Product Design निरेल Team 3 Presents
Power Crisis in India The supply of adequate, yet affordable electricity is a continuing challenge because expansion of supply, and adoption of cleaner technologies. In recent years, these challenges have led to a major set of continuing reforms and restructuring. Still, the gap between electricity supply and demand continues to grow; India is now importing coal as well as natural gas to keep up with energy consumption.  Energy demand is increasing dramatically due to rising incomes, industrialization, urbanization and population growth.  The demand will increase by a factor of two over the next 20 years
Indian Railway Rail transport is a commonly used mode of long-distance transportation in India Indian Railways has more than 64,015 kilometers of track . It has the world’s fourth largest railway network The total number of railway stations in India is estimated to be between 7,000 and 8,000. Railway consumes 2% of total available electricity in the country. It is 20% of the total shortfall in the country.
Regenerative braking Regenerative braking: The Delhi Metro saved around 90,000 tons of carbon dioxide (CO2) from being released into the atmosphere by regenerating 112,500 megawatt hours of electricity through the use of regenerative braking systems between 2004 and 2007.  It is expected that the Delhi Metro will save over 100,000 tons of CO2 from being emitted per year once its phase II is complete through the use of regenerative braking. But efficiency of regenerative braking is about 31%. So a better solution is required.
Our Idea :  निरेल (निरंतररेल)
Schematic diagram:  B1+E1       T	 T =train  B = bogie   E = rear engine  P = platform       = velocity       = acceleration    B2+E2 P
      T	 B1+E1 B2+E2 P
      T	 B2+E2 B1+E1 P
Video
Working The train is approaching a station at a velocity of 70km/hr (20m/s) . At a distance of 200m from the intersection the bogie(s) gets detached. The detached portion is then decelerated at 1.2m/s2 for a distance of 140m and then moves at a constant speed of 8m/s till it reaches the intersection. This ensures a time gap of 20sec at the intersection (switch) between last bogie of the train and detached bogie.  After the detached portion enters the loop line it can be taken by the rear engine to the station.
When the train arrives, a bogie and an engine (Engine C ) attached to the rear end are already waiting at the station in the loop line.  When the train is at a certain distance (release distance) from the switching junction, the Engine C starts. Then the Engine C is accelerated and decelerated for a fixed time such that it goes and attaches to the train at some distance( Meeting distance).
Bogie arrangement This train shall have all coaches of same class (either sleeper, AC or general as per the requirement), 1 pantry car at the beginning and a metro engine at the end. All the bogies are designated as per the stations at which they shall be discarded Passengers need to move once from the attached bogie to their respective destined bogie. To help with their luggage movement, an interlockable, extendable, luggage trolley shall be provided to them at the starting bogie which is locked into a groove in the bogie.
Once they move on to their destined bogie, They need not worry about when their station approaches. As their station approaches, their bogie gets discarded and brought to the platform by the metro engine where  		1)they can get down peacefully 		2)there will be no inflow of passengers 		3)they can take their own time not to miss any luggage 		4)No Tension at all
Link
Why a metro engine at back It achieves required velocity at the given amount of time. Even though it’s maximum velocity is limited, that is sufficient  for us. Using any other heavy engine would not be cost effective It has a part of it in which passengers can sit When bogie is discarded, it brings the bogie to station with       out using much energy As we may fix limit for number of bogies to be attached/detached per station. This engine suffices our requirement.
Attaching / Detaching Mechanism
Coupler The Scharfenberg (Schaku)  coupler  is one of the most commonly used types of fully automatic coupling.  Its use is generally restricted to mass transit systems.  The Schaku coupler makes the electrical and also the pneumatic connections and disconnections automatic.  Small air cylinders, acting on the rotating heads of the coupler, ensure the Schaku coupler engagement, making it unnecessary to use shock to get a good coupling.  Joining portions of a passenger train can be done at very low speed (less than 3.2 km/hr in the final approach), so that the passengers are not jostled about.  Maximum tonnage is 1,000 tons
