Tempe Town Lake
        Downstream Dam Replacement

NEW DAM ALTERNATIVES SELECTION




January 5, 2012
Timeline *
 Alternatives Evaluation – June thru November

 Project Update with Council – September 22

 Phase 1 Validate Concept & Select Dam Technology –

  November 2011

 Phase 2 Design New Dam / Acquire Permits – complete by July

  2013

 Bid and Procure Construction Contract by October 2013

 Start Construction by November 2013

 Construction Complete – December 28, 2015
Dam Design Criteria
 1.   Maintain or Improve Current Level of Flood
      Protection
 2.   Maintain Full Lake Quickly After Flood Event
 3.   Raise, Lower and Operate Reliably at Normal Lake
      Levels
 4.   Be Cost Efficient – Capital, Lifespan, O&M
 5.   Have Parts Easily Available
 6.   Be Compatible with Pedestrian Bridge, Existing
      Structures
 7.   Perform Well in this Climate
 8.   Meet Regulatory Requirements
Regulatory Conditions

       Regulatory Agency                    Concerns
                                            Water quality, channel conditions,
       U. S. Army Corps of Engineers
                                            404 permitting
       Flood Control District of Maricopa
                                            Flood control, levee maintenance
       County
       Federal Emergency Management
                                            Flood control, levees
       Agency (FEMA)
       Arizona Department of Water
                                            Dam Safety
       Resources
Alternatives Evaluation
              About 20 Dam Options
              Studied:
                 Radial (Tainter) Gates
                 Bascule or Bottom-Hinged Leaf Gates
                 Inflatable Rubber Dams(water and air-
                  filled)
                 Ogee Crest Weirs
                 Labyrinth Weirs
                 Many Styles of Fuse Plugs
                 Several Styles of Pneumatically-Operated
                  Hinged Crest Gates (Obermeyer)
                 Hydraulic Hinged Crest Gates
                 Dyrhoff Rubber Dams (Sumitomo)
                 Vertical Lift Gates
                 Swing Gates
                 Fusegates (Hydroplus)
                 Earth Embankment/Fuseplug
                 Several Styles of Mixed-type Spans
                 Cable-Operated Hinged Crest Gate
Three Viable Alternatives


   Sumitomo Rubber Dam

   Obermeyer Gate


   Hydraulic Hinged Crest
    Gate
Proposed Alternative
Locations
 Sumitomo – Replacing bladders, same
  location                Pedestrian
                            Bridge
Proposed Alternative
Locations
 Obermeyer – Adjacent to existing dam
                              Pedestrian
                                Bridge
Proposed Alternative
Locations
 Hinged Crest Gate–100ft west of existing
  dam                              Pedestrian
                                     Bridge
Life Cycle
Costs
                                                                                             Total
                                                        Total Project Total 50-Year
                                                                                      Construction and
                Alternatives                            Construction Life Cycle Costs
                                                                                        Life Cycle Cost
                                                            Cost      (Present Value)
                                                                                       (Present Value)


Sumitomo Rubber Bladders - 10 Yr. Rubber Life
                                                        $40,900,000    $138,300,000     $179,200,000
              (Replace Rubber Bladder every 10 years)



Obermeyer Gates - 10 Yr. Rubber Life
                                                        $32,800,000    $41,600,000      $74,400,000
              (Replace Rubber Bladder every 10 years)



Hinged Crest Gates                                      $35,400,000    $32,700,000      $68,100,000
Dam Recommendation

 Hydraulically Operated Hinged Crest Gate

     Safety & Reliability
     Durability
     Value (cost competitive)
     Engineering Requirements
     Regulatory Requirements
Dam Financing
          Preliminary Capital Cost Estimates: $36
           Million
          Includes Design, Materials, Construction
          Does Not Include East Dam or Pump
           System (New East Dam repl. $8M-$10M)
          Finance Options Include:
               Use Remaining $3,633,000
               Seek Voter Approval for Bond Authorization
                for Dam Replacement Capital Costs
               Sale of City Properties
               Lease / Purchase Agreement
               Combinations
Next Steps

                                          Public Meeting, Jan. 11, 5:30
                                           p.m. Tempe Center for the Arts

                                          Return to Council Jan. 19

                                          Review Financing Options

                                          Design, Permit, Build

Want more information?
Visit www.tempe.gov/lake
Click on Town Lake Dam Replacement in the Blue Box

Contenu connexe

Tendances

Environmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringEnvironmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringMartin Preene
 
Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Terry Aylward
 
Impacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areasImpacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areasMartin Preene
 
Dam & Reservoir Structure
Dam & Reservoir StructureDam & Reservoir Structure
Dam & Reservoir StructureMuhammad Farhan
 
Water dam versus Tailing Dam
Water dam versus Tailing DamWater dam versus Tailing Dam
Water dam versus Tailing Damfrank huangfu
 
Controlling Water On Construction Sites
Controlling Water On Construction SitesControlling Water On Construction Sites
Controlling Water On Construction SitesMartin Preene
 
Dannenbaum Engineering - River Update 9-19-2015
Dannenbaum Engineering - River Update 9-19-2015Dannenbaum Engineering - River Update 9-19-2015
Dannenbaum Engineering - River Update 9-19-2015law138
 
Ce 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thCe 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thEngrHayatHussain
 
Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5Statoil
 
Construction Dewatering PowerPoint
Construction Dewatering PowerPointConstruction Dewatering PowerPoint
Construction Dewatering PowerPointTerry Aylward
 
Dam construction
Dam constructionDam construction
Dam constructionalizay41
 
Dewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesDewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesMartin Preene
 
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingVladimir Popovic
 

Tendances (20)

Environmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringEnvironmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and Dewatering
 
Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015
 
Impacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areasImpacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areas
 
Dam & Reservoir Structure
Dam & Reservoir StructureDam & Reservoir Structure
Dam & Reservoir Structure
 
Asdso
AsdsoAsdso
Asdso
 
Water dam versus Tailing Dam
Water dam versus Tailing DamWater dam versus Tailing Dam
Water dam versus Tailing Dam
 
subsea
subseasubsea
subsea
 
Dam engineering i 2
Dam engineering i 2Dam engineering i 2
Dam engineering i 2
 
Controlling Water On Construction Sites
Controlling Water On Construction SitesControlling Water On Construction Sites
Controlling Water On Construction Sites
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Dannenbaum Engineering - River Update 9-19-2015
Dannenbaum Engineering - River Update 9-19-2015Dannenbaum Engineering - River Update 9-19-2015
Dannenbaum Engineering - River Update 9-19-2015
 
Ce 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thCe 413 hydraulic structures 8th
Ce 413 hydraulic structures 8th
 
Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5
 
Construction Dewatering PowerPoint
Construction Dewatering PowerPointConstruction Dewatering PowerPoint
Construction Dewatering PowerPoint
 
Dam construction
Dam constructionDam construction
Dam construction
 
Mining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering ProcessesMining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering Processes
 
Dewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesDewatering for open pit mines and quarries
Dewatering for open pit mines and quarries
 
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
 
Reservoir Dam Safety
Reservoir Dam SafetyReservoir Dam Safety
Reservoir Dam Safety
 
Diversion of headwork
Diversion of headworkDiversion of headwork
Diversion of headwork
 

Similaire à Tempe Town Lake dam replacement technology - short version

Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...ziiishan
 
Trench Drain Systems: Types, Benefits, Applications, and Overview
Trench Drain Systems: Types, Benefits, Applications, and OverviewTrench Drain Systems: Types, Benefits, Applications, and Overview
Trench Drain Systems: Types, Benefits, Applications, and OverviewMorris Group International
 
Advances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forwardAdvances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forwardIEI GSC
 

Similaire à Tempe Town Lake dam replacement technology - short version (6)

Floating Bridge
Floating BridgeFloating Bridge
Floating Bridge
 
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
 
Trench Drain Systems: Types, Benefits, Applications, and Overview
Trench Drain Systems: Types, Benefits, Applications, and OverviewTrench Drain Systems: Types, Benefits, Applications, and Overview
Trench Drain Systems: Types, Benefits, Applications, and Overview
 
11.01.04 Trench Drains
11.01.04    Trench  Drains11.01.04    Trench  Drains
11.01.04 Trench Drains
 
Rubber dam
Rubber dam Rubber dam
Rubber dam
 
Advances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forwardAdvances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forward
 

Plus de City of Tempe, Arizona

Tempe State of the City Address by Mayor Mark Mitchell
Tempe State of the City Address by Mayor Mark MitchellTempe State of the City Address by Mayor Mark Mitchell
Tempe State of the City Address by Mayor Mark MitchellCity of Tempe, Arizona
 
