TRAINING PROJECT:
 Design
 Finance
 Construction operation
 Maintenance of lucknow -repair road on the basis of
men, machine and material.
DESIGN:
 Design is strategy in getting appropriate projects scope
fitted to specific project purpose and need.
 Design use a systematic approach of using limited
resources to optimize the system.
 Design requires engineering judgement focusing on
project purpose, evaluating the safety and design
tradeoffs.
CONSTRUCTION:
 Preparation of soil sub grade.
 Preparation of sub-base course.
 Preparation of base course.
 Preparation of surface course.
 Rolling, screening sprinkling of water and grouting.
SUB GRADE:
 Preparation of sub grade takes place after clearing and
stump removal phase.
 3 basic technique is used
(a) Side cast fill
(b) Full bench construction with end haul
(c) Balanced road section with excavation fill in
layers
BASE COURSE:
 Base course is basic layer of road construction.
 It is formed with water bound macadam technique.
 First make surface free of dust and irregularities.
 Spread course aggregate properly on prepared surface
to proper grade / super elevation in such quantity that
desired thickness occur.
 Dry roll the surface.
 Sprinkle water and then roll again.
 Sprinkle the binding material at slow rate and roll.
EQUIPMENTS USES:
 Bulldozer
 Hydraulic excavator
 Roller
 Wheel loader
 Concrete lining paver
 Sweeping machine
 Water bound macadam
SWEEPING MACHINE:
 Machine is powered by a tractor.
 Cleaning brush is driven by a hydraulic motor.
 It is used for cleaning roads, highways.
 Especially for cleaning WMM/WBM layers prior to
bituminous coat.
WET MIX MACADAM PLANT:
 It is application designed product for preparation of
homogeneous mix material of WMM base/sub base
layer.
 It consists five units.
 Heavy duty four bin feeder unit
 Inclined slinger belt conveyor
 Single deck vibrating screen
 Pug mill unit
 Storage silo
WATER BOUND MACADAM:
SCOPE:
WBM consists of clean, crushed aggregate
mechanically interlocked by rolling and bonding
together with screening, binding material and water
laid on sub grade.
MATERIAL:
 Coarse aggregate
 Crushed broken stone
 Over burnt bricks
RESOURCE MANAGEMENT:
MATERIAL MANAGEMENT:
 Global sourcing
 Use of local material
MAN POWER MANAGEMENT:
 Right man for right job
 Involving local work force
MAINTENANCE:
 Maintenance of road can be easy as scraping off the
layer and replace it with new layer.
 Some time weather condition and improper
construction cause breakage and incorrect sloping.
 Then further maintenance required
 Grading
 Ditches
THANK YOU

Contenu connexe

Tendances

cement concrete road construction procedure
cement concrete road construction procedure cement concrete road construction procedure
cement concrete road construction procedure
jaknap123456
 
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
aryan kumar
 
Summer training ppt on cc road construction
Summer training ppt on cc road constructionSummer training ppt on cc road construction
Summer training ppt on cc road construction
Vijaypal Bagariya
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
Mylene Delmoro
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
Mat Kaos
 

Tendances (20)

Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
cement concrete road construction procedure
cement concrete road construction procedure cement concrete road construction procedure
cement concrete road construction procedure
 
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resources
 
Construction of flexible pavement in brief.
Construction of flexible pavement in brief.Construction of flexible pavement in brief.
Construction of flexible pavement in brief.
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
 
Project presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash GargProject presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash Garg
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
 
Cc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumarCc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumar
 
Summer training ppt on cc road construction
Summer training ppt on cc road constructionSummer training ppt on cc road construction
Summer training ppt on cc road construction
 
Construction of flexible pavement
Construction of flexible pavementConstruction of flexible pavement
Construction of flexible pavement
 
Maintenance of unsurfaced roads, wbm roads
Maintenance of unsurfaced roads, wbm roadsMaintenance of unsurfaced roads, wbm roads
Maintenance of unsurfaced roads, wbm roads
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Gravel Roads - The Economic Backbone of the State
Gravel Roads - The Economic Backbone of the StateGravel Roads - The Economic Backbone of the State
Gravel Roads - The Economic Backbone of the State
 
SUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWDSUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWD
 
Bitumin road construction
Bitumin road constructionBitumin road construction
Bitumin road construction
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
Highway construction and equipments
Highway construction and equipmentsHighway construction and equipments
Highway construction and equipments
 
Pavement failures
Pavement failuresPavement failures
Pavement failures
 
Unit 4
Unit 4Unit 4
Unit 4
 

Similaire à Mukesh ppt

Similaire à Mukesh ppt (20)

Roads design as per IRC 37
Roads design as per IRC 37Roads design as per IRC 37
Roads design as per IRC 37
 
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemwidening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage system
 
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
 
Road bridge & railway construction pdf
Road bridge & railway construction pdfRoad bridge & railway construction pdf
Road bridge & railway construction pdf
 
Asphaltic concrete pavement.
Asphaltic concrete pavement. Asphaltic concrete pavement.
Asphaltic concrete pavement.
 