Coupling Video1Coupling Video2Coupler –Basic explanation
Damper The velocities of the train and approaching bogie will be slightly different.So a shock absorber will be provided to minimise the impact during attachment. Following type of shock absorber is well suited for our purposes. Heavy Duty Shock Absorbers(Model No. HD A(3X2)) - HD Series Shock Absorbers from KONI-Enidine. http://www.koni-enidine-rail.com/HDmain.html
Shock Absorber
	Benefits
Energy saved When a train stops at a station its kinetic energy is lost into heat. The train is then accelerated back to its operating speed. If the train doesn't stop we are saving this kinetic energy. Hence, energy saved/bogie/station = ½ mv2			 where,  m = 60 tons v  = 20m/s
Energy Saved/Bogie/Station: 12MJ  In an intermediate station like Kharagpur where approximately 80 trains pass each day, and 20 bogies per train,     total energy saved would be = 12*80*20  				            = 19200MJ  This is equivalent to the electrical energy  produced from about 2.7 tons of coal in a thermal power plant.  Energy saved product would save energy for more than 3000 persons per day.
Additional advantages Time saved : 2 to 3 hours in a long journey.  Space conservation : Very less space is required for the platform. Tension of passengers - People may come any time but before the departure time and just sit and relax in the compartment. Efficiency – number of stations can be increased without increasing travel time.
Useful addons Periscope Magnetic shock absorber… Alarm Regenerative braking system
Thank you
BRAKES
Brake application The driver has placed the brake valve in the "Application“ position.  This causes air pressure in the brake pipe to escape.  The loss of pressure is detected by the slide valve in the triple valve.  Because the pressure on one side (the brake pipe side) of the valve has fallen, the auxiliary reservoir pressure on the other side has pushed the valve (towards the right) so that the feed groove over the valve is closed.  The connection between the brake cylinder and the exhaust underneath the slide valve has also been closed.  At the same time a connection between the auxiliary reservoir and the brake cylinder has been opened.  Auxiliary reservoir air now feeds through into the brake cylinder.  The air pressure forces the piston to move against the spring pressure and causes the brake blocks to be applied to the wheels.  Air will continue to pass from the auxiliary reservoir to the brake cylinder until the pressure in both is equal.  This is the maximum pressure the brake cylinder will obtain and is equivalent to a full application.  To get a full application with a reasonable volume of air, the volume of the brake cylinder is usually about 40% of that of the auxiliary reservoir.
Brake release The driver has placed the brake valve in the "Release" position.  Pressure in the brake pipe is rising and enters the triple valve on each car, pushing the slide valve provided inside the triple valve to the left.  The movement of the slide valve allows a "feed groove" above it to open between the brake pipe and the auxiliary reservoir, and another connection below it to open between the brake cylinder and an exhaust port.  The feed groove allows brake pipe air pressure to enter the auxiliary reservoir and it will recharge it until its pressure is the same as that in the brake pipe.  At the same time, the connection at the bottom of the slide valve will allow any air pressure in the brake cylinder to escape through the exhaust port to atmosphere.  As the air escapes, the spring in the cylinder will push the piston back and cause the brake blocks to be removed from contact with the wheels.  The train brakes are now released and the auxiliary reservoirs are being replenished ready for another brake application.
Specifications for valve Type – Resilient Butterfly valve (by electrically controlled actuators)   With one opening one outlet, normally closed Temp range - below 300 degree centigrade Pressure range- 4 atm to 9 atm Size- Diameter 2 cm to 5 cm Price range - 2000 to 5000 rupees.
Modification An electrically controlled valve will be attached at the opening of the the auxiliary reservoir in each bogie. The rear end engine driver will control this valve and in turn control the brake operation.