2016 Tempe, Arizona State of the City Address
2016 Tempe, Arizona State of the City Address 2016 Tempe, Arizona State of the City Address
2016 Tempe, Arizona State of the City Address City of Tempe, Arizona
 
Tempe Arts Plan - Photos only presentation
Tempe Arts Plan - Photos only presentationTempe Arts Plan - Photos only presentation
Tempe Arts Plan - Photos only presentationCity of Tempe, Arizona
 
Circle K New Year's Eve Block Party on Mill Avenue
Circle K New Year's Eve Block Party on Mill AvenueCircle K New Year's Eve Block Party on Mill Avenue
Circle K New Year's Eve Block Party on Mill AvenueCity of Tempe, Arizona
 
Circle K New Year's Eve Block Party on Mill Avenue in Downtown Tempe
Circle K New Year's Eve Block Party on Mill Avenue in Downtown TempeCircle K New Year's Eve Block Party on Mill Avenue in Downtown Tempe
Circle K New Year's Eve Block Party on Mill Avenue in Downtown TempeCity of Tempe, Arizona
 
State of the City 2013 by Tempe Mayor Mark Mitchell
State of the City 2013 by Tempe Mayor Mark MitchellState of the City 2013 by Tempe Mayor Mark Mitchell
State of the City 2013 by Tempe Mayor Mark MitchellCity of Tempe, Arizona
 

Plus de City of Tempe, Arizona (20)

Tempe Instagrammys 2021
Tempe Instagrammys 2021Tempe Instagrammys 2021
Tempe Instagrammys 2021
 
Tempe Instagrammys 2020
Tempe Instagrammys 2020 Tempe Instagrammys 2020
Tempe Instagrammys 2020
 
Tempe Instagrammys 2019
Tempe Instagrammys 2019Tempe Instagrammys 2019
Tempe Instagrammys 2019
 
Slideshare
Slideshare Slideshare
Slideshare
 
Tempe State of the City Address by Mayor Mark Mitchell
Tempe State of the City Address by Mayor Mark MitchellTempe State of the City Address by Mayor Mark Mitchell
Tempe State of the City Address by Mayor Mark Mitchell
 
Tempe Instagrammys 2018
Tempe Instagrammys 2018 Tempe Instagrammys 2018
Tempe Instagrammys 2018
 
Tempe State of the City Address 2017
Tempe State of the City Address 2017Tempe State of the City Address 2017
Tempe State of the City Address 2017
 
2017 AZCREW Tempe presentation
2017 AZCREW Tempe presentation2017 AZCREW Tempe presentation
2017 AZCREW Tempe presentation
 
2016 Tempe, Arizona State of the City Address
2016 Tempe, Arizona State of the City Address 2016 Tempe, Arizona State of the City Address
2016 Tempe, Arizona State of the City Address
 
Town Lake
Town LakeTown Lake
Town Lake
 
Tempe Arts Plan - Photos only presentation
Tempe Arts Plan - Photos only presentationTempe Arts Plan - Photos only presentation
Tempe Arts Plan - Photos only presentation
 
Circle K New Year's Eve Block Party on Mill Avenue
Circle K New Year's Eve Block Party on Mill AvenueCircle K New Year's Eve Block Party on Mill Avenue
Circle K New Year's Eve Block Party on Mill Avenue
 
Adaptive reuse
Adaptive reuseAdaptive reuse
Adaptive reuse
 
Circle K New Year's Eve Block Party on Mill Avenue in Downtown Tempe
Circle K New Year's Eve Block Party on Mill Avenue in Downtown TempeCircle K New Year's Eve Block Party on Mill Avenue in Downtown Tempe
Circle K New Year's Eve Block Party on Mill Avenue in Downtown Tempe
 
State of the City 2013 by Tempe Mayor Mark Mitchell
State of the City 2013 by Tempe Mayor Mark MitchellState of the City 2013 by Tempe Mayor Mark Mitchell
State of the City 2013 by Tempe Mayor Mark Mitchell
 
Tempe Center for the Arts -
Tempe Center for the Arts - Tempe Center for the Arts -
Tempe Center for the Arts -
 
2013 06-time-management-social-media
2013 06-time-management-social-media2013 06-time-management-social-media
2013 06-time-management-social-media
 
Connect with Tempe Through Technology
Connect with Tempe Through TechnologyConnect with Tempe Through Technology
Connect with Tempe Through Technology
 
A Mountain/Hayden Butte Pride
A Mountain/Hayden Butte PrideA Mountain/Hayden Butte Pride
A Mountain/Hayden Butte Pride
 
