There are techniques in pouring concrete and it would be nice to know about it to be able to pour concrete properly. for your concrete needs, check out http://fortisgw.com
2. Site Preparation
Before pouring
concrete, the site
needs to be
prepared. Any
rocks, grass or
dirt needs to be
removed.
3. .
There should be a solid, well-drained base.
The base should be filled with gravel to avoid it
from cracking under the heavy weight of vehicles
and to allow it to cure easily.
4. Forming is now done.
Concrete forms are
made from either
wood, metal or
plastic and should be
at least 4 inches tall.
It is held in place by
wood or metal
stakes.
7. Screed the top of the concrete
Screeding is
the technique
that gives
concrete a flat
surface. It
should be done
in a sawing
motion.
8. Start bull floating right after screeding
Bull floating makes use
of a large trowel to
even out high areas or
depressions and to
further compact the
concrete. This will also
help create a smoothly
finished surface.
9. Once water disappears, trowel the surface
Troweling is done to
create a smooth and
uniform finish all
across the concrete
surface.
10. Edging
Edging is best applied
to the area next to the
form, which is not
effectively handled by
troweling or bull
floating. This helps
make the edge of the
slab more durable
and less likely to chip.
11. Cut Control Joints
Concrete cracks
due to shrinkage
as it cures, so it is
imperative that you
put in control joints
to control where
the concrete will
crack.
12. Brooming
A special broom is used to create a
broom finish on the concrete surface.
Some other kinds of finishes are
smooth trowel, stamped and
textured.
13. Curing
If concrete dries slowly, it has
greater chances of curing
hardly and is more durable. It is
best to cover it with plastic
under cool and moderate
weather. However, if the
weather is hot, regularly water it
down with a garden hose.