Contenu connexe

Tendances

Design of trasnmission system
Design of trasnmission systemDesign of trasnmission system
Design of trasnmission systemSravan59
 
Automobile module v
Automobile module vAutomobile module v
Automobile module vANOOP P
 
Diesel locomotive technology
Diesel locomotive technologyDiesel locomotive technology
Diesel locomotive technologyRajneesh Budania
 
Automatic transmission
Automatic transmissionAutomatic transmission
Automatic transmissionSoumyaKhanna2
 
Railay internship report
Railay internship reportRailay internship report
Railay internship reportsubham gahir
 
Railway coaches
Railway coachesRailway coaches
Railway coachesnoor patel
 
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...Rohit Raj
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpurkalumutha
 
Enegy Regenaration in a Hydraulic Damper by Turbo Generator Flowpath Mechanism
Enegy Regenaration in a Hydraulic Damper by Turbo Generator Flowpath MechanismEnegy Regenaration in a Hydraulic Damper by Turbo Generator Flowpath Mechanism
Enegy Regenaration in a Hydraulic Damper by Turbo Generator Flowpath MechanismIJERA Editor
 
Automatic Speed Control System Paper Presentation
Automatic Speed Control System Paper PresentationAutomatic Speed Control System Paper Presentation
Automatic Speed Control System Paper Presentationguestac67362
 
Automotive braking systems
Automotive braking systemsAutomotive braking systems
Automotive braking systemsDon Maurer
 
Automobile module i
Automobile module iAutomobile module i
Automobile module iANOOP P
 
locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.Mukesh Maurya
 
wagon tippler with side arm charger - LMM GROUP
wagon tippler with side arm charger - LMM GROUPwagon tippler with side arm charger - LMM GROUP
wagon tippler with side arm charger - LMM GROUPLMM GROUP CO., LTD.
 
Railway workshop jodhpur
Railway workshop jodhpurRailway workshop jodhpur
Railway workshop jodhpurMAHESH SONI
 
Automatic transmission
Automatic transmissionAutomatic transmission
Automatic transmissionArsh Singh
 

Tendances (20)

Design of trasnmission system
Design of trasnmission systemDesign of trasnmission system
Design of trasnmission system
 
Automobile module v
Automobile module vAutomobile module v
Automobile module v
 
Diesel locomotive technology
Diesel locomotive technologyDiesel locomotive technology
Diesel locomotive technology
 
Automatic transmission
Automatic transmissionAutomatic transmission
Automatic transmission
 
Sanjeev inds
Sanjeev indsSanjeev inds
Sanjeev inds
 
Railay internship report
Railay internship reportRailay internship report
Railay internship report
 
Railway coaches
Railway coachesRailway coaches
Railway coaches
 
Automatic transmission system
Automatic transmission systemAutomatic transmission system
Automatic transmission system
 
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpur
 
Enegy Regenaration in a Hydraulic Damper by Turbo Generator Flowpath Mechanism
Enegy Regenaration in a Hydraulic Damper by Turbo Generator Flowpath MechanismEnegy Regenaration in a Hydraulic Damper by Turbo Generator Flowpath Mechanism
Enegy Regenaration in a Hydraulic Damper by Turbo Generator Flowpath Mechanism
 
Automatic Speed Control System Paper Presentation
Automatic Speed Control System Paper PresentationAutomatic Speed Control System Paper Presentation
Automatic Speed Control System Paper Presentation
 
Building utilities
Building utilitiesBuilding utilities
Building utilities
 
Automotive braking systems
Automotive braking systemsAutomotive braking systems
Automotive braking systems
 
Automobile module i
Automobile module iAutomobile module i
Automobile module i
 
locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.
 
Shuttle car
Shuttle car Shuttle car
Shuttle car
 
wagon tippler with side arm charger - LMM GROUP
wagon tippler with side arm charger - LMM GROUPwagon tippler with side arm charger - LMM GROUP
wagon tippler with side arm charger - LMM GROUP
 
Railway workshop jodhpur
Railway workshop jodhpurRailway workshop jodhpur
Railway workshop jodhpur
 
Automatic transmission
Automatic transmissionAutomatic transmission
Automatic transmission
 

Similaire à Nirail

Railway Training Report
Railway Training ReportRailway Training Report
Railway Training ReportVishal Singh
 
report of pneumatic braking system in railway wagon
report of pneumatic braking system in railway wagonreport of pneumatic braking system in railway wagon
report of pneumatic braking system in railway wagonROHITHKUMAR193
 
IRJET- Review of Vacuum Braking System
IRJET- Review of Vacuum Braking SystemIRJET- Review of Vacuum Braking System
IRJET- Review of Vacuum Braking SystemIRJET Journal
 
Train electriques 1.pptx
Train electriques 1.pptxTrain electriques 1.pptx
Train electriques 1.pptxArabiArabi2
 
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.docINDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.docAbhishekKumar408309
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...haxxo24
 
Power generation using speed breaker
Power generation using speed breakerPower generation using speed breaker
Power generation using speed breakerHitesh Sahu
 
Soft copy of railway wagon braking system1
Soft copy of railway wagon braking system1Soft copy of railway wagon braking system1
Soft copy of railway wagon braking system1Salim Malik
 
Presentation on Coach Care Complex
Presentation on Coach Care ComplexPresentation on Coach Care Complex
Presentation on Coach Care ComplexRitikBaghmar
 
