Factors - Financing Federal Funding State Funding Borrowing Against Future Funding
  • 15. Project Dimension Complexity Ranking DIMENSION RANK Context 5 Cost 4 Technical 3 Financing 2 Schedule 1
  • 16. Project Dimension Complexity Rating DIMENSIONS SCALE (0 – 100) Cost Dimension Complexity 99 Schedule Dimension Complexity 90 Technical Dimension Complexity 95 Context Dimension Complexity 100 Financing Dimension Complexity 92
  • 17. Complexity Map The Big Dig Project 0 10 20 30 40 50 60 70 80 90 100 Technical Cost FinancingContext Schedule
  • 18. Critical Planning and Analysis Methods Method 1: Define Critical Success Factors ◦ Community Needs ◦ Political Restrictions ◦ Federal and State Funding ◦ Major Project Components ◦ Center Artery (I-93) ◦ Ted Williams Tunnel ◦ Zakim Bunker Hill Bridge
  • 19. Method 2: Assemble Project Team Communication Collaboration ◦ Example ◦ Ted Williams Tunnel Ceiling Panel Collapse
  • 20. Method 3: Project Arrangements Design-Bid-Build Value Engineering Dispute Resolution Dispute Resolution Board
  • 21. Method 4: Early Cost Model and Finance Plan Incorrect Initial Cost Model and Finance Plan The cost model would have included ◦ Inflation ◦ Project Risk- Account for Cost Overruns ◦ More detail over Design Costs
  • 22. Method 5: Develop Project Action Plans Major Obstacles ◦ Restrictive Legislation ◦ Acquisition of ROW ◦ Cooperation of Utilities ◦ Community Support
  • 23. Tools for Managing Complex Projects The following tools were used in the Big Dig Project: •Public involvement plan •Critical permit issues •Offsite fabrication •Co-locate team •Dispute resolution plan
  • 24. Public Involvement Plan ◦ Project planners worked with community groups, government & business leaders to create a consensus of how the project would be built ◦ Mitigation: The process of keeping the city open and making certain all affected groups would be treated fairly ◦ Informed, organized interest groups press for their demands ◦ Public involvement plan produces early project wins of consensus but at the expense of late project soaring project costs
  • 25. Critical Permit Issues ◦ Bechtel/Parsons Brinkerhoff (B/PB): ◦ Engineering authority that approved, permitted, and released designs for construction ◦ Construction managers in charge of contractors & sub-contractors ◦ B/PB operated the project with the philosophy of getting this done, ask questions later ◦ Many plans that were permitted and released for construction were incomplete, contained numerous errors, and lacked proper subsurface exploration ◦ The lax oversight produced an estimated $750 million in construction over-runs
  • 26. Offsite Fabrication ◦ Utilized successfully on the CA/T project ◦ Several examples are: ◦ Immersed steel tubes for the Ted Williams Tunnel ◦ Steel box girder sections for the Bunker Hill Bridge ◦ Utilized successfully on the CA/T project ◦ Offsite fabrication of box girders and steel tubes produced accurate sections per specification that could be test connected at the factory to insure smooth and timely installation ◦ Quicker assembly time at the job site with smaller construction crews as compared to onsite fabrication ◦ Exposure of construction workers to difficult job environments was reduced as compared to onsite fabrication
  • 27. Co-Locate Team ◦ Co-Locate elements of the project team to produce a cohesive team effort to complete a project ◦ Perhaps the most controversial tool ◦ In 1998, State of Massachusetts combined B/PB with state workers into one integrated project organization ◦ Massachusetts Turnpike Authority was at the top of the organization chart ◦ State of Massachusetts designated B/PB as “owner’s representative” in several instances ◦ Who is in charge?
  • 28. Dispute Resolution Plan ◦ Two noteworthy dispute resolution plan techniques were utilized on the CA/T project: ◦ Partnering ◦ Mediation ◦ Partnering was practiced on the CA/T project for construction projects with a duration of least one year and a value of $1 million or more ◦ Mediation was utilized to resolve the dispute of responsibility for leaks at the Fort Point Channel tunnel area
  • 29. References ◦ Bartlett School of Planning (UCL). (2011). “The Central Artery/Third Harbor Tunnel Project (‘The Big Dig’), Omega Centre.” Bloomsbury, London. ◦ Gelinas, N. (2007). “Lessons of Boston’s Big Dig.” City Journal Autumn. New York, New York. ◦ Greirman, V. (2010). “The Big Dig: Learning from a Mega Project.” NASA, <http://appel.nasa.gov/2010/07/15/the-big-dig-learning-from-a-mega-project/> (November 13, 2013). ◦ Hsu, J. Mckay, S., McKnight, M. (2003). “Cost-Benefit Analysis of Boston’s Central Artery/Tunnel Project” Carnegie Mello University. Pittsburgh, PA. ◦ Lewis, R. and Murphy, S. (2003). “Artery Errors Cost More Than $1b.” The Boston Globe, <http://www.boston.com/globe/metro/packages/bechtel/> (November 13, 2013). ◦ Massachusetts Department of Transportation (MassDOT). (2013). “The Central Artery/Tunnel Project-The Big Dig.” MassDOT Highway Division. <http://www.massdot.state.ma.us/highway/TheBigDig.aspx> (October 5, 2013). ◦ National Research Council. “Completing the "Big Dig": Managing the Final Stages of Boston's Central Artery/Tunnel Project. Washington, DC: The National Academies Press, 2003. ◦ Poole, R.W., Samuel, P. (2011). “Transportation Mega-Projects and Risk.” Reason Foundation Policy Brief 97. Los Angeles, CA. ◦ Saltzman, J. (2009). “Big Dig Contractor Modern Continental Pleads Guilty.” Boston Globe. <http://www.boston.com/news/local/breaking_news/2009/05/modern_continen_2.html> (October 5, 2013). ◦ Salvucci, F. P. (2008). “Unearthing the Big Dig.” Massachusetts Institute of Technology. Cambridge, MA. ◦ Wood, D. (2001). “Learning From the Big Dig.” Federal Highway Administration: Public Roads, <http://www.fhwa.dot.gov/publications/publicroads/01julaug/bigdig.cfm> (November 13, 2013).