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
 
Unit 6..pptx
Unit 6..pptxUnit 6..pptx
Unit 6..pptx
 
INTERNSHIP REPORT 2021 pdf psr.pdf
INTERNSHIP REPORT 2021 pdf psr.pdfINTERNSHIP REPORT 2021 pdf psr.pdf
INTERNSHIP REPORT 2021 pdf psr.pdf
 
Industrial training abhi edited.pdf
Industrial training abhi edited.pdfIndustrial training abhi edited.pdf
Industrial training abhi edited.pdf
 
road construction
road constructionroad construction
road construction
 
Construction of Road pavement Civil Engineering
Construction of Road pavement Civil EngineeringConstruction of Road pavement Civil Engineering
Construction of Road pavement Civil Engineering
 
Subgrade, ETB and Asphalt Site Organisation construction procedure-2.pptx
Subgrade, ETB and Asphalt Site Organisation construction procedure-2.pptxSubgrade, ETB and Asphalt Site Organisation construction procedure-2.pptx
Subgrade, ETB and Asphalt Site Organisation construction procedure-2.pptx
 
Transportation Pavement.pptx
Transportation Pavement.pptxTransportation Pavement.pptx
Transportation Pavement.pptx
 
Low Cost Road Methods and Units with detailed elabroration
Low Cost Road Methods and Units with detailed elabrorationLow Cost Road Methods and Units with detailed elabroration
Low Cost Road Methods and Units with detailed elabroration
 
Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
 
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
 
Pm & construction equipment
Pm & construction equipmentPm & construction equipment
Pm & construction equipment
 
hochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptxhochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptx
 
Présentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptxPrésentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptx
 

Dernier

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Dernier (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 

Mukesh ppt

  • 1.
  • 2. TRAINING PROJECT:  Design  Finance  Construction operation  Maintenance of lucknow -repair road on the basis of men, machine and material.
  • 3. DESIGN:  Design is strategy in getting appropriate projects scope fitted to specific project purpose and need.  Design use a systematic approach of using limited resources to optimize the system.  Design requires engineering judgement focusing on project purpose, evaluating the safety and design tradeoffs.
  • 4. CONSTRUCTION:  Preparation of soil sub grade.  Preparation of sub-base course.  Preparation of base course.  Preparation of surface course.  Rolling, screening sprinkling of water and grouting.
  • 5. SUB GRADE:  Preparation of sub grade takes place after clearing and stump removal phase.  3 basic technique is used (a) Side cast fill (b) Full bench construction with end haul (c) Balanced road section with excavation fill in layers
  • 6. BASE COURSE:  Base course is basic layer of road construction.  It is formed with water bound macadam technique.  First make surface free of dust and irregularities.  Spread course aggregate properly on prepared surface to proper grade / super elevation in such quantity that desired thickness occur.  Dry roll the surface.  Sprinkle water and then roll again.  Sprinkle the binding material at slow rate and roll.
  • 7. EQUIPMENTS USES:  Bulldozer  Hydraulic excavator  Roller  Wheel loader  Concrete lining paver  Sweeping machine  Water bound macadam
  • 8. SWEEPING MACHINE:  Machine is powered by a tractor.  Cleaning brush is driven by a hydraulic motor.  It is used for cleaning roads, highways.  Especially for cleaning WMM/WBM layers prior to bituminous coat.
  • 9. WET MIX MACADAM PLANT:  It is application designed product for preparation of homogeneous mix material of WMM base/sub base layer.  It consists five units.  Heavy duty four bin feeder unit  Inclined slinger belt conveyor  Single deck vibrating screen  Pug mill unit  Storage silo
  • 10. WATER BOUND MACADAM: SCOPE: WBM consists of clean, crushed aggregate mechanically interlocked by rolling and bonding together with screening, binding material and water laid on sub grade. MATERIAL:  Coarse aggregate  Crushed broken stone  Over burnt bricks
  • 11. RESOURCE MANAGEMENT: MATERIAL MANAGEMENT:  Global sourcing  Use of local material MAN POWER MANAGEMENT:  Right man for right job  Involving local work force
  • 12. MAINTENANCE:  Maintenance of road can be easy as scraping off the layer and replace it with new layer.  Some time weather condition and improper construction cause breakage and incorrect sloping.  Then further maintenance required  Grading  Ditches