Power generation from speed breakers
Power generation from speed breakersPower generation from speed breakers
Power generation from speed breakersBhanu Tomar
 
air brakes used in trains
    air  brakes used in trains    air  brakes used in trains
air brakes used in trainsshreya mandhana
 
Air brakes in BOXNHL wagon
Air brakes in BOXNHL wagonAir brakes in BOXNHL wagon
Air brakes in BOXNHL wagonVibhanshu Jha
 
Power generation from speedbreakers
Power generation from speedbreakersPower generation from speedbreakers
Power generation from speedbreakersSuchit Moon
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysApeksha Shrivastav
 
Railway wagon braking system pdf by salim malik
Railway wagon braking system pdf by salim malikRailway wagon braking system pdf by salim malik
Railway wagon braking system pdf by salim malikSalim Malik
 
Roadside Dust Cleaning System
Roadside Dust Cleaning SystemRoadside Dust Cleaning System
Roadside Dust Cleaning SystemIRJET Journal
 
IRJET- Smart Shock Absorber
IRJET- Smart Shock AbsorberIRJET- Smart Shock Absorber
IRJET- Smart Shock AbsorberIRJET Journal
 

Similaire à Nirail (20)

Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
report of pneumatic braking system in railway wagon
report of pneumatic braking system in railway wagonreport of pneumatic braking system in railway wagon
report of pneumatic braking system in railway wagon
 
IRJET- Review of Vacuum Braking System
IRJET- Review of Vacuum Braking SystemIRJET- Review of Vacuum Braking System
IRJET- Review of Vacuum Braking System
 
Train electriques 1.pptx
Train electriques 1.pptxTrain electriques 1.pptx
Train electriques 1.pptx
 
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.docINDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
Power generation using speed breaker
Power generation using speed breakerPower generation using speed breaker
Power generation using speed breaker
 
Soft copy of railway wagon braking system1
Soft copy of railway wagon braking system1Soft copy of railway wagon braking system1
Soft copy of railway wagon braking system1
 
Presentation on Coach Care Complex
Presentation on Coach Care ComplexPresentation on Coach Care Complex
Presentation on Coach Care Complex
 
Power generation from speed breakers
Power generation from speed breakersPower generation from speed breakers
Power generation from speed breakers
 
air brakes used in trains
    air  brakes used in trains    air  brakes used in trains
air brakes used in trains
 
Air brakes in BOXNHL wagon
Air brakes in BOXNHL wagonAir brakes in BOXNHL wagon
Air brakes in BOXNHL wagon
 
Power generation from speedbreakers
Power generation from speedbreakersPower generation from speedbreakers
Power generation from speedbreakers
 
Aniket rathore
Aniket rathoreAniket rathore
Aniket rathore
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railways
 
Railway wagon braking system pdf by salim malik
Railway wagon braking system pdf by salim malikRailway wagon braking system pdf by salim malik
Railway wagon braking system pdf by salim malik
 
Air brakes project
Air brakes projectAir brakes project
Air brakes project
 
Roadside Dust Cleaning System
Roadside Dust Cleaning SystemRoadside Dust Cleaning System
Roadside Dust Cleaning System
 
AIR POWERED ENGINE
AIR POWERED ENGINE AIR POWERED ENGINE
AIR POWERED ENGINE
 
IRJET- Smart Shock Absorber
IRJET- Smart Shock AbsorberIRJET- Smart Shock Absorber
IRJET- Smart Shock Absorber
 

Dernier

Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...
Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...
Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...amitlee9823
 
Top Rated Call Girls South Mumbai : 9920725232 We offer Beautiful and sexy Ca...
Top Rated Call Girls South Mumbai : 9920725232 We offer Beautiful and sexy Ca...Top Rated Call Girls South Mumbai : 9920725232 We offer Beautiful and sexy Ca...
Top Rated Call Girls South Mumbai : 9920725232 We offer Beautiful and sexy Ca...amitlee9823
 
Dubai Call Girls R0yalty O525547819 Call Girls Dubai
Dubai Call Girls R0yalty O525547819 Call Girls DubaiDubai Call Girls R0yalty O525547819 Call Girls Dubai
Dubai Call Girls R0yalty O525547819 Call Girls Dubaikojalkojal131
 