Great women in Tempe's History
Great women in Tempe's HistoryGreat women in Tempe's History
Great women in Tempe's History
 

Dernier

Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkobhavenpr
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Krish109503
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfFahimUddin61
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docxkfjstone13
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)Delhi Call girls
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPsychicRuben LoveSpells
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfLorenzo Lemes
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Pooja Nehwal
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhbhavenpr
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Tableget joys
 

Dernier (20)

Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdf
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Table
 

Tempe Town Lake dam replacement technology - short version

  • 1. Tempe Town Lake Downstream Dam Replacement NEW DAM ALTERNATIVES SELECTION January 5, 2012
  • 2. Timeline *  Alternatives Evaluation – June thru November  Project Update with Council – September 22  Phase 1 Validate Concept & Select Dam Technology – November 2011  Phase 2 Design New Dam / Acquire Permits – complete by July 2013  Bid and Procure Construction Contract by October 2013  Start Construction by November 2013  Construction Complete – December 28, 2015
  • 3. Dam Design Criteria 1. Maintain or Improve Current Level of Flood Protection 2. Maintain Full Lake Quickly After Flood Event 3. Raise, Lower and Operate Reliably at Normal Lake Levels 4. Be Cost Efficient – Capital, Lifespan, O&M 5. Have Parts Easily Available 6. Be Compatible with Pedestrian Bridge, Existing Structures 7. Perform Well in this Climate 8. Meet Regulatory Requirements
  • 4. Regulatory Conditions Regulatory Agency Concerns Water quality, channel conditions, U. S. Army Corps of Engineers 404 permitting Flood Control District of Maricopa Flood control, levee maintenance County Federal Emergency Management Flood control, levees Agency (FEMA) Arizona Department of Water Dam Safety Resources
  • 5. Alternatives Evaluation About 20 Dam Options Studied:  Radial (Tainter) Gates  Bascule or Bottom-Hinged Leaf Gates  Inflatable Rubber Dams(water and air- filled)  Ogee Crest Weirs  Labyrinth Weirs  Many Styles of Fuse Plugs  Several Styles of Pneumatically-Operated Hinged Crest Gates (Obermeyer)  Hydraulic Hinged Crest Gates  Dyrhoff Rubber Dams (Sumitomo)  Vertical Lift Gates  Swing Gates  Fusegates (Hydroplus)  Earth Embankment/Fuseplug  Several Styles of Mixed-type Spans  Cable-Operated Hinged Crest Gate
  • 6. Three Viable Alternatives  Sumitomo Rubber Dam  Obermeyer Gate  Hydraulic Hinged Crest Gate
  • 7. Proposed Alternative Locations  Sumitomo – Replacing bladders, same location Pedestrian Bridge
  • 8. Proposed Alternative Locations  Obermeyer – Adjacent to existing dam Pedestrian Bridge
  • 9. Proposed Alternative Locations  Hinged Crest Gate–100ft west of existing dam Pedestrian Bridge
  • 10. Life Cycle Costs Total Total Project Total 50-Year Construction and Alternatives Construction Life Cycle Costs Life Cycle Cost Cost (Present Value) (Present Value) Sumitomo Rubber Bladders - 10 Yr. Rubber Life $40,900,000 $138,300,000 $179,200,000 (Replace Rubber Bladder every 10 years) Obermeyer Gates - 10 Yr. Rubber Life $32,800,000 $41,600,000 $74,400,000 (Replace Rubber Bladder every 10 years) Hinged Crest Gates $35,400,000 $32,700,000 $68,100,000
  • 11. Dam Recommendation  Hydraulically Operated Hinged Crest Gate  Safety & Reliability  Durability  Value (cost competitive)  Engineering Requirements  Regulatory Requirements
  • 12. Dam Financing  Preliminary Capital Cost Estimates: $36 Million  Includes Design, Materials, Construction  Does Not Include East Dam or Pump System (New East Dam repl. $8M-$10M)  Finance Options Include:  Use Remaining $3,633,000  Seek Voter Approval for Bond Authorization for Dam Replacement Capital Costs  Sale of City Properties  Lease / Purchase Agreement  Combinations
  • 13. Next Steps  Public Meeting, Jan. 11, 5:30 p.m. Tempe Center for the Arts  Return to Council Jan. 19  Review Financing Options  Design, Permit, Build Want more information? Visit www.tempe.gov/lake Click on Town Lake Dam Replacement in the Blue Box