Rekha Agarkar Escorts Service Kollam ❣️ 7014168258 ❣️ High Cost Unlimited Har...
Rekha Agarkar Escorts Service Kollam ❣️ 7014168258 ❣️ High Cost Unlimited Har...Rekha Agarkar Escorts Service Kollam ❣️ 7014168258 ❣️ High Cost Unlimited Har...
Rekha Agarkar Escorts Service Kollam ❣️ 7014168258 ❣️ High Cost Unlimited Har...nirzagarg
 
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorHow To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorAndres Auto Service
 
What Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingWhat Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingBruce Cox Imports
 
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...amitlee9823
 
Is Your BMW PDC Malfunctioning Discover How to Easily Reset It
Is Your BMW PDC Malfunctioning Discover How to Easily Reset ItIs Your BMW PDC Malfunctioning Discover How to Easily Reset It
Is Your BMW PDC Malfunctioning Discover How to Easily Reset ItEuroService Automotive
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Delhi Call girls
 
Greenery-Palette Pitch Deck by Slidesgo.pptx
Greenery-Palette Pitch Deck by Slidesgo.pptxGreenery-Palette Pitch Deck by Slidesgo.pptx
Greenery-Palette Pitch Deck by Slidesgo.pptxzohiiimughal286
 
➥🔝 7737669865 🔝▻ narsinghpur Call-girls in Women Seeking Men 🔝narsinghpur🔝 ...
➥🔝 7737669865 🔝▻ narsinghpur Call-girls in Women Seeking Men  🔝narsinghpur🔝  ...➥🔝 7737669865 🔝▻ narsinghpur Call-girls in Women Seeking Men  🔝narsinghpur🔝  ...
➥🔝 7737669865 🔝▻ narsinghpur Call-girls in Women Seeking Men 🔝narsinghpur🔝 ...nirzagarg
 
Hyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai Motor Group
 
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...amitlee9823
 
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...lizamodels9
 
John deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance ManualJohn deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance ManualExcavator
 
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办ezgenuh
 
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...amitlee9823
 
Vip Mumbai Call Girls Navi Mumbai Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Navi Mumbai Call On 9920725232 With Body to body massag...Vip Mumbai Call Girls Navi Mumbai Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Navi Mumbai Call On 9920725232 With Body to body massag...amitlee9823
 

Dernier (20)

Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...
Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...
Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...
 
(INDIRA) Call Girl Nashik Call Now 8617697112 Nashik Escorts 24x7
(INDIRA) Call Girl Nashik Call Now 8617697112 Nashik Escorts 24x7(INDIRA) Call Girl Nashik Call Now 8617697112 Nashik Escorts 24x7
(INDIRA) Call Girl Nashik Call Now 8617697112 Nashik Escorts 24x7
 
Top Rated Call Girls South Mumbai : 9920725232 We offer Beautiful and sexy Ca...
Top Rated Call Girls South Mumbai : 9920725232 We offer Beautiful and sexy Ca...Top Rated Call Girls South Mumbai : 9920725232 We offer Beautiful and sexy Ca...
Top Rated Call Girls South Mumbai : 9920725232 We offer Beautiful and sexy Ca...
 
Dubai Call Girls R0yalty O525547819 Call Girls Dubai
Dubai Call Girls R0yalty O525547819 Call Girls DubaiDubai Call Girls R0yalty O525547819 Call Girls Dubai
Dubai Call Girls R0yalty O525547819 Call Girls Dubai
 
Rekha Agarkar Escorts Service Kollam ❣️ 7014168258 ❣️ High Cost Unlimited Har...
Rekha Agarkar Escorts Service Kollam ❣️ 7014168258 ❣️ High Cost Unlimited Har...Rekha Agarkar Escorts Service Kollam ❣️ 7014168258 ❣️ High Cost Unlimited Har...
Rekha Agarkar Escorts Service Kollam ❣️ 7014168258 ❣️ High Cost Unlimited Har...
 
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorHow To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
 
What Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingWhat Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop Working
 
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
 
Is Your BMW PDC Malfunctioning Discover How to Easily Reset It
Is Your BMW PDC Malfunctioning Discover How to Easily Reset ItIs Your BMW PDC Malfunctioning Discover How to Easily Reset It
Is Your BMW PDC Malfunctioning Discover How to Easily Reset It
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
 
Greenery-Palette Pitch Deck by Slidesgo.pptx
Greenery-Palette Pitch Deck by Slidesgo.pptxGreenery-Palette Pitch Deck by Slidesgo.pptx
Greenery-Palette Pitch Deck by Slidesgo.pptx
 
➥🔝 7737669865 🔝▻ narsinghpur Call-girls in Women Seeking Men 🔝narsinghpur🔝 ...
➥🔝 7737669865 🔝▻ narsinghpur Call-girls in Women Seeking Men  🔝narsinghpur🔝  ...➥🔝 7737669865 🔝▻ narsinghpur Call-girls in Women Seeking Men  🔝narsinghpur🔝  ...
➥🔝 7737669865 🔝▻ narsinghpur Call-girls in Women Seeking Men 🔝narsinghpur🔝 ...
 
Hyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRC
 
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
 
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
 
(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7
(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7
(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7
 
John deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance ManualJohn deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance Manual
 
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
一比一原版(UdeM学位证书)蒙特利尔大学毕业证学历认证怎样办
 
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
 
Vip Mumbai Call Girls Navi Mumbai Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Navi Mumbai Call On 9920725232 With Body to body massag...Vip Mumbai Call Girls Navi Mumbai Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Navi Mumbai Call On 9920725232 With Body to body massag...
 

Nirail

  • 2. Power Crisis in India The supply of adequate, yet affordable electricity is a continuing challenge because expansion of supply, and adoption of cleaner technologies. In recent years, these challenges have led to a major set of continuing reforms and restructuring. Still, the gap between electricity supply and demand continues to grow; India is now importing coal as well as natural gas to keep up with energy consumption. Energy demand is increasing dramatically due to rising incomes, industrialization, urbanization and population growth. The demand will increase by a factor of two over the next 20 years
  • 3. Indian Railway Rail transport is a commonly used mode of long-distance transportation in India Indian Railways has more than 64,015 kilometers of track . It has the world’s fourth largest railway network The total number of railway stations in India is estimated to be between 7,000 and 8,000. Railway consumes 2% of total available electricity in the country. It is 20% of the total shortfall in the country.
  • 4. Regenerative braking Regenerative braking: The Delhi Metro saved around 90,000 tons of carbon dioxide (CO2) from being released into the atmosphere by regenerating 112,500 megawatt hours of electricity through the use of regenerative braking systems between 2004 and 2007. It is expected that the Delhi Metro will save over 100,000 tons of CO2 from being emitted per year once its phase II is complete through the use of regenerative braking. But efficiency of regenerative braking is about 31%. So a better solution is required.
  • 5. Our Idea : निरेल (निरंतररेल)
  • 6. Schematic diagram: B1+E1 T T =train B = bogie E = rear engine P = platform = velocity = acceleration B2+E2 P
  • 7. T B1+E1 B2+E2 P
  • 8. T B2+E2 B1+E1 P
  • 10. Working The train is approaching a station at a velocity of 70km/hr (20m/s) . At a distance of 200m from the intersection the bogie(s) gets detached. The detached portion is then decelerated at 1.2m/s2 for a distance of 140m and then moves at a constant speed of 8m/s till it reaches the intersection. This ensures a time gap of 20sec at the intersection (switch) between last bogie of the train and detached bogie. After the detached portion enters the loop line it can be taken by the rear engine to the station.
  • 11. When the train arrives, a bogie and an engine (Engine C ) attached to the rear end are already waiting at the station in the loop line. When the train is at a certain distance (release distance) from the switching junction, the Engine C starts. Then the Engine C is accelerated and decelerated for a fixed time such that it goes and attaches to the train at some distance( Meeting distance).
  • 12. Bogie arrangement This train shall have all coaches of same class (either sleeper, AC or general as per the requirement), 1 pantry car at the beginning and a metro engine at the end. All the bogies are designated as per the stations at which they shall be discarded Passengers need to move once from the attached bogie to their respective destined bogie. To help with their luggage movement, an interlockable, extendable, luggage trolley shall be provided to them at the starting bogie which is locked into a groove in the bogie.
  • 13. Once they move on to their destined bogie, They need not worry about when their station approaches. As their station approaches, their bogie gets discarded and brought to the platform by the metro engine where 1)they can get down peacefully 2)there will be no inflow of passengers 3)they can take their own time not to miss any luggage 4)No Tension at all
  • 14. Link
  • 15. Why a metro engine at back It achieves required velocity at the given amount of time. Even though it’s maximum velocity is limited, that is sufficient for us. Using any other heavy engine would not be cost effective It has a part of it in which passengers can sit When bogie is discarded, it brings the bogie to station with out using much energy As we may fix limit for number of bogies to be attached/detached per station. This engine suffices our requirement.
  • 17. Coupler The Scharfenberg (Schaku) coupler is one of the most commonly used types of fully automatic coupling. Its use is generally restricted to mass transit systems. The Schaku coupler makes the electrical and also the pneumatic connections and disconnections automatic. Small air cylinders, acting on the rotating heads of the coupler, ensure the Schaku coupler engagement, making it unnecessary to use shock to get a good coupling. Joining portions of a passenger train can be done at very low speed (less than 3.2 km/hr in the final approach), so that the passengers are not jostled about. Maximum tonnage is 1,000 tons
  • 19. Damper The velocities of the train and approaching bogie will be slightly different.So a shock absorber will be provided to minimise the impact during attachment. Following type of shock absorber is well suited for our purposes. Heavy Duty Shock Absorbers(Model No. HD A(3X2)) - HD Series Shock Absorbers from KONI-Enidine. http://www.koni-enidine-rail.com/HDmain.html
  • 22. Energy saved When a train stops at a station its kinetic energy is lost into heat. The train is then accelerated back to its operating speed. If the train doesn't stop we are saving this kinetic energy. Hence, energy saved/bogie/station = ½ mv2 where, m = 60 tons v = 20m/s
  • 23. Energy Saved/Bogie/Station: 12MJ In an intermediate station like Kharagpur where approximately 80 trains pass each day, and 20 bogies per train, total energy saved would be = 12*80*20 = 19200MJ This is equivalent to the electrical energy produced from about 2.7 tons of coal in a thermal power plant. Energy saved product would save energy for more than 3000 persons per day.
  • 24. Additional advantages Time saved : 2 to 3 hours in a long journey. Space conservation : Very less space is required for the platform. Tension of passengers - People may come any time but before the departure time and just sit and relax in the compartment. Efficiency – number of stations can be increased without increasing travel time.
  • 25. Useful addons Periscope Magnetic shock absorber… Alarm Regenerative braking system
  • 27.
  • 28.
  • 29.
  • 31.
  • 32. Brake application The driver has placed the brake valve in the "Application“ position.  This causes air pressure in the brake pipe to escape.  The loss of pressure is detected by the slide valve in the triple valve.  Because the pressure on one side (the brake pipe side) of the valve has fallen, the auxiliary reservoir pressure on the other side has pushed the valve (towards the right) so that the feed groove over the valve is closed.  The connection between the brake cylinder and the exhaust underneath the slide valve has also been closed.  At the same time a connection between the auxiliary reservoir and the brake cylinder has been opened.  Auxiliary reservoir air now feeds through into the brake cylinder.  The air pressure forces the piston to move against the spring pressure and causes the brake blocks to be applied to the wheels.  Air will continue to pass from the auxiliary reservoir to the brake cylinder until the pressure in both is equal.  This is the maximum pressure the brake cylinder will obtain and is equivalent to a full application.  To get a full application with a reasonable volume of air, the volume of the brake cylinder is usually about 40% of that of the auxiliary reservoir.
  • 33.
  • 34. Brake release The driver has placed the brake valve in the "Release" position.  Pressure in the brake pipe is rising and enters the triple valve on each car, pushing the slide valve provided inside the triple valve to the left.  The movement of the slide valve allows a "feed groove" above it to open between the brake pipe and the auxiliary reservoir, and another connection below it to open between the brake cylinder and an exhaust port.  The feed groove allows brake pipe air pressure to enter the auxiliary reservoir and it will recharge it until its pressure is the same as that in the brake pipe.  At the same time, the connection at the bottom of the slide valve will allow any air pressure in the brake cylinder to escape through the exhaust port to atmosphere.  As the air escapes, the spring in the cylinder will push the piston back and cause the brake blocks to be removed from contact with the wheels.  The train brakes are now released and the auxiliary reservoirs are being replenished ready for another brake application.
  • 35.
  • 36. Specifications for valve Type – Resilient Butterfly valve (by electrically controlled actuators) With one opening one outlet, normally closed Temp range - below 300 degree centigrade Pressure range- 4 atm to 9 atm Size- Diameter 2 cm to 5 cm Price range - 2000 to 5000 rupees.
  • 37. Modification An electrically controlled valve will be attached at the opening of the the auxiliary reservoir in each bogie. The rear end engine driver will control this valve and in turn control the brake operation.